ICT LIBRARY UPDATE. Bi-monthly Jan. April 2017 Vol. 15 : No Contents

Similar documents
ICT LIBRARY UPDATE. Bi-monthly Nov. Dec Vol. 15 : No. 6. Contents

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422

580 - NOISE BARRIERS OPSS 580 INDEX

1. SALIENT FEATURES OF THE DIPLOMA PROGRAMME IN MECHANICAL ENGINEERING (TOOL AND DIE)

Maintenance of Traffic sequence of operations including any phasing and detour maps;

TERMS OF REFERENCE FOR CONSULTANTS

2. The re-examination application link on the portal will be active during the below mentioned period:

Impact of Demonetization on Toll Collection in India

OFFICE MEMORANDUM COORDINATION AND PUBLICATION DIVISION (CPD), NSSO, SANKHYIKI BHAWAN, MAHARSHI VALMIKI MARG, NEW DELHI

In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or

THE DEVELOPMENT OF INTENSITY DURATION FREQUENCY CURVES FITTING CONSTANT AT KUANTAN RIVER BASIN

Shape Analysis of Bituminous Mixes With SBR

Faculty Profile (For booklet and website)

JURIS LEGAL & FINANCIAL SERVICES A PROFILE PRESENTATION

International students from non-english speaking backgrounds will be required to take an English language communications course.

Legislative Joint Transportation Committee Meeting. Arkansas Convention Center Texarkana Thursday, November 21, 2013

MAJOR GRADING PLAN CHECKLIST

MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX

ISSN TITLE PUBLISHER FREQUENCY ASIAN JOURNAL OF WATER, ENVIRONMENT AND POLLUTION.

SECTION 1 - GENERAL REQUIREMENTS

An Experimental Study on Effect of Scrap Tyre Crumbed Rubber on 80/100 Grade Bitumen

Metrological Telecommunication System Development Project

COURSE SCHEDULE

SAVITRIBAI PHULE PUNE UNIVERSITY

AKBAR BASHA Mobile: , Doha Qatar.

Simplification of Lighting and Light-Signalling Regulations

APPLICATION FOR APPROVAL OF A IENG EMPLOYER-MANAGED FURTHER LEARNING PROGRAMME

Financial Literacy Role of Partnerships

INTERNATIONAL JOURNAL OF CIVIL ENGINEERING AND TECHNOLOGY (IJCIET)

Proven precast solutions for every application

The Shell Bitumen Handbook

Scope of work of Architect (as per the agreement signed by the Architect)

BACHELOR PROGRAMS CREDIT HOURS SYSTEM C A I R O U N I V E R S I T Y

Time and Cost Analysis for Highway Road Construction Project Using Artificial Neural Networks

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

Kingdom of Cambodia: Institutional Strengthening of the Cambodian National Petroleum Authority

Mainstreaming Air Quality in Urban Development through South South Twinning

Theory Examination Date Sheet for Diploma Courses Session Nov-Dec, Time: 11:00AM (Friday Timing: 10:00AM)

Bhutan: Adapting to Climate Change through Integrated Water Resources Management

MANuFACturers industry QuALity statement.

PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA

B.E CIVIL ENGINEERING (PART TIME) Subject Name. Exam Date. Session

*For complete material(s) information, refer to

CONTROLLER OF EXAMINATIONS. B.E CIVIL ENGINEERING (PART TIME) Subject Name. Exam Date. Session

Preface... Acknowledgments... Glossary Introduction Management Systems and the Management of Chemical Process Safety...

Turning the wheels of your success

RECREATION, OPEN SPACE & CULTURE ELEMENT

Contents. Acknowledgments

06 March Day Date All Streams. Thursday 03 May 2018 Engineering Mathematics II. Saturday 05 May 2018 Engineering Physics

Praj Industries Limited. Q2 and H1 FY17 Results. Praj Industries Ltd

Profile. Administrative Experience: Subject coordinator in finance. Seminar/ Workshop/ Conference/ FDP/MDP attended:

People s Republic of China: Improving Energy Efficiency, Emission Control, and Compliance Management of the Manufacturing Industry

Ex-Ante Evaluation (for Japanese ODA Loan)

: Ground Improvement Techniques, Environmental Geo techniques

Canadian Technology Accreditation Criteria (CTAC) CIVIL ENGINEERING TECHNOLOGY - TECHNICIAN Technology Accreditation Canada (TAC)

Hydro Mechanics & Water Resources Engineering. Water. Management PTPG IV - Semester. PTPG IV - Semester Pre stressed Concrete

MINISTRY OF AGRICULTURE, LIVESTOCK & FISHERIES STATE DEPARTMENT OF FISHERIES AND BLUE ECONOMY

Contracts Awarded in May 2011

CITY OF LAREDO 3MG SAN ISIDRO SUBDIVISION ELEVATED STORAGE TANK

IJSER. Experimental Investigation of Increase The Strength of Bitumen By Using Plastic

shawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions.

GRADUATE PROGRAMMES Semester 1 Examination EXAM TIMETABLE

University of Houston System. System-wide Public Art Committee (SPAC) Operating Procedures Manual

REQUEST FOR PROPOSAL

Subject. Practical Papers 1"^ Sitting 2*^ Sitting. Theory Papers. Sixbject. Advance Library Classification Lab. Office Equipment & Services Lab

DR. PRAMOD KUMAR NAIK

AASHTO IDRRIM meeting

Reliability Analysis of Power Distribution System in Nigeria: A Case Study of Ekpoma Network, Edo State

Construction Management Engineering Technology

CONVEYANCE PIPELINE AND PUMP STATION

RAPID CONSTRUCTION-INOVATIVE APPROCH OF PREFABRICATED CONSTRUCTION

Numerical Modeling of Grouted Soil Nails

Maldives: Strengthening Capacity for Operations Management

MnDOT Contract Exhibit A - Scope of Services

PRECAST TECHNOLOGY- INTRODUCTION AND IMPLEMENTATION IN INDIA SMART EVOLUTION

Achievements January 2014 to January 2018

Government Of Newfoundland & Labrador Municipal Water, Sewer And Roads Master Construction Specifications

Faculty Details proforma for DU Web-site

in Developing Countries in FY2008

TABLE OF CONTENTS 1200 PLAN PREPARATION

Global Water Instrumentation, Inc.

CHAS EBY RESILITENT UTILITIES: Strategies & Concepts for Creating & Maintaining Sustainable Infrastructure in a Changing World SPEAKERS

New Development Bank Technical Assistance Policy

Safety (OSHA 10 hour)

The City of Kawartha Lakes Public Library

Dr. PRADEEP P THEVANNOOR LEARNING RESOURCE CENTRE LIST OF PRINTED JOURNALS 2017

Undergraduate Programme

Global Water Instrumentation, Inc.

835 Gil Harbin Industrial Blvd Valdosta, GA 31601

CURRICULUM- VITAE. Married. Name of the Board/ University

SECTION G ESTIMATE OF QUANTITIES

To purchase this report or receive an excerpt, please or call (+1)

HEADS Pro: The Simplest & Versatile software for Highway engg.&

New ITS Project Proposed INOGATE Work Program for Sustainable Energy (Component C)

Nandha Engineering College (Autonomous) Erode Examination -Sep 2018 Department Wise Time Table

City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS

TERMS OF REFERENCE FOR CONSULTANTS Attached Technical Assistance on Sri Lanka: Expressway Operations Improvement Project

Annex III - 3. Memorandum of Understanding on the development of the Pan-European Transport Corridor VII (The Danube) (DRAFT)

Construction Management Engineering Technology

AMERICAN INTERNATIONAL UNIVERSITY-BANGLADESH Spring PROPOSED EXAM SCHEDULE [Released on October 30, 2018]

Transcription:

1 Internal Circulation Only ICT LIBRARY UPDATE Bi-monthly Jan. April Vol. 15 : No. 1-2 Contents - Articles - Pages (Subject wise alphabetically indexed) - 2-3 - Addition of Books - 4- - Reports - 5-30 Prepared by : Neeru Saini Librarian

2 Architecture Articles 1 Design + Construction and Development (Architecture+ Design : May ) 2 The house reflects the personalities of its occupants : (Architecture+ Design : May ). 3 Retail and parking complex : (Architecture+ Design : April ) 4 Eco-friendly products for the future : (Architecture+ Design : April ) 5 Asphalt 1 Bitumen technology new developments in additives offer benefits to asphalt roads for use in challenging applications : (World Highways Jan.-Feb. ). 2 Bridge 1 Bridge construction and formwork : (World Highways : March ) 2 Concrete 1 Seismic performance of masonry in-filled reinforced concrete structures : (The Indian concrete Journal : May ). 2 Durable concrete by packing density method : (The Indian concrete Journal : May ). 3 A quantitative approach in designing self compacting concrete using compressible packing model : (The Indian concrete Journal : March ). 4 Durability studies of quaternary blended self compacting concrete using mineral admixtures : (The Indian concrete Journal : March ). 5 Design methodology for fibre reinforced concrete slabs on grade based on inelastic analysis : (The Indian concrete Journal : March ). Energy 1 Energy saving in sea water desalination process : (Water today : Feb. ).

3 General 1 Early Warning : Climate change is disrupting the spring season : (Down to Earth 16-30, April ). 2 Why only the Ganga : Calling the Ganga human is a legal gimmick : (Down to Earth 16-30, April ). Human Resource 1 From management to enablement (Human Capital : May ). 2 The planet of HR Apps (Human Capital : May ). 3 Integrating the values of leadership : (Human Capital : April ). 4 The curious case3 of appraisal. (Human Capital : March ). Railways & Metro Soil 1 Urban mobility projects in twin cities of Gujarat (Urban Railways : March ). 2 Industry expectations rise from new metro policy : (Urban Railways : Feb. ). 1 Reliability analysis of raft foundation on uniformly random soils : (Journal of structural engineering : Feb. March ). Water 1 Water and waste : Treatment technologies - Advancements in sewage processing : (Indian Infrastructure : April ). 2 The future of water : Bio filter technology for water recovery.. (Water today : March ). 3 Industrial water and wastewater treatment using membrane technologies.. (Water Today : March ). 4 Waterproofing for Healthy Structures : (NBM & CW : April ) 5 Build-tech offers new generation liquid membranes : (NBM & CW : April ).

4 BOOKS 1 20278 Contemporary urban planning 11 th ed. 2 20279 Kenya : Secured techno economic growth a global perspective 3 20280 Telengana : Secured techno economic growth a global perspective 4 20281 Andaman Nicobar : Secured techno economic growth a global perspective 5 20282 Amritsar : Secured techno economic growth a global perspective 6 20283 Haryana : Secured techno economic growth a global perspective 7 20284 Blue Economy for a trillion dollar 8 20285 Bhilwara : Secured techno economic growth a global perspective 9 20286 Sports sector : Secured techno economic growth a global perspective 10 20287 Jaipur : Secured techno economic growth a global perspective 11 20290 Standard bidding documents procurement of works and users guide 12 20458/20471 National building code of India : Vol. I : 2016 13 20459/20472 National building code of India : Vol. II : 2016 14 20460 BS : 5930 : 2015 Code of practice for ground investigations 15 20461 BS : 8004 : 2015 Code of practice for foundation 16 20462 ADB : TA No. 8072 (BAN) : Final report greater Dhaka sustainable urban transport project (42169-013)

5 Reports Sl. No. 1 Projects Name Acc. No. Title of the Report (Hard Copy) Soft Copy 20337 Monthly Inspection Report : No.68 : Jan. NH-15 (PA) : Independent engineer for 4 laning of Pathankot - Amritsar section from.. 20338 Monthly Progress Report : No. 77 : Jan. 20214 Monthly Inspection Report No. 67 : Dec. 2016 20215 QPR No. 25 : Dec. 2016 20216 MPR No. 76 : Dec. 2016 20456 Monthly Inspection Report No. 69 : 20457 Monthly Progress Report No. 78 : Feb. 20350 Monthly Progress Report : No. 104 : Jan. Year 2 NH-10 (Hary.) : Independent Engineering services for 4/6 laning of Delhi/Haryana border to Rohtak 20218 QPR : Dec. 2016 20219 MPR No. 103 : Dec. 2016 20454 MPR No. 105 : Feb, 3 4 NH-89 (Ajmer) : Development and operation of Ajmer Nagpur section of NH-89. Rajasthan (AAJ) : Independent engineer services for development of six lane Jaipur ring road from Ajmer road to Agra Road 20349 Monthly Progress Report : No.37 : Jan. 20422 MPR No. 38 : Feb. 20442 Monthly Inspection Report : March 20331 Monthly Report : Dec. 2016 20449 Quarterly Report : Dec. 2016 20450 Monthly Report : Jan. 2016

6 5 6 7 8 9 NH-47 (Chen.) : Independent consultancy services for 6/4 laing from Chengapalli Bihar (BSRDC) : Supervision consultancy of civil project of contract packages.. Raipur (Chhattishgarh) : PWD : Govt. of Chhattisgarh PIU : Raipur. NH-15 (Bikaner Suratgarh) : Independent engineer services for development and operation of Bikaner-Suratgarh section of.. NH-11/89 (SB) : Independent engineer for development and operation of Sikar Bikaner of NH-11 from 20197 MR: Nov. 2016 20274 Monthly Inspection Report : Dec. 2016 20277 Monthly Operation Report : Dec. 2016 20320 Monthly Inspection Report : Jan. 20321 Monthly Operation Report : Jan. 20431 Monthly Inspection Report : Feb. 20432 Quarterly Report : Feb. 20433 MPR : Feb. 20269 Quarterly Progress Report : Dec. 2016 (SH-91) 20270 Quarterly Progress Report : Dec. 2016 (SH-81) 20310 Monthly Operation Report : Jan. (SH-91) 20311 Monthly Operation Report : Jan. (SH-81) 20204 MPR : Dec. 2016 : SH-91 20205 MPR : Dec 2016 : SH. 81 20225 MPR : Nov. 2016 : SH. 81 20226 MPR : Nov. 2016 : SH-91 20425 MPR : Feb. : SH-91 20426 MPR : Feb. SH-81 20437 Design Review Report : June 2015 20330 MPR No. 41 : Jan. 20445 MPR No. 42 : Feb. 20232 MPR No. 40 : Dec. 2016 20276 MIR No. 15 : Jan. 20441 Monthly Inspection Report and operation maintenance No. 6 : Feb. 20470 Monthly inspection report operation and

7 10 NH-77 (MS) : Independence engineering services for two laning of Muzaffarpur Sonbarsa 11 NH77 (HM) : four laning of Hajipur-Muzaffarpur section of. 12 13 14 NH-152/65 (Kaithal) : Project management consultancy services for four laning of Kaithal to Rajasthan NH-28/31 (Tajpur) : Independence engineering series for the project of development of greenfield bridge across river ganga. NH-54 E (EW-11) : 4-laning of NH from Maibong-Harangajao section of.. maintenance. 20316 MPR : Jan. 2016 20201 MPR : Dec. 2016 20207 QIR : No. 21 20206 MPR : Nov. 2016 20440 MPR : Feb. 20439 MPR No. 76 : Feb. 20200 MPR No. 74 : Dec. 2016 20199 MPR No. 20 : Dec. 2016 20334 Monthly Inspection Report : Jan. 20202 MIR : Dec. 2016 20203 QPR : Dec. 2016 20224 MPR : Nov. 2016 20455 Monthly Inspection Report : Feb. 20273 QPR : No. 19 : Dec. 2016 20329 MPR No. 59 : Jan. 20453 MPR No. 60 : Feb. 15 Myanmar : Consultancy services for preparation of Detailed Project Report for Up-gradatation of Rih-Tedim Road section in Myanmar 20243 Package : (I) : FDPR : Vol. I : Main Report : Jan. 20244 FDPR : Vol. I (A) : Appendices to Report : Jan. 20245 FDPR : Vol. II : Design Report : Jan. 20246 FDPR : Vol. II (A) : Appendices to Design Report

8 (Part-1 of 2) : Jan. 20247 FDPR : Vol. II (A) : Appendices to Design Report (Part- 2 of 2) : Jan. 20248 FDPR : Vol. II (B) : Geotechnical Investigation Report : Jan. 20249 FDPR : Vol. III : Material Report : Jan. 20250 FDPR : Vol. IV : Environmental and Social Impact Assessment Report (ESIA) : Jan. 20251 FDPR : Vol. V : Rate Analysis & Cost Estimate : Jan. 20252 FDPR : Vol. VI : Bill of Quantities (BOQ) : Jan. 20253 FDPR : Vol. VII : Drawings : Jan. 20254 FDPR : Vol. VIII : Land Acquisition Plan (UPDATED ) : Jan. 20255 Package : (II) : FDPR : Vol. I : Main Report : Jan. 20256 FDPR : Vol. I (A) : Appendices to Report : Jan. 20257 FDPR : Vol. II : Design Report : Jan. 20258 FDPR : Vol. II (A) : Appendices to Design Report (Part-1 of 2) : Jan.

9 16 NH-30 (A) : (Fatuah) : Rehabilitation and upgrading to 2 lanes /2 lanes with paved shoulder configuration and strengthening of.. 20259 FDPR : Vol. II (A) : Appendices to Design Report (Part- 2 of 2) : Jan. 20260 FDPR : Vol. II (B) : Geotechnical Investigation Report : Jan. 20261 FDPR : Vol. III : Material Report : Jan. 20262 FDPR : Vol. IV : Environmental and Social Impact Assessment Report (ESIA) : Jan. 20263 FDPR : Vol. V : Rate Analysis & Cost Estimate : Jan. 20264 FDPR : Vol. VI : Bill of Quantities (BOQ) : Jan. 20265 FDPR : Vol. VII : Drawings : Jan. 20266 FDPR : Vol. VIII : Land Acquisition Plan (UPDATED ) : Jan. 20317 Monthly Progress Report : Dec. 2016 20339 Quarterly environmental monitoring report : Dec. 2016 20340 Quarterly Progress Report : Dec. 2016 20341 Monthly Progress Report No. 3 : Dec. 2016 20342 Monthly environmental monitoring report : Dec. 2016 20434 Monitoring environmental monitoring report :

10 17 NH-12/45 (MP) : Consultancy services for authority engineer for supervision of rehabilitation and up-gradation of Jabalpur to Hiran River.. 18 NH-98 (AAH) : Anisabad Aurangabad Hariharganj.. 19 20 NH-45-E (TK) : independent engineer services for two laning with paved shoulder of Dindiguk Theni,.. NH-47 (KL-3) : Independent engineering services for design, construction, development finance operation and maintenance Jan. 30435 MPR No. 4 : Feb. 20467 Monthly environmental minoring report : Feb. 20468 MPR No. 5 : Feb. 20275 MPR : Jan. 20230 MPR No. 4 : Dec. 2016 20318 MPR : Dec. 20319 MPR : No. 5 : Jan. 20437 Design Review Report : June 2015 20463 Pavement Design Report : July 2016 20271 Report of site visit : Jan. 2014 20323 MPR : Jan. 20427 MPR : Feb. 20220 MPR : Nov. 2016 20221 MPR : Dec. 2016 20335 Inspection Report No. 61 : Jan. 20336 MPR No. 62 : Jan. 20240 QPR No. 20 : Dec. 2016 20241 MPR No. 61 : Dec. 2016 20242 Inspection Report No. 60 : Dec. 2016 20443 Inspection No. 62 : Feb. 20444 MPR No. 63 : Feb. 20469 Inspection Report No. 63 : March 20332 MPR No. 64 : Dec. 2016 20333 QPR : Dec. 2016

11 21 22 of. 20233 MPR No. 63 : Nov. 2016 MP ( 2154) : consulting services for construction supervision of package.. MP (3189) : Construction of ADB Assisted seven highway corridors under. 20436 MPR : No. 65 : Jan. 20464 MPR No. 66 : Feb. 20267 QPR : Dec. 2016 20210 QPR : Sept. 2016 20211 MPR : Oct. 2016 20212 MPR : Nov. 2016 20213 MPR : Dec. 2016 20268 QPR : Dec. 2016 20217 MPR : No. 21 : Dec. 2016 20231 MPR No. 4 : Dec. 2016 20352 MPR No.22 : Jan. 20423 MPR : Feb. 23 NH-113 (Pratapgarh) : Rehabilitation and upgrading to 20272 Report of site visit. Jan. 2lane/2lane with paved.. 24 Rajasthan (Bikaner) : 20289 Final alignment report : Feb. 25 Bang. (L.B) : Construction of Paira Bridge (Lebukhali Bridge) Over the River Paira : Consultancy services for design and construction Supervision of Paira Bridge (Lebukhali Bridge) over the River Paira on Barisal Patuakhali Road (N8), Bangladesh (KFAED-841) 20288 Interim Report : Dec. 20291 Main Report : Culvert : Feb. 26 Jharkhand (MBIU) : Collection and Analysis of Bridge condition and bridge inventory data by MBIU or any other equipment for the purpose of the Major/Minor bridges on all NHs including those with NHAI for a period of three years in the state of Jharkhand (Package No. 8) 20292 Appendices : Feb. 20293 Annexures : Condition Survey and Inventory of Culverts ( Vol. : 1/9) : Feb. 20294 Annexures : Condition Survey and Inventory of Culverts ( Vol. : 2/9) : Feb.

12 27 28 29 MPSRSP-III : Agreement between M.P. Road Development corpn. Bihar (2894) : BSRDC : Bihar state highways project - IIAF (BSHP-IIAF) (Sub-Projet Road : SH- 83 and SH-88) ADB Loan No. 2894-IND) NH-103 (Varuna) : two laning of Varuna Bridge (NH-103) Rasiyari Road.. 20295 Annexures : Condition Survey and Inventory of Culverts ( Vol. : 3/9) : Feb. 20296 Annexures : Condition Survey and Inventory of Culverts ( Vol. : 4/9) : Feb. 20297 Annexures : Condition Survey and Inventory of Culverts ( Vol. : 5/9) : Feb. 20298 Annexures : Condition Survey and Inventory of Culverts ( Vol. : 6/9) : Feb. 20299 Annexures : Condition Survey and Inventory of Culverts ( Vol. : 7/9) : Feb. 20300 Annexures : Condition Survey and Inventory of Culverts ( Vol. : 8/9) : (Part -1 of 2) : Feb. 20301 Annexures : Condition Survey and Inventory of Culverts ( Vol. : 8/9) : (Part -2 of 2) : Feb. 20302 Annexures : Condition Survey and Inventory of Culverts ( Vol. : 9/9) : Feb. 20198 Project completion report : Part-II : sept. 2016 20312 Annual environmental monitoring report : Dec. 2011 20313 MPR : Dec. 2016 20314 QPR : Dec. 20315 MPR : Jan. 2016

13 30 31 NH-98 (Hariharganj) : Rehabilitation and upgrading to 2 lanes/2lane with paved shoulders configuration of. NH-565 : Rehabilitation and up gradation of NH 565 from km. 294. 000 to km 361.327.. 20424 MPR : Feb. 20222 MPR : Dec. 2016 20223 MPR : No. 31 : Dec. 2016 20227 MPR : Dec. 2016 Lot-1 20228 MPR : Dec. 2016 Lot-II 20229 QPR : Dec. 2016 20322 MPR : Jan. 20324 Monthly Environmental monitoring and supervision : Nov. 2016 20325 MPR : Nov. 2016 20326 MPR : Jan. (Lot-1) 20327 MPR : Jan. (Lot-II) 20328 MPR : Jan. 20347 MPR No. 30 : Nov. 2016 20348 MPR No. 30 : Jan. 20428 MPR : Feb. : Lot-1 20429 MPR : Feb. Lot-11 20430 MPR : Feb. 20343 Monthly Report No. 25 : Dec. 2016 20344 Monthly Report No. 26 : Jan. 20345 QPR No. 8 : Dec. 2016 20346 Monthly Maintenance Progress Report No. 26 : Jan. 20451 Monthly maintenance progress report No. 27 : Feb. 20452 Monthly report No. 27 : Feb. 32 NH-24 (Barilly-Sitapur) : Four lanning of Bareilly Section of 20351 Progress Report : Jan,. 217

14 NH-24 from km. 262.000 to km.413.200 in the state of U.P. under NHDP. 20195 Progress Report No. Dec. 2016 20303 Final Feasibility Report : Vol. I : Main Report : Feb. 33 34 35 Allahabad : Ministry of Road Transport & Highways (MORT & H) : Govt. of India - Consultancy services for preparation of Detailed Project Report for the construction of New 6 lane bridge parallel to existing 2 lane bridge at phaphamau near Allahabad in U.P. NH-8 (Gomti) : Independence engineering services for development and operation of beware Gomti section of. Myanmar : Consultancy services for preparation of Detailed Project Report for Upgradatation of Rih-Tedim Road section in Myanmar 20304 Final Feasibility Report : Vol. II : Technical Specifications : Feb. 20305 Final Feasibility Report : Vol. III : Bill of Quantities : Feb. 20306 Final Feasibility Report : Vol. IV : Rate Analysis & Cost Estimation : Feb. 20307 Final Feasibility Report : Vol. V : Civil Work contract Agreement : Feb. 20308 Final Feasibility Report : Vol. VI : Appendix to Final Feasibility Report : Feb. 20309 Final Feasibility Report : Vol. VII : Drawings : Feb. 20196 MPR No. 86 : Dec. 2016 20447 MPR No. 87 : Jan. 20448 Quarterly Inspection : Jan. 20243 FDPR : Package I : Vol. I : Main Report : Jan. 20244 FDPR : Package I : Vol. I (A) : Appendices to main report : Jan. 20245 FDPR : Package I : Vol. II : Design report : Jan. 20246 FDPR : Package I : Vol. II(A) : appendices to design report (Part-1 of 2) : Jan. 20247 FDPR : Package I : Vol. II (A) : appendices to design report (Part- 2 of 2) : Jan.

15 20248 FDPR : Package I : Vol. II (B) : Geotechnical investigation report : Jan. 20249 FDPR : Package I : Vol. III : Material Report : Jan. 20250 FDPR : Package I : Vol. IV : Environmental report and social impact assessment : Jan. 20251 FDPR : Package I : Vol. V : Rate Analysis and cost estimate : Jan. 20252 FDPR : Package I : Vol. VI : Bill of quantities : Jan. 20253 FDPR : Package I : Vol. VII : Drawings : Jan. 20254 FDPR : Package I : Vol. VIII : Land acquisition plan :Jan. 20255 FDPR : Package II : Vol. I : Main Report : Jan. 20256 FDPR : Package II : Vol. I (A) : Appendices to main report : Jan. 20257 FDPR : Package II : Vol. II : Design report : Jan. 20258 FDPR : Package II : Vol. II(A) : appendices to design report (Part-1 of 2) : Jan. 20259 FDPR : Package II : Vol. II(A) : appendices to design report (Part-2 of 2) : Jan. 20260 FDPR : Package II : Vol. II (B) : Geotechnical investigation report : Jan. 20261 FDPR : Package II : Vol. III : Material Report : Jan. 20262 FDPR : Package II : Vol. IV : Environmental report and social impact assessment : Jan. 20263 FDPR : Package II : Vol. V : Rate Analysis and cost estimate : Jan. 20264 FDPR : Package II : Vol. VI : Bill of quantities : Jan.

16 36 37 NH-58/72 (Haridwar) : Independent engineering services for 4 laning of Haridwar Dehradun section from Tanzania (Kolandoto-Lalago) : Consultancy services for carrying our feasibiulity study Environmental & Social Impact Assessment, Detailed Engineering Design and Preparation of Tender Documents for Upgrading of Kolandoto-Lalago-MW Anhuzi-Oldean B Junction : Road (328 Km.) to Bitumen Standard. 20265 FDPR : Package II : Vol. VII : Drawings : Jan. 20266 FDPR : Package II : Vol. VIII : Land acquisition plan :Jan. 20208 QPR No. 23 : Dec. 2016 20209 MPR No. 69 : Dec. 2016 20446 MPR : No. 70 : Jan. 20353 Lot : I : Kolandoto-Lalago (62.200 Km.) Section including : Mhunze(12.9 km.) and Lalago (4.38 Km.) Bypasses : Feb. 20354 Vol. 3 A : Material Report : Feb. 20355 Vol. 3 B : Hydrological/Hydraulic Report : Feb. 20356 Vol. 3 C : Survey Report : Feb. 20357 Vol. 2 : Drawing (Part 1 of 2) : Feb. 20358 Vol. 2 : Drawing (Part 2 of 2) : Feb. 20359 Lot : II : Lalago (62.200 Km.) to Mwamishali (km. 113.000) : Section including : Mwandete(2.33 Kms.) and Sanga Mwalugesha (3.05 Kms.) in Simiyu Region : Feb. 20360 Vol. 3 A : Material Report : Feb. 20361 Vol. 3 B : Hydrological/Hydraulic Report : Feb. 20362 Vol. 3 C : Survey Report : Feb.

17 20363 Vol. 2 : Drawing (Part 1 of 2) : Feb. 20364 Vol. 2 : Drawing (Part 2 of 2) : Feb. 20365 Lot : III : Mwamishali (Km. 113+000) to Nyahaa Junction (Km. 182+000 ) : Section including : Mwamishali bypass (10.44 kms) in Simiyu and Singida Region : Feb. 20366 Vol. 3 A : Material Report : Feb. 20367 Vol. 3 B : Hydrological/Hydraulic Report : Feb. 20368 Vol. 3 C : Survey Report : Feb. 20369 Vol. 2 : Drawing (Part 1 of 2) : Feb. 20370 Vol. 2 : Drawing (Part 2 of 2) : Feb. 20371 Lot : IV : Nyahaa Junction (Km. 182+000) to Dubechandi (Km. 258+000) : Section including : Matala Access Road (2 Kms) in Singida and Arusha Regions : Feb. 20372 Vol. 3 A : Material Report : Feb. 20373 Vol. 3 B : Hydrological/Hydraulic Report : Feb. 20374 Vol. 3 C : Survey Report : Feb. 20375 Vol. 2 : Drawing (Part 1 of 2) : Feb.

18 20376 Vol. 2 : Drawing (Part 2 of 2) : Feb. 20377 Lot : V : Dubechandi (Km. 258+000) to Oldean B Junction (Km. 333+690) in Arusha Regions : Feb. 20378 Vol. 3 A : Material Report : Feb. 20379 Vol. 3 B : Hydrological/Hydraulic Report : Feb. 20380 Vol. 3 C : Survey Report : Feb. 20381 Vol. 2 : Drawing (Part 1 of 2) : Feb. 20382 Vol. 2 : Drawing (Part 2 of 2) : Feb. 38 Tanzania (Kolandoto-Lalago) : Consultancy services for carrying our feasibiulity study Environmental & Social Impact Assessment, Detailed Engineering Design and Preparation of Tender Documents for Upgrading of Kolandoto-Lalago-MW Anhuzi-Oldean B Junction : Road (328 Km.) to Bitumen Standard. 20383 Final Engineering Design Report : Vol. I : Main Report : Feb. 20384 Final Engineering Design Report : Vol. II : Appendices to Main Report (Part-1of 3) : Feb. 20385 Final Engineering Design Report : Vol. II : Appendices to Main Report (Part-2of 3) : Feb. 20386 Final Engineering Design Report : Vol. II : Appendices to Main Report (Part-3of 3) : Feb. 20387 Final Engineering Design Report : Vol. III : Topographical Survey Report : Feb. 20388 Final Engineering Design Report : Vol. IV (A) :

19 Soils and Materials Investigation Report : Feb. 20389 Final Engineering Design Report : Vol. IV (B) : Geotechnical Report (Part-1 of 2) : Feb. 20390 Final Engineering Design Report : Vol. IV (B) : Geotechnical Report (Part-2 of 2) : Feb. 20391 Final Engineering Design Report : Vol. V : Hydrological- Hydraulic Report (Part -1of 2) : Feb. 20392 Final Engineering Design Report : Vol. V : Hydrological- Hydraulic Report (Part - 2 of 2) : Feb. 20393 Final Engineering Design Report : Vol. VI : Structure Design Calculations (Part- 1 of 13) : Feb. 20394 Final Engineering Design Report : Vol. VI : Structure Design Calculations (Part- 2 of 13) : Feb. 20395 Final Engineering Design Report : Vol. VI : Structure Design Calculations (Part- 3 of 13) : Feb. 20396 Final Engineering Design Report : Vol. VI : Structure Design Calculations (Part- 4 of 13) : Feb. 20397 Final Engineering Design Report : Vol. VI : Structure Design Calculations (Part- 5 of 13) : Feb. 20398 Final Engineering Design Report : Vol. VI : Structure Design Calculations (Part- 6 of 13) :

20 Feb. 20399 Final Engineering Design Report : Vol. VI : Structure Design Calculations (Part- 7 of 13) : Feb. 20400 Final Engineering Design Report : Vol. VI : Structure Design Calculations (Part- 8 of 13) : Feb. 20401 Final Engineering Design Report : Vol. VI : Structure Design Calculations (Part- 9 of 13) : Feb. 20402 Final Engineering Design Report : Vol. VI : Structure Design Calculations (Part- 10 of 13) : Feb. 20403 Final Engineering Design Report : Vol. VI : Structure Design Calculations (Part- 11 of 13) : Feb. 2018 20404 Final Engineering Design Report : Vol. VI : Structure Design Calculations (Part- 12 of 13) : Feb. 2018 20405 Final Engineering Design Report : Vol. VI : Structure Design Calculations (Part- 13 of 13) : Feb. 2018 20406 Final Engineering Design Report : Vol. VIII : Details of Quantities (Part -1 of 2) : Feb. 20407 Final Engineering Design Report : Vol. VIII : Details of Quantities (Part -2 of 2) : Feb. 20408 Final Engineering Design Report : Vol. IX : Confidential Cost Estimate : Feb.

21 39 KSHIP III (Karnataka) : Consultancy services for preparation of Detailed Project Report cum Transaction Advisory Services for Karnataka State Highways Improvement Project-III 20409 Final Resettlement Action Plan (RAP) : Feb. 20410 Non-Technical Executive summary Report : (English Version) : Feb. 20411 Final ESIA Report : Feb. 20412 Valuation Report (Part-A) : Feb. 20413 Valuation Report (Part-B) : Feb. 20414 Vol. 7 A - Plan & Profile : Feb. 20415 Vol. 7 B - Miscellaneous Drawings and Setting out Data (Part -1 of 2) : Feb. 20416 Vol. 7 B - Miscellaneous Drawings and Setting out Data (Part -2 of 2) : Feb. 20417 Vol. 7 C (Part-I) - Structural and Miscellaneous Drawings : Feb 20418 Vol. 7 C (Part-II) - Structural and Miscellaneous Drawings : Feb. 20419 Vol. 7 C (Part-III) - Structural and Miscellaneous Drawings : Feb. 20420 Vol. 7 C (Part-IV) - Structural and Miscellaneous Drawings : Feb. 20421 Vol. 7 C (Part-V) - Structural and Miscellaneous Drawings : Feb. 20473 FDPR : Vol. I : Main Report : March 20474 FDPR : Vol. II : Design Report (Part-A : Design of Road Features) : March

22 (KSHIP-III)-(Group-II) 20475 FDPR : Vol. II : Design Report (Part-B (1 of 6) : Bridge Design Calculation) : March 20476 FDPR : Vol. II : Design Report (Part-B (2 of 6) : Bridge Design Calculation) : March 20477 FDPR : Vol. II : Design Report (Part-B (3 of 6) : Bridge Design Calculation) : March 20478 FDPR : Vol. II : Design Report (Part-B (4 of 6) : Bridge Design Calculation) : March 20479 FDPR : Vol. II : Design Report (Part-B (5 of 6) : Bridge Design Calculation) : March 20480 FDPR : Vol. II : Design Report (Part-B (6 of 6) : Bridge Design Calculation) : March 20481 FDPR : Vol. II : Design Report (Part-C : Geotechnical Investigation Report ) : March 20482 FDPR : Vol. III : Material Report : March 217 20483 FDPR : Vol. IV : Engineering Report : March 20484 FDPR : Vol. VI : Drainage Design Report : March 20485 FDPR : Vol. IX : Social Impacts and Resettlement Action Plan (RAP) : March 20486 FDPR : Vol. XI : Technical Specifications : March

23 20487 FDPR : Vol. XII : Rate Analysis : March 20488 FDPR : Vol. XIII : Cost Estimates : March 20489 FDPR : Vol. XIV : Bill of Quantities : March 20490 FDPR : Vol. XVI : Technical schedules : March 20491 FDPR : Vol. XV : Drawings (Part-B (Part-1 of 2) : Bridge Drawings) : March 20492 FDPR : Vol. XV : Drawings (Part-B (Part-2 of 2) : Bridge Drawings) : March 20493 FDPR : Vol. XV : Drawings (Part-A (1 of 4) : Road Drawings) : March 20494 FDPR : Vol. XV : Drawings (Part-A (2 of 4) : Road Drawings) : March 20495 FDPR : Vol. XV : Drawings (Part-A (3 of 4) : Road Drawings) : March 20496 FDPR : Vol. XV : Drawings (Part-A (4 of 4) : Road Drawings) : March 20497 FDPR : Vol. I : Main Report : March 20498 FDPR : Vol. II : Design Report (Part-A : Design of Road Features) : March

24 20499 FDPR : Vol. II : Design Report (Part-B (1 of 2) : Bridge Design Calculation : March 20500 FDPR : Vol. II : Design Report (Part-B (2 of 2) : Bridge Design Calculation : March 20501 FDP R: Vol. II : Design Report (Part-C : Geotechnical Investigation Report ) : March 20502 FDPR : Vol. III : Material Report : March 20503 FDPR : Vol. IV : Engineering Report : March 20504 FDPR : Vol. VI : Drainage Design Report : March 20505 FDPR : Vol. IX : Social Impacts Assessment Report : March 20506 FDPR : Vol. XI : Technical Specifications : March 20507 FDPR : Vol. XII : Rate Analysis : March 20508 FDPR : Vol. XIII : Cost Estimates : March 20509 FDPR : Vol. XIV : Bill of Quantities : March 20510 FDPR : Vol. XVI : Technical Schedules : March 20511 FDPR : Vol. I : Main Report : March 20512 FDPR : Vol. II : Design Report (Part-A : Design of Road Features) : March

25 20513 FDPR : Vol. II : Design Report (Part-B : Bridge Design Calculation : March 20514 FDPR : Vol. II : Design Report (Part-C : Geotechnical Investigation Report : March 20515 FDPR : Vol. III : Materials Report : March 20516 FDPR : Vol. IV : Engineering s Report : March 20517 FDPR : Vol. V : Safety Audit Report : March 20518 FDPR : Vol. VI : Drainage Design Report : March 20519 FDPR : Vol. IX : Social Impacts and Resettlement Action Plan : March 20520 FDPR : Vol. XI : Technical Specifications : March 20521 FDPR : Vol. XII : Rate Analysis : March 20522 FDPR : Vol. XVI : Technical Schedules : March 20523 FDPR : Vol. XIII : Cost Estimates : March 20524 FDPR : Vol. XIV : Bill of Quantities : March 20525 FDPR : Vol. XV : Drawings (Part : A (1 of 2) : Road Drawings ) : March 20526 FDPR : Vol. XV : Drawings (Part : A (2 of 2) : Road Drawings) : March

26 20527 FDPR : Vol. XV : Drawings (Part : B : Bridge Drawings) : March 20528 FDPR : Vol. XV : Drawings (Part-B : Bridge Drawings : March 20529 FDPR : Vol. XV : Drawings (Part-A : (1 of 2) : Road Drawings : March 20530 FDPR : Vol. XV : Drawings (Part-A : (2 of 2) : Road Drawings : March 20531 FDPR : Vol. I : Main Report : March 20532 FDPR : Vol. II : Design Report (Part-A : Design of Road Features) : March 20533 FDPR : Vol. II : Design Report (Part-B (1 of 3) : Bridge Design Calculation : March 20534 FDPR : Vol. II : Design Report (Part-B (2 of 3) : Bridge Design Calculation : March 20535 FDPR : Vol. II : Design Report (Part-B (3 of 3) : Bridge Design Calculation : March 20536 FDPR : Vol. II : Design Report (Part-C : Geotechnical Investigation Report ) : March 20537 FDPR : Vol. III : Material Report : March 20538 FDPR : Vol. IV : Engineering Report : March 20539 FDPR : Vol. VI : Drainage Design Report : March 20540 FDPR : Vol. IX : Social Impacts Assessment Report : March

27 20541 FDPR : Vol. XI : Technical Specifications : March 20542 FDPR : Vol. XII : Rate Analysis : March 20543 FDPR : Vol. XIII : Cost Estimates : March 20544 FDPR : Vol. VXI : Bill of Quantities : March 20545 FDPR : XVI : Technical Schedules : March 20546 FDPR : XV : Drawings (Part-A (Part 1 of 3) : Road Drawings : March 20547 FDPR : XV : Drawings (Part-A (Part 2 of 3) : Road Drawings : March 20548 FDPR : XV : Drawings (Part-A (Part 3 of 3) : Road Drawings : March 20549 FDPR : XV : Drawings (Part-B : Bridge Drawings ) : March 20550 FDPR : Vol. I : Main Report : March 20551 FDPR : Vol. II: Design Report : (Part-A : Design of Road Features) : March 20552 FDPR : Vol. II : Design Report : (Part-B (I of 12) : March 20553 FDPR : Vol. II : Design Report : (Part-B (2 of 12) : March 20554 FDPR : Vol. II : Design Report : (Part-B (3

28 of 12) : March 20555 FDPR : Vol. II : Design Report : (Part-B (4 of 12) : March 20556 FDPR : Vol. II : Design Report : (Part-B (5 of 12) : March 20557 FDPR : Vol. II : Design Report : (Part-B (6 of 12) : March 20558 FDPR : Vol. II : Design Report : (Part-B (7 of 12) : March 20559 FDPR : Vol. II : Design Report : (Part-B (8 of 12) : March 20560 FDPR : Vol. II : Design Report : (Part-B (9 of 12) : March 20561 FDPR : Vol. II : Design Report : (Part-B (10 of 12) : March 20562 FDPR : Vol. II : Design Report : (Part-B (11 of 12) : March 20563 FDPR : Vol. II : Design Report : (Part-B (12 of 12) : March 20564 FDPR : Vol. II : Design Report (Part-C : Geotechnical Investigation Plan (Part- 1 of 2) : March 20565 FDPR : Vol. II : Design Report (Part-C : Geotechnical Investigation Plan (Part- 2 of 2) : March

29 20566 FDPR : Vol. III : Materials Report : March 20567 FDPR : Vol. IV : Engineering Report (Part-A : Engineering Survey) : March 20568 FDPR : Vol. VI : Drainage Design Report : March 20569 FDPR : Vol. IX : Social Impacts and resettlement Action Plan (RAP) : March 20570 FDPR : Vol. XI : Technical Specifications : March 20571 FDPR : Vol. XII : Rate Analysis : March 20572 FDPR : Vol. XIII: Cost Estimates : March 20573 FDPR : Vol. XIV : Bill of Quantities : March 20574 FDPR : Vol. XVI : Technical Schedules : March 20575 FDPR : Vol. XV : Drawings (Part-B : (Part-1 of 2) : Bridge Drawings) : March 20576 FDPR : Vol. XV : Drawings (Part-B : (Part-2 of 2) : Bridge Drawings) : March 20577 FDPR : Vol. XV : Drawings (Part-A : (Part-1

30 of 3) : Road Drawings) : March 20578 FDPR : Vol. XV : Drawings (Part-A : (Part-2 of 3) : Road Drawings) : March 20579 FDPR : Vol. XV : Drawings (Part-A : (Part-3 of 3) : Road Drawings) : March 40 NH-6 (BS) : Consultancy services for preparation of DPR. 20465 MPR No. 62 : Jan. Raigarh (PGP) : Geotechnical investigation for two laning/ two 20466 Final Report : March 41 laning with paved shoulder four laning of

31

32

33

34

35