Replacing the build plate clamps

Similar documents
Replacing the build plate clamps

DO35 MAINTENANCE INSTRUCTIONS

RTI TECHNOLOGIES, INC.

OTECO INC. MODEL ,000 PSI 4-1/16 PORT DM GATE VALVE MAINTENANCE MANUAL

Step 1: The larger tower box contains the tower machine, a set of Silver 100 Lid Keys, and a set of Black 002 Coin Box Keys

Removing the Z-Axis lead screw

EPPA2-KIT DUAL MONITOR ARM CONVERSION

KX2 Side KX installation

Replacing the Reciprocator on the SWF Compact Series Machine (601C and 1201C)

Model MSPPWRTW Large Flat Panel Single Arm Wall Mount

EllisSaw.com. EllisSaw.com P.O. Box Verona, WI

It is highly recommended that you use a thread lock compound such as Loctite brand on all threads to keep them from vibrating loose.

Preference Collection 5580 Treatment Console INSTALLATION GUIDE

STEINBERGER TRANSTREM (TYPE 2) TECHNICAL DOCUMENT

STRAIGHT HANDLEBAR KIT

REPAIR INSTRUCTIONS. Cat. No Cat. No MILWAUKEE ELECTRIC TOOL CORPORATION. SDS Max Demolition Hammer. SDS Max Rotary Hammer

HANDLEBAR KIT P/N APPLICATION BEFORE YOU BEGIN KIT CONTENTS TOOLS REQUIRED. Instr Rev Page 1 of 6

101B, 210X, ELM, VSTB Installation Manual

STENCIL MACHINE OPERATION uline.com H-259, H-347 H-408 CUTTING THE OIL BOARD INSERTING THE OIL BOARD

ELECTRIC TOOL CORPORATION

Replacing the Reciprocator on an SWF Multi-head.

Large Wood Windmill Assembly Instructions

OWNER S MANUAL. Safety. Please read this owner s manual before use and keep it at hand for reference. Warranty


V-MOTION LITE USER GUIDE. Rat Rig All rights reserved.

Jenny Legs Assembly Instructions

Crestline Dampening System. Installation Instructions. Hamada RS34 & VS34 Parent Unit DU34 Upper Unit. For Presses Originally Equipped With

Topo Freestanding Applications - Private Office

Page 1. SureMotion Quick-Start Guide: LARSACC_QS 1st Edition - Revision A 03/15/16. Standard Steel Bolt/Screw Torque Specifications

3.2.3 Rear Door Window and Quarter Window Carrier Assembly

3. Remove the flue collar by backing out the two Phillips round head machine screws.

Water Line and Water Line Assembly Gasket

Preference Collection and Treatment Console INSTALLATION GUIDE

Installation instructions for FC14S Forward Controls for Shadow ACE and Aero 1100

Heavy Duty Ceiling Tilt Mount Installation Manual

IMPORTANT WARRANTY & INSTALLATION INSTRUCTIONS ATTACHED

STRINGING MACHINE OWNER'S MANUAL. Copyright 1998 GAMMA Sports - All Rights Reserved

EMO. Service Instruction. created by Frank Weithöner. Table of contents: Special Tools Assembling Mixing Chamber

Special Z-Axis Ballscrew Replacement

RIPPER PEDAL. Bearing / Axle Replacement. ( Disassembly )

Q-Zone Hoop-Frame. Assembly Instructions. Copyright July 11, 2018 Grace Company (Reproduction Prohibited) Version 1.8

Chapter 6 Frame And Lens Repairs

Maintenance Information

OPERATIONAL MANUAL V1.0. Removing/Replacing Blades

Installation Instructions 8115F 8115SF

MOTOR & BULK HEAD. A Manual for Repair and Maintenance Technicians

Midwest RDH Handpiece Repair Procedure

JK TrailGate JK TrailGate

TechBench Installation Manual

Repairing Microsoft Wedge Touch Mouse Battery Cover Retaining Clip

INSTALLING YOUR NEW SPRING LIFT ARM KIT

Santorini. Instruction Manual. Cantilever. 10 Round / SSAG9-10

IMPORTANT WARRANTY & INSTALLATION INSTRUCTIONS ATTACHED

TOYOTA TACOMA TRAILER WIRE HARNESS Preparation

INSTALLATION INSTRUCTIONS

Authority22 Transition Roller for Existing Machines

Cut-True 16M Manual Paper Cutter

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

Installation instructions for FC9 & FC18 Forward Controls for Yamaha V-Max

Pole Mount Installation Guide

ABM International, Inc.

Quick Set Dovetail Jig

Installation instructions for FC17 Forward Controls for Triumph Rocket III Roadster

installation guide

ABM International, Inc. Navigator Assembly Manual

Grand Slam 270 Installation Instructions

Band-Master ATS Nano Pneumatic Banding Tool Operating Instructions

C4 Toe Rod Installation Document #: C4TR-1, sheet 1 of 6

CTTR Tire Rack Required tools

ITEM NO. PART NO DESCRIPTION QTY.

TOYOTA TACOMA 2005 TRAILER WIRE HARNESS Preparation

Queen Wingback Bed King Wingback Bed

INSTALL INSTRUCTIONS: FRAME REPAIR KIT

X-ST STRINGING MACHINE OWNER'S MANUAL

LF Series Assembly Instructions

Z-Truck Up-and-Down Motion. Y-Truck Side-to-Side Motion. Head. Squaring Plate. Sliding Plate FIGURE 1: THE CARVEWRIGHT MACHINE

SmartView Mounting Frame 3 Wide x 3 Deep Video Wall Display Installation Guide

1 of 12 5/24/2015 9:43 AM

Big & Tall Executive Chair Assembly Instructions

HD installation guide

CarvLock HDLM6 Manual Machinable Jaw Vise

Basic steps to time the Gammill quilting machine s rotary sewing hook

Contractors Rack Assembly and Installation Instructions

Assembly Instructions

Hollywood Swing Away 2 and 4 Bike Racks Assembly and Installation Guide

Required Tools: Suggested Additional Tools: 1 Cordless Drill with Robertson Bits 1 Ratchet Wrench 1 7/16 or 11mm socket 1 7/16 or 11mm Gear Wrench

4. Z-axis assembly. 4. Z-axis assembly. Written By: Josef Prusa manual.prusa3d.com Page 1 of 18

RULTRACT RETRACTOR CABLE REPLACEMENT INSTRUCTIONS. Rultract, Inc. is the ONLY authorized service center in the U.S.A.

Technical Information

C4 Fabrication Rock Slider Installation 14+ 5th Gen 4Runner w/o KDSS

Fig Remove chain cover plate bolts. Fig Remove hammer member. Fig Loosen set screws at base of 12-tooth sprocket.

Inventory (Figure 2)

EDGE2 DUAL MONITOR ARM

6' Wide Premium Greenhouse Benches

Bearing Overhaul Instructions for: Tallboy (.1) 2009

Side Winder R o u t e r L i f t.

1. Turn off or disconnect power to unit (machine). 2. Push IN the release bar on the quick change base plate. Locking latch will pivot downward.

MODEL T21973 METAL BLADE GUIDE SET INSTRUCTIONS

Lumber Smith. Assembly Manual. If you are having problems assembling the saw and need assistance, please contact us at:

What is a fastener? A device to locate or hold parts

Transcription:

Repair manual Replacing the build plate clamps Instructions The build plate clamps hold the glass plate in place on the heated bed. There are two fixed in place at the back of the heated bed and two at the front that can both be opened. When the glass plate is installed, it is pushed into the clamps at the back. After removing and reinstalling the glass plate many times, the back build plate clamps may lose their grip on the glass plate. If that happens, the glass plate can move during printing, leading to print issues such as shifted layers. If excessive force is applied to the clamps, they could break off. This can happen if the print is removed from the glass without taking the plate out of the printer first. If the clamps are damaged, it is recommended to replace them to retain optimal print quality. The following steps describe how to correctly replace the back build plate clamps. Caution: Make sure the build plate is cold, the Ultimaker is turned off and the power supply is disconnected before you start the replacement. Equipment/supplies needed Tools Pliers or socket wrench Parts 1 or 2x 1256 - Build plate clamp (back) Time 15 minutes Page. 1 / 7

Disassembly 1. Remove the glass plate Open the front two build plate clamps. Gently slide the glass plate out of the printer. 2. Move the Z stage up Place the print head in the front-right corner. Manually move the build plate halfway up. Page. 2 / 7

Disassembly 3. Remove the knurled nuts Loosen and remove the three knurled nuts from the base plate. Tip: Make sure to also remove the washers from the base plate; due to the copper grease, they may remain stuck to the plate. Put them around the knurled nuts with the greased side facing up. 4. Remove the springs Lift up the heated bed. Remove the build plate springs from all three bolts. Remove the build plate clamps from the front two bolts. Tip: Now move the build plate down again. This will create more room and makes performing the following steps easier. Page. 3 / 7

Disassembly 5. Remove the build plate clamps from the back of the heated bed Flip the heated bed over so the black side is facing towards you. Use pliers or a socket wrench to remove the two lock nuts from each of the build plate clamps at the back of the bed. Remove the clamps from the integrated bolts. Tip: The bolts are integrated in the heated bed and the build plate clamp only just fits over them. Because of this, it can be difficult to remove. Press the build plate clamp against the top side of the heated bed. From the bottom side, first lift up the side of the clamp on the outside of the bed to be able to move it over the bolt. Now rotate the clamp approximately 45º and remove it from the other bolt. Page. 4 / 7

Reassembly 1. Attach the new build plate clamps First place the hole of the new build plate clamp around the bolt on the inside of the bed. Rotate the build plate clamp and slightly lift it up to place the other hole around the outermost bolt. Repeat this for the other side. Using pliers or a socket wrench, secure the clamps to the bed with two lock nuts each. 2. Secure the back of the bed Flip the heated bed around again and align the bolt in the back with the hole in the base plate. Place a spring around the bolt in the back. Place a knurled nut through the opening in the back of the base plate and turn it counter clockwise to secure the heated bed. Page. 5 / 7

Reassembly 3. Prepare the front two bolts Put the front-left build plate clamp around the front-left bolt, then a spring. Put the front-right build plate clamp around the front-right bolt, then a spring. 4. Secure the front of the bed Align the front two bolts with the holes in the base plate. Place a knurled nut through the openings in the base plate. Gently push the bed down and turn the knurled nuts counter clockwise to secure the heated bed. Tip: The bed is more stable if there is more tension on the springs. Tighten all three knurled nuts until the distance between the top of the base plate and the underside of the heated bed is approximately 10 mm. Page. 6 / 7

Reassembly 5. Level the build plate Slide the glass plate on the heated bed. Close the front two build plate clamps to secure it in place. Turn the printer on and go to Maintenance > Build plate. Follow the leveling procedure to ensure that the build plate is correctly leveled. Page. 7 / 7