Metal Garden Display Shed

Similar documents
Metal Garden Shed. OWNER S MANUAL / Instructions for. Size 10 x 8 Ver: 1.2. Customer Service Hotline.

Metal Garden Shed. OWNER S MANUAL / Instructions for Assembly. Pent Roof Type. Size 6 x 4. Customer Service Hotline (800)

Metal Garden Skylight Shed

Storage Shed. OWNER S MANUAL / Instructions for Assembly. Size 4 x 6 Ver Customer Service Hotline (800)

Storage Shed. OWNER S MANUAL / Instructions for Assembly. Size 8 x 6 Ver: 2.0. Customer Service Hotline (800)

Storage Shed. Patent # Building Dimensions (One Extension) : Interior Dimension. 8 x 2 1/ /2 94 3/ / /8

Metal Garden Shed. Foundation Kit. Instructions for Assembly Size 8 x 6 USP US POLYMERS INC. PART 1 8 x 6 Foundation Assembly Instruction

THE HANDY GARDEN SHED. SNSD-E Owner s Manual

ASSEMBLY INSTRUCTIONS

English/French 06/04

Owner's Manual & Assembly Instructions

Owner's Manual & Assembly Instructions

AM500-U Installation Guide

E N G L I S H GARDEN SHED. Assembly Instructions. Suitable for Models WITH VARYING DEPTHS

Tilting Flat Panel Wall Mount Installation Guide

INSTALL INSTRUCTIONS WELCOME TO THE NEWAGE PERFORMANCE CABINETRY SERIES NEWAGE STEEL WELDED CABINETRY

AM95 Installation Guide

HowtoPlans. 5'x13' Chicken Tractor Plan. Designed for up to 8 chickens. .org

Model No. EP84-A, EP84AR-A, P84L

OWNER S MANUAL with Assembly Instructions

S H E D A S S E M B L Y I N S T R U C T I O N S

NOVA-EXT Versatile Projector Mount Model: NOVA-EXT

Install Instructions. NewAge Steel Welded Tall Locker

INSTALLATION INSTRUCTIONS

Gazebo GZ3584 Aluminum Composite Roof Panels

HowtoPlans..org. 6'x8' Storage Shed Plan

Installation Instructions Factory Style Bow Kit

Sonoma Outdoor Kitchen Pergola. Assembly Instructions

Lodge II Pergola. Manual and Installation Instructions. Please read these instructions before removing parts from crate

OWNER S BAY WINDOW GAZEBO

HUSTLER 7' & 8' POOL TABLE ASSEMBLY INSTRUCTIONS

MODEL No: GSS3030G. Model No:...GSS3030G Overall Size (W x D X H*) x 3000 x 2100mm Roof Type:...Gable *Minimum Wall Height


PB 8328 WS 8328 IMPORTANT!! JAMBOREE

INSTALLATION INSTRUCTIONS

Installation Instructions BestRail Ladder Rack Must be used with BestRail Accessories: Overhead Rack

Assembly instructions. 6x4. Model GH1354A. 6x6. Model GH1357A. 6x8. Model GH1360A. 6x10. Walk-in Greenhouse. Model GH1363A

GALVANIZED SHED GREEN 2.3 X 2.3 X 1.9m

Owner's Manual & Assembly Instructions

ASSEMBLY INSTRUCTIONS SS2520. BASE SIZE: 2.520m x 2.020m

INSTRUCTIONS FOR: GALVANIZED STEEL SHED 3 x 3 x 2.1mtr. MODEL No: GSS3030

Level, Pliers, 3/8" Electric Drill, Carpenters Square, Tape Measure, Metal Hack Saw, Silicone Caulking, Screw Drivers (Regular & Phillips)

SteelChief Installation Instructions for pre-assembled panel form sheds GABLE ROOF

S H E D A S S E M B L Y I N S T R U C T I O N S

Owner's Manual & Assembly Instructions

HowtoPlans. 24'x8' Walk In Chicken Coop Plan. Designed for up to 50 chickens. .org

DRIVEWAY SERIES D554 D560

Owner's Manual & Assembly Instructions

INSTALLATION INSTRUCTIONS

INSTRUCTIONS FOR ASSEMBLY 2355mm x 3125mm Workshop

Owner's Manual & Assembly Instructions

ASSEMBLY INSTRUCTIONS GG77. BASE SIZE: 2.190m x 2.020m

The Heritage Pergola

Ready-To-Assemble VersaRail INSTALLATION INSTRUCTIONS

Owner's Manual & Assembly Instructions

Pergola PR100N1. Assembly Instructions. Systems Trading Corporation Customer service: (877)

4' x 12' Walk-In Chicken Coop Plan. Designed for 3-5 chickens

INSTRUCTIONS FOR ASSEMBLY 2355mm x 4665mm Workshop

Owner's Manual & Assembly Instructions

HowtoPlans..org. 12'x20' Garden Shed Plan

Potting Store Assembly Instructions

HowtoPlans..org. 8'x10' Storage Shed Plan

Spa & Hot Tub Necessities. Cover Removal System Installation & Use Manual

Owner's Manual & Assembly Instructions

THANK YOU FOR PURCHASING OUR STUDIO RTA CREATION STATION

ATTENTION: PLEASE READ AND UNDERSTAND ALL INSTRUCTIONS AND WARNINGS BEFORE ASSEMBLING, INSTALLING OR USING THIS PRODUCT.

Absco Premier Garden Shed Assembly Instructions Model: J30302G

W6 series greenhouse

Installation Instructions SRC OFF ROAD ROOF RACK Wrangler,97-06 Wrangler,04-06 Unlimited Part # s 76711,76713,76715)

USE AND CARE GUIDE 1

P4263TP. Installation Guide. Low-Profile Tilting Portrait Mount for Flat-Panels

HowtoPlans..org. DuraMax 8'x12 Garden Shed Plan

Roof Only Lean-to Instruction Manual

Powered by. For further installation assistance: prxperformance.com/pages/murphy-rack

Owner's Manual & Assembly Instructions

Owner's Manual & Assembly Instructions X01

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

ASSEMBLY INSTRUCTIONS SS2010. BASE SIZE: 2.020m x 1.020m

PetSafe Cat Windoor. Installation Guide. Please read this entire guide before beginning

Owner's Manual & Assembly Instructions

NEVADA ASSEMBLY INSTRUCTIONS

Installation Instructions HighRock 4x4 TM

One Shelf, Wall Mounted A/V Component Stand Installation Guide Model: EX101SS

Owner's Manual & Assembly Instructions

Owner's Manual & Assembly Instructions

GB-AVSTOR5 Ceiling Equipment Storage Box with Pipe Coupler

Owner's Manual & Assembly Instructions

Installation Instructions Hinged Roof Rack

8x4 SpaceSaver Garden Shed Assembly Manual

Grand Garden Chalet 6X3 Assembly Manual - Costco

LAWN AND GARDEN GREENHOUSE

Owner's Manual & Assembly Instructions

LAWN AND GARDEN GREENHOUSE

INSTALLATION INSTRUCTIONS

Owner's Manual & Assembly Instructions SW01

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

Sean Conway Gazebo. Style # G-GZ107PST-06 DPCI # CONGRATULATIONS You ve purchased a fine item from Target.

VAN STORAGE SOLUTIONS FOR THE WAY YOU WORK

Tilting & Swiveling Flat Panel Wall Mount Installation Guide Model: AXS2040

W1610 1/2 10 X 16 SOLARIUM ASSEMBLY INSTRUCTIONS Assembly by more than one person is suggested.

Transcription:

A L L P U R P O S E M E T A L S T O R A G E S H E D S Metal Garden Display Shed OWNER S MANUAL / Instructions for Assembly Size 0 Ft x 2 Ft Customer Service Hotline (800) 483-4674 www.uspolymersinc.com Requires two people and takes 2-3 hours for Installation. Tall Walk in Shed Quick & Easy Assembly Ridge Reinforced Walls Wide Double Doors Available in Various Sizes Call us for any missing or damaged parts. Do not return to the store.

Duramax Storage Shed Limited Fifteen Year Warranty U.S. Polymer Inc. will send a replacement part free of charge, in the event of material defects and or workmanship for a period of fifteen years from the date of purchase. This warranty is extended only to the original purchaser. A purchase receipt or other proof of date of original purchase will be required before warranty service is rendered. In no event shall we pay the cost of flooring, labor, installation or any other costs related thereto. This warranty only covers failures due to defects in material or workmanship which occurs during normal use and does not extend to color change arising due to normal weathering or to damage resulting from misuse or neglect, commercial use, failure to follow assembly instructions and the owner s manual (including proper anchoring of the shed), painting, forces of nature and other causes which is beyond our control. Claims under this warranty must be made within the warranty period by calling -800-483-4674 or mail in a dated sales slip and clear photograph of the part to: U.S. Polymers, Inc. 695 Slauson Avenue Commerce, CA 90040 We reserve the right to discontinue or change components. If a component has been discontinued or is not available, U.S. Polymers, Inc. reserves the right to substitute a component of equal quality as may be compatible. Limits and Exclusions There are no express warranties except as listed above. The warrantor shall not be liable for incidental or consequential damages resulting from the use of this product, or arising out of any breach of this warranty. All express warranties are limited to the warranty period set forth above. Some states do not allow the exclusion or limitation on how long an implied warranty lasts, so the above limitations may not apply to you. This warranty gives you specific legal rights and you may also have other rights which vary from state to state or country to country.

Parts List : Check all parts prior to installation. CODE DESCRIPTION QTY BLA BASE BAR BACK LEFT BRA BASE BAR BACK RIGHT BASE BAR SIDE LEFT / RIGHT 2 BASE BAR FRONT 2 ECA ENTRANCE TAPER CHANNEL DCL DOOR COLUMN PROFILE LEFT DCR DOOR COLUMN PROFILE RIGHT ABLA TOP ANGLE BACK LEFT ABRA TOP ANGLE BACK RIGHT AS TOP ANGLE SIDE LEFT / RIGHT 2 SCA SLIDING CHANNEL COVER LEFT / RIGHT 2 SSA SLIDING CHANNEL SUPPORT SLA SLIDING CHANNEL LEFT SRA SLIDING CHANNEL RIGHT RSS ROOF SUPPORT LEFT / RIGHT 4 SBA ROOF SUPPORT BRACKET FRONT RIGHT / BACK LEFT 2 SB2A ROOF SUPPORT BRACKET FRONT LEFT / BACK RIGHT 2 RFA ROOF FLASHING FRONT RIGHT / BACK LEFT 2 RF2A ROOF FLASHING FRONT LEFT / BACK RIGHT 2 RFSS ROOF FLASHING SIDE 2 RFTS ROOF FLASHING TOP TSLA DOOR PANEL STRIP TOP LEFT TSRA DOOR PANEL STRIP TOP RIGHT BSLA DOOR PANEL STRIP BOTTOM LEFT BSRA DOOR PANEL STRIP BOTTOM RIGHT DSS DOOR PANEL STRIP SIDE LEFT / RIGHT 2 DSCLA DOOR PANEL STRIP CENTER LEFT DSCRA DOOR PANEL STRIP CENTER RIGHT WALL PANEL CORNER LEFT / RIGHT 2 WALL PANEL SIDE 5 WFL WALL PANEL FRONT LEFT WFR WALL PANEL FRONT RIGHT GPLA GABLE PANEL LEFT 2 GPRA GABLE PANEL RIGHT 2 GPS GABLE PANEL SUPPORT 2 RPS ROOF PANEL LEFT / RIGHT 2 DPLA DOOR PANEL LEFT DPL2A DOOR PANEL LEFT DPRA DOOR PANEL RIGHT DPR2A DOOR PANEL RIGHT ACCESSORIES CODE DESCRIPTION QTY BS BOTTOM SLIDER 4 DH DOOR HANDLE 2 FC FLASHING END CAP 2 TC TOP CORNER 4 TS TOP SLIDER 4 VC VENTILATION COVER 4 PLASTIC WASHER 46 PC PLASTIC SCREW COVER 04 T WEATHER STRIPPING TAPE 0.75MTR DIA. 4.2 x 0mm. (5/32 x 3/8 ) SHEET METAL SCREW 74 S2 DIA. 4.2 x 6mm. (5/32 x 5/8 ) SHEET METAL SCREW 24 M4 x 0mm. (5/32 x 3/8 ) MACHINE SCREW WITH NUT 98 - Use screws with plastic washers on top of prepainted surface only. BOTTOM SLIDER (BS) TOP CORNERS (TC) ACCESSORIES DOOR HANDLE (DH) TOP SLIDER (TS) PROFILES BASE BAR TOP ANGLE BACK (BLA, BRA, ) (ABLA, ABRA) BASE BAR ENTRANCE TAPER () CHANNEL (ECA) DOOR COLUMN PROFILE DOOR COLUMN PROFILE LEFT (DCL) RIGHT (DCR) SLIDING CHANNEL COVER TOP ANGLE SIDE (SCA) (AS) SLIDING CHANNEL SLIDING CHANNEL (SLA, SRA) SUPPORT (SSA) ROOF SUPPORT ROOF SUPPORT BRACKET (RSS) (SBA, SB2A) ROOF FLASHING ROOF FLASHING CENTER (RFA, RF2A, RFSS) (RFTS) PLASTIC WASHER () PLASTIC SCREW COVER (PC) DOOR PANEL STRIP DOOR PANEL STRIP SIDE TOP AND BOTTOM AND CROSS (TSLA, TSRA, BSLA, BSRA) (DSS, DSCLA,DSCRA) Tools You Will Need Hand Gloves Cordless Drill - Philips Head Screw driver - Philips Head Carpenter s Square Eye Protector 8 Step Ladder Adjustable pliers Level - 3ft. Tape Measure SHEET METAL SCREW (, S2) FLASHING END CAP (FC) MACHINE SCREW WITH NUT () VENTILATION COVER (VC) GABLE PANEL SUPPORT (GPS) WEATHER STRIPPING TAPE (T)

Exploded View RFTS RPS RPS RFA RF2A RPS RF2A RFA RPS SB2A SBA GPRA GPLA GPLA RSS RSS RSS SBA GPRA SB2A AS ABLA SLA SSA SRA ABRA AS BLA DCL WFL ECA BRA SCA WFR SCA DCR Left Door Right Door

23 584.2mm) 23 584.2mm) 6 (406.4mm) A. Foundation & Base Frame : It is important that these instructions are followed step by step. DuraMax must be installed on a level wooden platform or a level concrete foundation. Wooden Platform (Not Included) The following are the list of lumber and sizes you will need. Pressure Treated - Wood Studs: 2ea 2 x 4 x 25 (50mm x 88.9mm x 375 mm) 5ea 2 x 4 x 6 (50mm x 88.9mm x 406.4 mm) Wooden platform is extra and is not included. Don t install under windy conditions. Exterior Grade (CDX) - 3/4 (9mm) plywood ea 3/4 x 23 x 96 (9mm x 584.2mm x 2438.4mm) ea 3/4 x 23 x 29 (9mm x 584.2mm x 736.6mm) L-Brackets: 4ea Parts needed: () Base bar back left (BLA) () Base bar back right (BRA) (2) Base bar side (BA) (2) Base bar side (BS2A) (2) Base bar front () () Entrance taper channel (ECA) (2) Sheet metal screw () (20) Sheet metal screw (S2) Lay 50 x 88.9mm Flat - Use screws with plastic washers on top of prepainted surface only.. Use pressure treated wood studs 2 x 4 (50mm x 88.9mm) to create a platform frame that has an outside dimension of 23 x 25 (584.2mm x 375mm). L- BRACKET L- BRACKET 28 (7.2mm) 28 (7.2mm) 28 (7.2mm) 23 /2 (596.9mm) L- BRACKET L- BRACKET 25 (375mm) 2. Using exterior grade CDX 3/4 (9mm) plywood, cut and fit together the sheets to form solid foundation as shown. Foundation must be square and level. 96 (2438.4mm) 29 (736.6mm)

3. Assemble base bar back left (BLA) and base bar back right (BRA) with four () screws. See fig. & 2. Take care of sharp edges. BLA &2 BLA BRA BRA 4. Place the base bar assembly on top of the foundation. Use (S2) screws to fix the assembly to foundation. Left BLA Back S2 Front BRA Right 5. Place the base bar side() on left side. Insert the edge of () into the back base bar (BLA) and secure with () screws. See fig. Place the base bar side () on right side. Insert the edge of () into the back base bar (BRA) and secure with () screws. See fig. 2 BLA BLA BLA BRA 2 BRA BRA 2

6. Using a carpenter square, line up the corners. Secure base bar side assembly to the foundation with (S2) screws. BLA S2 BLA S2 BRA BRA 2 7. Place the base bar () on top of the base bar side on both side. Secure with () screws on both corners. See fig. & 2. &2 &2 8. Using the carpenter square, line up the corners. Secure the base () to the foundation with (S2) screws. S2 3

9. Place the entrance taper channel (ECA) on top of the (). Secure with (S2) screws to the foundation. See fig. & 2. S2 ECA ECA & 2 ECA 0. Measure in all direction as shown in figure. Make the base bar assembly in a perfect square. (367mm) (3037mm) Concrete foundation (367mm) 0a. (Concrete foundation) Using a carpenter square, line up corners. Align Base bars, mark the concrete at the holes in the base and drill concrete with /4 (dia. 6mm) concrete bit to accept anchor bolts to a 3/4 (44mm) depth. Replace base and secure with /4 x 3/8 (M6 x 35mm) anchor bolts (not provided). B. Walls & Columns All panels are clearly marked and care should be taken to use the correct one. Parts Needed: () Wall panel front right (WFR) () Wall panel front left (WFL) (2) Wall panel corners left&right () (5) Wall panel side () () Sliding channel right (SRA) () Sliding channel left (SLA) () Top angle back left (ABLA) () Top angle back right (ABRA) (2) Top angle side left & right (AS) () Sliding channel support left (SSA) (2) Sliding channel cover left/right (SCA) (4) Top slider (TS) () Door column profile left (DCL) () Door column profile right (DCR) (76) Sheet metal screw () (8) Machine screw () (64) Plastic washer () - Use screws with plastic washers on top of prepainted surface only. 4

. Place the wall panel (WFR) on the base bar () front right side of the shed. Line up the holes with base bar. Secure with () screws with washers from outside. WFR WFR 2. Place the wall panel corner left &right () on the base bar (). Line up the holes with base bar and use () screws with washers to Secure. Make sure the overlapping position is as shown in fig.. WFR ECA WFR BS2A 2 3. Use () bolt and nut with washers to join together the wall panels. WFR 5

4. Place the sliding channel right (SRA) on top of the wall panel (WFR) from inside. See the position in fig.. Line up the holes with wall panel. Use () screws with washers to fix. See fig. 2. SRA SRA &2 WCF WFR 5. Insert two pieces of (TS) Top slider into the sliding channel. See blowup. Make sure the position of the projection on (TS) towards inside. SRA TS WFR TS SRA Front 6. Place the wall panel (WFL) on the base bar () front left side of the shed. Line up the holes with base bar. Secure with () screws with washers from outside. WFL WFL Front 6

7. Place the wall panel corner left & right () on the base bar (). Line up the holes with base bar and use () screws with washers to secure. Make sure the overlapping position is as shown in fig. WFL WFL 8. Use () bolt and nut with washer to join together the wall panels. WFL 9. Place the sliding channel left (SLA) on top of the wall panel (WFL) from inside. See the position in fig. Line up the holes with wall panel use () screws with washers to fix. See fig. 2 SLA SLA &2 WFL 7

0. Insert two pieces of (TS) Top slider into the sliding channel. See blowup. Make sure the position of the projection on top slider towards inside. TS SLA TS SLA Front. Place the sliding channel support (SSA) in between the sliding Channels (SLA)& (SRA). Align the holes with sliding channel and secure with () screws. See fig. & 2. & 2 SRA SRA SRA SLA SLA SSA SLA SSA SSA 2. Place the wall panel () on the base bar (BLA). Line up the holes with base bar. Secure with () screws with washers. See fig. 2. Use () bolt and nut with washers to join together in the middle of the wall panel. See fig. 3. Make sure the overlapping position is as shown in fig.. 3 BLA 2 Fig.3 8

3. Place the top angle back left (ABLA) on top of the wall panel () from inside. See the position in fig.. Line up the holes with wall panel. Use () screws with washers to fix. See fig. 2. ABLA & 2 ABLA ABLA 4. Place the top angle side (AS) on top of the wall panel (). Line up the holes and secure with () screws with washers. See fig. & 2. ABLA & 2 AS 3 Top angle (AS) must sit on top angle (ABLA). ABLA AS ABLA AS AS SLA Fig.3 9

5. Place the wall panel () on the base bar (BRA). Line up the holes with the base bar and use () screws with washers to secure. See fig. 2. Use () nut and bolt with washer to join together the middle of the wall panel. See fig. 3 Make sure the overlapping of the panels. See fig. 3 BRA 2 Fig.3 ABRA 6. Place the top angle back right (ABRA) on top of the wall panel from inside. See the position in fig.. Line up the holes with wall panel use () screws with washers to secure. See fig 2. & 2 ABRA ABRA 7. Join the top angle back left and right (ABLA) & (ABRA) together with () screws from inside. See blowup. Make sure the overlapping position. See fig.. ABRA ABLA ABLA ABRA 0

8. Place the top angle side (AS) on top of the wall panel () from inside. Line up the holes with wall panel and secure with () screws with washers. Top angle (AS) must slide in between the sliding channel (SRA) and the wall panel (). AS 2 & 3 AS AS ABRA SRA AS ABRA 9. Continue to place the wall panel () on top of base bar and overlap the wall panel () and secure with () screws with washers. See fig.. Use () bolt and nut with washer to join together the middle of the wall panel. See fig. 2. 2 20. Continue to place the wall panel () and secure with () screws with washers. See fig.. Use () bolt and nut with washer to join together the middle of the wall panel. See fig. 2. 2

2. Follow the same way as item No. 20. Make sure the overlapping position is as shown in fig. & 2. 2 3 3 Fig.3 22. Place the left door column (DCL) on top of the base bar () and insert into the wall panel. See blowup. 2 DCL DCL ECA DCL 23. Secure the door column with () screws. Repeat the same for the right column (DCR). DCR DCL 2

24. Place the sliding channel cover (SCA) on top of the sliding support (SRA) and secure with () screws. SCA SRA SCA SRA 25. Place the sliding channel cover (SCA) on top of the sliding support (SLA) and secure with () screws. SCA SLA SCA SCA 3

C. Roof All parts are clearly marked and care should be taken to use the correct one. Parts Needed: (2) Gable panel left (GPLA) (2) Gable panel right (GPRA) (2) Roof support bracket front left / back right (SBA) (2) Roof support bracket front right / back left (SB2A) (4) Roof support Left & Right (RSS) (2) Roof panel Left & Right (RPS). Place the Gable panel (GPRA) on top of the sliding channel (SRA). See fig.. Push the Gable panel inside the top angle side (AS). See fig.2. Align the holes with sliding channel and secure with () screws from inside. AS GPRA SRA AS GPRA SRA,2&3 (2) Roof flashing front right / back left (RFA) (2) Roof flashing front left / back right (RF2A) (4) Roof flashing Side (RFSS) (2) Roof flashing center (RFCA) (2) Flashing end cap (FC) (4) Ventilation cover (VC) (4) Top corners (TC) (0.75 mtr.) Weather stripping Tape (T) (66) Sheet metal screw () (4) Sheet metal screw (S2) (50 ) Machine screw with nut () (58) Plastic washer () - Use screws with plastic washers on top of prepainted surface only. GPRA SRA GPRA AS Fig.3 2. Place the Gable Panel (GPLA) on top of the sliding channel (SLA). Insert the Gable panel inside the Top angle side (AS). Align the holes with sliding channel and secure with () screws from inside. GPLA AS SLA 4

3. Assemble the Gable panel (GPLA) & (GPRA) together with gable panel support (GPS) with () bolt and nut. See fig&2. Fix.the (GPS) to the sliding channel (SLA) & (SRA) with ()screws.see fig 3. GPLA GPRA GPLA GPS GPRA GPLA GPRA,2& 3 GPS GPS GPS SLA GPS SRA GPS Fig.3 4. Place the Gable panel (GPRA) & (GPLA) on top of the Top angle (ABLA) & (ABRA). See fig.. Insert the Gable Panel into the Top angle side (AS). Align the holes with Top angle and secure with () screws. GPLA GPLA GPRA ABRA AS ABRA AS GPLA GPLA,2&3 Fig.3 AS 5. Assemble the Gable panel (GPLA) & (GPRA) together with () bolt and nut. See fig. GPRA GPRA GPLA GPLA 5

6. Fix roof support brackets (SBA) & (SB2A) on both ends of Roof Structure (RSS) with () bolt & nut. See fig.make two sets. RSS SBA SB2A RSS 7. Assemble two roof structure(rss) together with () bolt and nut. See blowup. RSS 8. Fix the roof structure one end with roof support bracket to the gable panel using () bolt and nut. See fig. Fix the other end also with the roof support bracket. RSS 2 Make sure the taper side on roof structure must be up side. RSS Taper side 6 RSS GPRA SBA GPRA RSS SBA RSS GPLA SB2A GPLA RSS SB2A

9. Insert the one end of the roof structure assembly to the Gable panel. The Gable panel should go in between roof structure assembly. Secure with () bolt and nut. Continue the same for other end. Make sure the taper side on roof structure must be up side. & 2 & 2 Taper side RSS RSS 0. Place the roof panel (RPS) on top of the Gable panel (GPRA). Line up the holes with Gable panel and secure with () bolt and nut with washers. RPS GPRA RPS GPRA. Line up the holes with roof structure and top angle side and secure with () screws with washers. 7

2. Place the roof panel (RPS) on top of Gable panel and roof structure. Line up the holes with Gable panel and secure with () bolt and nut with washers. RPS 3. Line up the holes with roof structure and top angle side and secure with () screws with washers. RPS 4. Apply the weather stripping tape (T) after fixing roof panels. The tape must be applied all the ups and downs as shown in fig. T T RPS RPS 8

5. Assemble the roof flashing (RFA) and (RF2A) with roof panel as shown in fig. Use () screws with washers to secure. RF2A RFA RF2A RFA 6. Place the roof flashing top on top of the roof panel. Line up the holes and secure with () screws with washers. RFTS RFTS RF2A RFA RPS 7. Slide the flashing end cap to the front and back top of the roof and secure with () screws with washers. See fig. & 2. & 2 & 2 RFTS RFTS FC FC 9

8. Place the roof flashing side (RFSS) and top corner (TC) on the roof flashing joint and secure with (S2) screws. RFSS 2&3 RFSS RPS RFSS &3 RPS RFA RF2A 2&3 RFSS &3 S2 TC Fig.3 9. Insert the ventilation cover (VC) into the front Gable panel and secure with () screws. VC Front 20

the weather stripping tape till the end of roof panel. 20. Insert the ventilation cover (VC) into the back Gable panel and secure with () screws. VC Back 2

D. Door Parts Needed: () Door panel left (DPLA) () Door panel left (DPL2A) () Door panel right (DPRA) () Door panel left (DPR2A) (2) Door panel strips side left and right (DSS) () Door panel strip top left (TSLA) () Door panel strip top right (TSRA) () Door panel strip bottom left (BSLA) () Door panel strip bottom right (BSRA) () Door panel strip center left (DSCLA) () Door panel strip center Rigth (DSCRA) (2) Door handle (DH) (4) Bottom Slider (BS) (20) Sheet metal screw () (40) Machine screw () (24) Plastic washer () - Use screws with plastic washers on top of prepainted surface only. DPLA DH DH DPRA DPL2A DPR2A TSLA TSRA DSS DSS DSCLA DSCRA BSLA BSRA 22 Left Door Right Door

Right Door Assembly. Assemble the door panel (DPRA) & (DPR2A) together with () bolt and nut from inside. & 2 Remove the Polyethylene Film before assembling. DPRA DPR2A DPR2A DPRA a. Fix the door handle (DH) with door panel from front side with bolt and nut. DH 23

2. Assemble the door panel strip center (DSCRA) to the door panel from inside. Use () and () bolt and nut with washers. DPR2A DSCRA DPRA DPR2A DSCRA DPRA DSCRA DPR2A DPR2A DPRA Step #2 Step #3 Step #5 Fig.3 DPRA DPRA DSCRA DSCRA Step # Step #4 3. Assemble the door panel strip (DSS) to the door panel (DPR2A) from inside. Use () bolt and nut with washers. & 2 DPRA DPR2A DPR2A DPR2A DSCRA DSS DSS DSS 24

4. Assemble the door panel strip (TSRA) with door panel. Make sure the door panel top edge to be inserted into the (TSRA). See fig.. Secure the (TSRA) with (DSS) and door panel with () screws. See fig. 2. Use () bolt and nut with washers to secure with door panel at the middle of (TSRA). See fig. 3. &2 3 TSRA TSRA TSRA DSS DSS BSRA Fig.3 4a. Assemble the door panel strip (BSRA) with door panel. Make sure the bottom edge of the door panel to be inserted into the (BSRA). Secure with () screws to the (DSS) and use () bolt and nut with washers with door panel. See fig. 4. 4 BSRA Fig.4 5. Assemble the bottom slider (BS) to the door panel bottom side at both edge with () bolt and nut with washers. BSRA 25 BS

Left Door Assembly 6. Assemble the door panel (DPLA) & (DPL2A) together with () bolt and nut from inside. & 2 Remove the Polyethylene Film before assembling. DPLA DPLA DPL2A DPL2A 6a. Fix the door handle (DH) with door panel from front side with bolt and nut. DH 26

7. Assemble the door panel strip center (DSCLA) to the door panel from inside. Use () and () bolt and nut with washers. DPL2A DPL2A DPLA DSCLA DSCLA DSCLA DPL2A DPLA DPLA DPL2A Step #2 Step #3 Step #5 Fig.3 DPLA DPLA DSCLA DSCLA Step # Step #4 8. Assemble the door panel strip (DSS) to the door panel (DPL2A) from inside. Use () bolt and nut with washers. & 2 DPLA DPL2A DPL2A DPL2A DSCLA DSS DSS DSS 27

9. Assemble the door panel strip (TSLA) with door panel. Make sure the door panel top edge to be inserted into the (TSLA). See fig.. Secure the (TSLA) with (DSS) and door panel with () screws. See fig. 2. Use () bolt and nut with washers to secure with door panel at the middle of (TSLA). See fig. 3. TSLA Fig.3 &2 TSLA TSLA DSS DSS BSLA Fig.3 9a. Assemble the door panel strip (BSLA) with door panel. Make sure the bottom edge of the door panel to be inserted into the (BSLA). Secure with () screws to the (DSS) and use () bolt and nut with washers with door panel. See fig. 4. Fig.4 BSLA Fig.4 0. Assemble the bottom slider (BS) to the door panel bottom side at both edge with () bolt and nut with washers. BSLA 28 BS

. Slide the door panel assembly into the base bar front (). Make sure the bottom slider (BS) should slide inside the base bar front. See fig.. Fix the door panel top to the top slider (TS) with () screws. See fig.2 & 3 TS BS SLA/SRA TS Door Panel ECA Fig.3 a. To get proper alignment of the door realign the holes with door panel. See fig. Door Panel Fig.4 Fig.5 BS TS IMPORTANT 2. Fix the plastic screw cover (PC) to the screws and bolts edge from inside to prevent injury. PC PC 29 WE RECOMMEND TO CLEAR YOUR METALSHED OF SNOW AFTER EACH SNOWFALL