PREPARATION FOR CORE 2. Jari Kinaret Chalmers University of Technology Sweden

Similar documents
Graphene Flagship: Approaching the half-way point Collaboration with member states

FET Flagships in Horizon 2020

Research Infrastructures and Innovation

EUROPEAN GNSS APPLICATIONS IN H2020

Mainstreaming PE in Horizon 2020: perspectives and ambitions

HORIZON The New EU Framework Programme for Dr. Helge Wessel DG Research and Innovation. Research and Innovation

Roadmap for European Universities in Energy December 2016

FET in H2020. European Commission DG CONNECT Future and Emerging Technologies (FET) Unit Ales Fiala, Head of Unit

Convergence and Differentiation within the Framework of European Scientific and Technical Cooperation on HTA

ICT Micro- and nanoelectronics technologies

Workshop on Enabling Technologies in CSF for EU Research and Innovation Funding

WG/STAIR. Knut Blind, STAIR Chairman

SEAS-ERA STRATEGIC FORUM

The Fifth Framework Programme for Research and Technological Development ( )

Horizon Work Programme Leadership in enabling and industrial technologies - Introduction

Science-Driven Scenario for Space Exploration

Robotics: from FP7 to Horizon Libor Král, Head of Unit Unit A2 - Robotics DG Communication Networks, Content and Technology European Commission

SME support under HORIZON 2020

Report on the Results of. Questionnaire 1

PUBLISHABLE FINAL ACTIVITY REPORT

NEREID. H2020-ICT-CSA: Micro- and Nano-Electronics Technologies Grant Agreement n Enrico Sangiorgi,

Terms of Reference. Call for Experts in the field of Foresight and ICT

DANUBE INNOVATION PARTNERSHIP

Application Interest Group (AIG) Process Overview. Dr. Robert C. Pfahl Director of Roadmapping

Lithuania: Pramonė 4.0

MARITIME POLICY Assessment and Outlook for EU and CPMR. Aarhus, 23 January 2009 CPMR Political Bureau CPMR 2009

Proposing a European Partnership in HORIZON EUROPE

The ETV pilot programme: State of play, standardisation issues

Space in the next MFF Commision proposals

NATIONAL MINISTRIES. GSO Framework for Global Infrastructures G8 + 5

ERAC-SFIC 1353/15 AFG/nj 1 DG G 3 C

Rethinking the role of Social Sciences and Humanities (SSH) in Horizon 2020: toward a reflective and generative perspective

Outline. IPTS and the Information Society Unit IPTS Research Agenda on ICT for Governance

Horizon 2020 and Photonics

Getting the evidence: Using research in policy making

The Rolling Agenda. 3-year strategic programme and 2-year work programme, what about it? Opportunities and obstacles

Science2Society Boosting innovation efficiency across Europe

EUROPEAN COMMISSION Directorate-General for Communications Networks, Content and Technology CONCEPT NOTE

Horizon the new EU Framework Programme for Research and Innovation

Open Opportunities For Library Networks. in the European Union s 6th Framework Programme ( )

Christina Miller Director, UK Research Office

Written response to the public consultation on the European Commission Green Paper: From

Stakeholders Acting Together On the ethical impact assessment of Research and Innovation

H2020 Theme Oriented Training on ICT. H2020 Overview. Thies Wittig. Deputy Team Leader Project "Turkey in Horizon 2020"

SCAR response to the 2 nd Foresight Expert Group Report

The European Science Foundation (ESF) is the European association of 78 national research organisations in 30 countries, devoted to scientific

The Seventh China-EU Summit Held in The Hague, the Netherlands

Schleswig-Holstein Germany s True North. Maritime Technologies an Overview Interreg Baltic Sea Region Project Smart Blue Regions

April 2015 newsletter. Efficient Energy Planning #3

SETTING FOOD SAFETY RISK ANALYSIS RESEARCH PRIORITIES FOR HORIZON EUROPE. Marta Hugas EFSA Chief Scientist

THESIS PRESENTATION. Gabriele Goebel-Heise 5617A011-4

Impact and Innovation in H2020 Proposals and projects

Brief presentation of the results Ioana ISPAS ERA NET COFUND Expert Group

International Civil Aviation Organization ASSEMBLY 38TH SESSION EXECUTIVE COMMITTEE

Tools of strategic governance of industrial innovation: Smart specialisation. 24 October, ECRN Jan Larosse

Common Features and National Differences - preliminary findings -

European funding opportunities for Ocean Energy

COST FP9 Position Paper

(MULTilingualism. UNDerstanding MULTISAUND. Integrated to Speech and Audio. erstanding) SUCCESS STORY MTRD

9 Vaccine SMEs' Needs

FP7 Funding Opportunities for the ICT Industry

HORIZON Leadership in Enabling and Industrial Technologies (LEIT)

Innovation-Based Economic Development Strategy for Holyoke and the Pioneer Valley

ECC ALL ABOUT OUR ORGANISATION The Electronic Communications Committee

Materials Characterization Cluster A new European initiative

EC-Egypt Science and Technology Cooperation Agreement. Road Map

Digital Transformation Delivering Business Outcomes

A New Platform for escience and data research into the European Ecosystem.

ICU News Flash. ICU consortium. Infrared Imaging Components for Use in Automotive Safety Applications (ICU)

Torsti Loikkanen, Principal Scientist, Research Coordinator VTT Innovation Studies

Information Society Technologies in the 6th Framework Programme. Tom Bo Clausen Project Officer European Commission, IST programme Embedded Systems

TOWARDS A VISION ON GLOBAL RAW MATERIALS COOPERATION

Project Territorial Strategies for Innovation

FET Open in Horizon Roumen Borissov Scientific/Technical Project Officer Future and Emerging Technologies, DG CONNECT European Commission

HORIZON Wissenschaft mit und für die Gesellschaft. Mag. Daniel Spichtinger DG RTD B6 Ethik und Gleichstellung

The role of prototyping in the overall PRACE strategy

FP7 AAT Level 0. FP7 AAT Level 0. Roberto Bojeri. Workshop ACARE Italia. Torino, 17 Maggio 2012

DoReMi-MELODI Training and Education Forum Introduction and background

NORDIC ICT FORESIGHT Current state and future prospects in 2006

Foresight Impact on Policy making and Lessons for New Member States and Candidate Countries Insights from the FORLEARN mutual learning process

Wind Energy Technology Roadmap

The Research Infrastructures in FP7

Future and Emerging Technologies. Ales Fiala, Head of Unit C2 European Commission - DG CONNECT Directorate C - Excellence in Science

SPACE: EPIC SRC workshop

Research Development Request - Profile Template. European Commission

Korean scientific cooperation network with the European Research Area KORANET. Korean scientific cooperation network with the European Research Area

EU-Australia workshop 14 th November 2016

Access to Research Infrastructures under Horizon 2020 and beyond

Presentation of the results. Niels Gøtke, Chair of the expert group and Effie Amanatidou, Rapporteur

Work package 4: Towards a virtual foundry

NEXT GENERATION SILICON PHOTONICS FOR COMPUTING AND COMMUNICATION PHILIPPE ABSIL

No. prev. doc.: 9108/10 RECH 148 SOC 296 Subject: Social Dimension of the European Research Area - Adoption of Council conclusions

Building the ERA of Knowledge for Growth. Proposals for the 7 th Research Framework Programme

The Intellectual Property, Knowledge Transfer: Perspectives

Digital Transformation Delivering Business Outcomes

An Introdcution to Horizon 2020

Centre for Doctoral Training: opportunities and ideas

Existing Networks and their Role MESA Support Action and the MARPOS Gap Analysis

Advanced Impacts evaluation Methodology for innovative freight transport Solutions

A Research and Innovation Agenda for a global Europe: Priorities and Opportunities for the 9 th Framework Programme

Transcription:

PREPARATION FOR CORE 2 Jari Kinaret Chalmers University of Technology Sweden

Flagship in H2020 Framework Partnership Core Project 1 154 partners, 2016-18 National projects Core Project 2 > 120 partners, 2018-20 FLAG-ERA Regional projects Core Projects 3- > 120 partners, 2020- Other EU projects 2

Evolution of the Flagship Year Partners Academic Industrial Other Budget/yr Cumulative 2013 75 48 16 8 18 M 0 M (start) 2014 142 76 41 25 24 M 2016 154 75 53 26 44.5 M 54 M (inc. FP7) 2018 >120??? 44 M 143 M (inc. C1) 2020???? > 45 M 231 M (inc. C2)?????? 500 M (flagship) Clear trend towards more industrial involvement, as planned Involve new partners as needs arise and resources become available (Expression of Interest mechanism). So far, about 15% of the total EC funding has been spent, by the end of Core 1 the number will be about 29% and by the end of Core 2 about 46%.

Evolution of the research plan and the consortium Defined in the FPA: The adjustment of the research plan of the flagship will be based on four main ingredients: the input from expertise within the Flagship that arises from the analyses and considerations during Science and Technology Forums, the input from the Technology and Innovation Roadmap which takes into account global academic and industrial developments and trends, and the inter[natio]nal and external review processes carried out by the Flagship and the European Commission. Based on these inputs, the EB may decide that the research plan needs be adjusted by either initiating or strengthening some activities, or by de-emphasizing by or discontinuing others. These adjustments may imply a need to adjust the Flagship consortium. Approved by the entire consortium and communicated repeatedly to them since, at least, June 2015 4

Core 2 plans Continue moving towards higher technology readiness levels but keeping the fundamental science component as well Focus the activities: combine technology push (what is doable?) and market pull (what is worth doing?) Focusing decisions based on four input streams as outlined in the Framework Agreement: EC reviews (backward-looking) Our internal assessments (forward-looking) Our technology and innovation roadmap Our Science and Technology Forum Focusing involves identifying the best areas in terms of industrial impact/technological uncertainty, but it is likely to be have a side effect that some groups and partners will not have roles in Core 2 Some decisions were taken by the Executive Board 10 days ago, not yet pubished, and the implementation plans have not be fixed yet 5

EC Review Full report (58 pages) of the final review of the FP7 phase is available to all flagship partners on our intranet Onboard While the review is supposed to be a review, i.e. look back in time, it also contains some forward-looking statements that serve as inputs for Core 2 planning 6

Technology and innovation roadmap Draft version (499 pages) available for internal use on Onboard Lot of judgement on industrial relevance in Europe, compiled by Fraunhofer Institute through well-attended workshops, interviews with companies inside and outside the flagship consortium, and literature studies WP leaders can comment within a few weeks; an edited version of the roadmap will be published in 2017 7

Internal assessments Forward-looking, will take place in Nov Dec 2016 Each WP will be represented by WP leader, WP deputy, and up to 2 people they invite Four reviewers: one internal (leader of a different WP), one from Strategic Advisory Council, and two external (1 industry, 1 academia) Specific questions, e.g. SWOT analysis, goals for Core 2, how to handle a 20% cut in tasks or funding, how to use a 20% budget increase Reviewers will assess S&T uncertainty and technological impact in 4 and 10 years time, comment on SWOT and goals, and the 20% adjustments 8

Science and technology forum February 15-17, Madingley Hall, Cambridge WP leaders and deputies, Strategic Advisory Council, other members of the Exexcutive Board, ca. 50 attendees in total Will recommend final plans for Core 2 that the EB will decide upon The STF cannot start from an empty sheet but needs a baseline document, collecting all recommendations from the different sources; how this document will be produced is not yet decided 9

What is known: Increased focus on innovation, e.g. technology transfer officers or similar for each S&T WP 10% of budget reserved for spearhead projects Application-oriented, market motivated, aiming at a significant breakthrough, one person in charge Either within one WP or across several Strong industrial support; possibly an EoI call Not yet known when we can have the first suggestions Increased emphasis on cross-wp actions The Core 2 proposal must clearly describe realistic target, in a realistic relation to budget, with clear responsibilities (who is in charge of a task, which partner does what), typically no more than 6 tasks per WP (often divided in subtasks) SAC advise emphasizes the importance of fundamental research as the field is still quite young Submission date probably in June, 2017 text must be finalized in May 10

Spearhead projects New for Core 2, closest approximants in Core 1 include Task 15.4 Aerostructure manufacturing: Wing leading edge with graphene related materials: Produce and test resin compositions doped with graphene related materials (GRM), test the materials developed, and select the most promising one. Design and manufacture a piece of the leading edge of a horizontal tail from the AIRBUS A350 incorporating the GRM in resin. Test the produced aerostructures to determine if GRMs have enhanced their mechanical performance specifically with respect to bird impacts. Task 8.7 Prototype transceiver bank realised on SOI in 300mm CMOS 65nm line or on SiN 150mm on Si CMOS compatible line: Two prototypes will be demonstrated and based on the outcome of task 1 (detectors) and task 4 (modulators): 1) single wavelength, parallel optics (4x28 Gbit/s), and 2) 4 wavelength (wavelength-division multiplexing) transceiver (4x28 Gbit/s), both operating in the C band. The outcome will be a back-to-back system test of non-returnto-zero modulated signals. This will be compared with existing Si photonics based devices in terms of system performance at room temperature and at 80 C. Other evaluations will consider the impact of packaging on the uniformity of system performances in the different channels. 11

Graphene disruptive technologies - from academic laboratories to society Thank you for your attention! 12