SPECIFICATION FOR TOPOGRAPHIC AND HYDROGRAPHIC SURVEYS OF RECLAMATION AND DREDGING WORKS

Similar documents
HYDROGRAPHIC SURVEY STANDARDS AND DELIVERABLES

1. Land survey Work. 2. Civil and Structural engineering services.

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect

SECTION DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

1.1 GENERAL RECORD DRAWING REQUIREMENTS

PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

TOWN OF DOUGLAS EARTH REMOVAL SPECIAL PERMIT APPLICATION FORM Pursuant to Section 6.1 of the Douglas Zoning Bylaw

THE BRIEF FOR THE MAINTENANCE AND/OR INSTALLATION AND/OR PROVISION OF HYDRODYNAMIC EQUIPMENT

SECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS

A. Dewatering observation wells are part of dewatering allowance.

STATE UNIVERSITY CONSTRUCTION FUND

Section Meetings Section Material and Equipment. None Required

ACCESS TO HIGH VOLTAGE APPARATUS

Radio Log Book. for Canadian Flag Vessels. 1 Master s Signature. Transports Canada. Transport Canada TP 13926E MARINE SAFETY

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

APPENDIX D: DRAWING SUBMISSION STANDARDS

PART XII: TOPOGRAPHIC SURVEYS

Consultant s As Constructed Survey Certification Check List

MARINE PRIVATE MOORAGE APPLICATION REQUIREMENTS; EXAMPLE PLANS

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE)

CONTOURS SURVEYING 1 CE 215 CHAPTER -3- Ishik University / Sulaimani Civil Engineering Department 12/7/2017. Ishik University / Sulaimani

10010 RECORD DRAWING INFORMATION

OAK RUN BUILDING PERMIT

REQUEST FOR PROPOSAL

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS

A Report On Tide Gauges In Singapore. 1 The Republic of Singapore is an island city-state situated at the southern tip of

INFORMATION SHEET. : Properties Subject to the Slope and Seismic Hazard Zone Protection Act (SSPA) Ordinance

MEDICINE LICENSE TO PUBLISH

UW REGULATION Patents and Copyrights

SECTION 2 GENERAL REQUIREMENTS

SATELLITE NETWORK NOTIFICATION AND COORDINATION REGULATIONS 2007 BR 94/2007

AAPSilver System Performance Validation

Option 1. Design Options are diverse e.g. new route alignments covering a wide area. Option 2. Design Options are restricted

CHAPTER 11. Plan Standards

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

City of Massillon Site Plan Checklist

SUBMITTAL REQUIREMENTS RCV D REJECT PENDING

Last Name: First Name: M.I:

EMPLOYEE SECONDMENT AGREEMENT

List of Figures. List of Forms

Facility Services Subgroup Preface for Divisions 21` through 28

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

Special Provision No. 999F29 March 2018 REQUIREMENTS FOR INSTALLATION OF METALLIC DOWELS INTO CONCRETE

CITY AND COUNTY OF DENVER POLICY DENVER FIRE DEPARTMENT. Emergency Responder Radio Enhancement Coverage System (RES)

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project

CONNECTICUT LOTTERY CORPORATION OFFICIAL GAME RULES Connecticut Lucky-4-Life"

Record Drawing Standards for Projects Version 2.1

South African Distribution Code

UK Broadband Ltd - Spectrum Access 28 GHz Licence Company Registration no: First Issued 22 July Licence Number: /01/18

CHAPTER 11 SURVEY CADD

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS

MINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements.

3. The PAC (Permit Application Center) will notify the design professional of plan review results.

CONSTRUCTION SPECIFICATION FOR PORTABLE TEMPORARY TRAFFIC SIGNALS

This Call for Qualifications does not require the preparation of a design proposal.

Information package for obtaining a building permit

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

Arqiva Limited - Spectrum Access 28GHz Licence Company Registration no: First Issued 30 January Licence Number: /01/17

Clarifications in italics added July 2018

3. DESIGN SPECIFICATIONS

APPENDIX K DEPARTMENT OF PLANNING AND CODE ENFORCEMENT SUBDIVISION APPLICATION CENTER SUBMITTAL CHECKLIST

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).

UK Broadband Ltd Spectrum Access Licence Licence Number: Rev: 4: 11 January 2018

NEW YORK CITY FIRE DEPARTMENT. Notice of Adoption of Final Rule. 3 RCNY , entitled In-Building Auxiliary Radio Communication Systems

This Licence document replaces the version of the Licence issued by the Office of Communications (Ofcom) on 23 March 2015 to EE Limited.

PORT OF POOLE DEVELOPING FOR THE FUTURE

Emerging Subsea Networks

Section 1. Introduction

PLAN PREPARATION (G 700)

SECTION SUBMITTAL PROCEDURES

-and- (the Artist ) maquette means the drawing or model, prepared by the Artist, of the proposed Art Work;

For crossing under a railroad, contact the specific railroad company's engineering department.

APPENDIX A See rule 3(1) þþ APPLICATION UNDER SECTION 217-C OF THE TAMIL NADU DISTRICT MUNICIPALITIES ACT 1920 TAMIL NADU ACT V OF 1920.

BASELINE SURVEY, VISUAL - STANDARD

SECTION CONSTRUCTION PHOTOGRAPHS AND VIDEO RECORDING

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

Guidelines and Checklist For SAWS Sanitary Sewer. Developmental Engineering Division

Customer Connection Guide Updates Effective May 2017

KC Water Rules and Regulations For Water Main Extensions and Relocations

APPLICATION FOR SITE PREPARATION PERMIT

GUIDELINES FOR THE APPLICATION FOR A SPACE STATION CARRIER LICENCE. Section 1 - Introduction

OFFSHORE ANALYSIS & RESEARCH SOLUTIONS HOUSTON PETROLEUM SURVEYORS GROUP PERSONNEL DATA PROCESSING PARTNERSHIPS

MUSEUM SERVICE ACT I. BASIC PROVISIONS

CONTRACT OF EMPLOYiMENT. between LULA MAE PERRY. and the PICKENS COUNTY BOARD OF EDUCATION PICKENS COUNTY, GEORGIA

EE Limited - Public Wireless Network Licence Company Registration no First Issued: 26/03/93 - Licence Number: Rev: 20-10/01/17

REQUEST FOR PROPOSAL AERIAL PHOTOGRAPHY & DIGITAL MAPPING ROADS DEPARTMENT

Spectrum Licence Wireless Cable Service (500 & 600 MHz Band)

INTERNATIONAL STANDARD

Conceptual, Preliminary and Final Site Plan Review in Holladay City

Intellectual Property

EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) CONTENTS. (This contents page does not form part of the Grid Code) Paragraph No/Title

BookletChart. Sacramento River Andrus Island to Sacramento NOAA Chart A reduced-scale NOAA nautical chart for small boaters

Global Alignment of Survey Systems Proof of Concept

SECTION PROJECT MANAGEMENT AND COORDINATION

Transcription:

23 August 2001 SPECIFICATION FOR TOPOGRAPHIC AND HYDROGRAPHIC SURVEYS OF RECLAMATION AND DREDGING WORKS 1.0 EXTENT OF WORKS The main survey works shall comprise of the following : a. Carry out topographic and hydrographic survey works at the work site & b. Submission of survey drawings and reports. 2.0 TOPOGRAPHIC AND HYDROGRAPHIC SURVEY WORKS The survey scale and spacing shall be as specified by the Engineer. For the area where localised protrusions are observed or expected, the spacing shall be closer in order to pick up all peculiar features in the area. The same shall be applied to pick up the toe line and the crest line of any sloping ground. All survey levels are in Admiralty Chart Datum (ACD) for echo sounding survey and Land Survey Datum (LSD) based on relevant local survey grid system. The conversion between ACD and LSD shall be indicated in the survey drawing. A minimum of five (5) control stations of a reasonably permanent nature should be left at site, and should be clearly shown in the survey drawings. The echo sounding equipment shall be checked and calibrated at the beginning and end of each day s work. This shall be carried out within the area of the survey. The equipment shall be calibrated by approved method. Check soundings shall be made by lead line at reasonable spacing (30m) over the echo sounding survey emphasizing on coverage as directed by the Engineer. A continuous record of tide levels during the period of sounding shall be submitted along with the echo sounding survey report. The error in the survey shall not exceed the following : Echo Sounding In horizontal position = ± 3.0 m Topographic Survey ± 0.2 m In vertical position = ± 0.2 m ± 0.01 m Metric units shall be used throughout the survey. 3.0 SUBMISSION OF SURVEY DRAWINGS, REPORTS AND DISKETTES The following shall be surveyed and plotted on survey plan :- i) Lot boundaries ii) Vegetation edge STH 1

iii) iv) Existing structures Drainage outlets with invert level v) Pipeline/cable crossing/other utilities or services under and on ground surface vi) vii) viii) ix) Existing navigation marks Existing shore-protection works Sunken barges/vessels Rocky outcrops x) Contours (to include also these contours : +2.1m ACD, +1.2m ACD) xi) Ground levels The drawings to be submitted shall follow the format of the hydrographic survey drawings issued during tender. All the above drawings are to be in AutoCAD Format in 3D mode. The Contractor is to supply 5 sets of CD-ROM containing the survey data. The drawings shall be submitted as follows :- i) One (1) set of tracing. ii) iii) iv) Five (5) sets of prints. Five (5) sets (A3) of all drawings mentioned above. Five (5) sets of Report describing the survey details including description of all equipment used, tide observation, bench marks, positioning control, track plots, weather, personnel, photographs of all above-mentioned and all drain outlets, etc. v) Original set of all record, site notes, echo record, tide observation, daily site report, etc. The surveyor is expected to be a licensed land and hydrographic surveyor (registered in Malaysia), who shall check and endorse all drawings and reports submitted. He is expected to carry out the works in his normal professional capacity, including allowance for liaison with relevant authorities, hire of boats, and the likes to enable survey to proceed as specified. 4.0 HARBOUR REGULATIONS The Contractor shall be responsible for ensuring that his operations comply with the requirements of all regulations of the Marine Department and other relevant Authorities which may affect the works in any way. He shall be responsible for the payment of any dues or duties levied by the Marine Department and other relevant Authorities and for obtaining any permits, licences and approval required by Marine Department and other relevant authorities. 5.0 OPERATIONS OF OTHERS The ordinary business of other users within the working area will be continued during the progress of the works. The Contractor s operations must be conducted in such a way as to avoid all interference by land and water with other users within the working area. Telecoms approval may be required regarding frequency to be used in positioning system. STH 2

6.0 DAMAGE OF SERVICES The Contractor shall determine the precise location of any services in the survey area and shall take all necessary precautions to avoid damage to them. He shall at his own expense rectify any damage done and indemnify the Engineer from all claims in respect of any loss or injury arising from damage or interruptions of services. The term Services shall include any pipe line, cable, mooring, buoy, navigation light or mark, jetty or landing stage or any other works. 7.0 CONDUCT OF THE WORKS The Contractor shall, during the execution of the works, keep all plant and materials and all things connected with the works in good order and tidy to the satisfaction of the Engineer and shall clear them away on completion. 8.0 SAFETY The Contractor shall provide and maintain upon all vessels and floating plant employed on the works sufficient, proper and efficient life-saving apparatus. This apparatus shall comply with the requirements of all relevant statutes and regulations. 9.0 SERVICES AND EQUIPMENT The Contractor shall provide all facilities and equipment without limitation necessary for the proper performance of the works, including all transport for the movement of his employees, equipment and materials to and from the site. This responsibility shall include clearance, off loading and handling of all equipment and materials. 10.0 PROVISION FOR INSPECTION The Contractor shall give every facility to the officials of the Engineer or their representatives to inspect the works and shall observe any instructions given by them regarding the use of plant, equipment and temporary works. 11.0 BUOYS, LIGHTS AND MARKERS The Contractor shall provide all buoys and other markers for the indication of all submerged work and mooring together with all navigation lights, warning lights and markers required on the vessels and floating plant all to the requirements of the competent authorities. 12.0 SUPERVISION The Contractor shall provide sufficient experienced supervisors for the works to ensure that the works are properly and expeditiously executed. 13.0 EXISTING CHANNEL AND WATERWAY Existing channel and waterway shall be kept clear and navigable at all times. The Contractor is to maintain such channel and waterway for the duration of the Contract. A hydrographic STH 3

survey shall be taken of the existing channel and waterway at the beginning of the Contract and also at four (4) monthly interval. Should there be a major difference in this survey as compared to the original survey due to siltation or any other reason, then the Contractor is to dredge the affected area to the satisfaction of the Engineer at no additional cost. 14.0 PROGRESS OF THE WORKS During the course of the works, the Contractor shall keep full and detailed records of the progress of the works. These shall include weather, calibration test results and any other factors which may affect the accuracy of the survey. A copy of these records shall be delivered to the Engineer not later than noon on the day after which records were made together with a plan of the works marked up to show the extent of the area surveyed. If the works or any part of them do not, in the opinion of the Engineer, comply with this Specification then the deficient parts of the works shall be repeated at the Contractor s own expense. 15.0 CONFIDENTIALITY Except with the prior written consent of the Employer, the Contractor and the personnel and any other person associated with the survey shall not at any time communicate to any person or entity any data obtained from the survey. STH 4

23 August 2001 TABLE OF CONTENTS Description Page 1.0 EXTENT OF WORKS...STH1 2.0 TOPOGRAHPIC AND HYDROGRAPHIC SURVEY WORKS...STH1 3.0 SUBMISSION AND HYDROGRAPHIC SURVEYS...STH2 4.0 HARBOUR REGULATIONS...STH2 5.0 OPERATIONS OF OTHERS...STH3 6.0 DAMAGE OF SERVICES...STH3 7.0 CONDUCT OF THE WORKS...STH3 8.0 SAFETY...STH3 9.0 SERVICES AND EQUIPMENT...STH3 10.0 PROVISION OF ACCESS...STH3 11.0 BUOYS, LIGHTS AND MARKERS...STH3 12.0 SUPERVISION...STH4 13.0 EXISTING CHANNEL AND WATERWAY...STH4 14.0 PROGRESS OF THE WORKS...STH4 15.0 CONFIDENTIALITY...STH4 STH 1