Geiger Rhythm. Right ON SITE. Installation Principles

Similar documents
ROS-APT Caucus Plinth Table with Trough Note: Details apply, however the actual configuration of your table may vary from what is depicted here.

Assembly Instructions

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

IMPULSE G2/PULSE STATIC BRIDGE & RETURN MODULE. Drill. Desk Connecting. Outside by fastening the supplied wood screws from the HK-67 kit through the

FlexFrame - Storage Components and Skins

Workbench Instructions for Assembly

Oxford Stalls Installation Instructions

FitWork Walkstation Series 7 AdjusTables

Footer & Base Plate Assembly. installation guide. ILINE power/data beam

LCD LIFT Flat Panel Display System Installation Manual. Table of Contents

Linear Hook- on Worksurfaces

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)

Perks Assembly Instructions

Product must be installed as shown using the screws and brackets provided. Use of incorrect hardware could result in damage to the product.

Single Sided Height Adjustable Benching

Hover. Installation Instructions. Raised Panel. Version

INSTALLATION INSTRUCTIONS

Topo Freestanding Applications - Private Office

Assembly Instructions Nevins Phone Booth

Assembly Instructions

IMPULSE G2/PULSE STATIC BRIDGE & RETURN MODULE. Drill. Desk Connecting. Outside by fastening the supplied wood screws from the HK-67 kit through the

WORKSURFACE ASSEMBLY

Lange Crank Hoist-a-top Assembly Instructions

Locker Pedestal Installation Instructions

Range height adjustable assembly

INSTALLATION INSTRUCTIONS

LOFT DOOR HANGER BARN DOORS & HARDWARE. Hardware Installation Instructions. Page

TABLE OF CONTENTS REQUIRED TOOLS

Height Adjustable Benching End Panel and Utility Pole

Footprint Mobile Assembly Instructions

Cable Tray Kit: - Cable Tray - Cable Tray Cover - Power Block Support (x2) Top Support Kit: (x2) - 2 Top Supports. Quantities are per bench

Strata. urniture. Adriana Instructions. Parts in the Arm Box: Parts in the Body Box: Watch our assembly videos at

Worktop INDEX eight Capacity Unpacking

EPPA2-KIT DUAL MONITOR ARM CONVERSION

#916 CLASSIC 16 GUN CABINET ASSEMBLY INSTRUCTIONS

User Instructions Multiline Otter Scoreboard Caddy Assembly

Installation Instructions

TOOLS REQUIRED: HARDWARE INCLUDED: 13MM FLAT WRENCH FOR LEVELING THE STRUCTURE RATCHET WITH 5MM HEX BIT FOR CORNER SCREWS ON TOP TRAVERSE BEAMS

INS T A L L A TIO N INS T R U C TIO N S. Ceiling Mount Track System

INSTALLATION INSTRUCTIONS

Series 7 - Adjustable Height Tables

Preference Collection and Treatment Console INSTALLATION GUIDE

Workbench Instructions for Assembly

EmagiKit. Privacy Pod Plus. Quiet. Easy. Affordable. INSTRUCTIONS ASSEMBLY

Hardware and Components:

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

Series 7 AdjusTable Height Tables

a.k.a. casegoods instructions

TITAN2-EDGE Public Access Computer Station Dual Track

PROFILE Flat Panel Console System Installation Manual

APTOS DUOFOIL LEGS DRILL 1/8" DRILL BIT. Rev: Dwg: DUOFOIL LEGS DRILL DUOFOIL LEGS AT A 45 ANGLE TO EDGE OF TOP WITH WIRE CAVITY

RANGE DIGITAL HANDSET OPERATION. 1. Panel. 2. Initialization Procedure. 3. Move Up & Down. 4. Set Memory Positions. 5. Move to the Memorized Positions

Dublin Stalls Installation Instructions

Angled Side Flush with Panel Face

Right. Side Tower-Overhead Combination Revised 11/12/05 ON SITE A,B D,E C

Interra Installation Manual

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS DODGE RAM 2 & 4WD 1500 PART # P5058

OXYGEN INSTALLATION. Revision date

Assembly Instructions

TOOLS REQUIRED FOR ASSEMBLY. Rubber Mallet or Plastic Tip Hammer PARTS REQUIRED FOR ASSEMBLY OF SINGLE ENTRY STARTER.

Storage Cabinets 9000 Series Assembly Instructions

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTION

STAKS. Crossover Casegoods ASSEMBLY INSTRUCTIONS

POP PLUS / SPIDER SET-UP INSTRUCTIONS

Bunk Pod Front Entry Assembly Instructions

INSTALLATION INSTRUCTIONS Small Flat Panel Mounts Model: F-Series

ZAPF PANEL SYSTEM ASSEMBLY INSTRUCTIONS. It is recommended that the components be installed in the sequence of this assembly manual.

USSC LLC 4 ONE LLC FIELD MODIFICATION INSTRUCTIONS

P a r k c o n s o l e s i n k a s s e m b l y i n s t r u c t i o n s

Footprint Worksurface Assembly Instructions

RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS

JEEP JK ( 5 DOOR ) SLIMLINE II - FULL TRAY EXTREME RACK KIT

ASSEMBLY AND ADJUSTMENT

INSTALLATION INSTRUCTIONS

Strata. urniture. Mission Rim Instructions. Parts in the Arm Box: Parts in the Body Box:

Assembly Instructions Nevins Phone Booth

STEP 1 STEP 2 LEVELER KIT OPTION MOBILE CASTER KIT OPTION

INSTALLATION INSTRUCTIONS RH 412 STEEL DOORS

Setting Up the Polycom RealPresence Group Series Media Center

Star Trac Turbo Trainer Assembly & Setup

INSTALLATION INSTRUCTIONS

Interactive Monitor Arm

compile system INSTALLATION GUIDE Updated January 2019

IMPORTANT: installation. FLOOR ANCHORED CEILING HUNG OVERHEAD BRACED FLOOR-TO- CEILING ANCHORED

INSTALLATION INSTRUCTIONS

Installation Instructions - Model V4JSD 1

D3976 RECESSED EXIT INSTALLATION INSTRUCTIONS

INSTRUCTION BOOKLET #34. For Wallbed models: KING SIZE SIERRA WITH STORAGE HEADBOARD

Equilibrium. Conference Table. Installation Instruction. Revision B 11/07/16

13MM FLAT WRENCH FOR LEVELING THE GLIDES OF STRUCTURE 6MM ALLEN KEY FOR ROOF CLIPS PHILLIPS HEAD BIT FOR SCREWS FOR DOOR FRAME

Revised

IDR assembly instructions:

6MM ALLEN KEY FOR ROOF CLIPS PHILLIPS HEAD BIT FOR SCREWS FOR DOOR FRAME SPIRIT/LASER LEVEL TO LEVEL THE UNIT

Preference Collection 5580 Treatment Console INSTALLATION GUIDE

Installation Instructions

Figure A. Figure B. Figure C. Figure D

Joiner Kit For Models N388, C450, E402B, E411T, E415H, E440T, E442B, E521T and E522B

TrendWall Floor-To-Ceiling Panels Installation Instruction

Transcription:

ROS-GRW Geiger Rhythm Wall 1BGRZ3 Tools Required o Installation drawing of product layout o Cordless drill o #1, #2 & #3 Philips and Robertson Drill bits o Level o Measuring Tape Page 1

ROS-GRW Geiger Rhythm Wall Coat Cabinet to Wall Frame Connection 1. Attach (2x) coat to frame bracket (1BGP3K) to side wall of coat cabinet through pliot holes, using (8x) #8 x 1" Pan Head Wood Screws (50164). Depending on application, the bracket may span across two back to back coat cabinets. 2. Shift first wall frame over coat to frame bracket, aligning holes in wall frame with holes in bracket. 3. Attach wall frame to coat to frame brackets using (2x) 1/4-20x5/8" pan head machine screws (1BGP3R). 1BGRZ3 1BGP3K 50164 1BGP3R Page 2

ROS-GRW Geiger Rhythm Wall Wall Frame to Wall Frame Connection 1BGRZ3 1. Place frame connectors (1BGP3D) inside wall frame channel, aligning holes in wall frame with holes in connector. 2. Slide bolts (1BGCV9) through holes in wall frame, through holes in connectors and through holes in adjacent wall frame. 3. Fasten nuts (1GBCVB) to bolts. Frames should align vertically. 4. With all frames interconnected and optionally connected to a coat cabinet, level run of frames. 1BGCV9 1BGP3D 1GBCVB Page 3

ROS-GRW Geiger Rhythm Wall Wall Frame to Building Wall Connection 1. Loosely attach stabilizer bracket (1BGCWX) to underside, top center of wall frame with 1/4-20 x 5/8" pan head machine screw (1BDV5L) through threaded nut so that the bracket can still move as required. 2. With wall frames leveled and plumbed, mark location on wall through stabilzer bracket hole and drill for wall anchor or toggle (not provided). 3. Secure stabilizer bracket to wall and then tighten to wall frame. 1BGRZ3 1BGCWX 1BDV5L Page 4

ROS-GRW Geiger Rhythm Wall Wall Frame LED Light Strips (optional, check your installation drawings). 1. Feed supply cable(s) down along end of wall frame and snake through the hole in the face of the frame back to the interior of the wall frame. 2. Carefully remove a portion of the tape on the underside of the light strip align the end of the light strip with the end of wall frame and affix to the top of the wall frame, being careful to center it on the frame. 3. Remove the rest of the tape as you run the LED tape along the frame, past the end of the frame. 4. Snip the tape at the center of the joint nearest the end of the last wall frame in the run. Your installation may have more than one LED light strip for a run of wall frames. Check your installation documentation. 5. TV and Metal tiles may also require LED tape applied as shown. 1BGRZ3 Page 5

ROS-GRW Geiger Rhythm Wall Tiles 1. Attach hooks to tiles through pilot holes provided. TV tile and metal tiles will already have hooks attached. Use shorter throw hooks for tiles, longer throw hooks for low storage. Mount blue hooks to left end of tile (facing back of tile) and yellow hooks on the right. Use Flat head, Thread-Cutting Screw, 8-32 Thread, 3/8" Length for glass tiles (PN 1BGCX5). Use Flat head #8 x 1/2" wood screws for all other tiles and overheads (PN 1BHFPJ). 2. Working from bottom up, clip hooks onto frame. Blue hooks will catch upper button head rivet and yellow hooks will catch lower button head rivet. Seat firmly onto button rivets. 1BGRZ3 Note: On low panels behind storage, attach only the bottom hooks Page 6

ROS-GRW Geiger Rhythm Wall End Caps and Top Caps 1. Press top caps over wall frames. Top caps are the same length as the wall frames except when there is an adjacent end cap where they are slightly shorter. 2. Peel one side of double sided tape off end cap connectors (1BGP3F), and press onto frame end channel at regular intervals. Remove double stick tape from exposed side of end cap connectors. 3. Press metal end cap strip onto end cap connectors, being careful to center end cap on wall frame and align with the top cap. 4. Press fit base end cap onto bottom of wall frame. 1BGRZ3 Page 7

ROS-GRW Geiger Rhythm Wall Containers 1. For installations with height adjustable desks and credenzas, install height adjustable legs prior to interconnecting containers. Insert legs as shown into tubes of the technical containers. Tilt and fasten to tube assembly using (4x) M10 x 12mm button head screws (pn 1BGP3S) per leg. 1BGRZ3 Desk Credenza, Left End Credenza, Right End 1BGP3S Page 8

ROS-GRW Geiger Rhythm Wall Containers - Interconnect 2. For wall frame installations, first interconnect storage components that will make up each frame width, otherwise interconnect storage to storage in sequence. Interconnect through 1/4" end panel holes. 1BGRZ3 1-1/4" 3/4" 1/2" 3/4" end panel to container with internal tube: 1BH0P6, 1-1/4" screw to threaded insert 1/2" 3/4" 1/2" 3/4" end panel to 1/2" end panel connection: 1BGJ3G, 1" sleeve 1BGJ3S, 1/2" screw 1" 1/2" 1/2" 1/2" end panel to container with tube: 1BH0P5, 1" screw to threaded insert 5/16" 1/2" 1/2" 1/2" end panel to 1/2" end panel connection: 1BGJ3G, 1" sleeve 1BGJ3H, 5/16" screw 3/4" 3/4" 3/4" 3/4" end panel to 3/4" end panel connection: 1BGJ3G, 1" sleeve 1BGJ3J, 3/4" screw 3. Attach wall frame hooks to rear of storage using outside set of holes which align with wall frame button head rivets. Move storage sections to wall frame, tilt forward and clip hooks onto frame, press down firmly and level. Make section to section connections. Blue hooks go on the left as facing rear of containers and yellow go on the right. Use #8 x 1/2" Flat head screws to attach hooks to backs of storage. Page 9

ROS-GRW Geiger Rhythm Wall Connect Optional Task Light Mate LED Dimmer Receiver to Remote Control. See instructions below. 1BGRZ3 Connect the LED light cable(s) 1 to the LED Dimmer Receiver 2. Connect LED Dimmer Receiver 2 to LED Power Supply 3. Connect LED Power supply 3 to power outlet. Note: You can connect up to eight LED light cables to the LED Dimmer Receiver. Both the LED Dimmer Receiver and the LED Power Supply should be fastened to the underside of a worksurface or another stable surface. LED light components can be stored inside the back of storage containers. Page 10

Geiger Rhythm Table Desk 1BGRZ4 Tools Required o Installation drawing of product layout o Cordless drill o #2 & #3 Philips and Robertson Drill bits o Level o Measuring Tape Page 1

Geiger Rhythm Table Desk 1BGRZ4 Assemble Two Sets Of Legs 1. Fasten wood leg to foot (1BGCWV) using (4x) using 1/4-20 x 1-1/4" Flanged Socket Cap Screws (1BGP3T). 2. Fasten top frame (1BGP37) to wood leg using (4x) 1/4-20 x 1-1/4" Flat Head Machine Screws (1B862V). 3. Install Levelers (1BGCWW) to foot (1BGCWV). Page 2

Geiger Rhythm Table Desk 1BGRZ4 Assemble Frame And Attach To Top 1. On a protected surface, lay table top onto surface with underside of top facing up. 2. Attach one of the leg assemblies to the underside of the table top using #8 x 1" pan head wood screws (50164). Center leg assembly front to back and inset frame 7-3/4" from table edge. 3. Insert C channels into frame. 4. Insert unattached leg assembly into C channels and attach to underside of top. 5. Roughly center C channels between leg assemblies and fasten using (4x) set screws (1BFT1P). 6. Carefully lift assembled table and flip right side up. 7. Place table and level. Page 3

Geiger Rhythm Fixed Height Runoff Desk 1BGRZ5 Tools Required o Installation drawing of product layout o Cordless drill o #2 & #3 Philips and Robertson Drill bits o Level o Measuring Tape Page 1

Geiger Rhythm Fixed Height Runoff Desk 1BGRZ5 Assemble Outer Leg 1. Fasten wood leg to foot (1BGCWV) using (4x) using 1/4-20 x 1-1/4" Flanged Socket Cap Screws (1BGP3T). 2. Fasten top frame (1BGP37) to wood leg using (4x) 1/4-20 x 1-1/4" Flat Head Machine Screws (1B862V). 3. Install Levelers (1BGCWW) to foot (1BGCWV). Page 2

Geiger Rhythm Fixed Height Runoff Desk 1BGRZ5 Assemble Inner Leg 1. Fasten bracket (1BGP34) to frame (1BGCVV) using (4x) 1/4-20 x 5/8" button flange head machine screw (1BGP3B) through lock washer (1BC54H). Note: There are three possible points to attach the bracket to frame to account for leveling conditions. The lowest connection point is used when the floor rises from the technical container to the outside of th desk. 2. Fasten bracket/frame assembly to technical container tube using (4x) 1/4-20 x 3/4" pan head machine screws (1BGP19). Page 3

Geiger Rhythm Fixed Height Runoff Desk Assemble Frame 1. Insert C channels into inner frame assembly. 2. Insert outer leg assembly onto C channels and set offset distance. 3. Roughly center C channels between leg assemblies and fasten using (4x) set screws (1BFT1P). 4. Place frame assembly and level. 1BGRZ5 Page 4

Geiger Rhythm Fixed Height Runoff Desk 1BGRZ5 Attach Lid Bracket and Power Well 1. If specified, attach simplex or dual USB component to power well. Drop component with cable down into round hole in power well, slide plastic nut over cable and tighten to power well. 2. On a protected surface, lay table top onto surface with underside of top facing up. 3. Attach lid bracket (1BGCW4) to underside of desk top using (4x) #8 x 1" pan head wood screws through pilot holes. 4. Attach power well (1BGCWB) to underside of desk top using (4x) #8 x 1" pan head wood screws through pilot holes. Page 5

Geiger Rhythm Fixed Height Runoff Desk Attach Top 1. Lift desk top onto frame, centering top on frame assembly and offset from end by 3" as shown. 2. Attach desk top to frame assembly using (20x) #8 x 1" pan head wood screws (51153). 1BGRZ5 Page 6

Geiger Rhythm Fixed Height Runoff Desk 1BGRZ5 Attach Lid Assembly 1. Peel double face tape protection from lower cup and press lower cup onto lid bracket, aligning pins on lower cup with holes on lid bracket. 2. Peel double face tape protection from upper cup and press lid onto upper cup aligning pins on upper cup with holes on lid. 3. Rotate lid with upper cup 180 degrees and slot upper cup/lid onto lower cup. Rotate lid back to cover desk top grommet hole. Page 7

Geiger Rhythm Fixed Height Runoff Desk Monitor Arm Preparation 1. Screw M12 x 45mm threaded rod roughly half way down into bracket. 2. Drop plastic cable manager into circular cutout in lid. 1BGRZ5 Dual Monitor Arm Single Monitor Arm Page 8

Geiger Rhythm Adjustable Height Runoff Desk 1BGRZ6 Tools Required o Installation drawing of product layout o Cordless drill o #2 & #3 Philips and Robertson Drill bits o Level o Measuring Tape Page 1

Geiger Rhythm Adjustable Height Runoff Desk 1BGRZ6 Assemble Outer Leg 1. Fasten offset brackets(1bgcwr & 1BGCWP) to height adjustable leg using (4x) lock washer and 1/4-20 x 5/8" flange head machine screws (1BGP3B) with a 4mm hex head wrench. 2. Fasten leg assembly to frame (1BGCVV) using (4x) lock washers and 1/4-20 x 5/8" pan head machine screws (1BGP3R). Note: Screws are magnetic to better allow insertion into offset brackets. 3. Plug leg power cable into height adjustable leg. 4. Fasten leg cover (1BGCW3) to frame using (4x) 1/4-20 x 5/8" pan head machine screws (1BGP3R). 5. Fasten foot (1BGCWV) to height adjustable leg using (4x) M10 x 12mm button head machine screws (1BGP3S) using 6mm hex head wrench. Screw levelers (1BGCWW) onto foot. 1BGCWR 1BGCVV 1BGCWP 1BGCWV 1BGCWW Page 2

Geiger Rhythm Adjustable Height Runoff Desk 1BGRZ6 Assemble Inner Leg 1. Fasten brackets (1BGP33 & 1BGCWR) to height adjustable leg using (4x) 1/4-20 x 5/8" button flange head machine screw (1BGP3B) through lock washer (1BC54H). 2. Plug leg power cable into height adjustable leg and run through either bracket. 3. Fasten frame (1BGCVV) to leg assembly using using (4x) 1/4-20 x 5/8" pan head machine screws (1BGP3R) through lock washer (1BC54H). Note: There are three possible points to attach the bracket to frame to account for leveling conditions. The lowest connection point is used when the floor rises from the technical container to the outside of the desk. 4. Fasten shroud (1BGP44) to frame assembly using (4x) 1/4-20 x 5/8" pan head machine screws (1BGP3R). Page 3

Geiger Rhythm Adjustable Height Runoff Desk 1BGRZ6 Assemble Inner Leg 1. Press fit height adjustable leg / frame assembly all the way through container column. 2. Tilt container onto its back and fasten leg to container using (4x) M10 x 12mm pan head machine screws (1BGP3S). 3. Attach plug strip clips to side wall of container opposite hinges, through pilot holes. Press plug strip onto clips and feed cable left or right out through cable access hole. Page 4

Geiger Rhythm Adjustable Height Runoff Desk 1BGRZ6 Assemble Frame 1. Insert C channels into inner frame assembly. 2. Insert outer leg assembly onto C channels and set offset distance. 3. Roughly center C channels between leg assemblies and fasten using (4x) set screws (1BFT1P). 4. Place frame assembly and level. 5. Place height adjustable controller in slot in beam. Controller is normally installed to the right of where the user will sit. Page 5

Geiger Rhythm Adjustable Height Runoff Desk 1BGRZ6 Attach Lid Bracket and Power Well 1. If specified, attach simplex or dual USB component to power well. Drop component with cable down into round hole in power well, slide plastic nut over cable and tighten to power well. 2. On a protected surface, lay table top onto surface with underside of top facing up. 3. Attach lid bracket (1BGCW4) to underside of desk top using (4x) #8 x 1" pan head wood screws through pilot holes. 4. Attach power well (1BGCWB) to underside of desk top using (4x) #8 x 1" pan head wood screws through pilot holes. Page 6

Geiger Rhythm Adjustable Height Runoff Desk Attach Top and Power Unit 1. Lift desk top onto frame, centering top on frame assembly and offset from end by 3" as shown. 2. Attach desk top to frame assembly using (12x) #8 x 1" pan head wood screws (51153). 3. Interconnect height adjustable power components and attach power unit to underside of desktop. 4. Feed power unit plug into power well and then down into shroud to plug into plug strip in container below. 5. Attach height adjustable controller to desk edge. 1BGRZ6 Page 7

Geiger Rhythm Adjustable Height Runoff Desk 1BGRZ6 Attach Lid Assembly 1. Peel double face tape protection from lower cup and press lower cup onto lid bracket, aligning pins on lower cup with holes on lid bracket. 2. Peel double face tape protection from upper cup and press lid onto upper cup aligning pins on upper cup with holes on lid. 3. Rotate lid with upper cup 180 degrees and slot upper cup/lid onto lower cup. Rotate lid back to cover desk top grommet hole. Page 8

Geiger Rhythm Adjustable Height Runoff Desk Monitor Arm Preparation 1. Screw M12 x 45mm threaded rod roughly half way down into bracket. 2. Drop plastic cable manager into circular cutout in lid. 1BGRZ6 Dual Monitor Arm Single Monitor Arm Page 9

Geiger Rhythm Adjustable Height Credenza 1BHFPF Tools Required o Installation drawing of product layout o Cordless drill o #2 & #3 Philips and Robertson Drill bits o Level o Measuring Tape Page 1

Geiger Rhythm Adjustable Height Credenza 1BHFPF Assemble Frames 1. Fasten brackets 1BGCWT and 1BGCWS to height adjustable legs using (4x) 1/4-20 x 5/8" button flange head machine screw (1BGP3B) through lock washer (1BC54H). Make sure bracket aligns with top of leg assembly and that bracket hole is oriented as shown below. 2. Fasten frames (1BGCVW) to leg assemblies using using (4x) 1/4-20 x 5/8" pan head machine screws (1BGP3R) through lock washer (1BC54H) and (4x) 1/4-20 x 5/8" button flange head machine screw. Note: There are three possible points to attach the bracket to frame to account for leveling conditions. The lowest connection point is used when the floor rises from the technical container to the outside of the desk. 1BGP3B Button head flange screw 1BGP3B Button head flange screw 1BGCWT 1BGP3R pan head machine screw 1BGCVW 1BGP3B Button head flange screw Left Leg 1BGCWS 1BGCVW 1BGP3B Button head flange screw Bracket Hole 1BGP3R pan head machine screw Right Leg Page 2

Geiger Rhythm Adjustable Height Credenza 1BHFPF Assemble Shroud 1. Fasten left shroud (1BGP46) to left frame assembly using (4x) 1/4-20 x 5/8" pan head machine screws (1BGP3R). 2. Fasten right shroud (1BGP45) to right frame assembly using (4x) 1/4-20 x 5/8" pan head machine screws (1BGP3R). 1BGP45 Right Assembly 1BGP3R 1/4-20 x 5/8" pan head machine screw 1BGP46 Left Assembly Page 3

Geiger Rhythm Adjustable Height Credenza 1BHFPF Assemble Technical Containers 1. Press fit height adjustable leg / frame assembly all the way through container column. 2. Tilt container onto its back and fasten leg to container using (4x) M10 x 12mm pan head machine screws (1BGP3S). 3. Attach plug strip clips to side wall of container opposite hinges, through pilot holes in container closest to power source. Press plug strip onto clips and feed cable left or right out through cable access hole. Right Assembly Left Assembly 1BGP3S Page 4

Geiger Rhythm Adjustable Height Credenza 1BHFPF Assemble Frame 1. Insert C channels into one of the frame assemblies. 2. Following installation plans, set wood technical containers into position, offset dimensionally as shown below, interconnect with adjacent storage if applicable and level technical containers. 3. Slide C channels into frame assembly and roughly center. Fasten using (4x) set screws (1BFT1P). 4. Place height adjustable control in slot in beam. Control is normally installed to the right of the user. 5. Connect height adjustable leg cables to control box. Connect control cable to control box. 6. Connect control box power cable into control box. Feed cable into technical container and plug into plug strip. Page 5

Geiger Rhythm Adjustable Height Credenza Attach Top and Power Unit 1. Lift desk top onto frame, centering top on frame assembly and offset fas shown. 2. Attach desk top to frame assembly using (12x) #8 x 1" pan head wood screws (51153). 3. Arttach control box to underside of desktop. 4. Attach height adjustable control to desk edge. 1BHFPF Page 7

Geiger Rhythm Adjustable Height Credenza 1BHFPF Attach Lid Bracket and Power Well 1. If specified, attach simplex or dual USB component to power well. Drop component with cable down into round hole in power well, slide plastic nut over cable and tighten to power well. 2. On a protected surface, lay table top onto surface with underside of top facing up. 3. Attach lid bracket (1BGCW4) to underside of desk top using (4x) #8 x 1" pan head wood screws through pilot holes. 4. Attach power well (1BGCWC) to underside of desk top using (4x) #8 x 1" pan head wood screws through pilot holes. Page 6

Geiger Rhythm Adjustable Height Credenza Attach Top and Power Unit 1. Lift desk top onto frame, centering top on frame assembly and offset fas shown. 2. Attach desk top to frame assembly using (12x) #8 x 1" pan head wood screws (51153). 3. Arttach control box to underside of desktop. 4. Attach height adjustable control to desk edge. 1BHFPF Page 7

Geiger Rhythm Adjustable Height Credenza 1BHFPF Attach Lid Assembly 1. Peel double face tape protection from lower cup and press lower cup onto lid bracket, aligning pins on lower cup with holes on lid bracket. 2. Peel double face tape protection from upper cup and press lid onto upper cup aligning pins on upper cup with holes on lid. 3. Rotate lid with upper cup 180 degrees and slot upper cup/lid onto lower cup. Rotate lid back to cover desk top grommet hole. Page 8

Geiger Rhythm Adjustable Height Credenza Monitor Arm Preparation 1. Screw M12 x 45mm threaded rod roughly half way down into bracket. 2. Drop plastic cable manager into circular cutout in lid. 1BHFPF Dual Monitor Arm Single Monitor Arm Page 9

ROS-GRS Geiger Rhythm Storage 1BHFPG Tools Required o Installation drawing of product layout o Cordless drill o #1, #2 & #3 Philips and Robertson Drill bits o Level o Measuring Tape Page 1

ROS-GRS Geiger Rhythm Storage Attach Power Modules and Phone Charger 1BHFPG Guest Containers Remove top and bottom shelves. Feed plug cable out of container towards power source. Fasten power module with bracket through pilot holes in the rear of container using (4x) #8 x 1/2" flat head wood screws. Personal Containers Feed plug cable out of container towards power source. From interior of cabinet, fasten power module with bracket through pilot holes in the rear of container using (4x) #8 x 1/2" flat head wood screws. Personal Container Phone Charger Remove top and bottom shelves. Feed plug cable out of container towards power source. Fasten power module with bracket through pilot holes in the rear of container using (4x) #8 x 1/2" flat head wood screws. Wireless Phone Charger Press fit phone charger disk up into underside of top panel. Tighten screws to fix in place. Feed cables out through side panel and connect cable to power supply. Page 2

ROS-GRS Geiger Rhythm Storage Interconnect containers and level Interconnect storage units through 1/4" end panel holes provided. 1BHFPG 1-1/4" 3/4" 1/2" 3/4" panel to 1/2" panel 1BH0P6, 1-1/4" screw to threaded insert 1" 1/2" 1/2" 1/2" panel to 1/2" panel 1BH0P5, 1" screw to threaded insert 3/4" 3/4" 3/4" 3/4" panel to 3/4" panel 1BGJ3G, 1" sleeve 1BGJ3J, 3/4" screw 1/2" 3/4" 1/2" 3/4" panel to 1/2" panel 1BGJ3G, 1" sleeve 1BGJ3S, 1/2" screw 5/16" 1/2" 1/2" 1/2" panel to 1/2" panel 1BGJ3G, 1" sleeve 1BGJ3H, 5/16" screw Page 3

ROS-GRS Geiger Rhythm Storage Attach Power Module Covers and Storage Tops 1BHFPG Power Module Covers Angle power module cover slightly towards back, press and snap down. Attach 1/2" tops Peel top layer of hook & loop strips from storage containers. For tray application, cut velcro as shown. Peel tape from loose hook & loop strips and apply to underside of 1/2" tops and tray so that they will contact hook & loop strips on storage tops. Carefully press down tops and trays, making sure they align side to side and front to back with storage containers. Page 4