HERITAGE CASEMENT BOW & BAY WINDOW

Similar documents
VISTALUXE CASEMENT, AWNING, & PICTURE WINDOW

INSTALLATION INSTRUCTIONS FOR REPLACEMENT FORGENT WOOD GLASTRA WINDOWS RECOMMENDATIONS FOR COMMON INSTALLATION OF ALL REPLACEMENT WINDOWS.

INSTALLATION INSTRUCTIONS FOR FORGENT SLIDING PATIO DOORS RECOMMENDATIONS FOR COMMON INSTALLATION OF SLIDING PATIO DOORS.

STERLING DOUBLE HUNG & STUDIO WINDOWS

STACKING MULTI-SLIDE DOOR SYSTEM

POCKETING MULTI-SLIDE DOOR SYSTEM

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit.

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

Tools required by installer: Materials required by installer:

INSTALLATION INSTRUCTIONS FOR TEUTONIC ENTRANCE DOOR RECOMMENDATIONS FOR COMMON INSTALLATION OF ENTRANCE DOORS.

INSTALLATION GUIDE WOOD PIVOTING CIRCLE/ OVAL

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACIÓN FOR CLAD CASEMENT & AWNING WINDOW VENTANA DE DOS HOJAS CON REVESTIMIENTO

Integrity Polygon and Round Top Installation and Finishing Instructions

Installation Guide for Architectural Wood Hinged Windows

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS

WOOD OUT SWING AWNING, CASEMENT, & HOPPER WINDOW

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL

Flashing Materials. Rough Opening Preparation

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032)

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) ImpOrTaNT INFOrmaTION & GlOssary.

INSTALLATION INSTRUCTION SINGLE PANEL, SINGLE PANEL WITH SIDELIGHT COMBINATION AND 20 MINUTE FIRE RATED WOOD FRAME ENTRY DOOR

Sliding Glass Door Assembly and Installation Guide

INSTALLATION INSTRUCTIONS DOUBLE-HUNG WINDOW WITH FINS

Sun Windows General Information New Construction Hinged Door Installation Instructions

Sun Windows General Information New Construction Sliding Door Installation Instructions H F

Installation Guidelines. Next Dimension. Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window

Vinyl Windows and Doors Manufactured by Pella Corporation

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

Installation Guide for Andersen Architectural Clad Awning Windows

Installation Guide for Andersen Architectural Clad Hinged Windows

WINDOW REPLACEMENT INSTRUCTIONS FOR CASEMENT, DOUBLE-HUNG AND CLAD FRAME WINDOWS USING FRAME SCREWS

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GLOSSARY ROUGH OPENINGS

Frameless Inline Door With Return QCI5263

INSTALLATION INSTRUCTION INSTRUCCIONES DE INSTALACIÓN FOR CLAD HINGED PATIO DOOR PUERTA DE BISAGRA PARA PATIO

Installation Guidelines for all Quaker products with nail fins New Construction nail fin installation with a Zip sheathing system.

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows with Exterior Trim or Nail Fin (JII024)

NEW CONSTRUCTION, REPLACEMENT AND FLUSH FIN REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS

Installation Guide for Andersen 400 Series Tilt-Wash Transom Windows with Stormwatch Protection (PG Upgrade) Manufactured After 2006

INSTALLATION INSTRUCTIONS - INSTRUCCIONES DE INSTALACION FOR HURRICANESHIELD IMPACT-RESISTANT DOUBLE-HUNG, SINGLE-HUNG AND SIMULATED-HUNG

Installation Guide for Andersen Architectural Clad Inswing Entry and Patio Doors

Transom Joining. for Andersen Elliptical Windows over Perma-Shield Gliding Patio Door

Installation of Fiberglass Windows

Vinyl Windows and Doors

WINDOW REPLACEMENT INSTRUCTIONS FOR SINGLE-HUNG, DOUBLE-HUNG, CASEMENT, AWNING INTO EXISTING CASEMENT FRAME USING FRAME SCREWS

Installation Guide for Andersen 400 Series Tilt-Wash Transom and 200 Series Narroline Transom Windows

(773) INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GL OSSARY ROUGH OPENINGS

Steel Reinforced Joining Thank you for choosing Andersen. Please leave this guide with building owner.

INSTALLATION INSTRUCTION FOR WOOD DOUBLE-HUNG AND CASEMENT WINDOWS USING WOOD BRICKMOULD OR FLAT CASING

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

NEW CONSTRUCTION PATIO DOOR INSTALLATION INSTRUCTIONS (WITH NAILING FLANGE)

Installation Guide. for Andersen 400 Series Tilt-Wash Picture Windows with Stormwatch Protection (High-Performance Impact Resistant Glass)

INSTALLATION INSTRUCTIONS

Thermally Broken Framing and Door Installation

INSTALLATION INSTRUCTION FOR CLAD BOW WINDOWS WITHOUT HEAD AND SEAT BOARD

Casement/ Casement Picture Pocket Installation (Interior) Tools: (Not Provided by Manufacturer) Fig Supplies: (Not Provided by Manufacturer)

INSTALLATION INSTRUCTIONS for Vinyl Projecting Windows with Integral Nailing Fin (JII023)

INTERIOR. Checkrail. Flashing tape

Heavy Wall Applied Stop Tube Frame and Door Installation

Installation Guide for Andersen 400 Series Gliding Windows

Curtain Wall Installation Guide

Installation Recommendations for Finless Frame Doors

Panel Assembly and Installation

Vinyl Windows and Doors

VINYL WINDOWS (new construction or replacement) page 2. VINYL PATIO DOORS pages WOOD CLAD WINDOWS (new construction).page 5 WOOD CLAD WINDOWS

ULTRA WINDOW & DOOR EXPANDERS AND RECEIVERS INSTALLATION INSTRUCTIONS

Installation Guide. for E-Series/Eagle Clad Hinged Inswing French Door

Reinforced 10 Bow Window Assembly and Installation Guide for Andersen 400 Series Transom Joined Casement Windows

T he Double-Hung Replacement System replaces the sash and balance system of an older double-hung window. The

Frameless Inline Door QCI5254

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

THERMO-FIT REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS (BRICKMOULD / NO NAILING FLANGE)

Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions

Please read thoroughly and understand completely all the steps in this instruction prior to beginning installation.

PELLA INSTALLATION INSTRUCTIONS - ADVANCED PERFORMANCE Nail Fin, Nail Fin with J-Channel and EnduraClad Exterior Trim with Nail Fin Windows

How To Install Windows: Nail-Fin Application

Steel Reinforced Joining Guide (Horizontal / Vertical)

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS

Installation Guide for Andersen 200 Series Tilt-Wash Picture, Transom and Circle Top Windows

Installation Guide for Andersen Frenchwood Patio Door Sidelights and Transoms

INSTALLATION INSTRUCTIONS for Custom and Premium Pocket Windows (JII022) IMPORTANT INFORMATION AND GLOSSARY SAFETY AND HANDLING

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE

Vinyl Windows and Doors

VINYL REPLACEMENT WINDOW INSTALLATION STANDARDS

INSTALLATION INSTRUCTIONS - INSTRUCCIONES PARA LA INSTALACIÓN CLAD WINDOWS WITH FLUSH FLANGE

Vinyl Windows Manufactured by VPI Quality Windows

Pocket Door Installation Instructions

Norwood Windows Permaglass Fiberglass Products Installation Instruction

Phone # La Jolla Doors. Block Frame Installation Manual Aluminum Frame with either Vinyl or Aluminum Panels

VYTEX PREMIUM SLIDING GLASS DOOR. Table of Contents. Precautions and Safety 2. Tools Required...3. Inspect and Prepare Door...4

PREHUNG DOOR SYSTEM INSTALLATION INSTRUCTIONS: FIBRECOMP COMBINATION UNITS

tile redi redi DOOR Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE:

Vinyl Windows and Doors Manufactured by VPI Quality Windows

Mira Premium Series Bi-Parting French Sliding Patio Door Installation Instructions

Eagle clad double-hung window installation instructions

Installation Instructions

Installation Instructions

Installation Guide for E-Series/Eagle Clad Mechanically Fastened Windows

Please read and understand all instructions before beginning. These instructions cover the non-impact aluminum sliding glass door.

DOOR INSTALLATION GUIDE WOOD FRAMING New Construction

Transcription:

HBB HERITAGE CASEMENT BOW & BAY WINDOW INSTALLATION INSTRUCTIONS READ THESE INSTRUCTIONS COMPLETELY BEFORE STARTING ANY INSTALLATION Kolbe & Kolbe Millwork, Co., Inc. 1323 S. 11th Ave. - Wausau, WI 54401 - www.kolbe-kolbe.com 5088670

Recognize this symbol. When this symbol appears be aware of possible injury or product dammage. TOOLS REQUIRED BEFORE STARTING Level Square Tape Measure Screws Wood shims 8d box nails Hammer Sealant Power drill 9/64" drill bit 3/16" drill bit 7/64" drill bit 1/8" drill bit 3/8" drill bit Phillips screwdriver Safety Glasses/Goggles Hearing Protection Device WARNING: *REMEBER SAFETY FIRST* Always wear Proper Eye and Hearing protection when installing, removing or performing adjustments to Kolbe Window and Door products. INTRODUCTION This installation guide is intended for a wood or concrete/masonry wall (includes a rough opening, lined with a 1-1/2" (38mm) thick wood buck/treated where necessary). Contact your Kolbe Window & Door supplier for information on installing units into other wall conditions. WARNING: Read the following instructions completely before attempting any installation. Proper installation and periodic home maintenance of Kolbe windows and doors is essential for upholding and sustaining the quality of our products. Failure to install and maintain our product properly will void any warranty, written or implied. HERITAGE SERIES CASEMENT BOW & BAY WINDOW INSTALLATION INSTRUCTIONS STEP #2A: Sealant Caulking For perimeter sealing the installer must decide if a moving or non-moving sealant joint is required (examples of moving or non-moving type joints are illustrated on drawings 1A - 1F). (1A) NON-MOVING (1C) MOVING (1B) NON-MOVING (1D) MOVING HBB 1 STEP #1: PREPARE ROUGH OPENING Check: 1. The material/lumber quality and fasteners must be structurally adequate for design load requirements. 2. The opening must be sized correctly. Typically the rough opening should be sized 1/2" (13mm) wider and 1/2" (13mm) higher than the outside measurement of the window frame. The masonry opening should typically be sized 1/2" (13mm) wider and 1/2" (13mm) higher than the clad nosing/exterior casing (verify with local building codes). 3. The opening must be plumb, square, level and in plane (NOT TWISTED). 4. The individual construction members should not be twisted. 5. It is critical that the sill plate beneath the unit is perfectly level for proper operation. 6. Make sure the opening is properly flashed. CAUTION: When installing into a wall with exterior rigid foam insulation panels, be sure to place solid blocking material behind the nailing fin/trim holder. This will provide proper support when fastening the unit into the provided opening. Any support bracket and blocking should be secured directly to the exterior sheathing. CAUTION: A brick, stone, marble or concrete face installed up against the window s sill could cause the unit to become inoperable. STEP #2: PRELIMINARY WINDOW PREPARATION Remove the shipping packaging, skid plates or factory applied bracing. Make sure the unit is not damaged and that the dimensions agree with the rough opening. Fig 1 (1E) NON-MOVING (1F) MOVING These Techniques are general guidelines only, and may not be appropriate for all perfomance requirements. The installer is responsible for consulting the contractor, structural engineer, architect, or consumer for proper installation according to local codes and/or ordinaces. Kolbe Windows & Doors recommends that moving joints have at least a 1/4" (6mm) gap between building components. Kolbe & Kolbe has available a pamphlet on perimeter vapor barrier, flashing and sealing applications. The pamphlet contains information on a number of methods for applying a flashing material and sealant around the window rough opening. The information can be obtainted by contacting your local Kolbe & Kolbe distributor. The window rough opening perimeter must be properly flashed. CAUTION: Regardless of perimeter sealing techniques, the following steps must be followed. STEP #3: SILL SUPPORT PLATFORM PREPARATION The sill plate beneath the unit must be perfectly level. In cases where a Kolbe Window & Door insulated platform has not been purchased, one must be constructed. Begin by determining which platform layout (Fig.13, found on Page 5) represents your bow/bay. Next, from the provided chart, transfer the given values to the corresponding letter designations. Using these measurements, layout the outline of the support platform on a piece of 3/4"(19mm) plywood (Fig. 3). Cut along the outline.

HBB 2 NOTE: If your installation includes a head platform, it should be laid out at this point. Place the support platform/insulated platform on a sheet of 3/4"(19mm) plywood. Trace around the platform perimeter. Deduct the measurement allocated for the jamb depth (Fig. 2). NOTE: If an installation, including the Kolbe Window & Door cable support kit is utilized, the preliminary platform preparation procedure (Step #6A) should be followed. TOP BOARD JAMB DEPTH CLEARANCE HOLES BOTTOM BOARD 2 1/4" On the top surface of the support platform (Fig. 3), measure in from the exterior perimeter 2-1/2"(64mm) for clad and 3-9/16"(90mm) for wood units. Then measure in 1-1/2"(38mm) from the back face of the platform. Cut 3/4"(19mm) x 2"(51mm) support blocks and place inside the previously drawn lines. Cut 1 1/2"(38mm) x 1-11/16"(43mm) support blocks and place inside the previously mentioned lines. Then place insulation between the support blocks. FILLER 1 1/2" SPACER BLOCK 1" DIAMETER HOLE 3 9/16" WOOD BAY PLATFORM SHOWN Fig. 4 SUPPORT BLOCK SUPPORT BRACKET SUPPORT PLATFORM 2 1/2" Place the support platform into the opening. Center it in the opening, equalizing the platform to rough opening gap. The platform must be level across the width. Shim if necessary. Fasten the platform to the sill plate using #10 x 2-1/4"(57mm) screws. Place one fastener 4"(102mm) from each end and every 8"(203mm) to 10"(254mm) in between. Install a vapor barrier over the top of the insulation. As a final step, cut filler strips to secure to the sides of the rough opening (Fig. 4). Place fasteners 3"(76mm) from the ends and every 8"(203mm) to 10"(254mm) in between. STEP#3A: SUPPORTING THE SUPPORT PLATFORM A bow/bay that projects more than 12"(305mm) requires support from below and above. Place a Kolbe Window & Door support bracket or any other type of bracket below the support platform. If brackets are not required skip Step 3B. STEP #3B: SUPPORT BRACKETS Place a Kolbe Window & Door support bracket or other type of brace under each mullion location, or as close as possible. If stud locations do not facilitate proper support placement, support blocking should be utilized (Fig. 5). Secure the bracket to a stud or support blocking with lag bolts. LAG BOLT Fig. 2 Fig. 3 SUPPORT BRACING Fig. 5 Continue by securing through the platform into the support bracket with #8 x 1-1/2"(38mm) screws. A minimum of two brackets on bow units larger than a 4-wide N Series and on bay units is recommended. Three brackets are recommended on 7-wide bow windows. #10 x 2" SCREWS #10 x 3" SCREWS 2 X 4 BLOCKING HEAD PLATFORM PLATFORM #10 x 2 1/4" SCREWS INSULATION 10d FINISH NAIL STEP #3C: HEAD SUPPORT PLATFORM PREPARATION When a roof soffit or cable support system cannot be used for support, you may choose to use a head platform. Attach a 2"(51mm) x 4"(102mm) blocking to the wall (Fig. 6). Fasten through the head platform blocking into the header with #10 x 3"(76mm) screws. Screws must also be used to fasten through the headboard into the blocking. Kolbe Windows & Doors recommends pre-drilling a 3/16"(5mm) clearance hole through the head platform 2-1/4" (57mm) in from the face of the platform (Fig. 2). Place the holes 4"(102mm) in from each end and every 8"(203mm) to 10"(254mm) in between. STEP #4: GENERAL INSTRUCTION FOR ALL INSTALLATIONS Apply a 3/16"(5mm) bead of sealant to the valley created by the side jamb of the window and support wedge. Apply a second bead of sealant next to the first, along the back side of the support wedge (Fig. 1A). Place the bow/bay on the support platform and slide the unit into the rough opening. The nailing fin/brickmould support block must be flush with the exterior sheathing. Center the unit, equalizing the box to rough opening gap. Fig. 6 CAUTION: When using the cable support kit, make sure that the ends of the cables will continue through the bow/bay post and support platform. Insulate between the top platform and the headboard. Do not pack the insulation in too tightly. Check to ensure the sill and seat board are level. Shim wherever necessary. Level and shim the sill and side extension jambs. Measure the distance from the upper left corner of the extension jamb to the lower right. Measure the remaining two corners. The two measurements must be within 1/16"(2mm). Adjust shims wherever necessary. Run 10d finish nails through the seat board and side extension jambs (Fig. 6). The nails should be placed 4"(102mm) from each corner then every 8"(203mm) to 10"(254mm) in between. Level, shim and secure the head board in the same manner as the seat board. CAUTION: A 1/4"(6mm)(minimum) gap between the window perimeter and framing material should be provided when using brick, stone, marble or concrete as an exterior facing. This should provide for most movement or settling of the structure, which could affect the operation of the unit. The gap should be spanned by an appropriate sealant joint.

HBB 3 STEP #5: FASTENING HEAD PLATFORM TO UNIT Predrill a 7/64"(3mm) pilot hole through the head platforms clearance hole and into the head of the bow/bay. Secure a #10 x 2" (51mm) screw into the head jamb of the bow/bay, through each of the clearance holes (Fig. 6). STEP #6: ADDITIONAL ANCHORING You may choose to drive a fastener through the side jamb nailing fin/ brickmould. When nailing through the brickmould, the holes must be properly filled and or sealed. Nailing through the nailing fin or brickmould alone is not sufficient to permanently secure the window into an opening. See Step #6A for additional anchoring requirements. Nailing through the K-Kron finish will void the finish warranty, unless proper procedures are followed. STEP #6A: CABLE SUPPORT Follow the instructions provided with your cable support kit. Using the template supplied with your cable support kit, mark the location of the holes utilized by the cable support system. After the hole placements have been transferred from the template to the support platform, drill a 1"(25mm) diameter hole through the support platform and a 3/8"(10mm) diameter hole through the head platform (if utilized) (Fig. 4). If a head platform is not used on a bow unit, increase the diameter of the hole in the end of the bow post to 3/8" (10mm) (Fig. 7). Drill down about 1/2"(13mm) from the top of the head jamb. Additional drilling is not required on bay units without a head platform. INCREASE TO 3/8" DIAMETER "T" NUT Into each of the predrilled 3/8" (10mm) diameter holes, place a T nut. Tap the nut into place until properly seated. Slide cable, rod end, through each of the T nuts or PVC bay post tubes (Fig. 8). If a headboard is not used on a bay unit, the T nut is omitted from the assembly procedure. Kolbe Windows & Doors recommends placing a scab board over the end of the bay post. Drill a 3/8" (10mm) diameter hole through the scab board, at the bay post tube location (Fig. 9). SCAB BOARD Fig. 7 Fig. 8 WASHER LOCK WASHER Fig. 9 Fig. 10 NUT STEP #6B: APPLYING CABLE COMPONENTS Slide the 1 1/4" (32mm) washer and lock washer over the end of the rod at the end of the cable. Continue by threading the hex nut onto the rod end (Fig. 10). Turn the nut until the end of the rod extends just beyond the nut. STEP #6C: MOUNTING CABLE HOLDER Fasten the cable holder to the building structure. Determine the most appropriate location for the cable holder. Fig. 11 illustrates a number of possible mounting scenarios. Set the holder in CABLE Fig. 11 HOLDER place and mark the screw hole locations. Drill a 1/8" (3) diameter pilot hole through each of the 15" marked hole locations. FASTEN MINIMUM CABLE END Secure the cable holder in place with 2 - #10 x 2" (50mm) screws. From the upper end of the cable, pull the cable tight. The washers and nut should be drawn up to one another and flush with the bottom of the window frame (Fig. 12). Proceed by wrapping the cable around the cable holder, as shown in (Fig. 11). Cable should be taut. Secure the remaining length of cable. STEP #6D: CABLE ADJUSTMENT If temporary braces were used, they should be removed at this time. Check to make sure the seat board is level. If an adjustment is necessary, it can be performed by tightening the nut at the base of the support cable. You will need a standard screwdriver and the adjustment handle provided with your cable support kit. Slide the adjustment handle over the nut on the end of the support cable (Fig. 12). Fit the blade of the screwdriver into the slot on the end cable rod. While keeping the screw driver in a stationary position, turn the adjustment handle. Follow this procedure for the remaining cable(s), checking as you 2 X 4 Fig. 12 BLOCKING go the level of the seat board. Nut Adjustment Handle INSULATION Insert the adjustment hole plug into the adjustment hole. CAUTION: If the unit is severely out of alignment, incremental adjustments may need to be spread out over a period of time. This will avoid any damage that may occur to your unit. If minor adjustment does not remedy a problem, the unit may need to be removed and re-installed.

HBB 4 STEP #7: GENERAL MAINTENANCE Periodic checks should be made to your bow/bay window. Make sure that your unit is level. Adjustments can be made by removing the adjustment hole plug and tightening the adjustment nut. Follow the instructions given in Step #6D. STEP #8: INSULATION & INTERIOR CASING/ TRIM It is recommended to install fiberglass insulation in the void created by the outer perimeter of the door frame and rough opening members. Using a putty knife, work in the insulation. It should be installed loosely, and fill entire depth of gap. CAUTION: Over-packed insulation can lessen the insulating effectiveness and cause the frame to be distorted, which may result in poor operation of the sash. If you choose to use a foam type insulation, it must be of a low expansion type foam and, used in con junction with fiberglass insulation. Follow the manufacturers instructions for proper application of the foam. As a final step, apply interior casing. STEP #9: EXTERIOR AND INTERIOR FINISHING INSTRUCTIONS This instruction step has been kept brief. When applying a finish, follow the information provided by the manufacturer. Contact your Kolbe Window & Door distributor for additional finishing information. Primed wood units must remain dry and finishing should be completed within 30 days. Bare wood should be prefinished or finished immediately following installation. Periodic/Yearly inspection and maintenance of Kolbe & Kolbe windows for damage or deterioration of exterior sealants and/or finishes should be performed. Also, check to see if the exterior sealants have any gaps, leaks, or signs of damage and deterioration. Cracks in the K-Kron finish, resulting from joint movement, which may occur during the installation process or over the life of the product, must be caulked with a high quality sealant immediately to maintain the integrity of this paint finish. Finally, check insulating (IG) units for cracks or fogging. CLEANING A yearly cleaning with mild soap and sweet water (tap) solution is recommended for the sash and frame, then rinse. Clean glass with any standard glass cleaner, keeping it from running down the sash onto frame and weatherstrip. DO NOT PRESSURE WASH. HARDWARE Check all fasteners, making sure all hardware is properly secured. INSULATING GLASS Broken or fogged IG units, requiring reglazing or replacement, should be referred to your Kolbe & Kolbe distributor. MAINTENANCE TIPS AND/OR PROCEDURES CAUTION: Kolbe Window & Doors standard H K insulating glass has a LoE coating on surface two (2). It does not match clear glass or other LoE products. Do-it-yourself reglazing/replacing without Kolbe Windows & Doors permission will void the product s war ranty. A high quality, exterior rated, acrylic latex topcoat should be applied to factory primed exterior surfaces. On a bare wood exterior, apply an installer selected quality system. On bare wood interiors, use an installer selected, top quality stain, sealer and/or polyurethane varnish. On factory primed interiors apply, a quality top coat system.

Figure 13 PLATFORM LAYOUT - UNIT OA A B C D E F G H 3 WIDE S 47-1/2 4-3/16 3/4 7 15-3/4 N/A N/A N/A N/A N 59-7/16 4-3/16 3/4 7-11/16 19-11/16 N/A N/A N/A N/A W 71-5/16 4-3/16 3/4 8-3/8 23-5/8 N/A N/A N/A N/A X 89-1/8 4-3/16 3/4 9-7/16 29-9/16 N/A N/A N/A N/A 4-WIDE S 62-13/16 4-5/16 1-3/16 8-1/2 15-1/2 9-7/8 N/A N/A N/A N 78-1/2 4-5/16 1-3/16 9-1/2 19-5/16 11-1/4 N/A N/A N/A W 94-3/16 4-5/16 1-3/16 10-9/16 23-3/16 12-5/8 N/A N/A N/A X 117-3/4 4-5/16 1-3/16 12-1/16 29 14-3/4 N/A N/A N/A 5 WIDE S 77-5/8 4-7/16 1-5/8 9-15/16 15-1/16 12-11/16 15-3/4 N/A N/A N 97 4-7/16 1-5/8 11-5/16 18-13/16 14-3/4 19-11/16 N/A N/A W 116-3/8 4-7/16 1-5/8 12-11/16 22-9/16 16-13/16 23-5/8 N/A N/A X 145-1/2 4-7/16 1-5/8 14-11/16 28-3/16 19-15/16 29-9/16 N/A N/A 6 WIDE S 91-13/16 4-9/16 2-1/8 11-5/16 14-1/2 15-1/2 15-1/2 16-7/8 N/A N 114-3/4 4-9/16 2-1/8 13 19-5/16 18-3/16 19-5/16 19-15/16 N/A W 137-11/16 4-9/16 2-1/8 14-3/4 21-3/4 20-15/16 23-15/16 23-1/16 N/A X 172-1/8 4-9/16 2-1/8 17-1/4 27-3/16 25 29 27-5/8 N/A 7 WIDE S 105-5/16 4-11/16 2-3/4 12-11/16 13-7/8 18-3/16 15-1/16 20-15/16 15-3/4 N 131-5/8 4-11/16 2-3/4 14-11/16 17-15/16 21-9/16 18-13/16 25 19-11/16 W 157-15/16 4-11/16 2-3/4 16-11/16 20-13/16 24-15/16 22-9/16 29-1/16 23-5/8 X 197-7/16 4-11/16 2-3/4 19-11/16 26 29-15/16 28-3/16 35-3/16 29-9/16 HBB 5 UNIT OA A B C D 30 BAY S (31-1/4 + CENTER UNIT WIDTH) 4-11/16 2-3/4 13-3/16 14-11/16 N (38-1/8 + CENTER UNIT WIDTH) 4-11/16 2-3/4 15-3/16 18-1/8 W (45-1/16 + CENTER UNIT WIDTH) 4-11/16 2-3/4 17-3/16 21-5/8 X (55-1/2 + CENTER UNIT WIDTH) 4-11/16 2-3/4 20-3/16 26-13/16 45 BAY S (27-9/16 + CENTER UNIT WIDTH) 4-11/16 2-3/4 17-3/8 12-3/8 N (33-1/4 + CENTER UNIT WIDTH) 4-11/16 2-3/4 20-3/16 15-3/16 W (38-7/8 + CENTER UNIT WIDTH) 4-11/16 2-3/4 23 18 X (47-3/8 + CENTER UNIT WIDTH) 4-11/16 2-3/4 27-1/4 22-1/4 D F H OA 7WIDE 5WIDE 6WIDE 3WIDE BOW BAY 4WIDE C E G A B LAYOUT IS 1/2 OF THE ACTUAL PLATFORM For further information visit Kolbe & Kolbe on the internet at www.kolbe-kolbe.com. 5088670-1M-0202-SP