Offshore Drilling Rigs

Similar documents
NORWAY. Norwegian Industrial Property Office (12) APPLICATION (19) NO (21) (13) A1. (51) Int Cl.

Dry trees for cost effective solution with the Wellhead Barge: WHB

Subsea Well Engineering

An Introduction to Oil & Gas Drilling and Well Operations

Well Abandonment Services. Plug into a New Approach

Appendix F Lock-Down Sleeve Decision. Appendix F Lock-Down Sleeve Decision

Dagang Zhang China-America Frontiers of Engineering Symposium San Diego, USA

NOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1

GE Oil & Gas Drilling & Production. VetcoGray subsea wellhead systems. Advanced solutions for extreme conditions

Oil&Gas Subsea Production

Floating Systems. Capability & Experience

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015

Module No. # 01 Lecture No. # 3 Safety in design and operations. (Refer Slide Time: 00:10)

p. 1 p. 29 p. 39 p. 67 p. 79 p. 87 p. 95

Jørn Scharling Holm DONG Energy

Offshore Development Concepts: Capabilities and Limitations. Kenneth E. (Ken) Arnold Sigma Explorations Holdings LTD April, 2013

The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure.

Challenges of Deep Water To Jackup Conductors And Risers

Deepwater well design, construction & drilling operations

Deepwater Mooring Deeper and Leaner

A marginal field (re-)development using several alternative methodologies 1

Macondo Blowout Lessons Learned for Prevention and Mitigation

2016 Employee Product Education Courses

VIRTUS CONNECTION SYSTEMS Advanced Diverless Connection Solutions for any Subsea Field Application

Conductor Installation Services. Today s technology traditional values

To Jackup Conductors And Risers

Mahmut Olcay KORKMAZ, Caner GÜNEY, Özgür AVCI, Mete Ercan PAKDİL Rahmi Nurhan CELIK

June 24, 2010 RPSEA Project 1502 Thomas E. Williams int.com

2 THE PROPOSED WHITE ROSE OILFIELD DEVELOPMENT 2.1 PROJECT DESCRIPTION

Getting to Grips with Deepwater Handling Operations

Ultra deep water and ultra deep drilling technologies for 21 st Century Mohole. Engineering Development Advisory Committee J-DESC, JAPAN

Drilling Systems. Cameron Drilling Control Systems Applications. 1 Semi-submersible Platform Applicaton

BT-4000 LIGHT WORKOVER UNIT

OFFSHORE SPECIALIST ENGINEERING SERVICES. ZEE Engineering Consultants

Marine Risers. Capability & Experience

Land wellhead systems & offshore surface wellhead systems

Riser Installation in Deep & Ultra Deep Water

Oil & Gas T T S O I L & G A S.

Vincent/Enfield Conductor and Flowbase Installation Review. Roy Grant, TSMarine

Moduels in PetroTrainer. PetroTrainer. How PetroTrainer is used

Sinking of the Deepwater Horizon. 11 perish and 115 survive

Advancing Global Deepwater Capabilities

International Well Control Forum IWCF. Well Control Training Syllabus. Drilling Level 2. 1 st January 2014 Version 3.0

Refining the DP Watch Circle

BP SWOPS Single Well Oil Production System. Sandy Meldrum CEng, MIMechE

Siem WIS. Siem WIS AS. Closed Loop Drilling CLD. August Siem WIS AS.

Investor Relations Presentation April 30, 2013

MAERSK SUPPLY SERVICE. Actively taking part in solving the energy challenges of tomorrow

Contents. iii. 3 Cable-Tool and Rotary Drilling 11 Cable-Tool Drilling 11 Rotary Drilling 14

Development. JOGMEC Techno Forum November 2014 Japan Drilling Co., Ltd. Drilling Technology Department Masahiro Nakamura

AADE Houston Chapter. Group. 26 January 2011

MOORING SOLUTIONS IN ASIA PACIFIC A SINGLE, LOCAL SOURCE OF MOORING, POSITIONING AND RIG MOVING SERVICES

TZ400 Self - elevating Drilling Unit General Specification (Revision: B1)

Mooring Capabilities. Angola Brazil Egypt Equatorial Guinea Malaysia Mexico Norway Singapore United Kingdom United States

Angola Brazil Mooring Egypt Equatorial Guinea Capabilities Malaysia Mexico Norway Singapore United Kingdom United States

Mooring Capabilities. Angola Brazil Egypt Equatorial Guinea Malaysia Mexico Norway Singapore United Kingdom United States

Offshore Access to America s Oil and Natural Gas Resources

Deep Water Definitions

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015

Diverse Capabilities Targeted Solutions

When a drilling project is commenced, two goals must be achieved:

Single / Dual Barrier HP Drilling Risers

SWS Ultra deepwater drillship

SAFER, SMARTER, GREENER

Comprehensive Plug and Abandonment Systems

Offshore. Christian Tribout Senior Vice President, Offshore. Investor Presentation Paris, October 17, New York, October 19, 2007

The Future of Offshore Drilling: Beyond Ultra Deep. Chris Beckett, CEO Pacific Drilling S.A. September 22, 2014

Recent advancement in well-control technology improves safety and allows cost savings for well designs

International Well Control Forum Well Intervention Pressure Control Subsea Syllabus

4 Briefing. Responsible investor

Offshore & onshore drilling market for LV AC drives

Offshore Support Vessels Located in the US Gulf of Mexico in March 2018

FLNG in Harsh Environment - Disconnectable and Relocatable Riser System

Otway Gas Development Seabed Assessment and Drilling Program

Arctic and Cold Climate. Capability & Experience

INTERNATIONAL. June 2017 Volume 13. A Buoyant Future. Reducing Cost and Risk in Floating Offshore Wind

New Developments in Regulation of U.S. Offshore Oil and Gas Operations

2009 S. Kenny, Ph.D., P.Eng. Lecture Goals. Historical Overview. Students will be able to: Lecture 18 Pipeline Installation

WHITE ROSE DEVELOPMENT PROJECT. Canada-Newfoundland and Labrador Benefits Report. For the Period April 1 June 30, 2004

4 DEVELOPMENT AND PRODUCTION SCENARIOS

Subsea STP Buoy Mooring

HELIX ENERGY SOLUTIONS

MACTECH OFFSHORE CAPABILITIES

PANEL CRIB PIERS AND TOWERS

Intervention/Decommissioning

CONNECTION. Certified System Components. Subsea Connections

InterMoor Innovation in Action. InterMoor: USA Mexico Brazil Norway Singapore & Malaysia UK West Africa

TMR4225 MARINE OPERATIONS. SPRING 2004 Introduction

Discipline. Technology TECHNOLOGY DEVELOPMENT. Technology WITHIN SBM OFFSHORE

Industry Response - Post Macondo

Dynamic Approach to Quasi-static Nonlinear Problems for Sub-Sea Applications

(12) United States Patent

WHITE ROSE OILFIELD COMPREHENSIVE STUDY REPORT SUBMITTED BY:

Experience, Role, and Limitations of Relief Wells

Next generation offshore wind tools

United States Patent (19) Cobb

Chapter 02. Casing and Tubing

Personalized Service, Industry Expertise. Franklin Howard

SUBSEA WELL CONTAINMENT. Global Basis. Deepwater & Emerging Technologies Group (DETG) AADE Houston Chapter 25 January 2012

SubSea MudLift Drilling: from JIP to the Classroom

Transcription:

Offshore Drilling Rigs Drilling Offshore Drilling Rigs Many of the world s potential reserves of hydrocarbons lie beneath the sea, and the hydrocarbon industry has developed techniques suited to conditions found in the offshore, both to find oil and gas and to successfully produce it. Modern and advanced drilling techniques and methods have increased Companies ability to find hydrocarbons and the speed at which their projects are developed. There are technology advances for exploration and development, better control of environmental impacts, increased efficiency, and improved understanding of the marine environment. The techniques and equipment for drilling offshore wells (offshore drilling) are very similar to those used for onshore drilling. The main differences consist in the arrangement of the drilling rig and of the equipment, and in certain particular methods of carrying out the operations, which have to be adapted to the requirements dictated by far more difficult and often extreme environmental conditions. This entails considerably higher costs, to which must also be added considerable investments to provide the facilities and plants for subsequent field development. An offshore drilling rig has to create the same working conditions as for onshore rigs which can move from one point to another without any difficulty, and they have several

additional features to adapt them to the marine environment, including: Heliport a large deck area that is placed high and to the side of offshore rigs; It is an important feature since helicopters are often the primary means of transportation. Living quarters usually comprise bedrooms, a dining hall, a recreation room, office space, and an infirmary. Cranes used to move equipment and material from work boats onto the rig and to shift the loads around on the rig. Risers used to extend the wellhead from the mudline to the surface. These conditions increase the complexity of the offshore rigs, and justify their higher daily rate compared with an onshore drilling rig of the same capacity. From an operational point of view, offshore drilling may be subdivided into two main categories, depending on the water depth. Bottom supported drilling rigs The safety equipment, i.e. ordinary Blow-Out Preventers (BOPs) located permanently above sea level and accessible from the supporting structure; drilling operations are identical to those carried out in onshore drilling. Floating drilling rigs The wellhead and the subsea BOPs are placed on the seabed, and are not therefore directly accessible

from the supporting structure. Drilling operations differ from onshore ones, as the rig floats, subjected to the action of the wind, currents and waves, which cause it to make small horizontal and vertical movements. The use of floating rigs is necessary for exploratory drilling in water depths of more than 100 m (this refers solely to exploratory drilling operations, and not to the subsequent development drilling). Exploration Drilling Rigs (from Shell) Bottom supported rigs Barges They are designed to work in shallow water (less than20 ft deep).

The rig is floated to the drillsite, and the lower hull is sunk to rest on the sea bottom. The large surface area of the lower hull keeps the rig from sinking into the soft mud and provides a stable drilling platform. Drilling Barge (from Parker Drilling) Submersibles They are barge that are designed to work in deeper water (to 50 ft deep); They have extensions that allow it to raise its upper hull above the water level. Submersible Drilling Rig Platforms

Platformsuse a jacket (a steel tubular framework anchored to the ocean bottom) to support the surface production equipment, living quarters, and drilling rig. Multipledirectional wells are drilled from the platform by using a rig with a movable substructure. The rig is positioned over preset wellheads by jacking across on skid beams. After all the wells are drilled, the rig and quarters are removed from the platform. Smaller platforms use a jackup rig to drill the wells. Offshore Drilling Platform Jackups Jackupsare similar to platforms except that the support legs are not permanently attached to the seafloor The weight of the rig is sufficient to keep it on location The rig s legs can be jacked down to drill and jacked up to move to a new location when under tow, afloating hull buoys the jackup. Thederrick is cantilevered over the rear to fit

over preset risers if necessary. Jack Up Drilling Rig Floating drilling rigs They are not attached or resting on the ocean bottom and have special features to facilitate this: They are held on location by anchors ordynamic positioning Thedrill string and riser are isolated from wave motion by motion compensators. There are two categories of drilling floating rigs Semi-submersible rigs They consist of a large triangular, rectangular or pentangular platform, connected with submerged hulls by means of large columns which vary in number from 3 to 8, according to the shape of the vessel They are kept vertical over the site by means of mooring or dynamic positioning systems Semis are subjected to wave motion, their drilling

apparatus is located in the center where wave motion is minimal. Semis are flooded to a drilling draft where the lower pontoons are below the active wave base, thereby stabilizing the motion. Semi Submersible Drilling Rig Drill ships Drilling ships are used for operating in deep waters, often under extreme environmental conditions, such as drilling in arctic areas Drilling ships represents on optimal solution of drilling exploratory wells in remote areas, far removed from supply points, as it can carry all the material necessary for drilling even a particularly difficult well. Drilling ships are kept in a vertical position over the well by means of mooring or dynamic positioning systems Drilling ships when moored can be used for drilling in depths of up to about 1,000 m, while

for greater depths dynamic positioning systems must be used, and with these the ship is capable of operating in 3,000 m of water The drilling apparatus on a drill ship is mounted in the center of the ship over a moon pool, which is a reinforced hole in the bottom of the ship through which the drill string is raised and lowered The ship can be turned into the oncoming wind or currents for better stability Drilling Ship (from Maersk Drilling) Drilling from floating offshore rigs The techniques for drilling offshore wells from floating rigs are basically the same as those used for onshore wells. In general, the factors involved in drilling wells from floating rigs are due to the following: the the and the the wellhead is located on the seabed; submarine BOPs are located on the subsea wellhead are controlled hydraulically or electrically from surface; BOPs are connected to the rig by means of a marine

riser(enabling the drilling fluid to circulate upwards); the marine riser, connected at the top of the BOP stack, has a ball joint on its base and a slip joint above sea level to offset the horizontal and vertical movements of the rig; the lines for preventing blowouts (kill lines and choke lines) run from the surface manifold on the rig to the subsea wellhead, as independent lines fixed to the outside of the marine riser. Offshore drilling operations Drilling starts after the rig has been positioned vertically over the well, by means of mooring or dynamic positioning systems. The first operation consists in placing on the seabed (by means of a pipe string) of a temporary guide base( a strong steel framework with a central hole which has a tapered inlet at the top, provided with four guidelines and a number of steel pins that become embedded in the seabed and prevent displacement). The pipe string is then disconnected, leaving only the temporary guide base on the seabed, with the four guidelines that connect up with the rig. Now, the drilling phase can begin, so as to place the first casing (the foundation pile) and it is carried out using the circulation of seawater, the cuttings do not rise to the surface but are scattered over the seabed. The foundation pile is taken down to a depth of a few tens of metres. At this point the foundation pile is lowered into the hole again using a light frame and the four guidelines. The foundation pile ends with a permanent guide structure, characterized by four tubular columns placed at the apexes, through which run the guidelines. The four columns serve in the subsequent phases to

guide the submarine BOPs to the wellhead with precision. The permanent guide structure contains the housing for the wellhead, to which the successive casings will be anchored. The subsea wellhead has a different system of flanging and anchoring the casings and it is shaped in such a way as to enable the lock-up of the hydraulic connector to which the BOPs are coupled. Next, the foundation pile is fully cemented by means of a drill string. Once the cement has set, drilling continues, boring the second section of the hole inside the foundation pile, in which the second casing is inserted. Once the conductor pipe has also been fully cemented, the well has a stable structure and it is possible to install the submarine BOPs. After this drilling continues with the sequence of operations typical of onshore wells.

Drilling from floating vessels (from Encyplopaedia of Hydrocarbons ENI) Subsea BOPs In offshore drilling BOPs have the same function as those used in onshore wells, but are connected in a single complex (the BOP stack) before being mounted on the wellhead, so as to reduce assembly times at the sea bottom. They are lodged in a square-section cage structure with female columns at the apexes, into which the male tubular columns of the permanent guide structure fit. The BOP stack is lowered and fastened to the wellhead by means of a hydraulically controlled connection, ensuring hydraulic sealing. In the event of temporarily abandoning the well because of adverse weather and sea conditions, it is possible to suspend the pipes on the shaped rams of the lower BOP, to unscrew the pipes and to close the well with the upper blind rams at this point it is possible to disconnect also the marine riser and possibly to abandon the site. The marine riser can be reconnected when the sea and weather conditions improve. The hydraulic lines controlling the various functions of the BOP stack converge in a connector block, to which is connected the bundle of flexible pipes for their control from the surface. The BOPs can be operated in a similar way to that used in onshore wells, known as the direct system.

A semisub drilling rig and a subsea BOP Stack A drilling ship and a subsea BOP stack