API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS. API RP 17G2 Subsea Pumping Well Intervention Systems TASK GROUP STATUS

Similar documents
API 17G Update. API SC17 Summer Meeting 12 Jun API 17G Monthly Leadership Update 1

API Subcommittee MAY 2018 TABLE OF CONTENTS 1. SCOPE OF WORK PREVIOUS STATUS REPORT DATE MEMBERSHIP...

API Subcommittee JAN 2019 TABLE OF CONTENTS 1. SCOPE OF WORK PREVIOUS STATUS REPORT DATE MEMBERSHIP...

API Subcommittee JAN 2018 TABLE OF CONTENTS 1. SCOPE OF WORK PREVIOUS STATUS REPORT DATE MEMBERSHIP...

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS API 17H REMOTELY OPERATED TOOLS AND INTERFACES TASK GROUP STATUS

API SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS. API 17G Standards for Subsea Well Intervention Systems TASK GROUP STATUS

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS

API 17G Update. API SC17 Winter Meeting 07 Feb API 17G Update SC17 Winter Meeting 1

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS

b. A roll call was completed and confirmed that there was a quorum of 22 present for this meeting (a minimum of 15 is required).

John Bednar, Chairman

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS. API 17G4 Riserless Subsea Well Intervention Systems REVISION TASK GROUP STATUS

Deepwater riserless (RLWI) enablers for increased oil recovery. Bringing shallow water experience to deepwater.

MINUTES API Subcommittee 17 (SC17) Subsea Production Equipment 2015 Winter Committee Meeting Houston, Texas (BP Westlake Location) January 20, 2015

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS

MINUTES API Subcommittee 17 (SC17) Subsea Production Equipment 2016 Winter Committee Meeting Houston, TX Wednesday, January 13, 2016

UDW Technology Conference Dan McLeod / John Jacobson Lockheed Martin MS2 July 27, Secure Energy for America

21st Joint Meeting of ISO/TC67/SC4/WG6 and API SC17 Technip Building Old Katy Road Houston, TX. February 7, 2007 Joint Meeting - 8:30 am

19th Joint Meeting of ISO/TC67/SC4/WG6 and API SC17 Atlanta Hilton Hotel API Summer Standards Conference Atlanta, GA

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS

Recreation Facility Hours

The P&J Platform. For further information regarding our advertising packages contact the P&J Energy Team on:

Holidays in United States, SEA Charter Master Calendar

VAN BUREN COUNTY TENNESSEE

Draft MINUTES, Revision 1 API SC 17 Subsea Production Equipment 2012 Winter Meeting Houston, Texas January 19, 2012

Matrix Composites & Engineering Ltd

2014 Exploration & Production Standards Conference Subcommittee 10. January InterContinental Dallas Addison, Texas

The Evolution & Future of API Coiled Tubing Standards. Ryan Addison Tenaris Coiled Tubes API Co-Chairman Resource Group for Coiled Tubing

THE CHARLES WHITE COLLECTION. Papers, /2 linear feet

Veterans and Offshore Drilling

February 2011 Page 1. CHAPTER REPRESENTATIVE Lonnie Kerley Plains Exploration STEERING COMMITTEE

ISO/TC 67/SC 4 N 267 ISO/TC 67 N

Thomas Turner Presley Descendant Information. First Generation

Curling Community Calendar

Chris and Wes are calm professional trades people with good problem solving skills

HERTS & BEDS WOODTURNERS WOODBITS

ISO/TC67/SC4 Work Group 4 Annual Report

Advisory Committee for the Ocean Energy Safety Institute

Koso kentintrol Overview :

Conference Agenda. May 24, pm: Pre-conference Networking Drinks Reception and pre-registration

Climate Update. Wendy Ryan Research Associate For Nolan Doesken, State Climatologist.

NATIONAL INSTITUTE OF ECONOMIC AND SOCIAL RESEARCH ESTIMATES OF MONTHLY GDP. Embargo until hours on 11 th January 2013

Software as a Medical Device (SaMD)

The world s largest oil discovery Melbourne Mining Club Cutting Edge Series 15 March 2016

David Galbraith Convenor ISO TC 67/SC 7/WG 3 Project Leader ISO & ISO Fixed Steel Offshore Structures / Topsides Structures

2015 Exploration & Production Winter Standards Meeting Subcommittee 10. January 27-29, 2015 Intercontinental Hotel New Orleans, LA

Homogenisation of Maximum and Minimum Air Temperatures in Ireland. Mary Curley * and Seamus Walsh

Stoa Administrative Calendar

Learn more at

API RP 53 Recommend Practices for Blowout Prevention Equipment Systems for Drilling Wells vs. Standard 53 4 th Edition 2011

SC20 MEETING MINUTES January 29, E&P Winter Standards Meeting InterContinental New Orleans New Orleans, Louisiana

parents & leaders 10-Aug-17 Unit Commisioner Meeting 7:00pm-8:00pm Goldsmith Building 1950 West 3rd Street Unit Commissioners NA NA NA

The P&J Platform. For further information regarding our advertising packages contact the P&J Energy Team on:

Annual Report to ISO TC67 / SC4 For 2005 Plenary Meeting May 12-13, 2004 Milan, Italy

Electricity. Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug. Gas. Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug

Bridge Condition Assessment Using Remote Sensors

May 2011 Page 1. CHAPTER REPRESENTATIVE Lonnie Kerley Plains Exploration STEERING COMMITTEE

STRLodgingPerformanceSnapshotAugust2017CYTD

Climate Update March 2006 Meeting


Climate Update. Nolan Doesken, State Climatologist Atmospheric Science Department Colorado State University.

THOMSON REUTERS INDICES EQUAL WEIGHT COMMODITY TOTAL RETURN INDEX

Drought Update for March 2006

The Future of Offshore Drilling: Beyond Ultra Deep. Chris Beckett, CEO Pacific Drilling S.A. September 22, 2014

Massport Capital Programs Enterprise Schedule Management. Primavera Schedule Toolkit Design. January 2018 Version 1.0

GLOBAL RIG AND OFFSHORE CONSTRUCTION MARKETS

ISO/TR TECHNICAL REPORT

1. John Bednar, API SC 17 Chairman, welcomed the group to the meeting at 8:00 AM and outlined various safety and housekeeping issues.

Offshore Pipeline Technology OPT 97

National Radio Channels. PPM measurement October 2017

Climate Update. Nolan Doesken State Climatologist Atmospheric Science Department Colorado State University.

Billy Blackburn. Lyndon Lockett

Additional materials: A Genealogy of the Daniel Stevens Family Bible Record was also submitted.

FORESIGHT METHOD HORIZONS. Module. Introduction to Foresight for Canada Beyond 150

2018 Landing Site Selection

NEWSPAPERS and MAGAZINES. Cakebread, Robey & Co Ltd Trade Catalogue (July 1938) (Builders Materials: with diagrams and illustrations)

GMDN An Introduction. Mark Wasmuth CEO, GMDN Agency

LEE COUNTY TRAUMA SERVICES DISTRICT BOARD OF DIRECTORS MEETING. THURSDAY, April 28, 2016

JOINT INDUSTRY OFFSHORE OPERATING PROCEDURES TASK FORCE, JOINT INDUSTRY OFFSHORE EQUIPMENT TASK FORCE, JOINT INDUSTRY SUBSEA WELL CONTROL AND

Preparation of requirements. Part I Notification principles and time schedule

Merton Clinical Commissioning Group Register of Declared Interests 2017/18 v.12 (last updated: )

4) If your birthday fell on a Sunday this year, what day will it fall on next year? 5) If it is autumn now, what season will it be in 100 seasons?


Subsea Production Market and Industry Teaming. Presented by: Bruce Crager Executive Vice President: Expert Advisory Group Endeavor Management

5380 Old Bullard Rd. Suite Tyler, TX (903)

Oyster Monitoring ( ) Nikki Dix, Pam Marcum, Matt Monroe

Vibration Assessment of Complex Pipework

LEE COUNTY TRAUMA SERVICES DISTRICT BOARD OF DIRECTORS MEETING. THURSDAY, February 2, 2017

Assessing the Feasibility of Wind Power Production for the University of Rhode Island s Bay Campus

API COPM CPMA Chapter 20.X

January 2011 Page 1. CHAPTER REPRESENTATIVE Lonnie Kerley Plains Exploration STEERING COMMITTEE

Climate Update September 24, 2003 WATF meeting

Emergency Pipeline Repair Systems; A Global Overview of Best Practice

Training Course Calendar 2014

Customer Feedback Summary. Recent Reviews & Published Comments. Cranberry Twp, PA (412) for. Of 619 customers surveyed, 379 responded

Bridge Condition Assessment Using Remote Sensors

Drought Update January 18, 2005 WATF Meeting

Southeast Region Reserve Components. Conveyance Progress Report

60% 100% 100% Performance Report YTD YTD YTD. June Development Services Division. In this Edition. target: 100% target: 100% target: 100%

A marginal field (re-)development using several alternative methodologies 1

Transcription:

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS API RP 17G2 Subsea Pumping Well Intervention Systems TASK GROUP STATUS 11 JANUARY 2017

1. INTRODUCTION 2. STATUS The 17G2 document addresses subject matter and technology relevant to subsea pumping well intervention systems. The purpose of a subsea pumping well intervention system is to pump fluid into or out of a subsea well. Subsea pumping systems typically involve a spooled fluid conduit with the fluid conduit not being rigidly attached to the subsea well similar to a top tensioned intervention riser system. No tooling is conveyed through the fluid conduit, therefore, the mode of operation for these subsea pumping well intervention systems is considered to be riserless. A subsea pumping well intervention system consists of a group of components and equipment packages that could comprise a standalone system or may supplement part of the permanent installed subsea system infrastructure operated together as a system. Ballot Comments for the first draft 17G2 document were received in August 2016. Responses for each comment was addressed by the subcommittee and distributed to all individuals who provided comments. In addition, Working Draft 2 was also distributed and inclusive of updates from comment resolution proposals. A general session face to face meeting was conducted in October 2016 in an effort to allow 17G2 members and those individuals outside of the subcommittee who provided comments to review the proposed resolutions and gain consensus. The outcome of that meeting resulted in updating the document in its current format as Working Draft 3. This latest draft will be sent out once a successful vote of the parent documents (17G and G1) is obtained. Working Draft 3 is comprised mainly of editorial changes to make improve readability along with a few supplemental technical tables and technical updates for clarification. It is the aspiration of the 17G2 subcommittee to send Working Draft 3 out for vote as a first edition Recommended Practice once the parent documents receives the required affirmative votes. -1- [11Jan17 Winter Mtg]

3. MEMBERSHIP TABLE 1-1: API RP 17G2 TASK GROUP MEMBERS Andy Henderson Oceaneering AHenderson@oceaneering.com Bart Steuten Airborne b.steuten@airborneoilandgas.com Bill Barry Atlantic Wave LLC w.barry@shell.com Casey Kavanaugh BSEE casey.kavanaugh@bsee.gov Charles Tavner Magma Charles.tavner@magmaglobal.com Chris McLaren Enpro Subsea CMcLaren@enpro-subsea.com Chris Martens BSEE christopher.martens@bsee.gov Colin Johnston SeaNation LLC cjohnston@seanationllc.com Dan Williams Master Flo dhwilliams@masterflo.com Daniel Sadenwater Chevron sadenwater@chevron.com Dave McKay Subseatek dave.mckay@subseatek.com David Bell Bechtel OG&C dmbell@bechtel.com Dr. Al Conle University of Windsor faconle@gmail.com Eddie Karlsen FTO SERVICES Eddie.Karlsen@fmcti.com Fengjie Yin 2H Fengjie.Yin@2hoffshoreinc.com Fernando Hernandez SECC Oil & Gas Ltd fernando.hernandez@secc-oilandgas.com Jeff Partridge Trendsetter J.Partridge@trendsetterengineering.com Jim McAllister Shell james.mcallister@shell.com Joe Savoy Wild Well Control jsavoy@wildwell.com Joe Scranton Altiss joe@altisstech.com John Gaver 2H john.gaver@2hoffshoreinc.com Madhu Hariharan 2H madhu.hariharan@2hoffshoreinc.com Mark Cerkovnik 2H Mark.Cerkovnik@2hoffshoreinc.com Mayank Murarka murarka_m@yahoo.com Mahesh Sonawane 2H Offshore mahesh.sonawane@2hoffshoreinc.com Matthew Massey Magma Global matthew.massey@magmaglobal.com Mike Campbell 2H Offshore mike.campbell@2hoffshoreinc.com Mike Hess Shell michael.hess@shell.com Mike Swift Hess Corporation mswift@hess.com Martin van Onna Airborne m.vanonna@airborneoilandgas.com Mitch Holloway Shell mitchell.holloway@shell.com Moses Ling Aker Solutions moses.ling@akersolutions.com Paul Armitage SECC Oil & Gas Ltd pa@secc-oilandgas.com Professor Steve Tipton University of Tulsa smt@utulsa.edu Ramsay Cook Oceaneering RCook@oceaneering.com Rob Hill Aker Solutions Rob.Hill@akersolutions.com Roy Whiteman FMC ROY.WHITEMAN@fmcti.com Ryan Addison Tenaris raddison@tenaris.com Steve Robb Enpro Subsea srobb@enpro-subsea.com Stuart Steen SECC Oil & Gas Ltd ss@secc-oilandgas.com Shankar Sundararaman 2H Offshore shankar.sundararaman@2hoffshoreinc.com Taylor Enze Airborne T.enze@airborneoilandgas.com Troy Theal Chevron ttbg@chevron.com William Siersdorfer One Subsea William.Siersdorfer@OneSubsea.com Vamsee Achanta 'Vamsee S. Achanta (achantav@gmail.com)' Brian Skeels FMC BRIAN.SKEELS@fmcti.com Mitch Dziekonski Titanium Engineers mitch@titaniumengineers.com Neil Crawford Oceaneering NCrawford@oceaneering.com -2- [11Jan17 Winter Mtg]

4. UPDATED TARGET DATES FOR DELIVERABLES API RP 17G2 RISERLESS SUBSEA PUMPING SYSTEMS API 17-G2 Document Chronology (January 2017) Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Kick Off 2013 2014 2015 Distrib to 17G Comments Rewrite Ballot Draft Update Doc 2016 WD3 Cmplt G2 Vote 2017 Awaiting affirmative vote for parent documents (17G & G1) prior to sending 17G2 for vote to SC17 voting members. 5. MAJOR ISSUES None. 6. ANTICAPTED NEW WORK ITEMS None 7. PLANS FOR FUTURE MEETINGS Next meeting is anticipated in early February as a telecom to validate members are satisfied that the 17G2 document is ready for submittal to SC-17 for final vote. -3- [11Jan17 Winter Mtg]

8. RESOURCE NEEDS None. 9. ADDITIONAL INFORMATION -4- [11Jan17 Winter Mtg]