QUARTERLY ACTIVITY REPORT

Similar documents
OTTO TO DRILL 400 MILLION BARREL NANUSHUK OIL PROSPECT ON ALASKA NORTH SLOPE IN EARLY 2019

FY19 production and capital expenditure guidance

Matthew Allen MD & CEO Joint Venture partner Byron Energy (Operator) is a proven

QUARTERLY ACTIVITIES REPORT SEPTEMBER 2016

Phoenix South-3 drilling update 29 June 2018

For personal use only

For personal use only

Dorado-1 drilling commenced 5 June 2018

Kinetiko Energy Limited ACN:

For personal use only

For personal use only

ALASKA OPERATIONS UPDATE WINX-1

Phoenix project drilling update 29 June 2017

ASX ANNOUNCEMENT (ASX: BRU) 4 May 2011

Phoenix South-3 drilling commenced 17 April 2018

TMS Initial Drilling Program Update

The world s largest oil discovery Melbourne Mining Club Cutting Edge Series 15 March 2016

ASX Release. 20 April Dear Shareholder, ADX Dougga Presentation to ETAP and Ministry in Tunisia

For personal use only

Block 9 Prospectivity Assessment Identifies Multiple High Impact Exploration Drilling Opportunities

For personal use only

JACKA REPORTS INITIAL OIL RESERVES FOR AJE FIELD DEVELOPMENT, OFFSHORE NIGERIA

Quarterly Report 31 December 2018

For personal use only

For personal use only

ASX ANNOUNCEMENT ASX: IVZ CLARIFICATION REGARDING PRESS REPORTS ON OIL DISCOVERY IN ZIMBABWE. 2 NOVEMBER 2018.

The world s largest oil discovery since Resources Rising Stars 24 th & 25 th May 2016 Gold Coast, Queensland

SOUTHWESTERN ENERGY PROVIDES THIRD QUARTER 2003 OPERATIONAL UPDATE

Alaska New Billion Barrel Fairway July 2018

Initial Drilling Program Update

FAR in the MSGBC Basin

Quarterly Exploration Activities Report

A Step Change in Activity

Cuba: Binding farmout agreement signed for Block 9

For personal use only

ASX Release NILDE AREA PERMIT FARMOUT OFFSHORE ITALY. Highlights

For personal use only

For personal use only

Buffalo field moving closer to production 3 May 2018

World class oil discovery offshore Senegal. RIU Good Oil Conference 14 September 2016

Q1 FY18 Quarterly Report for 3 months to 30 September 2017

Address to the 2018 Annual General Meeting of Cooper Energy Ltd by the Managing Director, David Maxwell 8 November 2018

Q2 FY18 Quarterly Report for 3 months to 31 December 2017

ABN SIGNIFICANT HYDROCARBON POTENTIAL IN JACKA S RUHUHU BASIN EXPLORATION PROJECT IN TANZANIA

Annual General Meeting 11 September 2017

Freedom Oil & Gas to Webcast Investor Presentation at VirtualInvestorConferences.com on April 11

For personal use only

Q STRIKE ENERGY LIMITED QUARTERLY ACTIVITIES REPORT For the period ending 31 March 2013

Company Presentation. AGM 29 th November, 2016

NON-EXCLUSIVE AGREEMENT TO EXPLORE MARENGO GAS FIELD GREATER AREA

For personal use only

Further information about the Duhat Prospect is set out in the Appendix attached to this announcement. --Ends--

GALOC PHASE II DEVELOPMENT APPROVED AND RESERVES UPGRADED

Europa Oil & Gas plc / Index: AIM / Epic: EOG / Sector: Oil & Gas 02 March 2015 Europa Oil & Gas (Holdings) plc ( Europa' or the Company') Newsletter

For personal use only

Q3 FY18 Quarterly Report for 3 months to 31 March 2018

GOOD OIL CONFERENCE SEPTEMBER

New Nevada Exploration Farm-in & JV Project

For personal use only

Discovering and developing quality oil prospects in the Western Canadian Sedimentary Basin Corporate Presentation September 2011 TSX-V: PDO

The Directors wish to inform you about recent exploration activities:

The standout emerging oil and gas company on ASX October 2018

Cluff Natural Resources Plc / Index: AIM / Epic: CLNR / Sector: Natural Resources

EXTRAORDINARY GENERAL MEETING. Managing Director Presentation. 27 October 2017

Persistence, partnership and the prize

Q4 FY18 Quarterly Report for 3 months to 30 June 2018

Good Oil Conference. 7-8 September Slide 0

DANA GAS RELEASES Q1 FINANCIAL RESULTS

For personal use only

For personal use only

For personal use only

BUILDING VALUE THROUGH WORLD CLASS ASIAN ASSETS AGM, 5 SEPTEMBER 2018

MARCH 2009 QUARTERLY REPORT. Herewith is Tap Oil Limited s Quarterly Report for the period ended 31 March 2009.

Nido Petroleum Limited Investor Update. Phil Byrne, Managing Director

RMP Energy Announces New Management Team Transition

Cluff Natural Resources Plc / Index: AIM / Epic: CLNR / Sector: Natural Resources. Cluff Natural Resources Plc ('CLNR' or 'the Company')

CORPORATE PRESENTATION TSX-V: TGC I OTCQX: TNVMF

Norwest Energy NL. For personal use only. Annual General Meeting 29 November SHELLEY ROBERTSON Managing Director & Chief Executive Officer

AT A GLANCE. US$16.9 billion. US$52 billion. 41 million 5,299

For personal use only

PETROMINERALES ANNOUNCES 2013 CAPITAL PLAN, OPERATIONAL UPDATE AND INCREASED CREDIT FACILITY

EMP Approval to Drill Next Dome Complex

Australis Oil and Gas

Annual Statement of Reserves

3D Oil Limited Annual General Meeting

ΙΠB IPB Petroleum. For personal use only. BROWSE FLNG Proposed Development 15.5 TCF Gas 417 MMbbls Condensate (IPB 100%) (IPB 100%) (IPB 100%)

Looking Statements. Section 27A of the Securities Act of 1933 and Section 21E of the Securities. Forward

Baron Energy, Inc Business Plan

Dussafu Gabon Update January, 2018

Spectrum. The Pareto Oil & Offshore Conference. Jan Schoolmeesters, COO. 4 th September 2013

Corporate Presentation

SOUTHERN HEMISPHERE SECURES US$25M FARM-IN OPTION AGREEMENT WITH ANGLO AMERICAN IN CHILE

Vancouver Small-Cap Conference Blackbird Energy Inc. BBI TSX Venture Liquid Rich Bigstone Montney

BLACKBIRD ENERGY INC.

Building Momentum. Chris Jacobsen Premier Natural Resources. SPEE Tulsa November 19, With Private Equity

Letter of Intent Signed for Philippines Drill Rig

FOR IMMEDIATE RELEASE OGDCL UN-AUDITED FINANCIAL RESULTS FOR THE FIRST QUARTER ENDED 30 TH SEPTEMBER 2017

For personal use only

For personal use only

Proposed Reverse Takeover by Warrego Energy Limited and AIM Listing. David Casey Managing Director & CEO

Transcription:

FOR THE QUARTER ENDING 30 JUNE 2014 Titan Energy Ltd (ASX: TTE) ( Titan or the Company ) is pleased to provide the following report on its operations during the three-month period ending 30 June 2014. This quarter the Company increased activity in Australia, and the USA. HIGHLIGHTS EXPLORATION & APPRAISAL Holcomb Ranch, Mueller Exploration Inc. Spuds the Holcomb 1-H well AWE Limited Spuds Drover-1 in EP 455 Successful sale of a 12.5% interest in the Sargent Ranch project area Continued Revenue from Allen Dome North production Titan Energy s Chairman, Mr. Darren Levy, said: Titan Energy has recently ramped up its activities by focusing on near term exploration projects within its existing portfolio. This strategy, with some successful exploration, will enable Titan to achieve positive cashflows necessary for the further development of the potential company changing project EP455. To this end we are encouraged by the news from Holcomb 1-H and we should be in a position soon to announce further near term developments on Sargent Ranch and Perry Ranch. To further develop this strategy our teams in Australia, and the USA are investigating meaningful near term opportunities to assure continued momentum. Our current drilling program and further near term activities will ensure the next quarter is an extremely exciting time for Titan Energy.

ASSET TABLE Asset Interest % Quarterly change in holding % Acreage Explanation / Date Texas Allen Dome 94-276 North Allen Dome 85-344 South Perry Ranch 100-302 Sargent Ranch 37.5-12.5 337 Sale of interest 20/06/14 Holcomb 7.33-4.33 4350 Sale of interest 30/04/14 Ranch Colorado Sodbuster II 0-80 1360 Terminated 30/06/14 Louisiana Greathouse 50-252 Nevada Railroad Valley 100-9808 Lake Valley 100-7660 Illinois Kinmundy 90-441 Western Australia DR 11 0-100 55 100 Expired 04/06/14 EP 455 18.5-112 400 Table 1. Titan Energy Assets JUNE QUARTER PRODUCTION TABLE ALLEN DOME QU`ARTERLY PRODUCTION Reese 2A Reese S2 State 3A Total (BBL) April 107 608 107 822 May 206 650 109 965 June 226 680 113 1019 Total (BBL) 539 1938 329 2806 Table 2. Quarterly Production Table

EP 455 North Perth Basin The Company s Joint Venture partner AWE Limited ( AWE ) announced on the 30 June 2014 that the Drover-1 exploration well had commenced drilling at 21:30 (AWST) on Sunday 29 June 2014. The Drover-1 exploration well is located on pastoral land in the Shire of Coorow, approximately 18km southeast of Green Head and 220km north of Perth. The well will be drilled vertically to a planned total depth of 2,400 meters, and is forecast to take approximately four weeks to complete. Drover-1 was designed to test the unconventional gas potential in the southern area of AWE s Perth Basin acreage, and is targeting the Kockatea and Carynginia shale formations, the Irwin River Coal Measures, and the High Cliff Sandstones. Core samples will be collected and sent for analysis before determining the next phase of activity.

Figure 1. Enerdrill s Rig 3 drilling at Drover #1

Holcomb Ranch Texas On the 11th December, 2013 the Company acquired an 11.66% Working Interest (WI) in the Holcomb Project by paying US$321,500 for geological and land expenses and a further payment of US$503,000, being 13.33% of the total cost of drilling and completing the initial test well through to the tanks. The Company would then earn an 11.66% WI. During the quarter the Company sold a portion of its WI in the Holcomb project area to a US exploration company. In the transaction, Titan received US$306,500 and reduced its WI to 7.33%. Proceeds of the sale were allocated towards the Holcomb 1- H cash call. On the 5 June 2014, the Company announced that The Unit Texas Drilling Rig #359 had spudded the Holcomb 1-H well at 15:30 Sunday, June 1 2014 (US time). Unit Texas Drilling Rig #359 drilled the curve to a Total Vertical Depth of 8,605 feet (2621m) with a 90-degree horizontal section through the Mississippian Chappel Limestone. The 6 1/8 hole followed a pre-determined trajectory within the Chappel Limestone, which intersected multiple, naturally occurring fracture sets with good hydrocarbon shows. Total projected cost for drilling and completion of Holcomb 1-H was budgeted at US$3.7M. The efficiency of the project to date suggests that total costs will not reach this figure. Subsequent Event Holcomb Ranch Texas The Unit Texas Rig #359 reached a Total Measured Depth of 12,166ft (3708m) on the 3 July 2014. Several highly prospective fracture sets were encountered in the horizontal section between 10,950 and 12,166ft, with continuous oil shows and elevated gas readings throughout the interval. After rigging down Unit Texas Rig #359, the Operator, Mueller Exploration Inc. began assembling tanks, separators, flow-lines, and other onsite infrastructure necessary to place the well on production directly to sales. A completion unit will be mobilized to site to bring the well online and conduct flow testing. Multiple potential fracture sets have been identified for production.

Figure 2. Unit Texas Drilling Rig #359 Drilling Holcomb 1-H

Sargent Ranch, Texas The Company has successfully completed a sale of part of its interest in its Sargent Ranch project in Texas. In the transaction Titan received US$125,000 for a 12.5% working interest. Allen Dome North Texas Titan Energy s experienced US team has managed production efficiently, with focus on best oilfield practice, and best outcome for shareholders. Ongoing maintenance, and a planned workover program will continue to ensure optimum recovery, and production stability. Production from the Allen Dome North field totaled 2806 barrels of oil for the June quarter. Sodbuster II, Colorado The board has made a decision to terminate its Participation Agreement with Downey Resources LLC in its Sodbuster II acreage in Colorado. It was agreed the project did not conform with the Company s business model, and tenure was returned to Downey Resources LLC. DR 11, Western Australia On 28 May 2013, Titan Energy submitted an Application to Suspend and Extend the terms of tenure pertaining to DR 11. Titan requested 18-months in order to complete its work obligation for the area. On the 27th September the Company received an approval for a 12-month Suspension and Extension of terms expiring 4 th June 2014. The Company found this to be insufficient time to complete the Warradarge #2 Deep Exploration Well in line with best industry practice. The Company nominated this time to complete rehabilitation and reporting for the area. During the quarter a decision was made to submit an application to surrender the permit area in good standing. Capital Raising During the quarter, and since the end of the quarter, the Company has raised $2.45 million by the issue of convertible notes. Furthermore, $992,000 of convertible notes were converted to equity thereby reducing the Company s exposure to debt funding. Some additional funds were raised by the issue of options.

AUSTRALIAN PROSPECTIVE RESOURCES TABLE GROSS Gross Prospective Resources (AWE Limited 81.5% Titan Energy Ltd 18.5%) Asset Unit GROSS PROSPECTIVE Evaluator RESOURCES (Evaluation Date) Best Estimate Australia EP 455 (Perth Basin) Billion Standard Cubic Feet (BCF) 2,393 Deloitte REA (October 2013) ^ Source: AWE ASX Announcement, Perth Basin independent resource estimate, February 6 2014 USA RESERVES & RESOURCES TABLE NET TO TITAN Net Reserves Texas Asset Interest Unit NET RESERVES 1P 2P 3P Allen Dome North 94% MMbbl 0.336 0.479 0.479 Net Contingent Resources Texas Asset Interest Unit NET CONTINGENT RESOURCES 1C 2C 3C Sargent Ranch 37.5% MMbbl 0.069 0.095 0.180 Sargent Ranch 37.5% MMboe 0.356 0.491 0.705 Net Prospective Resources Texas Asset Interest Unit NET PROSPECTIVE RESOURCES Low Best High Estimate Estimate Estimate Perry Ranch 100% MMbbl 1.103 1.225 1.348 Holcomb Ranch 7.33% MMbbl 0.756 0.840 0.924 Holcomb Ranch 7.33% MMboe 0.523 0.580 0.640 Louisiana Greathouse 50% MMbbl 0.363 0.485 0.606 MMbbl = million barrels of oil MMboe = million barrles of oil equivalent Evaluator (Evaluation Date) (March 2014) Evaluator (Evaluation Date) (June 2014) (June 2014) Evaluator (Evaluation Date) (October 2013) (January 2014) (January 2014) Estimation Method Deterministic Estimation Method Deterministic Deterministic Estimation Method Probabilistic Probabilistic Probabilistic (January Probabilistic 2014) 100 mcf = 17.2 BOE 1 bcf = 172,455 BOE *5.81 mcf = 1 BOE The estimated quantities of Prospective Resources that may potentially be recovered by the application of a future development project(s) relate to undiscovered accumulations. These estimates have both an associated risk of discovery and a risk of development. Further exploration appraisal and evaluation is required to determine the existence of a significant quantity of potentially moveable hydrocarbons.

For further information please contact: Darren Levy Chairman T: +61 8 9322 6955 M: +61 418 558 485 E: info@titanenergy.com.au John McKnight Titan Energy Inc 5120 Woodway Drive, Suite 9020 Houston, Texas 77056 M: +1-713-429-1832 E: jmcknight@titanenergy.com.au Qualified Petroleum Reserves and Resources Evaluators Information in this announcement pertaining to Petroleum Reserves, and Resource Evaluations has been disclosed in announcements previously released by: AWE Limited on the 6 February 2014, titled Perth Basin independent resource estimate, Titan on the 25 February 2014, titled Allen Dome North Reserves Evaluation, and on the 23 February 2014, titled TTE US Reserves and Resources update. The Company is not aware of any new information or data that materially affects the information included in previous announcements, and that all the material assumptions and technical parameters underpinning the estimates in the previous announcements continue to apply and have not materially changed. Technical information, including information in relation to petroleum reserves, & resources, provided in this announcement, is based on, and fairly represents information and supporting documentation and/or compiled by the Company's technical advisor, Richard W. Pomrenke, Owner - Manager of Energy Recovery Concepts (ERC). Mr Pomrenke holds a Bachelor of Science in Petroleum Engineering with a minor in Geology, he is a member of the Society of Petroleum Engineers, and has more than 40 years of experience as Petroleum Engineer involved with all aspects of oil and gas operations and analyses, Domestic US and International. Mr Pomrenke has reviewed the results, procedures and data contained in this announcement and consents to the inclusion in this announcement of the matters based on the information in the form and context in which it appears. Technical information in this report is based on information compiled by Mr John McKnight, US Chairman of Titan Energy Inc who has consented to the inclusion of this information in the form and context in which it appears. Mr McKnight has over 20 years experience in all phases of petroleum exploration and production, as both an employee and consultant. Mr McKnight reviews the Company s operations with the help of various professional consultants, appropriately qualified and experienced in their respective fields. He is also a member of the Society of Petroleum Engineers.