EBTRON a measurable difference!

Similar documents
EBTRON a measurable difference!

INSTALLATION INSTRUCTIONS LARGE FLAT PANEL IN WALL ENCLOSURE Model: PAC-500

INSTALLATION INSTRUCTIONS PART#:17A045200MSS\17A045200MA MODULAR GRILL GUARD FOR FORD SUPER DUTY F250/F

INSTALLATION INSTRUCTIONS 3 BULL BAR 99-04, 04 "HERITAGE" F-150/250LD 2WD, 97-04, 04 "HERITAGE" 4WD WD EXPEDITION/ WD EXPEDITION PART

SAFETY THIS PRODUCT IS FOR OFFROAD USE ONLY. ALL LIABILITY FOR INSTALLATION AND USE RESTS WITH THE OWNER.

INSTALLATION INSTRUCTIONS SIDE BAR FORD ESCAPE & MAZDA TRIBUTE PART #

LARGE FLAT PANEL DISPLAY STATIC MOUNT PST 2000 Series

INSTALLATION INSTRUCTIONS

TYGER GUARD. Parts List BEFORE INSTALLATION WARNING TG-GD6C /5

INSTALLATION INSTRUCTIONS PART#:17GT23MSS\17GT23MA MODULAR GRILL GUARD FOR CHEVY SILVERADO 1/2 TON 99-02

INSTALLATION INSTRUCTIONS. Large Flat Panel Wall Mount Model: PRO-2000 Series

INSTALLATION INSTRUCTIONS / DODGE RAM CREW CAB 2500/3500

TEL:1-866-XANATOS INSTALLATION INSTRUCTIONS GRILL GUARD FOR FORD EXPLORER PART # 17FJ26MA

(W) INSTALLATION INSTRUCTIONS 3" ROUND & 4" OVAL SIDEBAR (90-DEG BENT END) DODGE RAM 1500 QUAD CAB PART #DZ /DZ /DZ /DZ

INSTALLATION INSTRUCTIONS UTV LIGHT BAR KIT Part Number: and Application: All UTV s*

BLEACHER ASSEMBLY INSTRUCTIONS

SAFETY THIS PRODUCT IS FOR OFFROAD USE ONLY. ALL LIABILITY FOR INSTALLATION AND USE RESTS WITH THE OWNER.

MPA-9000 Universal Ceiling Projector Mount Kit

Austin Standing Seam Awning with Overhead Braces Assembly and Installation Instructions. Assembly Instructions

Thank you for purchasing out product! *Please read these instructions and follow them step by step. *

CIRRUS AIRPLANE MAINTENANCE MANUAL

PORTA-DOCK, INC. AP17 APD DS 4 X 16 T12 AW17 CPD DS 4 X 16 T12

PFXGP4201TADW. Pro-face Xycom GP4000 PFXGP4201TADW

Assembly Instructions for Model: VMDD26

INSTALLATION INSTRUCTIONS HEAVY DUTY TILT WALL MOUNT Model: PPH-2000

3" SIDEBAR CHEVY TRAVERSE/GMC ACADIA/07-10 SATURN OUTLOOK/07-09 BUICK ENCLAVE (EXCL BUICK ENCLAVE)

Installation Guide. Overview

CRITICAL INFORMATION:

LCD LIFT Flat Panel Display System Installation Manual. Table of Contents

PORTABLE ADJUSTABLE BASKETBALL SYSTEM

SunTrackerTwo Preparation

STANDARD MICROWAVE COMBINER MODEL SMC-XX-X-HP-X

Passenger/Right Center and Rear Support Brackets. Driver/Left Center and

INSTALLATION INSTRUCTIONS VENETIAN 84" SLIDING SHOWER DOOR SYSTEM (180º INSTALLATION)

RBP-1215B-RX DODGE RAM QUAD CAB RX3

INSTALLATION INSTRUCTIONS 3 ROUND & 4 OVAL SIDEBAR (90-DEG BENT END) DODGE RAM MEGA CAB PART NUMBER SB1214S SB1214B

(2) Plastic Plugs (2) Frame Bracket. Spacers. License Plate Bracket. (2) 12mm Single Bolt Plates. (2) 12mm Double Bolt Plates

INSTALLATION INSTRUCTIONS

(2) 25mm x 20mm x 5mm Adhesive Backed Foam Pads. 100mm x 50mm x 1.0mm Adhesive Backed Foam. (2) Spacer Plates. Passenger/Right Side Frame Mounting

(6) Plastic Retainers. Passenger/Right. Passenger/Right Support Brackets

ESA-300 Full Breakout

INSTALLATION INSTRUCTIONS PART#:17A096400MSS\17A096400MA MODULAR GRILL GUARD FOR TOYOTA TACOMA 05-09

Page 1 of 6 Systems Inc.

INS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)...

SAFETY INJURY & HAZARD

Assembly Instructions for model: VMPR1

INSTALLATION INSTRUCTIONS

Assembly Instructions for Model: VMPL3

INSTALLATION INSTRUCTIONS SMALL FLAT PANEL ADJUSTABLE PITCH WALL MOUNT Model: FTR Series

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

ESA-200 Fixed Sidelite

INSTALLATION INSTRUCTIONS

FIRST TEAM SPORTS, INC.

Dual Arm Tilt LCD Mount

INSTALLATION INSTRUCTIONS

Fixed Wall Arm. Installation Guide. Part number Rev E 2012 PolyVision Corporation All rights reserved

Big Sweep Lathe Dust Catcher System

Installation Instructions Jeep JL Front Grumper Product Number: GR4600 Application: 18+ JEEP JL

Sliding Door Kit

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS DODGE RAM 2 & 4WD 1500 PART # P5058

Sliding Door Kit

INSTALLATION INSTRUCTIONS GRILLE GUARD RAM 1500 PART # 5058/5058-2

SAFETY THIS PRODUCT IS FOR OFFROAD USE ONLY. ALL LIABILITY FOR INSTALLATION AND USE RESTS WITH THE OWNER.

installation guide

Passenger/Right Front Mounting Bracket

6MM ALLEN KEY FOR ROOF CLIPS PHILLIPS HEAD BIT FOR SCREWS FOR DOOR FRAME SPIRIT/LASER LEVEL TO LEVEL THE UNIT

INSTALLATION INSTRUCTIONS 6 OVAL BENT END SIDEBARS DODGE RAM 1500, CREW CAB PART#: /241533B

INSTALLATION INSTRUCTIONS GRILLE GUARD 09-ON DODGE RAM PART #

INSTALLATION INSTRUCTIONS

MEDIUM FLAT PANEL DISPLAY TILT MOUNT MSP-MT (MTR-V)

User Instructions Multiline Otter Scoreboard Caddy Assembly

Installing the CACS Ceiling with Aisle Ducts

PARTS INCLUDED IN FIXED STAIR CABLE RAIL KIT:

HD installation guide

Flat Panel Dual Swing Arm Wall Mount (FWD-110) MSP-SA

S48-L12-SC AND G48-L12-GC STEEL PORTA-DOCK S82 SC 6 X 12 PLATFORM AND G82 GC 6 X 12 PLATFORM

MSP-DCCPGSU Large Screen Static Display Mount

Support. (3)Passenger Support. Brackets. (2) Running Board (example only)

INSTALLATION INSTRUCTIONS

MSP-DCCPGTU Large Screen Tilt Display Mount

ED1300/1300F SERIES CONCEALED VERTICAL ROD DEVICE INSTALLATION INSTRUCTIONS

Beacon/Morris HEATER FLOOR KIT

Due to possible damage in shipping, the vertical stop assembly has been removed from this machine.

SAFETY SENSORS FIELD OF VIEW WILL BE ALTERED WITH USE OF THE REPLACEMENT BUMPER. Injury hazard

Installation Instructions

Driver/Left Top. Support Bracket

SAFETY. Injury hazard

Operating instructions OI/FPD350-EN Rev. H. FPD350 Torbar Averaging pitot tubes

TYGER GUARD. Parts List BEFORE INSTALLATION WARNING TG-GD6D /7. Tyger Guard. Tube Brackets (Bull Bar) passenger or driver side

FORD INTERCEPTOR SEDAN READY BUCKLE

TOOLS REQUIRED: HARDWARE INCLUDED: 13MM FLAT WRENCH FOR LEVELING THE STRUCTURE RATCHET WITH 5MM HEX BIT FOR CORNER SCREWS ON TOP TRAVERSE BEAMS

3400 to 3440 Scarfing Sled Owners Manual Please Read Carefully!

Ford Pick Up Rear leaf Spring Kit Installation Instructions

KFI Hybrid Mount Installation Manual

Installation Manual for the Rockmeister Roof Ladder

Blackout Fan Kits with Breathable Wall Light Traps

Rotary Fixture M/V/X CLASS LASER SYSTEMS. Installation and Operation Instructions

INSTALLATION TORSION SPRING FRONT OR REAR MOUNT LOW HEADROOM. 1 Cutting Vertical Track. 2 Fully Adjustable Jamb Brackets

GrowSpan Heavy-Duty Commercial Cold Frame

Transcription:

GP1, HP1 AND SP1 DUCT AND PLENUM PROBE INSERTION MOUNT INSTALLATION Document Number 930-0030 OVERVIEW This document provides the instructions necessary to install Standard insertion mount probes as shown in Figure 1. Insertion mount probes are installed externally through the sidewall of the duct/plenum. Installation consists of marking and preparing the mounting holes and then installing and securing the probes. For detailed probe information, refer to the Duct/Plenum Probe technical manual under separate cover. For detailed information on transmitter set up and operation of the complete airflow measurement station, refer to the associated transmitter technical manual (under separate cover). Observe the following precautions during installation: Figure 1. Insertion Mount Probe CAUTION Location of the probe(s) is critical for proper performance of the airflow station. Probes must be installed in accordance with the engineer s plans and Minimum Placement Guidelines (Figures 4 and 5) for the specified location. For additional probe placement detail, refer to the probe technical manual under separate cover. Ensure that adequate installation/service clearance exists at the installation site to permit installation of the probe into the duct/plenum, and that the cable length for the probes is sufficient to reach the planned transmitter installation. Refer to the mechanical details of Figure 2. On applications where multiple probes are to be installed at a single measurement location, install probes in accordance with Figure 3 (Insertion Mount Probe Spacing/Configuration). In addition, when traverse data is desired (Gold Series GP1 probes only), place the lowest numbered probe at the top of the duct for horizontal mounting. For vertical mounting, place the lowest numbered probe on the left side of duct when viewed from the upstream side of the mounting location, with cables exiting on the higher side to prevent any potential moisture from accumulating on the heated sensors. Insulation that may interfere with mounting should be temporarily removed prior to installation and replaced afterwards. INSERTION MOUNTING OVERVIEW Figure 2 provides Standard insertion mount probe installation details. Standard probes 18 in (457.2 mm) and longer include a terminal stud (and, for rectangular ducts, a terminal bracket plate) for additional support at the far end of the probe. On these longer probes, a terminal stud mounting hole is required on the other side of the duct (opposite the insertion side). Shorter standard probes (under 18 in / 457.2 mm) do not require a terminal bracket or end stud hole, and are fabricated 0.25 in (6.3 mm) less than the overall duct size. Install probes as follows. Convenient check boxes are included at each step., Inc. 1663 Hwy. 701 S., Loris SC 29569 Toll Free: 800.2 (232.8766) Fax: 843.756.1838 www..com 1

INSERTION MOUNT MARKING AND PREPARATION 1. Each probe package is factory labeled for the specific location and duct size for which it is designed. Orders for locations requiring multiple probes at a specific location are typically banded and packaged together. Determine the specific duct location for the probe(s) as indicated on the engineer's plans showing where the airflow measuring station is to be located. Refer to Figure 3 for probe spacing and orientation. 2. Carefully open the probe packaging and inspect for damage. Proceed to the specific additional installation instructions for rectangular ducts (at step 3), round ducts (at step 6) or flat oval duct applications (at step 9). For Rectangular Ducts 3. The first dimension of the probe size indicates the length of the probe. The second dimension indicates the specific duct insertion side dimension 'X'. Refer to Figure 2 and verify that the probe is the correct size for the application duct size. Mark a point at the center of the insertion side of the duct at X. Draw a line on the insertion side of the duct at this point that is perpendicular to the edge of the duct. This line will be used to locate the position of the hole(s) to be drilled for probe insertion. The number of probes for the specific measurement site determines the probe installation location and orientation as shown in Figure 3. 4. Using the applicable Rectangular Insertion Mount Probe Spacing/Configuration detail of Figure 3, locate and mark the location(s) on the insertion side of the duct (where the probe(s) will be inserted) at the line drawn in step 3. 5. Prepare a 1.25 in (31.75 mm) insertion hole on the side of the duct where each probe will be inserted and complete the appropriate step 5a or 5b for the corresponding probe terminal end. 5a. For Standard probes 18 in (457.2 mm) and greater, a terminal end bracket and terminal stud is provided on the non cable probe end opposite the insertion side bracket. Mark the location for the probe terminal stud hole to be prepared on the duct wall that is opposite the insertion side hole. 5a1. Using the terminal end bracket as a guide and while keeping the top of the bracket parallel to the edge of the duct, mark the locations of the four terminal end bracket mounting holes. 5a2. Prepare the 1.25 in (31.75 mm) hole for the probe end bracket at the duct location marked in 5a. OR 5b. For Standard probes under 18 in (457.2 mm), no terminal end bracket or stud is supplied, therefore no additional marking or drilling is required on the opposite side of the duct. 2, Inc. 1663 Hwy. 701 S., Loris SC 29569 Toll Free: 800.2 (232.8766) Fax: 843.756.1838 www..com

For Round Ducts 6. Mark and draw a line around the circumference of the duct at the probe(s) insertion point(s). The number of probes for the specific measurement site determines the probe installation locations and orientation as shown in Figure 3. Applications with multiple probes must be staggered 1.5-2 in (38.1 to 50.8 mm) from each other as shown in Round Duct Probe Spacing detail of Figure 4 to prevent probes from intersecting at the center of the duct. 7. Using the applicable Round Duct Probe Spacing detail of Figure 3, locate and mark the probe insertion location(s) on the circumference line drawn in step 6 where each of the probe(s) will be inserted. 8. Prepare a 1.25 in (31.75 mm) insertion hole on the insertion side of the duct where each probe will be insert- ed. 8a. For Standard probes equal to and greater than 18 in (457.2 mm), a terminal stud is included at the probe end opposite the insertion side bracket. For these probes, mark and prepare a 0.5 in (12.7 mm) terminal stud mounting hole for the terminal stud on the opposite side of the duct for each probe. 8b. For Standard probes under 18 in (457.2 mm), no terminal stud is supplied, therefore marking and drilling is not required on the opposite side of the duct. Proceed to step 12, Final Assembly. For Flat Oval Ducts 9. Mark and draw a line around the circumference of the duct at the probe(s) insertion point(s). For oval duct applications, orientation is determined by duct size application as shown in the Oval Duct Probe Spacing table and detail application illustrations of Figure 3. Configuration 2b, 3b and 4b probes must be staggered 1.5 to 2 in (38.1 to 50.8 mm) from each other to prevent probes from hitting one another (intersecting) at the center of the duct. 10. Using the Oval Duct Probe Spacing table and detail applications shown in Figure 3, locate and mark the probe installation location(s) on the circumference line drawn in step 9 where each of the probe(s) will be inserted. 11. Prepare a 1.25 in (31.75 mm) insertion hole on the side of the duct where each probe will be inserted. 11a. For probes equal to and greater than 18 in (457.2 mm), a terminal stud is included at the probe end opposite the insertion side bracket. For these probes, mark and prepare a 0.5 in (12.7 mm) terminal stud mounting hole for the terminal stud on the opposite side of the duct for each probe. 11b. For probes under 18 in (457.2 mm), no terminal stud is supplied, therefore marking and drilling is not required on the opposite side of the duct. Proceed to step 12, Final Assembly., Inc. 1663 Hwy. 701 S., Loris SC 29569 Toll Free: 800.2 (232.8766) Fax: 843.756.1838 www..com 3

P R E S S FINAL ASSEMBLY FOR S 12. Carefully insert each probe assembly through the insertion side mounting hole, making sure that the larger insertion side gasket is firmly seated against the insertion side bracket. On probes with terminal studs, ensure that the terminal stud passes through the hole prepared on the opposite side of the duct. Fasten the insertion side mounting plate to the duct at four places with appropriate sheet metal screws, making sure that the printed airflow arrow on the plate and probes is in the actual direction of duct air flow and that the plate is parallel to the edge of the duct. On probes without terminal studs, proceed to step 15. If the airflow direction labels are not visible on the probe or bracket, orient the probe so that the SET SCREWS (two per sensor insert) face the DOWNSTREAM side of the probe. (Setscrews are only on the downstream insert side). 13. For rectangular duct applications with probes of 18 in (457.2 mm) or greater, place the terminal end bracket plate onto the terminal stud that is protruding through the opposite side of the duct. (On round and oval duct applications with probes 18 in / 457.2 mm and greater, the terminal end bracket is not required.) Pass the bracket over the end stud and locate it using the marks prepared in step 5a1. Fasten the terminal end bracket plate to the duct at the four marked locations using appropriate fasteners. 14. Place the smaller foam shock absorber/gasket over the terminal mounting stud, then place the large flat washer against the shock absorber/gasket. Tighten the lock nut onto the terminal mounting bolt until snug. A tight fit is not required, and can limit probe movement that can cause air leakage when the duct is pressurized. 15. Connect all sensor probes to the transmitter. This completes probe installation. Complete the installation, wiring and set up of the associated transmitter as detailed in the separate Transmitter Installation Guide and Installation, Operation and Maintenance Technical Manual (under separate cover). INSERTION MOUNT INSTALL DETAIL 1.00 in. (25.4 mm) Overall Duct Size (including internal insulation) 1.50 in. 38.10 mm 3.75 in. (95.25 mm) 0.75 in. (19.05 mm) Gasket Mounting Screws 8 Req d (4/ Bracket Field Supplied) Terminal end bracket 1.1 in. (27.94 mm) dia. tube [8.00 in. (203.20 mm) to 192.00 in. ( 4876.80 mm) long] 0.75 in. ( 19.05 mm) dia. sensor opening 1 to 48 sensors/probe per probe Set-screws for sensor inserts on probes must always face downstream in airflow. Insertion side bracket Washer Lock nut 0.375 in. (9.52 mm) x 1.50 in. (38.1 mm) Stud Gasket 4.00 in. (101.60 mm) INSERTION MOUNT BRACKET DETAIL 0.375 in. (9.53 mm) Insertion Side Bracket Airflow 0.188 in. (4.78 mm) Mtg. Holes (4) Cable 4 in (101.60 mm) 1/2 in (12.70 mm) Terminal End Bracket 0.188 in. (4.78 mm) Mtg. Holes (4) 0.375 in. (9.53 mm) Probes under 18 in (45 7. 2 mm) are not equipped with the terminal end bracket, and therefore do not require a mounting hole on the opposite side of the duct. 0.75 in. (19.05 mm) 0.50 in. (12.70 mm) 4.00 in (101.60 mm) Figure 2. Standard Insertion Mount Probe Mechanical Detail 4, Inc. 1663 Hwy. 701 S., Loris SC 29569 Toll Free: 800.2 (232.8766) Fax: 843.756.1838 www..com

RECTANGULAR DUCT PROBE SPACING One Probe Two Probes Three Probes Four Probes ROUND DUCT PROBE SPACING One Probe Two Probes Three Probes Four Probes 1/6 X 1/3 X 1/3 X 1/6 X 1/8 X 1/8 X 45 OVAL DUCT PROBE SPACING Select configuration diagram from table based upon probe length/ duct size and sensor density <- - - - - - - - - ADJACENT SIDE LENGTH - - - - - - - - -> <- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -P R O B E L E N G T H - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -> 12 18 24 30 36 42 48 54 60 66 72 84 96 108 120 D C B A D C B A D C B A D C B A D C B A D C B A D C B A D C B A D C B A D C B A D C B A D C B A D C B A D C B A D C B A 12 2b 1a 1a 1a 2b 1a 2c 1a 2c 1a 2c 1a 3c 1a 3c 1a 3c 1a 3c 1a 3c 1a 3c 1a 4c 1a 4c 1a 18 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 2c 1a 2c 1a 2c 1a 2c 1a 3c 1a 3c 1a 4c 1a 4c 1a 4c 1a 24 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 2b 3c 1a 2b 3c 1a 4c 1a 30 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 2b 3c 2b 1a 2b 3c 2b 1a 36 3b 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 42 2b 1a 2b 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 48 4b 3b 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 54 4b 3b 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 60 4b 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 66 4b 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 72 4b 2b 1a 2b 1a 2b 1a 2b 1a 2b 1a 84 4b 2b 1a 2b 1a 2b 1a 2b 1a 96 4b 2b 1a 2b 1a 2b 1a 108 4b 2b 1a 2b 1a 120 4b 2b 1a 1a 1 PROBE OVAL 2b 2 PROBE OVAL 2c 2 PROBE OVAL 3b 3 PROBE ROUND 3c 3 PROBE OVAL 1/6 X 1/3 X 1/3 X 1/6 X 4b 4 PROBE ROUND 4c 4 PROBE OVAL 1/8 X 1/8 X 45 Figure 3. Insertion Mount Probe Spacing/Configuration, Inc. 1663 Hwy. 701 S., Loris SC 29569 Toll Free: 800.2 (232.8766) Fax: 843.756.1838 www..com 5