NOTE: This paper relates to a closed book exam & therefore candidates should attempt this exam paper with no study-notes or text books.

Similar documents
2394 EXAM PAPER. 1. State THREE circumstances that would require a periodic inspection and test to be carried out on an installation

C&G Level 3 Award in the Periodic Inspection, Testing and Certification of Electrical Installations. Earth Fault Loop Impedance Tests

C&G Level 3 Award in the Periodic Inspection, Testing and Certification of Electrical Installations

MinorWorks/Single Circuit Electrical Certificate

7 o/c4 - To meet the requirements of BS 7671, all fault current protective devices without back-up protection on the supply side must be capable of:

NATIONAL RULES FOR ELECTRICAL INSTALLATIONS. Fourth Edition. Extracts from Amendment No.1: June 2011

Module Title: Electrical Installation II Laboratory Sheet:

Licensed Electricians Practical Assessment (LEP)

Licensed Electricians Practical Assessment (LEP)

Automatic disconnection of lighting circuits from dimming equipment

Company Directive STANDARD TECHNIQUE: SD5R/2. Earth Fault Loop Impedances and Phase to Neutral Loop Impedances at LV Installations

ET 61 - Electrician Theory Examination Marking Schedule

-(where thenl is mutual responsibility for the design)

Les Hampson Cert Ed FSCTE, Chairman CAI Technical Committee

APRIL 2017 Level 3 Advanced Technical Diploma in Electrical Installation (450) Level 3 Electrical Installation Theory Exam

EAS Electrical Appliance Serviceperson Answer Schedule

Grounding and Lightning arrestors

ELECTRICIAN S THEORY EXAMINATION 20 November 2010 QUESTION AND ANSWER BOOKLET

ET 40 - Electrician Theory Examination Marking Schedule

Analysis of transfer touch voltages in low-voltage electrical installations

returned to your distributor for attention. 14. Do not operate the function switch while the instrument is connected to a circuit.

Technical Certificate in Electrical Installation Version Sample September Question Paper Pack

Protective earthing, protective conductor and automatic disconnection in case of a fault (Fault protection)

UNIT Earthing and Earth Fault Current Protection (SCQF level 6)

Product Classroom. Introduction. Grounding Systems. TN system. Title. Grounding System Introduction. Date October, 2016.

PROTECTION AGAINST FAULT CURRENT

Installation Tester BENNING IT 115. Operating Manual

Options to Improve the MEN System into the 21 st Century

Company Directive STANDARD TECHNIQUE: SD5F. Relating to connecting multiple small low voltage connections with limited network analysis

Installation Tester BENNING IT 130. Operating Manual

5357 Level 3 Electrotechnical / 2365 Level 3 Diploma in Electrical Installations (Buildings and Structures) Sample papers

ELECTRICAL INSTALLATION CONDITION REPORT

FINAL - ER 70 Electrician Regulations Answer Schedule. Question 1 Marks Reference Marking notes

City and Guilds: Permitted Reference Materials (Electrotech) Version 2.3 (October 2013)

So, let us investigate those parts of the Wiring Regulations that need to be considered in the early stages of the design procedure.

FINAL - IT 30 ELECTRICAL INSPECTOR EXAMINATION ANSWER SCHEDULE. Question 1 Marks Reference Marking notes. (2 marks) EA 2

EurotestCOMBO MI 3125 / MI 3125E Short instructions Version 2.2, Code no

6. Internal lightning protection

FINAL - EST Electrical Service Technician Answer Schedule

TN, TT & IT Earthing Arrangements

ET 51 - Electrician Theory Examination Marking Schedule

G SAFETY WARNINGS. LT300 High current loop tester. User guide

Multi-Function Installation Tester MEGGER CM500. User Guide MEGGER

Industrial and Commercial Power Systems Topic 7 EARTHING

1. general. 1.1 electric shock. 1.2 direct and indirect contact. electric shock. indirect contact. direct contact

Code for Design of Low Voltage Electrical Installations

GROUNDED ELECTRICAL POWER DISTRIBUTION. Excerpt from Inverter Charger Series Manual BY: VIJAY SHARMA ENGINEER

power Knowledge The Hager Guide to current thinking on the regulations, protection and control of Klik lighting circuits.

Section 3. Test Procedures

CURRENT FUTURE REGULATIONS PROPOSALS

INSTRUCTION MANUAL MULTI-FUNCTION TESTER KEW 6016

Safety Issues Caused by High Earth Resistance and Identifying Them Using Instruments

EurotestXE MI 3102H BT, MI 3102 BT Instruction manual Version 1.0, Code no

Chapter F Protection against electric shocks

Portable Appliance Testers. OmegaPAT MI 2140 BetaPAT MI 2141 User Manual Ver Code No

INSTRUCTION MANUAL DIGITAL PSC-LOOP TESTER MODEL 4118A KYORITSU ELECTRICAL INSTRUMENTS WORKS,LTD.

EurotestEASI MI 3100 SE MI 3100 s Instruction manual Version 1.1, Code no

QUICK SETUP GUIDE SECULIFE IP

INSTALLATION WARNING: BEFORE COMMENCING INSTALLATION ISOLATE YOUR MAINS ELECTRIC SUPPLY

MEGGER CM300 MK II, CM400 MK II & CM500

ECE 528 Understanding Power Quality

Chapter F Protection against electric shocks

Tech Talk (12) Down to Earth: A Discussion of the General Requirements for the Earthing of Control and Instrumentation Systems

Measurements on electric Installations in theory and practice Instruction manual Code:

FAQ ON EARTHING STANDARDS 16/08/2018

17TH EDITION BS TH EDITION BS7671 HOW THIS AFFECTS YOU. A BITESIZE LOOK at RCDs and parts of the 18th edition DPC. wylexreasons.co.

EASQ ELECTRICAL APPLIANCE SERVICEPERSON (QUALIFIED) MARKING SCHEDULE. SECTION 1 Marks Reference Marking notes Qu 1 A 10 MΩ (2 marks)

MFT1800 Series. Multifunction testers. User Manual

/B

17th Edition IEE Wiring Regulations: Explained and Illustrated

MFT1700 series. Multifunction testers. User manual

ER 87 Electrician Regulations Answer Schedule. Question 1 Marks Reference Marking notes. (1 mark) ESR 27(2) (2 marks) ESR 74A(1AA)

Equipment Description Quantity as per drawings Actual quantity

SERVICING & METERING SERVICING AND METERING SECTION 5 SEC5:

Operating manual Installation Tester BENNING IT 110 / BENNING IT 120 B

The future of installation testing is here. The Fluke 1650 Series Multifunction Testers

ELECTRICAL SAFETY TESTERS. Wings for Your Projects. APPLICATION NOTE

Instruction Manual for Digital Grounding Resistance Meter. Table of Contents

ELECTRICAL EQUIPMENT. Inspection. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E

ECP COMPACT AND MICRO SUBSTATION COMMISSIONING PROCEDURE

Candidate Handbook answers

2/15/2015. Current will always try to return to its source. In order for there to be current, there must be a complete circuit

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS

STATIC ELECTRICITY & ANTISTATIC FLOORING EXPLAINED Test Methods, Flooring Classification & More.

17th Edition IEE Wiring Regulations: Design and Verification of Electrical Installations

NZQA registered unit standard version 2 Page 1 of 8. Demonstrate knowledge of theory for registration of electrical installers

MACROTEST G1 & G2. I'm pure technology. Touch me, please.

GROUND TESTERS For all of your Ground Testing needs...

1650 Series Multifunction Installation Testers

, Power Industries and Communications Industry Training Board

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Distribution systems and protection against indirect contact and earth fault

Requirements for Electrical Installations - BS 7671: 2008 incorporating Amendment No.3, 2015 [IETWiring Regulations]

Chapter 6. WIRING SYSTEMS Safe Electrical Design

FINAL - ET 60 - Electrician Theory Examination Marking Schedule

ENSURING PUBLIC SAFETY THROUGH PROPER EARTHING IN LOW VOLTAGE NETWORKS

National Marine Manufacturers Association Compliance Specialist Examination A.C. Electrical (2018 Model Year) ABYC E-11 Supplement 56

MEASURING INSTRUMENTS AND TESTERS

DIGIT & POINTER MULTIMETER

The first installation safety tester with automated testing based on patent pending AUTO SEQUENCE.

Transcription:

City & Guilds Fundamental Inspection & Testing 30 Question Test Sheet (2392-10 Paper No1.) NOTE: This paper relates to a closed book exam & therefore candidates should attempt this exam paper with no study-notes or text books. Once the exam is completed, delegates should use the On Site Guide and GN3 to check their answers 1 The certificate issued for an initial verification must be accompanied by a schedule of a. Test results only b. Inspections only c. Tests and schedules of inspections d. Test results and schedule of inspections 2 On completion of an initial verification of an additional new circuit, the inspector should provide a. A Minor Works Installation Certificate b. A periodic Certificate b. relevant comments on the condition of the existing electrical installation c. details of any departures to the Distribution Network Operator 3 A Minor Electrical Works Certificate does not require a record of a. System earthing arrangements b. Departures from BS7671 c. Method of fault protection d. Prospective fault current 4 Which one of the following documents does not include model forms for certifications purposes? a. HSE Guidance notes GS38 b. The On Site Guide c. IEE guidance Notes 3 d. BS7671 5 Apart from an Electrical Installation Certificate and associated schedules, additional documentation must be issued for initial verification where a. Bedrooms have been converted into bathrooms b. Stand by generators are present c. The property is occupied by a tenant d. An electrical installation incorporates an RCD

6 Before conducting an inspection and test of a new shower circuit, one of the most important items of information is the a. Date of installation of the circuit b. Size, type, and rating of the cable and the protective device c. Manufacture and power rating of the shower unit d. Manufacture of the test equipment used 7 Which human sense is most likely to indicate that a BS3036 fuse has just operated the moment a circuit switch is closed a. Taste b. Touch c. Smell d. Hearing 8 Any item that does not need inspection during initial verification should marked a. X b. N/A c. LIM d. 9 A human sense appropriate during initial verification of an installation would be a. Touch b. Taste c. Intuition d. None 10 A New installation is protected against faults by ADoS. When inspecting this method of protection, which of the following is not a essential check a. Earthing conductor b. Circuit protective conductors c. Fire barriers d. Main Protective bonding conductors 11 Where mechanical protection is not provided, supplementary bonding conductors should be of a csa of not less than a. 2.5mm 2 b. 4.00mm 2 c. 6.0mm 2 d. 10.0mm 2

12 An additional CPC is connected in parallel with the SWA of a cable. This has the effect of? a. Increasing the overall resistance b. Decreasing the overall resistance c. Decreasing the voltage drop under load conditions d. Increasing the voltage drop under load conditions 13 In a room containing a bath, Zone 0 is a. Within the bath b. Immediately above the bath c. 600mm around the bathtub d. Beyond 600mm from the bathtub 14 When carrying out an Earth Fault Loop Impendence on a final circuit, the earthing conductor must a. Disconnected from all the protective conductors b. Connected to all the protective conductors c. Only connected to the main equipotential protective bonding conductors d. Only disconnected from the circuit protective conductors 15 The non statutory document that is applicable to the construction and use of test equipment is a. HSE guidance Note GS38 b. The IEE On Site Guide c. IEE Guidance Notes 3 d. BS7671 16 When a number of circuits are added to a distribution board the overall insulation resistance will a. Decrease b. Remain unchanged c. Be the average of the circuit values d. Increase 17 Which one of the following identifies the conditions required before performing a test of insulation resistance? a. Consult the client follow safety procedures and erect warning signs b. Inform HSE c. Inform staff, the HSE, and erect warning signs d. Consult the engineer, inform HSE and tell the client

18 Which one of the following results would confirm the separation of SELV circuits from circuits operating at 230 volt as required by BS 7671 a. Test Voltage 250 V Minimum resistance 0.25MΩ b. Test Voltage 250 V Minimum resistance 0.5MΩ c. Test Voltage 500 V Minimum resistance 0.5MΩ d. Test Voltage 500 V Minimum resistance 1.0MΩ 19 Where residual current devices are to be connected in series, to ensure correct operation in the event of a fault there must be suitable a. Discrimination b. Distribution c. Discernment d. Displacement 20 A test of prospective fault current should be undertaken at the point in installation of an over-current protective device in order to ensure it is a. Capable of being replaced b. Able to safely disconnect the fault likely to occur at that point c. To ensure it is twice the protective devices value d. Able to disconnect in the required time 21 Continuity of conductors should be verified by using a. A continuity tester b. A high resistance ohm meter c. An earth fault loop impedance tester d. A low resistance ohm meter 22 In order to ensure that the risk of electric shock under fault conditions is significantly reduced, it is important that, a. Basic protection is provided b. All protective conductor terminations have a warning label c. All protective conductors are in place and disconnection times are met d. The earthing conductor must not be less than 25.00mm 2 23 When two copper cores each with a resistance of 0.1Ω are connected together in parallel the combined resistance would be a. 0.5 Ω b. 0.2 Ω c. 0.1 Ω d. 0.05 Ω

24 An additional result of conducting a test for ring final continuity is to achieve a value for a. Insulation resistance b. Polarity c. R1 + R2 d. RCD operating times 25 The unit of measurement for insulation resistance is a. mω b. Ω c. kω d. MΩ 26 The maximum tabulated value of earth fault loop impedance for a circuit is 1.85Ω. If the resistance of the line and cpc of a new circuit is 1.03Ω. the maximum accepted external earth loop impedance value is a. 0.82Ω b. 0.45Ω c. 0.35Ω d. 0.20Ω 27 Before carrying out a test of insulation resistance a. The circuit must be isolated b. A loop impedance test is undertaken c. All loads must be connected d. All switches must be open 28 The type of earthing system which includes an installation earth electrode is a. TT b. TN-S c. TN-C-S d. IT 29 A 100 ma residual current device is installed to provide fault protection. The maximum applied test current to confirm compliance is. a. 50 ma b. 100 ma c. 150 ma d. 200 ma 30 The current measured between line and neutral at the origin of an electrical installation forming part of a TT system would be recorded as the a. Design current b. Nominal current c. Rated current d. Prospective fault current