Earthing, HV Switching and Associated Operational Equipment. Approval: Chief Operating Officer

Similar documents
Field Instruction Switching Activities. Purpose. Scope. Objective. Safety

HIGH VOLTAGE RULES. Document Owner: HV Group. Authorised: Electrical Services Manager Liberty Primary Steel

ACCESS TO HIGH VOLTAGE APPARATUS

UNCONTROLLED COPY. Queensland Electricity Entity Standard for Safe Access to High Voltage Electrical Apparatus. August 2015

EI HIGH VOLTAGE INSULATION TESTING POLICY

SUBJECT HEADING: Switching Programmes ISSUE: 18

SERVICING & METERING SERVICING AND METERING SECTION 5 SEC5:

Field Instruction. Induced voltages can occur in overhead lines, underground cables, or in switchyards.

ECP HV INSULATION TESTING

ECP HV INSULATION TESTING

Section 3. Test Procedures

Title Operating Work - Low Voltage Distribution System. Reference Number POP 06 - (RIC Standard: EP SI)

Guideline for Creating Disconnection Points and Establishing a Not Electrically Connected Area

25kV A.C. Electrified Lines - Traction Bonding

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING. Rev. 01

Endeavour Energy Electrical Safety Rules. October 2013

DISTRIBUTION BUSINESS

AN EXAMPLE OF A STANDARD ARC FLASH PPE LABELING STRATEGY

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-II) OVERHEAD NETWORK GROUNDING. Rev. 01

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS

DESIGN PRACTICE NOTE DESIGN/REVIEW REQUIREMENTS FOR TRACTION BONDING PLAN

SWITCHING SAFETY & RELIABILITY CONFERENCE

Electrical Procedure No E032. Procedure No: ELE 032

SPTS 1 - Ratings and General Requirements for Plant, Equipment and Apparatus for The ScottishPower System and Connection Points to it.

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

FAQ ON EARTHING STANDARDS 16/08/2018

PSSI 27 Work or Testing On or Near to High Voltage Direct Current (HVDC) Plant and Apparatus

Connection of Embedded Generating Plant up to 5MW

ECP DISTRIBUTION TRANSFORMER COMMISSIONING PROCEDURE

SAFETY AND HEALTH STANDARD ELECTRICAL GROUNDING Effective Date: 07/17/10 Standard: Document Number: KUCSH0039 Rev: 4

10. DISTURBANCE VOLTAGE WITHSTAND CAPABILITY

SYNCHRONISING AND VOLTAGE SELECTION

TS RES - OUTSTANDING ISSUES

Network Standard NS

ECP HV METERING EQUIPMENT COMMISSIONING PROCEDURE

Evaluating Step and Touch Potential Risks on Earthing Systems of High Voltage Cable Systems TP, THINUS DU PLESSIS ESKOM SOUTH AFRICA HJ, HARTMUT JAGAU

2 Grounding of power supply system neutral

ECP COMPACT AND MICRO SUBSTATION COMMISSIONING PROCEDURE

BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 1T-18

Document No Amendment No Approved By Approval Date Review Date

Company Directive STANDARD TECHNIQUE: SD7F/2. Determination of Short Circuit Duty for Switchgear on the WPD Distribution System

Curriculum Document. Name Phone Logo. TETA House 344 Pretoria Avenue Randburg Gauteng. Physical Address. Postal Address

2011 / Circuit Tracer

Revision 24 of Issue 3 of the Grid Code has been approved by the Authority for implementation on 19 th November 2007.

returned to your distributor for attention. 14. Do not operate the function switch while the instrument is connected to a circuit.

Single Line Diagram of Substations

Electrical Switchgear & Power Transformer Testing. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E

AN EXAMPLE OF A STANDARD ARC FLASH PPE LABELING STRATEGY

Instruction Manual for Digital Grounding Resistance Meter

INSTALLATION & TESTING OF UNDERGROUND PRIMARY AND SECONDARY POWER CABLES PRIOR TO ENERGIZATION

AC Voltage- Pipeline Safety and Corrosion MEA 2015

C&G Level 3 Award in the Periodic Inspection, Testing and Certification of Electrical Installations

IMP/007/011 - Code of Practice for the Application of Lightning Protection

FINAL - EST Electrical Service Technician Answer Schedule

Code for Design of Low Voltage Electrical Installations

ELECTRICIAN S THEORY EXAMINATION 17 November 2012 QUESTION AND ANSWER BOOKLET

EAS Electrical Appliance Serviceperson Answer Schedule

Education & Training

National Marine Manufacturers Association Compliance Specialist Examination A.C. Electrical (2018 Model Year) ABYC E-11 Supplement 56

Earthing of Electrical Devices and Safety

Unit 2. Single Line Diagram of Substations

Equipment Description Quantity as per drawings Actual quantity

ECP GROUND-MOUNTED SWITCHGEAR WITH PROTECTION RELAYS COMMISSIONING PROCEDURE

FINAL - IT 30 ELECTRICAL INSPECTOR EXAMINATION ANSWER SCHEDULE. Question 1 Marks Reference Marking notes. (2 marks) EA 2

FINAL - ER 70 Electrician Regulations Answer Schedule. Question 1 Marks Reference Marking notes

ET 40 - Electrician Theory Examination Marking Schedule

BVM Systems Limited. PQSensor MkIII Installation & Commissioning Manual - 1 -

ULC STANDARDS TECHNICAL WORK PROGRAM (WTO) Last modified on:

VI 3 - i TABLE OF CONTENTS

Company 'A' Wind Turbine Safety Rules (3 rd Edition) Support Procedure P2 PROCEDURE FOR APPROVAL OF TOOLS, EQUIPMENT AND PROCESSES

GROUNDED ELECTRICAL POWER DISTRIBUTION. Excerpt from Inverter Charger Series Manual BY: VIJAY SHARMA ENGINEER

Overview of Grounding for Industrial and Commercial Power Systems Presented By Robert Schuerger, P.E.

2014 NEC Changes Part 1

Industrial and Commercial Power Systems Topic 7 EARTHING

Reference Number PCP 02 (RIC Standard: EP SP)

ECP GROUND-MOUNTED SWITCHGEAR COMMISSIONING PROCEDURE

Substation HV Cables. Document Number: 1-11-FR-07

Article 250 Grounding & Bonding

Substation: From the Outside Looking In.

INTERNATIONAL STANDARD

HIGH VOLTAGE PHASE COMPARATORS

Generation Interconnection Requirements at Voltages 34.5 kv and Below

2394 EXAM PAPER. 1. State THREE circumstances that would require a periodic inspection and test to be carried out on an installation

STANDARDIZING ARC FLASH PPE LABELS

CONTINUING EDUC ATION

American Electrical Institute

Installation and Operational Instructions for ROBA -switch Type 017._00.2

NFPA-70E. Electrical Safety in the Workplace. Standard for Edition

Industrial Electrician Level 3

VBS TBS KTS BSS LFS UFS

Distribution transformers Part 2 Ground mounted transformers not closecoupled

The Importance of the Neutral-Grounding Resistor. Presented by: Jeff Glenney, P.Eng. and Don Selkirk, E.I.T.

DEVELOPING TESTING PROCEDURES FOR HIGH VOLTAGE INNOVATION TECHNOLOGIES

Single Earthed Neutral and Multi Earthed Neutral. Single Earthed Neutral and Multi Earthed Neutral: Multi Grounded Neutral System (MEN):

Ham Radio Safety In & Out Of The Shack

Module Title: Electrical Installation II Laboratory Sheet:

Webinar: An Effective Arc Flash Safety Program

Licensed Electricians Practical Assessment (LEP)

Form-IV. Form of Inspection/Test Report. (Under Regulation 43)

PHASE ROTATION METER. Operating and Instruction Manual. a n d A C C E S S O R I E S

Transcription:

ACCESS PRACTICE AP 24 Earthing, HV Switching and Associated Operational Equipment Process Authority: Manager Operations Improvement Approval: Chief Operating Officer Version Date: 27/08/2013 Revision: A 1 PURPOSE The purpose of this procedure is to specify requirements relating to Earthing, HV switching and to standardise practices when undertaking this work. 2 SCOPE This procedure applies to personnel that are assessed competent and authorised to apply Earths and HV Switch Snowy Hydro Operational Equipment 3 PROCESS 3.1 Earthing Earthing is the task of maintaining apparatus at earth potential All work associated with Earthing shall be undertaken by authorised personnel. Earthing equipment shall be suitably rated for the fault level at the earthing point. Types of Earths Operational Earths Operational Earths are used by authorised operators to maintain the isolated apparatus at Earth potential. Indicative Earths Indicative Earths are connected to apparatus which will not be worked on, but is earthed because work near the apparatus may encroach upon Safe Approach Distance. An authorised operator applies & removes Indicative Earths. Working Earths Working Earths may be used where the Operational Earth is remote or whenever there is the possibility that the apparatus could be energised by lightning, induction, etc, and there is a possibility that the Operational Earths may not effectively maintain the apparatus at earth potential. An authorised person can apply Working Earths, or the work party may request an authorised operator to apply them. Working Earths are applied as close as possible to the apparatus to be worked on. Working Earths as a control measure is the responsibility of the work party. AP24 Rev A THIS DOCUMENT IS UNCONTROLLED IN HARD COPY Page 1 of 7

3.1.1 Proving De-energised Safe Approach Distances shall always be maintained when proving de-energised. The approved de-energised testing device shall be checked to ensure correct operation immediately before and after proving de-energised. In a circumstance where the proving de-energised indicates apparatus is at nominal voltage (alive), do not proceed. A second operator shall confirm the isolations to ensure that all sources of supply are isolated. Earths may only be connected after confirmation of isolation. 3.1.2 Application of Earths Before applying an earth, the identity of the apparatus and the physical state of the points of isolation shall be visually confirmed. The apparatus shall be proved de-energised using an approved device as near as practicable to the point to be earthed. Earths are connected to the system earth before it is connected to the apparatus and shall be disconnected from the apparatus before it is disconnected from the system earth. Earths shall be tagged with an earth tag. The tie-on section of the earth tag shall be attached to each earth prior to application. The tear-off section of the tag shall be attached to the isolation program or permit or lock box. The two sections shall be matched before restoration of the circuit. Only trailing earths on vehicles, and earths used on spare disconnected high voltage apparatus, are exempt from this requirement. Earth tag is to be retrieved from the earth when it is removed from the plant and restored to the storage location it is not to be removed before the earth is removed from plant. 3.1.3 Earthing Points Permanently installed earthing switches shall be used for the initial earthing of apparatus if possible, even if they will not be part of the final earthing arrangements. If high voltage apparatus can be energised from a low voltage source (e.g. voltage transformers), the apparatus shall be earthed either on the high voltage or low voltage side. 3.1.4 Visibility of Earth Switch Contacts When an earth switch is used for earthing apparatus the contacts of the permanently installed earth switch are to be visually checked, where possible, to ensure correct operation. For fully enclosed earth switches where it is not possible to check the contacts, a positive mechanical indication is necessary to demonstrate it is closed. 3.1.5 Bridges and Bonds Working on or near conductive apparatus or materials may result in dangerous conditions. These dangerous conditions may be caused from energisation by induction or due to a break in conduction. To alleviate this problem it is necessary to install bridges or bonds to ensure earth conditions are maintained. AP24 Rev A THIS DOCUMENT IS UNCONTROLLED IN HARD COPY Page 2 of 7

3.1.6 Attachment and Removal of Portable Earths within Safe Approach Distance Where it is not possible to attach a portable earth to high voltage apparatus without part of a person's body maintaining the Safe approach distance (including application of Earth by hand) to the conductor to be earthed the following procedure is used: the attachment of an earth may only be performed by an operator when another authorised person is present to assist in the Earthing procedure, and all conductors required to be Earthed shall be discharged prior to applying Earths using an approved device by an authorised person maintaining Safe Approach Distance, and the approved device used for discharging shall be kept in contact with each conductor, close to the point being earthed before and until such time as the earth is secured. The application of the Earth may be by hand or approved portable earth device. For removal the following procedure is used: the removal of an earth may only be performed by an operator when another authorised person is present to assist in the Earthing procedure, and the approved device used for discharging shall be kept in contact with each conductor, close to the Earth point by an authorised person maintaining Safe Approach Distance before and until such time as the applied earth is removed 3.1.7 Earthing of Overhead High Voltage Lines Overhead high voltage lines shall be earthed near the work site. The point to be earthed shall first be proved de-energised. Then the earthing device, which has been connected to a system earth, shall be applied to the conductor by means of an approved insulating rod, operating rod or haulage line. 3.1.8 Earthing of Metal Clad Switchgear The practice of proving de-energised Metal Clad switchgear should be avoided where practicable, as in most cases the risk of testing de-energised may present an unacceptable safety risk If the switchgear provides a low risk method for proving de-energised it may be tested (e.g., Holec equipment with the neon test gear is considered low risk). Testing other switchgear (e.g. LMT switchgear) is a high risk and rigorous controls shall be implemented. 3.1.9 Earthing via Remote Operation of a Circuit Breaker When Earthing via remote operation of a circuit breaker the Operator need not prove de-energised prior to closing the Circuit Breaker if clause 3.1.8 applies. 3.1.10 Earthing Metal Clad Switchgear with Portable Earths Prior to this work being undertaken a detailed Work Method Statement/s (WMS) shall be approved as it is considered at least a medium risk. 3.1.11 Opening Shutters of Metal Clad Switchgear Prior to opening shutters on metal clad switchgear a specific detailed Work Method Statement/s (WMS) shall be approved as it is considered at least a medium risk. 3.1.12 Earthing of Capacitors (LV and HV) AP24 Rev A THIS DOCUMENT IS UNCONTROLLED IN HARD COPY Page 3 of 7

Each individual capacitor shall be discharged to earth before it is touched. Persons applying earths to capacitor banks shall maintain safe approach distances. High voltage capacitors or apparatus containing high voltage capacitors shall not be discharged or earthed until five minutes after the capacitor has been isolated. All terminals (neutral and active) shall be earthed. For work on capacitor voltage transformers (CVTs), both the high voltage and low voltage conductors shall be earthed. 3.2 Earth Tags An individually numbered earth tag shall be attached to each earth including earth switches, such that where possible the tag cannot be removed until the earth is removed. Earth tags shall show: the relevant isolation / restoration program number or permit number; the date it was attached The tear-off section of the tag shall be attached to: the isolation program for isolation and indicative earths; and to the permit for working earths, bridges or bonds. The isolation program or permit number shall be entered on both sections of the earth tag. The two sections shall be matched prior to cancellation of the permit or restoration of the circuit. AP24 Rev A THIS DOCUMENT IS UNCONTROLLED IN HARD COPY Page 4 of 7

Table 1. Summary of Security of Earthing Apparatus and associated Tagging UNCHANGED DURING PERMIT ALTERED DURING PERMIT Operational Earth earth switch portable earth Indicative Earth earth switch portable earth Working Earth earth switch Operator applied Recipient applied portable earth Danger Tag, Earth Tag & Safety Locked Danger Tag & Earth Tag Danger Tag, Earth Tag & Safety Locked Danger Tag & Earth Tag Earth Tag & Safety Locked Earth Tag & Safety Locked Earth Tag Warning Tag, Earth Tag & Safety Locked Warning Tag & Earth Tag ---- ---- Earth Tag & Safety Locked Lock Earth Tag & Safety Locked Earth Tag Upon finding damaged or detached tags the finder shall immediately report the find to the Operator or Recipient. The Operator or Recipient shall investigate; suspending permits if necessary, and replace the tag on the apparatus that it was securing Once removed, the tags shall be disposed of to prevent confusion with tags that may have become detached. 3.3 Removal of Operational Earths during Currency of a Permit During the currency of a permit it may be necessary for removal of Operational Earths to conduct tests. In this circumstance, where the Operational Earth is to be temporarily removed is an Operational Earth, it shall only be removed by an operator, upon request of the recipient, and will be replaced by an operator immediately following the completion of the checks. 3.4 Recording of Earths The tear-off section of the Earth tag shall be attached to the restoration program. Working earths shall be recorded by the recipient on the recipient s copy of the permit and the tear-off section of the Earth tag shall be attached to the recipients permit. 3.4.1 Inability to Match Earth Tag Sections In a circumstance where one or both of the sections of the Earth tag are lost or damaged the following will be done prior to removing the earth: AP24 Rev A THIS DOCUMENT IS UNCONTROLLED IN HARD COPY Page 5 of 7

the operator will be informed of the situation; the operator and another authorised person will witness the removal of the earth; the operator and another authorised person will check all possible earthing points to ensure all earths are removed from the apparatus under permit; and the operator will conduct any necessary tests to prove all earths are removed. 3.5 Earthing and Work on Earth Switches Work shall not be carried out on Earth Switches that are being used as an Operational Earth. When working on Earth Switches that are not being used as an Operational Earth (i.e. Operational earths are applied elsewhere in the circuit)it is important that the recipient shall maintain the conductors in an earthed condition at all times, (i.e. use working earths and the working earth shall not be removed until the work has been completed and/or the earth switch locked closed) Conditions may arise where the earth will have to be applied and removed by the working party under the operator's supervision. 3.6 Above Ground Earth Mats When operating high voltage apparatus equipped with bare metal handles attached to an above ground Earth Mat, it is necessary to check that the mat is solidly and visibly connected to the operating handle and to the system earth. 3.7 Earths or Earth Switches subjected to Fault Current Portable earthing equipment or earth switches that have been subjected to fault current shall be removed from service and reported to the Manager Asset Performance. 3.8 Inspection and Testing of Portable Earths and Operating Equipment All portable earths and operating equipment will be inspected prior to use and tested periodically as required. AP24 Rev A THIS DOCUMENT IS UNCONTROLLED IN HARD COPY Page 6 of 7

4 Personal Protective Equipment when Earthing or Switching When proving de-energised, connecting/disconnecting earthing or local HV switching the person shall wear appropriate personal protective equipment namely: PPE Arc Rated Hard Helmet Shall meet Aus/NZ Standard AS1801 Arc Rated Face Shield AS/NZS 1337 Arc Rated Switching Coat Hi Viz Wet Weather Parka NENS 09 17 kv Rubber Insulated Gloves (Not required for switch-stick use.) Leather Gauntlets to protect rubber gloves 17 kv Insulated Mat. (Metal clad or metal handles only) AS 2225 AS/NZS 2161.4 AS/NZS 2978 AP24 Rev A THIS DOCUMENT IS UNCONTROLLED IN HARD COPY Page 7 of 7