Wellhead Standards. Walter T. Haven, P.G. Energy Program Supervisor

Similar documents
Table Of Contents Casing Head 02 Christmas Tree & Tubing Head Tubing Spool 04 Contact Us

Town of Skowhegan Application For Development Review

DE027: X-mas Tree & Wellhead Operations, Maintenance & Testing

Section 808. FENCING

SW Region Asset Specifications: Four Strand Barbed Wire Fence Specifications

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

LPK1550 Hydraulic Crimping Tool 15-ton

Amite and Pike Counties, Mississippi; and

Fire Safety During Construction, Tar Kettles, and Bituminous Melters

WAL-MART SUPERCENTER # ; Milwaukie, OR: SPECIFICATIONS. Revisions to Specification Fence

Oil and Gas UK Well Integrity Guidelines

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect

BSOL: Key Standards for the Oil & Gas Industry. bsigroup.com/bsol

# Insite RE Inc./ Verizon Wireless Special Use Permit Project Review for Planning and Zoning Commission

Training Fees 4,250 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch

In any of the 5 star hotel. The exact venue will be intimated prior to course commencement.

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

Minor Site Plan Review Process

SUBMITTAL REQUIREMENTS RCV D REJECT PENDING

Risk Management Department. Control of Hazardous Energy

February 4, 2004 PROPOSAL FOR DECISION PROCEDURAL HISTORY. Mark Helmueller, Hearings Examiner

SECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP

SE Region Asset Specifications Four Strand Barbed Wire Fence Specifications

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2017

Model Numbers: P/N Date TPS-200 POLE SAW ATT TPS-200. Supplier To The Outdoor Power Equipment Industry

BRACE ASSEMBLIES FOR WIRE FENCES. What They Are - How They Work - How To Construct Them

SECTION 5 TRANSFORMERS

DE059: Hydrocarbon Production Operations

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

LEADING THE WAY IN WELLHEAD AND PIPELINE TECHNOLOGY. Wellheads Christmas Trees Gate Valves Surface Safety Valves Frac Trees Check Valves

SECTION III SUBMITTALS AND APPROVALS

DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN

OKLAHOMA CORPORATION COMMISSION OIL & GAS CONSERVATION DIVISION P.O. BOX OKLAHOMA CITY, OK (Rule 165:10-3-1) PERMIT TO DRILL

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS

HDD Wire Guided Waterway Crossing ATON Plan. Youghiogheny River (S122)

pipeline FSHR and tether for fatigue, stress, and any other abnormal condition (e.g., corrosion) that may negatively impact the riser or tether; and

Underwater Tool Section

ROCK DRILLS Tabor Place, Santa Fe Springs, California, CA 90670, U.S.A.

CHECKLIST THE FOLLOWING INFORMATION AND DOCUMENTATION MUST BE SUBMITTED TO DEVELOPMENT SERVICES BEFORE YOUR APPLICATION CAN BE PROCESSED.

DOLPHIN SHELL & TUBE MARINE CONDENSERS (DSTMC)

SECTION CHAIN LINK FENCING

Macondo Blowout Lessons Learned for Prevention and Mitigation

APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT

NTL No N06 Information Requirements for EPs, DPPs and DOCDs on the OCS Effective June 18, 2010

SECTION 35 ANTENNAS AND TOWERS

Testing Services Training. Field-proven training and competency development programs

CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST

Dynamic Approach to Quasi-static Nonlinear Problems for Sub-Sea Applications

MODEL T TON HYDRAULIC PRESS INSTRUCTIONS (For Machines Mfd. Since 10/17)

Series B Medical Gas Service Outlet Upgrade Kits

Heidrun Inverted Gas Lift System

Fuel - Defuel Valve. Model Maintenance & Repair Manual. SM61499 Issued: February 1996 Applicable additional manuals: NONE

FG-02: Apply Hard Surface

BEFORE THE STATE OIL AND GAS BOARD OF MISSISSIPPI

The Lease Pumper s Handbook. Chapter 4 Understanding the Oil Well. Section B DRILLING OPERATIONS

FIRE RATED DOOR AND FRAME GENERAL REQUIREMENTS

Memorandum. Application for Amendment to DNR Land Use Permit # LAS29209

APPENDIX FENCE GENERAL NOTES

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section ELECTRICAL IDENTIFICATION

CSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

ROOF-CEILING CONSTRUCTION

Absolute Block. Uncontrolled When Printed Document to be part superseded by GKRT0055 Iss 1 and GKRT0077 Iss 1 (published on 07/09/2013)

SECTION IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT

An Introduction to Oil & Gas Drilling and Well Operations

MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

Glenco Gas/Liquid Syringes from Spectrum Chromatography

Permit Application. General Information

Guidelines for the Protection of the General Public in Compliance with Safety Code 6

37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, Dag Almar Hansen, CEO Gas-Lift Workshop 1. Feb. 3-7, 2014

Newfoundland Offshore Area Petroleum Production and Conservation Regulations SOR/ CANADA-NEWFOUNDLAND ATLANTIC ACCORD IMPLEMENTATION ACT

APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015

Requirement for Holes - Holes for Hanging

COMPONENTS INSTALLATION

Woven Wire Fence. Fencing for small ruminant prescribed grazing. Job Sheet No. AL382C - 1

Testing. Material testing will be according to applicable AASHTO, ASTM or Department methods as specified.

APPENDIX 1: CONSTRUCTION PLAN CHECKLIST

The central computer system shall compile and record, among other things, the following information: 1. Amount deposited in the coin drop area and bil

MSU Extension Publication Archive. Scroll down to view the publication.

MSR/MSB Mechanical Setting Tool

SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

THE SHOW. Guidelines for Booth Display/ Rules & Regulations

MSR/MSB Mechanical Setting Tool

3/14/2015 Contacted and Solicited bids from construction vendors to build location. (San Jan, Orbit, Sweat, Storm).

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review

ACCESS TO HIGH VOLTAGE APPARATUS

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

FENCING PRODUCTS FENCING PRODUCTS. Please call:

Minor Site Plan Application and Checklist Land Disturbing Activities

For crossing under a railroad, contact the specific railroad company's engineering department.

Oil and Gas Production Technician Skill Standards

Ring Pair Corrosion Monitor : RPCM

Flex Fence Instruction Manual

WASTE AND DEBRIS MANAGEMENT AUGUST 28, 2013

National Craft Assessment and Certification Program S P E C I F I C A T I O N S

Send your directly to

Last Name: First Name: M.I:

MESP TECHNICAL SPECIFICATION FOR AN ESSENTIAL SERVICES SUPPLY STEP UP TRANSFORMER

2. There was no sign on or near Freeman Smith # D-1 SWD well or battery. This is a violation of Part II A. 3. of the permit.

Transcription:

Wellhead Standards Walter T. Haven, P.G. Energy Program Supervisor

Definitions "Wellhead" means the upper terminal of the well including adapters, ports, valves, seals, and other attachments (15A NCAC 02C.0100). Christmas Tree means the set of valves, spools and fittings connected to a wellhead to direct and control the flow of formation fluids from the well. (Modified from Schlumberger.)

Wellhead Equipment API 6A: Specification for Wellhead and Christmas tree Equipment (Reference) Wellhead and Christmas tree equipment must meet most recent and relevant API standards (Ohio) All surface equipment must be pressure rated to withstand operating pressures to which it is subjected. (15A NCAC 05D.0107 (i)): Christmas tree fittings or wellhead connections, flow lines and treating facilities, shall have a working pressure in keeping with anticipated working pressures generated by the well as determined from drillstem tests or other pressure testing procedures acceptable to the director.

Wellhead Equipment and Operations (Arkansas) Wellhead equipment shall be installed and maintained so that static bottom hole pressures may be obtained at any time by the State. Valves shall be installed so that pressures can be readily obtained on both casing and tubing. Pressure gauges for surface, intermediate, production casings and for tubing for continual monitoring of mechanical integrity.

Wellhead Equipment and Operations (Pennsylvania) The wellhead must be equipped with a check valve to prevent backflow from the pipeline(s) into the well. (Pennsylvania) On completion of drilling operations, the operator shall install and use equipment (i.e. shut off valve) as may be necessary to enable the well to be effectively shut-in while logging and servicing the well after completion of well construction.

Wellhead Identification Sign Posted in a conspicuous location, either on or near the wellhead. Durable weatherproof, rustproof metal or other material approved by the Director (15A NCAC 02C.0107). Must remain legible at all times (Ohio). Must be posted within 72 hours after completion of well construction activities (15A NCAC 02C.0107). Equivalent sign to be posted during well construction.

Wellhead Identification Sign Characteristics Two-inch or larger letters One sign for each wellhead Information Needed: Name of well operator(s) Name of county and nearest town State permit number, lease name, and well number Local emergency phone number and company emergency phone number

Fencing Requirements Shall be placed no closer than ten feet to the wellhead or any portion of the tank battery. Danger, Keep Out (or similarly worded) and No Smoking signs shall be securely attached to each side of the outside of fencing. Well operator identification sign, securely attached to each side of the outside of the fencing Operator name Operator emergency telephone number Site location street address, or nearest address to access road entrance The well operator shall install the fence around the wellhead, tank battery, and associated production equipment, within 30 days after well construction Identification sign also needed at any entrance to an access gate or at access road entrances to property.

Fence Details Chain link Minimum eight feet in height Nine gauge Topped with 3 strands of barbed wire Securely anchored in the ground Image courtesy of Juvenile Justice Information Exchange

Fencing Requirements Fence Gate access required Any gate must be at least four feet in width Any gate must be lockable Fence must have at least one gate Two gates at opposite ends of the fencing for two or more tanks in battery Keys or combinations to fence gate locks and access road gates shall be provided to DEMLR, on request

Other Safety and Security (Ohio) All gates, electrical boxes and pickup-lines shall be locked unless in use, under repair, or company staff or representatives are on-site. Keys or combinations to the locks shall be provided to DEMLR and local emergency response staff on request. (Tank standards?) (15A NCAC 05D.0107) Any rubbish or debris shall be disposed of so as not to constitute a fire hazard.

Wellhead Area (Ohio) Equipment and vegetation shall be maintained consistent with reasonably prudent operations, including being free of refuse, in order to assure protection of public health or safety or to prevent damage to natural resources. (Ohio) Equipment not used in the production of the well shall not be stored at the well site. Replacement equipment or replaced equipment shall not be stored on-site for more than thirty (30) days. (Ohio) any producing equipment at the well-head and related storage tanks be protected by an earthen dike or earthen pit which shall have a capacity sufficient to contain any substances resulting, obtained, or produced in connection with the operation of the related oil or gas well. (Addressed in tank and pit standards?)

Wellhead Area Setbacks (Ohio) Oil Production Tanks 50 ft from public road 100 ft from inhabited structures 50 ft from any well 3 ft between tanks Mechanical Separators 50 ft from any well 10 ft from production tanks 100 ft from inhabited structures Refer to Environmental Standards Committee?