The Castle House Assembly Instructions By Laser Dollhouse Designs

Similar documents
The Rowen Victorian Assembly Instructions By Laser Dollhouse Designs

Seascape Bungalow Assembly instructions. Laser Dollhouse Designs

The Hamlin Assembly Instruction By Laser Dollhouse Designs

Little Briana Cottage Dollhouse assembly instructions

Hegeler Carus Mansion Assembly Instructions By Laser Dollhouse Designs

Kristiana Tudor Assembly Instructions By Laser Dollhouse Designs

Vivian Mansion Assembly Instruction By Laser Dollhouse Designs

Wayside Cottage Assembly Instructions By Laser Dollhouse Designs

The Lansdowne One Car Garage Assembly Instruction by Laser Dollhouse Designs

Craftman One Car Garage Assembly Instruction by Laser Dollhouse Designs

How to assemble the Reims Gueux Pit End Modules #005

How to assemble the Reims Gueux Pit Centre Module #005

CABINETRY Assembly Instructions

INSTALLATION: D1-NOTCH DRYWALL TRIM FLANGE

TIP FOR GETTING STARTED

Corona Concepts presents The Lily All Wood Dollhouse. Instructions and Assembly Guide

6MM ALLEN KEY FOR ROOF CLIPS PHILLIPS HEAD BIT FOR SCREWS FOR DOOR FRAME SPIRIT/LASER LEVEL TO LEVEL THE UNIT

Mach Wall Installation Instructions

Corona Concepts presents The Laurel All Wood Dollhouse. Instructions and Assembly Guides

SE5a Wing Panels rev 1.0


Assembly Instructions for Summit Motel Kits # SMFS and SMBD

13MM FLAT WRENCH FOR LEVELING THE GLIDES OF STRUCTURE 6MM ALLEN KEY FOR ROOF CLIPS PHILLIPS HEAD BIT FOR SCREWS FOR DOOR FRAME

1 Door Wall Unit ASSEMBLY GUIDE. Page 1 of 7 14/04/2009 Revision 3. WARNING: Contains small parts, keep out of reach of children.

Woodchip Loader All Scales

Figure 1. RAILING INSTALLATION The following instructions describe the installation of three types of railing sections: Line, Stair, and Angled

Assembly Instructions

Privacy Wall Glass Selections - Polished Edge Slider Door

Nanton Grain Mill Assembly

TRANSIT 148 HIGH ROOF WALL LINERS INSTALLATION INSTRUCTIONS

Joiner Kit For Models N388, C450, E402B, E411T, E415H, E440T, E442B, E521T and E522B

FUSELAGE CONSTRUCTION

Ripple Hanger ASSEMBLY INSTRUCTIONS

EASY POOL STEP (NE113)

TOOLS REQUIRED: HARDWARE INCLUDED: 13MM FLAT WRENCH FOR LEVELING THE STRUCTURE RATCHET WITH 5MM HEX BIT FOR CORNER SCREWS ON TOP TRAVERSE BEAMS

Castle Hoarding Kit Assembly Directions. by Ben Pope, DBA Vatican Enterprises June 30, 2012

Post & Rail Crossbuck

INSTALLATION AND CARE INSTRUCTIONS

PROMASTER 136 WB LOW ROOF WALL LINERS INSTALLATION INSTRUCTIONS

NEXUS SERIES CABINETS

Installation Instructions for. Before You Begin TOOLS REQUIRED

CVS Pharmacy kit in HO scale

COMPOSITE RAILING INSTALLATION

Wall Panel Installation Instructions

(56501) Corona Concepts presents The Willow All Wood Dollhouse. Instructions and Assembly Guide RTD AA

Vigilant Cigar Humidor Vault. Assembly Instructions

INSTALLATION AND CARE INSTRUCTIONS

Parts List (Continued) 18 each: #8 x 0.625" Truss Head Phillips Screw 20 each: #8 x 1.75" Flat Head Phillips Screw 4 each: #8 x 1.25" Flat Head Philli

Installation And Care Instructions. Vertical Honeycomb Shades

TOOLS REQUIRED Metal Wood Wood and Metal Screws. #16 Drill #12-24 Tap. 1/8 Drill

Exponents Bench Cushion

Pergola Installation Instructions

1 Door Tall Unit ASSEMBLY GUIDE. WARNING: Contains small parts, keep out of reach of children.

2 Door Tall/Split Unit

PAINT & MISC. Notes. Table of Contents. Front Handrail Posts Front Handrails Closet Shelving Exterior Deck...

Shetland Stalls Installation Instructions

VCL Aluminium Fitting Instructions

Installation Instructions

Version 1.0. Forbes Credenza File Cabinet.

Vertical Honeycomb Shades

Installation Instructions

NORMAN SHUTTERS INSTALLATION INSTRUCTIONS. 4 Sided Z Frame. (Inside Mount - 2 panel) Getting Started

Box Track INSTALLATION INSTRUCTIONS

Chapter 17 - Porch Trim

1 Door Base Unit ASSEMBLY GUIDE. Page 1 of 9. WARNING: Contains small parts, keep out of reach of children.

#11179 Wellington ARBOR

End of Row Doors. Revision Number 1

INSTALLATION INSTRUCTIONS

EASY-IN POOL STEP SYSTEM NE132

2 Door Base Unit ASSEMBLY GUIDE. Page 1 of 9 28/04/2009 Revision 3. WARNING: Contains small parts, keep out of reach of children.

BRACKET FIX SYSTEM FITTING INSTRUCTIONS

Assembly and Installation Guide

Modern Gas Station backdrop building kit in HO scale

Assembly Instructions

Octagon Vinyl Gazebo Assembly Instructions For 10 & 12 Models

Section 8. Curved units. Curved units

Rockwell 4-in-1 Sliding Door

Determine the proper ground fixing stair position, by using, as a reference, the landing tread [Fig. 7].

ELEVEN COLLABORATIVE. CONFERENCE TOPS Assembly Instructions

How To Measure Your Finished Opening

Hardware and Components:

Instructions and Assembly Guide

Ceiling Tile Installations Part 1. Sheetrock Installations Part 2. WolfVision Support 2055 Sugarloaf Circle, Suite 125 Duluth, GA 30097

Hinge Door&Inline Panel-Recess

NOTE: Top section pole (Q) is packed INSIDE bottom section pole (S)

Assembly Instructions

7/8n2 Scale Plantation Coach

Deauville Installation Guide

PVC Composite Railing & Stair Kit

San Felipe: Step by Step Pack 6

Multiples EM_ 1.4. Install 1X1/1X2/1X3/1X4 Housings. Installation Instructions for. This product is suitable for indoor locations.

Versatrac Bypass Door Units, Conventional and Top Track, 300 and 400 Series

3 D Printer Enclosure Assembly Instructions

Phone # La Jolla Doors. Block Frame Installation Manual Aluminum Frame with either Vinyl or Aluminum Panels

INSTALLATION MANUAL FORTRESS SERIES

Modular Drawer & Door Systems Installation Instructions Locking Drawers and Receding Doors

Workbench Instructions for Assembly

MAKO TM CASH DISPENSER

Silverware Chest Plan

A Step-by-Step How To Guide

Transcription:

The Castle House Assembly Instructions By Laser Dollhouse Designs

HOUSE PARTS First floor slots labeled 1A-1G First floor Walls labeled 1A-1G First floor interior door frames (4) Wall 1A frames (6) Main Door Assembly 2 nd Floor labeled 2A-2i Lg window frames (2) Interior doors (3) 2 nd floor walls labeled 2A-2F)

HOUSE PARTS Tower walls 5.5 ceiling height (10) with two tab feet and (28) single tab feet. Plexiglass window inserts (16) small and (1) large. Interior door frames (3) 3 rd Floor base 3 rd Floor walls 3A-3D

HOUSE PARTS 4 th floor base 4 th floor walls 4G-4i 4 th floor ceiling Wall assemblies 2 nd & 3 rd Floor tower walls 5 ceiling height (27) 2 nd & 3 rd Floor walls 5 height ceiling with opening (3) Tower roof cap base (4)

HOUSE PARTS Tower cap roof assembly (40) Tower cobles (80) Main Entry frame (1) Tower window frames (80) Extended Tower walls (10)

Parts for spiral stairs assembly 17 Risers double notch 1 lower Risers (larger of two) 1 Upper Riser (Smaller of two) 18 Handrails 18 Treads 1 landing 1 assembly support/ cutout guide 1 center support rail

SPIRAL STAIRS ASSEMBLY Step 1. Take the assembly support/ cutout guide and lay on a flat surface. Next insert the dowel into the center hole. DO NOT GLUE THESE TOGETHER!!! see in figure 6 This will help keep the stairs level during assembly. Once assembly is done the assembly support/ cutout guide will be removed. Figure 1

ASSEMBLY Step 2. Using the lower riser (the bottom part and larger of the two) Figure 2, and a tread Figure 3, glue to the left side as seen in figure 4. Make sure the tread circle angle is to the left when the round hole is facing up. See note below. Figure 2 Note: Tread facing up and notch to the left, riser glued to the bottom left side. Figure 3 Figure 4

ASSEMBLY Step 3. Using the remaining risers with two tabs (figure 5) and remaining treads glue them together with the risers on the bottom left side. Figure 6 You should have when done 17 assemblies with risers having a bottom tab and one without a tab along with the upper final riser and final landing. Figure 7 Figure 5 Figure 6 Figure 7

ASSEMBLY Step 4. With the center support dowel still in the holder, take the step assembly with no bottom tab and insert from the top (figure 8) of the dowel and slide down to the bottom. Make sure dowel is straight up and down and step assembly is flush to the bottom. Figure 9 Using superglue, glue step ring to dowel. DO NOT GLUE THE SUPPORT AS IT IS NOT PART OF THE STAIRS!!! GLUE!!! Figure 8 Figure 9

ASSEMBLY Step 5. Run superglue along the edge where handrail will be placed (figure 10) and install handrail. Figure 11 GLUE!!! Figure 10 Figure 11

ASSEMBLY Step 6. Run superglue along the right edge of your first assembled step, Figure 12. Next take one of the 17 assembled steps with a tab (figure 13) and insert on dowel and slide down and join to the lower step. Figure 14. Make sure that the front riser meets up with the lower steps handrail. You may have a small gap in the cutout middle of the step. This is fine as it is more important that the riser and rail align in order to meet the next step assembly. Figure 12 GLUE!!! Should meet up together!!! Figure 13 Figure 14

ASSEMBLY Step 7. Repeat steps 11 and 12 until you reach the top and have approx. a quarter inch of space left. Figure 15. Using the remaining parts insert final riser with no upper tab and final tread landing with no holes, Figure 16. Assembly complete. Leave in safe area to dry on base plate, once ready to position in house remove lower plate and insert to house floor. Figure 15 Figure 16

HOUSE ASSEMBLY Assembly : (Note; recommend doing a dry assembly prior to gluing. This way you are familiar with the way parts go together. Follow Instructions but use tape to hold parts walls and floors together. Pass up installing windows, doors and stairs.) Step 1. Install to front wall 1A the 6 small frames if doing dry assembly skip this step. Refer to figure 1. Figure 1 Step 2. Locate walls 1E (2) and install interior door frames (4). Refer to figure 2. If doing dry assembly skip this step. Figure 2

Step 3. Front door assembly, install wall 1B. Refer to figure 3. Figure 3 Step 4. Install door hinges. Refer to figure 4. Figure 4 Step 5. Install door to wall 1B. (DO NOT GLUE LOWER DOOR TO THE FLOOR OR WALL TO HINGE) glue hinge square notch to wall only. Refer to figure 5. Figure 5 Step 6. Install upper frame above door, if dry assembly skip this step. Refer to figure 6. Figure 6

Step 7. Install remaining walls, refer to figure 7. Figure 3 Figure 7 Step 8. Install second floor on wall 1A-1G Refer to figure 8. Figure 8

Step 9. Install stairs by inserting the upper part first thru the second floor cutout by front rail to cutout and align to first floor, insert the dowel into the holes. Refer to figure 9 & 10. Figure 9 Figure 10 Step 10. Locate 28 walls for the first floor they have center tabs on the top and bottom, the walls with two bottom tabs are for the second floor. Refer to figure 11 Figure 11

Step 11. Insert the 28 wall by inserting one end into a floor slot and gently raise second floor and insert other side. Apply weight with free hand on installed walls to help keep them in place as you go around. Start from the inside and work outward. Refer to figure 12. Once a corner is complete run masking tap from bottom of first floor to second floor to hold corner in place. Refer to figure 13. Figure 12 Figure 13 Step 12. Complete all four corners as seen in figure 14. Figure 14

Step 13. Locate window frames and install windows by aligning them by looking from the inside with window on opposite side of wall. Make sure you see even amount of window frame in opening for all sides. See figure 15. Step 14. Place plexiglas into wall cutout. See figure 16. Figure 15 Figure 16 Step 15. Place window frame to hold plexiglas by aligning to frame opposite side of wall. See figure 17. Figure 17

Step 16. Install interior doors for the second floor by inserting door assemblies (2) into walls and apply door frames to opposite side. Step 17. Install 2 nd floor walls, see figure 18. Figure 18 Step 18. Install 3 rd floor onto 2 nd floor walls by aligning tabs and slots. see figure 19. Figure 19

Step 19. Install 5.5 ceiling height walls (10) as you did for the first floor to the two rear sides of the house and hold in place with masking tape. See figure 20. Figure 20 Step 20. Install 3 rd floor walls 3A-3D after installing windows and interior door as discussed earlier. See figure 21. Figure 21 Step 21. Install 3 rd floor roof. See figure 22. Figure 22

Step 22. Install 4 th floor walls 4G-4i. See figure 23. Figure 23 Step 23. Install 4th ceiling. See figure 24. Figure 24 Step 24. Install wall assemblies by matching the walls to the labeled marked locations for each floor, insert the center spacers between each set of walls. See figure 25. Figure 25

Step 25. house should look as it does in figure 26. Figure 26 Figure 27 Step 26. Install open tower walls with openings to the inside of the right and left side front as well as left rear. See figure 27.

Step 27. Add remaining (27) 5 walls and tower roof circles as seen in figure 28. This will complete three towers minus roofs. Figure 28 Step 28. Assemble tower roof supports to roofs as seen in figure 29. You will have 40 assemblies when completed. Figure 29

Step 29. Install large rear right tower with remaining 10 extended walls and roof base circle. Step 30. Install tower roof assemblies to each tower circle base. Once all are in place align and glue. If dry fitting do not glue. See figure 30. Figure 30

Step 31. Install main entry frame. See figure 31 Figure 31 Step 32. Install the 80 cobles around each tower. See figure 32 Figure 32 Step 31. Install the 80 tower window frames around each tower. See figure 33 Figure 33

The Castle House is now completed Laser Dollhouse Designs www.laserdollhouses.com Email: laserdollhouses@aol.com