INS Process Outline Requirements

Similar documents
SPECIFICATION FOR SINGLE-MODE OPTICAL FIBRES

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

835 Gil Harbin Industrial Blvd Valdosta, GA 31601

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

East Central College

The CAD Technician s Role in Office Practice and Procedure

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

A STUDY ON THE CAUSES OF DESIGN CHANGES EFFECTING THE CONSTRUCTION PROJECT PERFORMANCE NUR ARFAHANEM BT MOHAMAD UMPANDI (AA12204)

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

Business reform Action Plan Rec # 299 to 303 Certification of Electrical Installation by Electrical inspectorate

SECTION SUBMITTAL PROCEDURES

Quality Control Manual For Asme Certification READ ONLINE

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

00-General Drawings. Doc. no.: NA-00-STS002

SECTION SUBMITTAL PROCEDURES

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

SECTION - II BID DATA SHEET

Scheduling, dimensioning, bending and cutting of steel reinforcement for concrete Specification

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

submittals 1s e c t i o n

(AMMA) American Maritime Modernization Association

Overview of Textron Systems Supplier First Article Inspection (FAI) expectations

AS/NZS :2017. Electrical installations Selection of cables AS/NZS :2017

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

PRACTICAL UNDERSTANDING AND INTERPRETATION OF TECHNICAL STANDARD TS30a WELDING SPECIFICATION

ASME Geometric Dimensioning and Tolerancing Professional Certification Applicant Information Handbook

Part 3: Image quality classes

SECTION SUBMITTAL PROCEDURES

Siemens ST950 & ST900 Statement of Compliance Against TR 2513 Issue A, September 2005 Performance Specification for Wig Wag Signal Control Equipment

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA

Supplier Quality Requirements for First Article Inspection SQR-011. Revision Date: 16 March 2011

CIRRUS AIRCRAFT FAI INSTRUCTION

Section Meetings Section Material and Equipment. None Required

Australian Standard. Design review AS IEC IEC 61160, Ed.2 (2005) AS IEC

HYDROGRAPHIC SURVEY STANDARDS AND DELIVERABLES

BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement

White Lake Township Building Dept Highland Rd. (248) White Lake, MI Fax (248)

Australian/New Zealand Standard

Cielito Lindo de Tubac Home Owners Association PAINTING POLICIES AND PROCEDURES

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018

SECTION OPERATION AND MAINTENANCE DATA

SECTION SCHEDULE OF VALUES PART 1 - GENERAL 1.1 THE REQUIREMENT A. This Section defines the process whereby the Schedule of Values (Lump Sum

Manual for preparation of design guides of integrated circuits packages

Plant Client Contract Code Document ID Contract No. TECHNICAL SPECIFICATIONS DC SHUNT Rev 00 Page 1 of 2

Engineering Drawing System

CORPORATE QUALITY SYSTEM PROCEDURE

SIGN PERMIT APPLICATION

10930 W. Sam Houston Parkway N., Suite 900

Special Provision No. 999S29 May 2010

Technical Specifications: Supply of Seamless Grade TP304L Pipe and Grade WP304L Pipework Fittings to the ITER Organization (IO).

ISO/IEC INTERNATIONAL STANDARD

UMBC POLICY ON TECHNOLOGY FLUENCY UMBC III

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

LICENSING THE PALLAS-REACTOR USING THE CONCEPTUAL SAFETY DOCUMENT

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

INTERNATIONAL STANDARD

Australian Standard. Non-destructive testing Ultrasonic methods Evaluation and quality classification of metal bearing bonds (ISO :1992, MOD)

CENTRAL MICHIGAN UNIVERSITY

SPECIFICATIONS SPECIFICATION TYPES

Office for Nuclear Regulation

AWS J1.1M/J1.1:2013 An American National Standard. Specification for Resistance Welding Controls

ASME NQA-1 Quality Assurance Requirements for Nuclear Facility Applications. Prague, CR July 7 8, 2014

European Ground Systems Common Core

SECTION PANELBOARDS

Petroleum, Petrochemical and Natural Gas Industries Steam Turbines Special-purpose Applications

Preparing for the new Regulations for healthcare providers

ISO INTERNATIONAL STANDARD

Answer: Qualification statement should be provided with the bid.

Special Provision No. 999F29 March 2018 REQUIREMENTS FOR INSTALLATION OF METALLIC DOWELS INTO CONCRETE

ISO INTERNATIONAL STANDARD. Non-destructive testing Qualification of radiographic film digitisation systems Part 2: Minimum requirements

DEPARTMENT OF DEFENSE HANDBOOK STANDARD MICROCIRCUIT DRAWINGS

Architectural Design Process

Brad Luke. Director Peddle Thorp Auckland

AWS C3.9M/C3.9:2009 An American National Standard. Specification for Resistance Brazing

The Association of South African Quantity Surveyors Die Vereniging van Suid-Afrikaanse Bourekenaars PRELIMINARIES. Project. Employer.

Machinery Directive 2006/42/EC

ISO INTERNATIONAL STANDARD. Petroleum, petrochemical and natural gas industries Shell-and-tube heat exchangers

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

AS Australian Standard STEEL WIRE FOR TENDONS IN PRESTRESSED CONCRETE. This is a free 5 page sample. Access the full version online.

SPECIFICATION FOR UHF HANDHELD AND DESKTOP RADIOS FOR SHUNT YARDS

1. Attached is a copy of addendum #4 issued by Diamond Schmitt Architects, dated

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

ENGINEERING DRAWINGS MANAGEMENT POLICY (IFC/AS BUILTS)

Inspection and Test Plan for Battery Charger

This document is a preview generated by EVS

MATERIALS DIVISION MEMORANDUM

PITKIN COUNTY STANDARDS for ELECTRONIC DRAWINGS and DOCUMENTS SUBMISSION

Regarding the durability of New Zealand grown European oak timber to be used internally in a new dwelling at 350 Jones Road, Blenheim

Cast Copper Alloy Solder Joint Drainage Fittings: DWV

(R) Aerospace First Article Inspection Requirement FOREWORD

MOY/SCMI/60 SPECIFICATION OF ACCURACY FOR VEE PIECES FOR EXTERNAL SCREW THREAD MEASUREMENT

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

DEPARTMENT OF DEFENSE HANDBOOK STANDARD MICROCIRCUIT DRAWINGS

Australian Standard. Graphical symbols for general engineering. Part 3: Welding and non-destructive examination AS AS 1101.

This document is a preview generated by EVS

Transcription:

Specification Date: 20/3/17 INS Process Outline Requirements UNCONTROLLED WHEN PRINTED Author: J Cooch AUTHORISATION Date: 20/3/17 A Brown Owner: J Cooch (Signature) N.B. only required for hard copy If issued externally: Controlled Copy No. (Enter No.) Issued to: (Name) AMENDMENT RECORD REPLACES: (N/A) Issue No. Date Summary of Amendment 1 20/3/17 First Issue Page 1 of 6 This document and any copyright or other intellectual property rights relating to its content is the property of International Nuclear Services Limited

Contents Section Title Page Introduction 3 1 General 4 2 References 4 Appendix 1 Process Outline requirements 5 Page 2 of 6

Introduction Contractors will usually control the manufacture of products and parts thereof using Quality Plans (QPs), as this is a requirement of ISO 9001. However, for goods and services that have an impact on nuclear safety, International Nuclear Services Ltd (INS) has a Contract requirement for the Contractor to provide specific and higher level details of the full manufacturing, inspection and testing process to ensure that the complete process is suitably defined and controlled, and that the quality requirements of the Contract will be met. These details shall be provided by the Contractor in the form of a Process Outline. This document is intended to specify in detail the requirements of the Process Outline that shall be issued to INS for acceptance. Where relevant, INS will request a draft Process Outline with the Tender and the formal Process Outline in accordance with the Schedule of Documents in Schedule 1 of the Contract. The INS Contract Quality Requirements Manual (PROM 088 S03, Reference 1) refers to Quality Grading of products and services. The requirements of each Quality Grade are identified using the key shown to the right of each heading or subheading as follows: All clauses within the heading or subheading shall apply to these specified Quality Grades. The example above indicates that all clauses in that heading or subheading are applicable to Quality Grade 1, Quality Grade 2 and Quality Grade 3. Note that the requirement for a Process Outline applies to Quality Grades 1 and 2 only. Page 3 of 6

1. General 1.1. The required structure of the Process Outline is specified in Appendix 1. 1.2. A draft Process Outline will be requested in the Request for Quotation (RFQ). The intention is that the draft (partly completed) Process Outline provided with the Tender gives confidence to INS that the Contractor has a comprehensive and well defined manufacturing, inspection and testing process that will result in the quality requirements of the Contract being met. 1.3. The Process Outline provided post Contract award is intended to include all requirements of Appendix 1. 1.4. The Process Outline shall be provided to INS for acceptance in accordance with the Schedule of Documents in Schedule 1 of the Contract and Reference 1. 1.5. Note that Quality Plans (Reference 2) shall be consistent with the Process Outline. 2. References 1: PROM 088 S03, INS Contract Quality Requirements Manual 2: PROM 088 S06, INS Quality Plan requirements Page 4 of 6

Appendix 1 Process Outline requirements The Process Outline shall include the following: 1. Scope A description of the action taken by the Contractor/Subcontractor to assure compliance to manufacturing, quality and technical specification requirements in the manufacture of the product and its component parts. A statement that the shop floor operating procedures, inspection and test procedures and other relevant documentation referenced in the Process Outline are available at the Contractor/ Subcontractor, and (with the exception of Quality Plans (QPs)) may be revised without obtaining INS acceptance for shop floor use, provided the revisions do not include changes to the sequence of process steps or to the critical parameters stated therein. 2. Applicable general documents Include general process specifications (eg component cleaning, calibration) not referred to in Section 4. 3. Process flow chart Include a process flow chart of all manufacturing and inspection/test activities that shows: i. feed components coming in at appropriate steps; ii. iii. basic steps and where there are repeat steps; functional responsibilities (eg squares are manufacturing, circles are QC). 4. Sequence description This section should comprise a landscape table that has columns for the following: Page 5 of 6 i. step number (sequential); ii. iii. iv. function responsible for this step (eg manufacturing, QC); step description (eg release from store, material feed, weld, cut to shape, inspect dimensions, prepare weld sample, weld rework); step controlling procedure (reference and issue number of Operating Procedure (OP) or QP); v. relevant clause of the step controlling procedure; vi. vii. any applicable process qualification report for the step (reference and issue number); equipment used in the step (eg Vernier callipers, TIG welding m/c, CCMM);

viii. ix. any INS Hold or Witness Points for this step; is a signoff required for step (yes/no for operator or QC inspector signoff); x. what record is available for completion of this step (eg inspection sheet, N/A). 5. Conventional Off The Shelf (COTS) items/raw materials List of raw materials, eg pins as per applicable drawing, glue as per specification X, and proprietary items bought-in. 6. Visual standards List of visual standards used (if any). 7. Contact materials Reference to Approved Materials List or Prohibited Materials List as relevant. Page 6 of 6