CABLE RAILING INSTALLATION GUIDE FOR WOOD POST SYSTEMS

Similar documents
MARINE-GRADE 316L STAINLESS STEEL RAILING ARCHITECTURALLY CORRECT POSTS AND HANDRAIL RAILING BUYER S GUIDE VIEWRAILSYSTEMS.COM

DESIGN. DELIVER. DONE. RAILING + FLOATING STAIRS

Create cable assemblies to fit your style

Cable Cutter Square. 25 Tape Measure. Chalk Line Level Loctite 242 Blue

Clearview Railing System Installation Instructions

Now available at participating Feeney (2/14) AF# A. Stores. 1/8'' Stainless Steel Cable Assemblies to Enhance Any Railing and Any View!

Installation Instructions

ATLANTIS RAIL HandiSwage Installation Instructions ATLANTIS RAIL Contact Information Atlantis Rail Systems November, 2013

Chalk Line. #4 Phillips Driver Bit. Cable Cutters

Horizontal Cable Systems

ATLANTIS RAIL Contact Information

Hammer. Loctite 242 Blue. April 2018 trademarks of Suncor Stainless, Inc. Loctite is a registered trademark of Henkel Corporation

QUICKLOCK ASSEMBLY TYPE #2 INSTRUCTIONS

PARTS INCLUDED IN FIXED STAIR CABLE RAIL KIT:

UNIT No FRAMELESS PIVOT SHOWER DOOR

Transform Cable Rail MUST be installed on 4" x 4" wooden posts sleeved with Transform post sleeves to support cable tension!

ATTRACTIVE VERSATILE DURABLE

Horizontal Cable Systems

Face Mount to Through-the-Post Mount

American Morse Equipment

ATLANTIS RAIL Contact Information: Atlantis Rail Systems 70 Armstrong Road 3900 Civic Center Drive Plymouth, MA North Las Vegas, NV 89030

Make your railing view friendly with the original stainless steel cable infill for wood, metal, and composite-sleeved wood railing.

INSTALLATION INSTRUCTIONS. Level Rail With Cap: Page 2 Level Rail Without Cap: Page 8 Stair Rail: Page 12

CertainTeed INSTALLATION GUIDE SIMTEK FENCE PRODUCTS. Fence Installation Guide 3', 4' & 6' High

Installation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

2017 UPDATED INSTALLATION INSTRUCTIONS

HANDRAIL HEIGHT PER LOCAL CODE AUTORITY

The following instructions will guide you through the installation of your new vinyl railing.

#4 Phillips Driver Bit 1/8, 4mm, 5.5mm & 8mm (5/16 ) Allen Wrench. Safety Glasses

Ripple Hanger ASSEMBLY INSTRUCTIONS

HANDRAIL HEIGHT PER LOCAL CODE AUTORITY

Installing AZEK Evolutions Rail

IMPORTANT: Read all sections before you start

HOW TO INSTALL HORIZONTAL ROD RAILING TREX SIGNATURE STANDARD

AFCO-Rail Post INSTALLATION INSTRUCTIONS AFCO-RAIL POST

Guide to Cable Railings

INSTALLING INVISIRAIL GLASS PANELS POST INFORMATION... 2 PRE-INSTALLATION... 2

ASSEMBLY GUIDE. Mia Narrow Bookcase

CXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately

The following instructions will guide you through the installation of your new vinyl railing stair kit.

I N S T A L L A T I O N I N S T R U C T I O N S. RailEasy MARINER

HOW TO INSTALL HORIZONTAL ROD RAILING TREX SIGNATURE STANDARD

Side Winder R o u t e r L i f t.

INSTALLATION INSTRUCTIONS PRAVOL DURA-SHIELD COMPOSITE DECK RAILINGS

PTC Model 4. Programmable Turntable Controller. Basic Motor Mount Kit P/N Installation Instructions

Open Up Your View With CABLE SYSTEMS

Kit 102 Series Installation Instructions for Wood or Metal Posts on Level Runs

1/8 Stainless Steel Cable Assemblies to Enhance Any Railing and Any View!

TREX SELECT RAILING. Installation Instructions PARTS

TREX ENHANCE RAILING (Also Applies to Trex Select Railing) Installation Instructions

INSTALLATION INSTRUCTIONS

HILGARD Part Number Spectrum Lane ~ Missoula MT ~

Model 5400H / 7000H Illustrated Installation Instructions

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

1/8 Stainless Steel Cable Assemblies to Enhance Any Railing and Any View!

Tape Measure Carpenter s Square Touch-up Paint Chalk Line. Blue 242. Template

Template. Blue 242. May 2018 trademarks of Suncor Stainless, Inc. Loctite is a registered trademark of Henkel Corporation

Installing. Cable Railings. Two specialty tools and a few techniques expand your design options

PVC Composite Railing & Stair Kit

SHADOWBOX INSTALLATION FOR: Standard 6 H x 8 W Shadowbox Fence 5 x 5 Routed Posts Dog Ear or Straight-Edge Pickets 1.75 x 3.5 Rail

Wagon Vise Retrofit Installation Instructions. American Craft Woodworks. Wagon Vise

INSTALLING YOUR NEW SPRING LIFT ARM KIT

Series 1100 Aluminum Door Canopy

Series 1500 Aluminum Door Canopy

Chain Drive Vise. Installation Instructions. (revised 11/29/2018)

RAILING. Installation Guide

Dura-Lock Roof System

Slide the stock rubber tank mount caps onto the ends of the CS-1 tank mount:

PRIVACY INSTALLATION FOR: Standard 6 H x 8 W Privacy Fence 4 x 4 Post Sleeve & Brackets Dog Ear or Straight-Edge Pickets 1.75 x 3.

Handrail Installation. Paramount Cable Railing Systems 49 Stokes Drive Carson City, NV

Roof Rack Installation Instructions

Model 6100 Illustrated Installation Instructions Contractors Wardrobe

Level Railing. Installation Guide. v2.5 W W W. S O L U T I O N S A L U M I N U M. C O M

INSTALLATION INSTRUCTIONS

Dusty Harp Pickup for lever harps

PRO System with Dedicated Automatic Kerf Keeper Installation Manual - SP-2 (V1.0) 0706

Cardo DOOR & RETURN SHOWER ENCLOSURE INSTALLATION PLEASE READ THESE INSTRUCTIONS CAREFULLY.

Installation Instructions for Vista Air Vertically Folding Walls

Installation of Balustrade Systems

TREX SELECT RAILING Installation Instructions

INSTALLATION INSTRUCTIONS

2x Bottom Bracket. 1x Rail Support STEP 1 STEP 2

VINYL CLASSIC FREESTANDING PERGOLA ASSEMBLY INSTRUCTIONS

POST INSTALL INSTRUCTIONS

TREX TRANSCEND RAILING

Installation Instructions for. Handrail Component System

Frameless Fixed Panel Slider

RTI TECHNOLOGIES, INC.

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY. 6 3/8" [161.9mm]

Giraud Tool Company, Inc.

TREX REVEAL RAILING Installation Instructions

Chain Drive Vise. Installation Instructions. (revised 05/04/2016)

ENIGMA AIR ENCLOSURE

General Array Layout Sketch

UNIVERSAL PANEL AND GATE

UNIDOOR (STYLE B & C)

Bushwacker Jeep Flat Style Fender Flares Front Pair

Straight Stringer Installation Instructions

Palladian/ Keystone Models 202/204 Maintenance Kit

Transcription:

RAILING INSTALLATION GUIDE FOR WOOD SYSTEMS Welcome to Viewrail! We are excited to help you install your new railing system. We know you will enjoy it for many years to come. Our goal is to bring you top quality products in a very organized package. This binder is your resource for the following information: Installation Instructions for Viewrail Railing Systems Code Compliance Information Our mission is to create simplicity and elegance, and we can t wait to see that become a part of your décor. If you need any help, please feel free to give us a call. As a victory lap, send us some photos of your finished project. We ll enter you into a quarterly photo contest where you can win up to $0! Blessings from your Viewrail team, Len, Fernando, and Trent Unpack & Prep page Mount Intermediate Posts page Drill page Run & Tension page Cleaning & Code page

Unpack & Prep Your shipment has arrived and it s time to get busy installing! The first thing you need to do is unpack your boxes. While you re unpacking, keep your eyes open for any shipping damage. You ll also want to check your layout (drawing made to quote your job, found in the back of this binder) for order accuracy. If anything is wrong or damaged, you must contact us within business days. What You ll Need Here s a quick rundown of what you will need to get started with most cable railing installations. Our / stainless steel cable comes in spools of 00 or 00 feet. Tension Kits Tension Kits come in boxes of 0 or Kits, Kit is needed for each end of every cable run. s Depending on which Tension Kits you re installing, you should have the Rail Installation Kit, DriveTite Installation Kit, or both. The contents of the tool kits are explained on the next page. Rail Installation Kit (VR00) Crimpers and cutters have clear purposes, but our kit has a few unique tools, which are explained below. Tightening Made to rest on the cable, the Tightening has teeth that fit into the notches on a. It holds the fitting during tightening so the cable doesn t spin. Wooden Block The Wooden Block is used to simplify the process of tapping in the Insert Sleeves. Straddling the cable, the block provides an even surface to tap and prevents the sleeve from entering the post at an angle. String Run the provided string through the bottom holes of your layout with the posts in place before they are installed. This exercise will help you know exactly where to install posts for optimum cable clearance on stairs. Intermediate Posts Sometimes referred to as pickets, these posts are made to minimize cable deflection for the purpose of safety and code compliance. Your project may not require these posts if your main posts are spaced less than feet apart. DriveTite Installation Kit (VR0) cutters have a clear purpose, but our kit has a few unique tools, which are explained below. These customized channel locks have a space cut out in the bottom of the jaw to make room for the cable so you can get a solid grip on the fittings while compressing. Wooden Block The Wooden Block is used to simplify the process of tapping in the Insert Sleeves. Straddling the cable, the block provides an even surface to tap and prevents the sleeve from entering the post at an angle. String Run the provided string through the bottom holes of your layout with the posts in place before they are installed. This exercise will help you know exactly where to install posts for optimum cable clearance on stairs.

Mount Intermediate Posts If your project requires intermediate posts, this is where the installation will begin. If you don t require intermediate posts, move on to the Drilling section. These posts are not designed to offer structural support to the handrail. Angle Section Installation of / Intermediate Posts Level Section Installation of / Intermediate Posts. Measure from bottom of the handrail to the mounting surface.. Cut intermediate post to the the previous step with any device appropriate for cutting stainless steel. Remove any burrs with a file.. Slide the Foot Cover followed by the Intermediate Post Mounting Bracket onto the cut end of the intermediate post.. Mount the top end of the intermediate post into the handrail with the provided screws.. Make sure the post is vertical, then screw the Intermediate Post Mounting Bracket into the mounting surface with the provided screws.. Slide the Foot Cover over the Intermediate Post Mounting Bracket. Helpful Tip: Once cut to size, you can use an intermediate post as a drilling guide for your posts. This will ensure that all of your cable holes line up.. Run string to simulate the bottom cable of your angled run.. Hold the intermediate post up to the bottom of the handrail with the bottom hanging off the side of the stair.. Slide post to find where a cable hole will line up with your bottom cable (string).. Covering the post top with a rag to protect the finish, use pliers to bend the post top to the appropriate angle.. Slide the Foot Cover then the Intermediate Post Mounting Bracket onto the cut end of the intermediate post. /" Max Spacing. Mount the top end of the intermediate post into the handrail with the provided screws. Critical Info: spans between posts can be no more than with a structural post at least every ʹ. " Max Post Spacing. Once you ve found the proper post location, mark the cut length for the post.. Cut intermediate post to the the previous step with any device appropriate for cutting stainless steel. Remove any burrs with a file.. Make sure the post is vertical, then screw the Intermediate Post Mounting Bracket into the mounting surface with the provided screws. 0. Slide the Foot Cover over the Intermediate Post Mounting Bracket.

Drilling Once you have determined your post spacing and installed intermediate posts as necessary, you re ready to check your layout one last time before drilling the wood posts. Run String Run a string along the side of the posts to simulate the bottom cable before drilling holes. This process will ensure that you have proper clearance from the stair nosing to the cable. If you have any specialty posts or bends, run the string along them so you can visualize the layout and identify any tricky spots. Mark Posts Make a template for marking hole locations on the posts. (You can use an Intermediate Post as a template after it has been cut to size.) The holes should be " apart from center to center. This spacing will allow the cable to deflect slightly and remain less than " apart. A sharp, pointed object like an awl or a punch can be used to mark your wood post. Mark both sides of each post that requires a through-hole. /" Max Spacing Turning Corners There are a few ways to turn corners in a system with wood posts. Carefully consider the following information before you begin drilling your corner posts. Start/Stop Corner This configuration terminates a cable run in each post. Single Post Corner This configuration uses standard Level Tension Kits (VR0). If your post is smaller than ", offset cable runs by /". Determining Hole Size Hole size and depth depends on which tension kits and components you are installing. Here s the breakdown: Pass-Through Posts A pass-through post is any post that cable will pass through without any tensioning components attached. If you are installing Wood Insert Sleeves (VR) in your pass-through posts, you ll need /" holes.* If no inserts are being used, we recommend /" holes. End Posts An end post is any post that will have tensioning components attached. If you are installing our Wood Level Tension Kit (VR) or Wood Angle Tension Kit (VR), you will need /" holes* that go all the way through the post. *We recommend using a /" spade bit for drilling these holes. For DriveTite and DriveTite Surface end post drilling instructions, see the kit installation instructions on pages 0 and. Drilling We recommend drilling a hole half way through the post then going to the other side of the post and drilling through so that the holes meet in the middle. If you drill all the way through the post from one side, it is likely that the hole will not be straight. Angle Single Post Corner This configuration uses Level Tension Kits (VR0) and Angle Tension Kits (VR). DriveTite Single Post Corner This configuration uses DriveTite Kits (VR). Good for level or angles. Minimum post thickness: / DriveTite Surface Single Post Corner This configuration uses DriveTite Surface Kits (VR). Good for level or angle runs. Minimum post thickness: /

Run & Tension Standard Kits Now that the posts are mounted, handrail is securely attached, and holes are drilled, you re ready for cable. This section will lead you through four stages: Measure & Cut, Crimp, Thread & Tension, and Apply Sleeves. Measure & Cut. Measure the distance from the outside face of one Tensioning Post (where the cable terminates) to the outside face of the other Tensioning Post.. Based on which Kit you re installing, subtract the amount listed below from your measurement in the previous step: NOTE: This amount is to be subtracted ONCE per cable. Do not subtract from each end. Wood Level Tension Kit (VR) on both ends / Wood Angle Tension Kit (VR) on both ends / Wood Level Tension Kit & Wood Angle Tension Kit. Once you ve determined cut length, mark one cable and cut. We recommend cutting and crimping one cable at a time. Measure outside to outside Measure outside to outside Thread & Tension. Put the through the hole of a Tensioning Post and thread the Tension Receiver (with Stainless Washer) on the Threaded Crimp Fitting. Tighten turns. *If this is an angled run, be sure to add the Angle Washer and Oval Washer to the Tension Receiver before threading into the.. Thread the cable through each post, putting the proper sleeves on the cable as your layout requires. Please read the Sleeves section below before completing this step.. Place the Guide Pin in the end of the and use it to align the threads with the Tension Receiver at the final post. Snug the cables, but do not tighten until all cables have completed this step.. Begin tightening at the middle of the post and work out using the Allen Wrench and Tightening. Tighten from each end so that the Threaded Crimp Fitting is into the post far enough that the sleeve can be inserted. NOTE: Tightening the cable too much could apply stress to the screws or brackets that attach the handrail to your posts. Stop tightening once cable is taut. Guide Pin Use Guide Pin for easier alignment and threading. Tension Receiver Stainless Washer Tension Receiver Crimp. Slide the cable into the until it cannot slide any further.. Put the fitting, with the cable inside it, between the crimper dies.. Crimp the fitting onto the cable, avoiding the threads and fins of the fitting. Be sure to crimp all fittings twice. When crimped correctly, you ll see the number 0 inside the crimped area. A Look at How each Kit Works CRIMP TWICE. Use the Tightening to hold the fittings in place while tightening. Do not allow the cable to spin while tightening. Tip: When installing on an angle, crimp and attach the bottom end first. This will allow gravity to help hold the Guide Pin in place when aligning and attaching Tension Receivers at the top Apply Sleeves Make sure the Sleeves are put on the cable as it is being strung through the posts. Only apply the Sleeves once all other installations have been finished and cables are tightened.. To apply the Sleeves, tap them in using the wood block provided in your tool kit. How to Install Adhesive Sleeves. Wipe the area on the post where the sleeves will be installed with a clean rag. Peel the backing off and do not touch the adhesive.. Once you are ready to apply the Adhesive Sleeves, simply press them against the post, applying moderate pressure for - seconds. Tightening Use Tightening and Allen Wrench to tension. Tensioning Order Allen Wrench Stainless Washer 0 Oval Washer Wood Insert Sleeve Wood Level Tension Kit (VR) Stainless Washer Tension Receiver Wood Angle Insert Tension Receiver Wood Angle Tension Kit (VR) Angle Washer Use care to keep steel tools, dirt, harsh chlorine-based cleaners, and acids away from any stainless steel parts before, during, and after installation.

ompress r /" Hole Run & Tension DriveTite DriveTite Level Installation Now that you have your handrail secured and any necessary intermediate posts installed, you re ready get started with DriveTite. We recommend using Measure a Forstner with String bit to drill the / holes because it makes the bottom of the hole flat. A spade bit will make the center of the hole deeper, Tape one making end it more difficult to drive the screw in straight. It s also a good idea to clear the hole of any debris before mounting the. Slide Wood Angle Inserts onto. Make sure prongs face posts that able to total urement from ous step. tension cables. eep Remove adhesive Press Wood Angle Insert into hole with Tap with wood block until fully seated.. Slide Wood Angle Inserts onto. Make sure prongs face posts that 0. Remove adhesive Press Wood Angle Insert into hole with Tap with wood block until fully seated. " Max " Post Max Spacing Post Spacing " Max Post Spacing Angle Installation Wedge For angled runs like stairs, follow the Clear instructions any debris above. from hole. except for steps and. Use /" Hole Make sure steps and driving screw. to the right in /" Deep their place... Modified Cut Pliers to total Cut to total then ADD /" then ADD /" Wedge Wedge Slide Wood Angle Inserts onto Slide. Wood Angle Inserts onto. Make sure prongs face posts Make that sure prongs face posts that /" Max Spacing /" Max Spacing then ADD /" " Max Post from Spacing String " Max to Tape Post Measure Spacing.... /" Max /" Max Spacing Spacing /" Max Spacing then ADD /" /" Hole /" Hole " Max Post Spacing String is included in the DriveTite Transfer Installation Measurement Kit " Max Post Spacing to Tape from Measure String /" Forstner Bit /" Forstner Bit /" Deep from hole. from hole. Make sure Make sure is started into BOTTOM hole before /" Max Spacing /" Max Spacing then ADD /" *When installing in hardwoods, drill / hole to a depth of / and make the pilot hole /. then ADD /" String is included in the DriveTite String is Installation included in Kit the DriveTite Installation Kit then ADD /" then ADD /" from hole. from hole. Make sure Make sure Barrel is started Fitting into hole before is started into driving hole before screw. driving screw. /" Deep /" Deep from hole. Repeat steps until Make sure all from Barrel cables hole. Fitting are mounted. BOTTOM TOP Make sure Now tighten both ends to tension cables. Use the to keep Use the to keep from hole.. Make /" sure Barrel Hole Fitting /" Hole /" this Hole order Remove adhesive /" Deep /" Deep 0 0 /" Deep Remove Measure adhesive with String Press Wood Angle Press Wood Angle Insert into hole with Insert into hole with Drill Holes Drill at Holes at then ADD /" a 0º Anglea 0º Angle Now tighten both ends to tension Now tighten cables. both ends to tension cables. Use the to /" keep Use Pilot Barrel the Hole Fitting/" to Pilot keep Hole Tap with wood block Tap with wood block DO NOT vertical TIGHTEN while YET! tightening. /" vertical Deep while tightening. /" Deep until fully seated. until fully seated. To accommodate the opposing but don t Tension tighten. cables in pilot holes, we recommend Remove adhesive Remove adhesive compressing and setting DriveTite BOTTOM 0 TOP TOP 0 in the bottom post first. Run the cable, making sure it isn t twisted, Press Wood Angle Press Wood Angle then compress the fittings for the Insert into hole with Insert into hole with String is included in the DriveTite Installation Kit top post with the screw hole in the lower position. This step is to avoid twisting the cable. Tap Transfer with wood Measurement block Tap with wood block until fully seated. until fully seated. Measure with String /" Deep Drill holes at a 0º angle. /" Forstner Bit Wedge /" Hole Cut to total /" Forstner Bit /" Hole Cut to total Slide Wood previous Angle step. Inserts onto. Make sure prongs face posts that /" Hole /" Deep Slide Wood Angle Inserts onto. Make sure prongs face posts that Drill Holes at a 0º Angle /" Hole /" Deep. " Max Post Spacing Wedge Wedge Wedge Wedge STOP /" Forstner Bit /" Hole /" Hole String is included in /" Forstner Bit /" Forstner Bit Cut to total Slide Wood A Make sure pr they will String ente Cut to total measurement Cut fromto total previous measurement step. from Cut to total Use Use the the to keep to Barrel keep Fitting vertical while while tightening. tightening. Tension cables cables in in order 0 Notched 0 for. Use the Now tighten both to keep ends Barrel to tension Fittingcables. vertical Use while the tightening. to keep 0 Tape o Slide Wood Angle Inserts ont Make sure prongs face posts Slide Wood An Make sure Slide pro W they will Make enter. s they wi Remove a Press Wo Insert into Tap with until fully 0 then ADD /" then ADD /" To accommodate To the accommodate opposing the opposing

/" Max Spacing /" Max Spacing ompress r able to total urement from ous step. tension cables. eep the 0 Run & Tension DriveTite Surface DriveTite Surface Level & Angle Installation Now that you have your handrail secured and any necessary intermediate posts installed, you re ready get started.. Tape o /" Max Spacing /" Max Spacing /" Max Spacing /" Drill Bit /" Max Spacing /" Drill Bit Mark the o Tape /" one Drill end Bit " Max Post Spacing String /" Drill Bit /" Drill Bit " Max Post Spacing /" Drill Bit. /" Max Spacing... /" Max Spacing /" Max Spacing " Max Post Spacing " Max Post Spacing String is included in the DriveTite Installation " Max Kit Post Spacing String is included in the DriveTite Insta /" Hole /" Hole " Max Post Spacing Tape /" one Deep end /" Deep /" Drill Bit /" Drill Bit Drill Holes at to Mark Tape the Measure other end /" Drill Bit Cut to total a 0º Angle " LEVEL RUNS: subtract /" Transfer Deep Measurement Cut to total Slide Surface C /" Deep /" Deep LEVEL RUNS: subtract /" Make sure it is Transfer Slide S from Measurement String correct directi Make s BOTTOM TOP correc " from Max String Post Spacing " Max Post Spacing " Max Post Spacing String Cut to is total included in the DriveTite Installation Kit Cut to total Cut to total LEVEL RUNS: subtract /" *When LEVEL installing RUNS: in subtract hardwoods, /" LEVEL RUNS: subtract /" Slide Surface Cover onto. Slide Surface Cover onto. Slide Surface Cover onto. make the pilot hole /. Cut previous to total step. LEVEL RUNS: subtract /" Slide correct Surface direction. Cover onto. correct direction. correct direction. For ANGLE Runs: Wedge correct direction. Wedge Slide Surface Cover onto. correct direction. Press Surface Cover over with If desired, you can add an adhesive to Surface Cover... Barrel Fitting DO NOT TIGHTEN YET! LEVEL RUNS: subtract /" Repeat steps until all cables are mounted. Wedge Wedge STOP Wedge LEVEL RUNS: subtract /" Wedge Cut (Notch facing in) to total Use the to keep the Barrel Fitting Now vertical tighten while both tightening. ends to tension cables. Use Tension the cables in to keep the 0 0 Now tighten both ends to tension cables. Use the DO NOT TIGHTEN to keep YET! the 0 0 Wedge Slide Surface Cover onto. correct direction. Cut to total String is included in the DriveTite Installation Kit Use the to keep the Use the to keep the 0 0 Press Surface Cover over Press with Surface Cover over with If desired, you can add an adhesive to If desired, you can add Surface an adhesive Cover. to Surface Cover. Press Surface Cover over with If desired, you can add an adhesive to Surface Cover. Slide Surface Cover onto. correct direction. Barrel FittingWedge. 0. ANGLE RUNS: use exact measurement Use the to keep the vertical Now while tightening. both ends to tension cables. Use the to keep the Tension vertical cables in while tightening. 0 0 Now tighten both ends to tension cables. Use the to keep the 0 DO NOT TIGHTEN YET! Press but Surface don t tighten. DO Cover NOT TIGHTEN YET! Press Surface Cover over over Barrel Fitting with Press Surface Cover with over with If desired, you can If desired, you can add an adhesive If desired, you to can add an adhesive to the inside add of an the adhesive to Surface Surface Cover. Cover. Surface Cover..

Cleaning & Code Clean, Clean, Clean! Cleaning and sealing your stainless steel Viewrail system after installation is the best investment you can make to ensure the lasting beauty of this elegant railing. EXTERIOR INSTALLATIONS If the work site is still active after your system is installed, rinse stainless steel thoroughly with water to remove any surface contaminates. (A pressure washer is great for this task!) Once thoroughly rinsed, cover your system until all work on the site is complete. The goal is to protect the stainless steel from any airborne iron particles or harsh chemicals that can cause discoloration. Once all work on the site is complete, uncover your system and give it another healthy rinsing. We highly recommend applying Marine Stainless Steel Liquid Polish followed by Marine Stainless Steel Liquid Sealant. If you didn t order these products with your system, contact your Viewrail salesperson for ordering information. IMPORTANT: Polish must be rinsed away completely before application of the sealant. This requires a substantial amount of water. (Optional step: Wipe the stainless steel down with rubbing alcohol to ensure all of the polish has been removed.) INTERIOR INSTALLATIONS As soon as installation is complete, clean all stainless steel with a retail stainless steel cleaner (the same kind you would use on stainless steel appliances). If the work site is still active, cover your system to protect it from airborne contaminants. When all work on the site is complete, uncover your system and clean again if necessary. Code Compliance Information Code Compliance for ʺ Sphere Meeting the ʺ sphere rule means that cables should be spaced on the standard spacing provided in the Viewrail posts. The standard spacing is ⅛ʺ O.C. which allows a reasonable amount of deflection of the cable when the posts are spaced no more than apart. When laying out a deck or balcony, it is tempting to space posts farther than apart; however, the deflection of the cable increases dramatically and it cannot be overcome with increased tension. Do not place posts more than apart and do not space cables more than ⅛ʺ apart to conform to the ʺ sphere rule. Often, posts are placed adjacent to each other for a dual corner. When placing two posts in a corner, be sure to place them no more than ʺ from each other.