KDH-1B Weigh Module Installation Instructions

Similar documents
SX - se ries 75 SX 5

SX - se ries 150 SX 15-15

SM 15K - Series 15kW DC POWER SUP PLIES

SM 15K - Series 15kW DC POWER SUP PLIES

SM se ries watts DC POWER SUP PLIES

SM 15K - Series 15kW DC POWER SUP PLIES

SM series watts DC POWER SUP PLIES

SM Series 3300 W DC POWER SUP PLIES

INTERIOR FINISHES CHAPTER 8

SM Series 3300 W DC POWER SUP PLIES

SM Series 3300 W DC POWER SUP PLIES

SM Se ries 6000 W DC POWER SUP PLIES DELTA ELEKTRONIKA B.V. Mod els Volt age range Cur rent range. Three phase input

The Dramatic Publishing Company

SAVING ENERGY THROUGH IMPROVING CONVECTION IN A MUFFLE FURNACE. Alina Adriana MINEA and Adrian DIMA

INFLUENCE OF RUNNING CONDITIONS ON RESONANT OSCILLATIONS IN FRESH-AIR VENTILATOR BLADES USED IN THERMAL POWER PLANTS

Filter-Based Synthetic Transmit and Receive Focusing

Capacitor, De-tuned Capacitor & Filter Bank Products. The ABB Solution to Harmonics

SM Se ries 800 W DC POWER SUP PLY

Jun ior Cer tifi cate Ex ami na tion, 2003 Ma te ri als Tech nol ogy (Wood) Mon day 16 June - Morning Sec tion A- Higher Level 40 marks

SPECIAL CONSTRUCTION

Telex. Op er at ing In struc tions ST300. Transmitter SR Channel Receiver SR-50. Single Channel Receiver

En vi ron men tal Planning, Prevention And Di sas ter Re sponse In The Ara bian Gulf

1073 & 1084 Channel Amplifier

THAT Corporation APPLICATION NOTE 103

EXPERIMENTAL RESEARCH OF LIMITS FOR THERMAL MODULATION TRANSFER FUNCTION. Ljubiša D. TOMI] and Mom~ilo P. MILINOVI]

CHAPTER 10 MEANS OF EGRESS. User Note: See Pref ace page iv ( mar ginal mark ings ) for Chap ter 10 reor ga ni za tion in for ma tion.

Im por tant Note 1. Mains Sup ply (rack units) 4 DC Power Sup ply In di ca tors (rack units) Mod ule Mod ule 7

APC-30T. Omni-Purpose 30 Watt Wide Angle Horn Loudspeaker. General Description. Features. Specifications. Applications APC-30T

JB1010 Ten-Channel Junction Box

SM se ries watts DC POWER SUP PLIES

En ter prise Re source Plan ning (ERP) Sys tem: An Ef fec tive Tool for Pro duc tion Man age ment

Low Cost, Single-Supply Differential Amplifi er AD626

AGASTAT 7000 Series, Industrial Electropneumatic Timing Relay

Picosecond Vi bra tional Spec tro scopy of Intermolecular Energy Transfer and Overtone Re lax ation in Liquid Bromoform

ASTER Imagery for British Columbia An Online Exploration Resource 1

JCR-VIS Credit Rat ing Com pany Lim ited June, 2002

Air craft Noise versus Re spect for Home and Pri vate Life. Chapter XVI Air craft Noise ver sus Re spect for Home and Pri vate Life.

AC CES SORY DE CODER MX82E, MX82D, MX82V

Proportional Reasoning

In te grated En do scope for Real-Time 3D Ul tra sound Im ag ing and Hyperthermia: Fea si bil ity Study

Ra ti omet ric Lin ear Hall Ef fect Sen sor

Check mate for Chil dren

Telex Op er ating In struc tions PROFESSIONAL WIRE LESS IN TER COM SYS TEM TR-300, BTR-300

THERE ARE A lim ited num ber of bids

AGASTAT GP/ML/TR Series, 10 Amp Control Relay, Non-latching, Latching & Timing Versions

351 En gi neer ing Ter race, mail code Amsterdam Avenue New York, NY

Exsultet [AT THE EASTER VIGIL]

Sin gle-el e ment Fo cused Ul tra sound Trans ducer Method for Har monic Mo tion Im ag ing

FT 9003 Frequency divider. Instruction Manual

Padmount Style SF6 Insulated Switching Solutions

FT Frequency divider. Instruction Manual

CRITICAL REVIEW OF THERMOELECTRICS IN MODERN POWER GENERATION APPLICATIONS. Khalid M. SAQR and Mohd N. MUSA

Organized Small-scale Self-help Housing

ES TI MA TION OF DOSES RE CEIVED BY OP ER A TORS IN THE 1958 RB RE AC TOR AC CI DENT US ING THE MCNP5 COM PUTER CODE SIMULATION

Dec. 17, WOLFF 2,412,703 RADIO LOCATOR DEVICE. Fillied Aug. 29, 194l 2 Sheets-Sheet l. rena

Man ual on col lec tive bar gain ing and dispute resolution in the Pub lic Ser vice

Guide line for thin layer hot mix as phalt wearing courses on residential streets

MASS OF SAINT ISAAC JOGUES

De voted to Prof. Pavel Povinec 65-th an ni ver sary

Chinese Empire. Chinese Empire

Crawling Waves from Radiation Force Excitation

METASEMANTICS AND OBJECTIVITY

Ta ble of Con tents. Table of Contents

Power Chess for Kids Volume 2

Trans par ency, Ac cess to In for ma tion, and Well-Be ing

General Council approves work programme on implementation problems of developing countries

African trade ministers to meet on WTO challenges

A Bit Serial Input, Constant-Current Latched LED Driver

Cath e ter Ul tra sound Phased-Ar ray Trans duc ers for Ther mal Ab la tion: A Fea si bil ity Study

Wis con sin MAPPING BUL LE TIN Vol. 29, num ber 1 Winter 2003

Femtosecond Flu o res cence Dy nam ics of trans-azo ben zene in Hexane on Ex ci ta tion to the S 1 (n,

Promoting water-related innovation through networked acceleration

Pu shing and bra king aid. Trans la ti on of the ori gi nal user's manual. movilino

Real-Time Cal i bra tion of Tem per a ture Es ti mates dur ing Radio fre quen cy Ab la tion

Pakistan INTRODUCTION

Cosmic Fruit Bowl. Comedy by Rosemary Frisino Toohey. The Dramatic Publishing Company

Moore spells out priorities for Seattle Ministerial Conference

SI-3010LLSL. Linear. Regulators. 1.5 A, Ultra-Low-Dropout, 1~3.3 V Regulator

ORTEC R.F.C. GmbH PF 1103, D Landshut, Ger many Tel.: Fax:

New Zealand s Moore heads WTO

THE COM PAR I SON OF GAMMA-RA DI A TION AND ELEC TRI CAL STRESS IN FLU ENCES ON OX IDE AND IN TER FACE DE FECTS IN POWER VDMOSFET

Cases Deal ing with Communication. Cases with Strong Rep re sen ta tion of Topic. Alice s Expense Account. Chemplus Inc. (B) The Auto Fi nance Cen tre

SAMPLE KYRIE. Dm (Em) Dm (Bm) (Bm) (G) (Em) (Bm) (D) Chri ste. ri e e. son. ri e e lé. Gm7 F (G) Gm7. (Bm) (Em7) (D) (Em7) (D) son. Chri ste.

FIBERLIGN Suspension: Double & Spread Double

SERIAL # OWNERS MANUAL PARACHUTE LABORATORIES INC LEXINGTON AVE. SUITE 106 DELAND, FL. USA

2011 Cadillac CTS Coupe

From Riches to Rags at a Time of Pros per ity:

COURSE DESCRIPTIONS Accounting (ACCT) Agricultural Economics (AGEC) Anthropology (ANTH) Biology (BIOL)

All improvements of David(R)zehn!

ABSTRACTS. 1. Quantatative Ultrasound 1

Charles Hertan. Power Chess for Kids. Learn How to Think Ahead and Be come One of the Best Play ers in Your School

Q Grille Part # Q WARNING: STEEL MESH & GRILLE CAN BE EXTREMELY SHARP!

A2 - Neutron Diffraction - Instruments

EN VI RON MEN TAL DEG RA DA TION OF CAR BON NANOTUBE-MOD I FIED COM POS ITE LAM I NATES: A STUDY OF ELECTRICAL RESISTIVITY

Keysight Technologies The Fundamentals of Signal Analysis. Application Note

ALEXANDER SHUL'GA, Preliminary comments on the reinterpretation of symbolic universe concept

DE COM MIS SION ING OF NU CLEAR FA CIL I TIES AT THE NU CLEAR RE SEARCH IN STI TUTE REZ PLC

Les s on Objectives. Student Files Us ed. Student Files Crea ted

IMPORTANT: PLEASE RETAIN THIS INSTRUCTION MANUAL FOR FUTURE REFERENCE

Design/Installation Guide

Transcription:

KDH-1B Weigh Module Installation Instructions TM004 Rev. E - March, 2005

NOTICE BLH Nobel makes no representation or warranties of any kind whatsover with respects to the contents hereof and specifically disclaims any implied warranties or merchantability or fitness for any particular purpose. BLH Nobel shall not be held liable for errors contained herein or for incidental or consequential damages in connection with the furnishing, performance, or use of this publication or its contents. BLH Nobel reserves the right to revise this manual at any time and to make changes in the contents hereof without obligation to notify any person of such revision or changes.

Ta ble of Con tents SEC TION I Gen eral In for ma tion... Page 1-1 1.1 IN TRO DUC TION... Page 1-1 1.2 DE SCRIP TION... Page 1-1 1.3 KDH-1B AC CES SORIES... Page 1-2 1.3.1 Sim u lated Weigh Mod ules... Page 1-2 1.3.2 Ther mal In su la tion Pads... Page 1-2 1.3.3 As sem bly... Page 1-2 1.4 KDH-1B DI MEN SIONS... Page 1-3 1.5 WAR RANTY PO LICY... Page 1-4 1.6 FIELD EN GI NEERING... Page 1-4 SEC TION II In stal la tion... Page 2-1 2-1. GEN ERAL... Page 2-1 2.2 AS SEM BLY IN STRUC TIONS (For Units in Kit Form)... Page 2-1 2.3 KDH-1B WEIGH MOD ULE IN STAL LA TION IN STRUC TIONS... Page 2-4 2.3.1 Step by Step In stal la tion In struc tions... Page 2-4 2.3.1.1 Po si tioning... Page 2-4 2.3.1.2 Sur face Prep a ra tion - Base... Page 2-4 2.3.1.3 Sur face Prep a ra tion - Top... Page 2-4 2.3.1.4 Me chan i cal In stal la tion... Page 2-4 2.3.1.5 Elec tri cal In stal la tion... Page 2-5 2.3.2 Shimming for Load Dis tri bu tion... Page 2-5 2.3.3 In stal la tion Ex am ples... Page 2-5 SEC TION III Op er a tion... Page 3-1 3.1 TEM PER A TURE CON SID ER ATIONS... Page 3-1 3.2 LOAD CON SID ER ATIONS... Page 3-1 SEC TION IV Main te nance... Page 4-1 4.1 CAL I BRA TION... Page 4-1 4.2 MAIN TE NANCE/TROU BLE SHOOTING... Page 4-1 Page Listings for Figures and Tables Fig ure 1-1. KDH-1B Weigh Mod ule... Page 1-1 Fig ure 1-2. Ac com mo da tion For Ther mal Ex pan sion... Page 1-1 Fig ure 1-3. Cy lin dri cal Tube Trans ducer... Page 1-1 Fig ure 1-4. Ac com mo da tion For Ir reg u lar Sur faces... Page 1-1 Fig ure 1-5. Sim u lated Weigh Mod ule... Page 1-2 Fig ure 1-6. Ther mal Pad Kits... Page 1-2 Fig ure 2-1. The KDH Weigh Mod ule... Page 2-1 Fig ure 2-2. KDH-1B As sem bly In struc tions Steps 1-4... Page 2-2 Fig ure 2-3. KDH-1B As sem bly In struc tions Steps 5-6... Page 2-3 Fig ure 2-4. KDH-1B Weigh Mod ule Ori en ta tion... Page 2-4 Fig ure 2-5. KDH-1B In stal la tion As sem bly Di a gram... Page 2-5 Ta ble 1-1. KDH-1B Spec i fi ca tions... Page 1-4

SECTION I General Information 1.1 INTRODUCTION This man ual pro vides gen eral in for ma tion, in stal la tion, op er at ing, and ser vice in for ma tion for KDH-1B Weigh Mod ules (Fig ure 1-1). The cy lin dri cal tube type trans ducer of fers sev eral ad - van tages over rect an gu lar shear beam de signs. Su pe rior re sis tance to mois ture con tam i na tion is ac - com plished by elim i nat ing gaged pock ets on the out side of the beam. In stead, the KDH uses strain gages ap plied to the in side wall of the tube. In ad di tion, the ca ble en try is equipped with a con duit fit ting for ca - ble pro tec tion and is in ter nally pot ted. Struc turally, the cy lin dri cal tube is equally strong in both the ver ti cal and hor i zon tal planes (Fig ure 1-3). Un like rect an gu lar shear beams that are typ i cally weaker in the hor i zon tal plane, KDH mod ules are less af fected by sideloads in duced by vi bra tion, wind, or pro cess dy - nam ics (Fig ure 1-4). Force Figure 1-1. KDH-1B Weigh Module 1.2 DESCRIPTION Re ac tion Re ac tion KDH-1B Weigh Mod ules are pre ci sion trans duc ers for mea sure ment of weight or other forces. The trans ducer con tains bonded strain gages which are placed to mea - sure ap plied shear stresses. The strain gages are wired in a Wheatstone bridge cir cuit that, when pro vided with an ex ci ta tion volt age, pro duces changes in the elec tri - cal out put pro por tional to the ap plied force. The cy lin dri cal dou ble ended shear beam mod ule is de - signed to mea sure shear stresses in duced by an ap plied load with out er rors caused by ther mal ex pan - sion (Fig ure 1-2). The com bi na tion beam and mount ing hard ware are ide ally suited for use on large out door stor age ves sels where tem per a ture, wind, and pos si bly seis mic forces are en coun tered. Figure 1-3. The Cylindrical Tube Transducer The de sign of the mount ing hard ware elim i nates the need for pins and/or bolts to at tach the beam. This re - duces the ad verse ef fects of vary ing edge and point stresses and makes the over all mod ule less sus cep ti - ble to cal i bra tion changes. Low pro file de sign, sym met ri cal mount ing bolt pat terns, and stan dard yoke mount ing plates make KDH mod ules easy to in stall on new or ex ist ing struc tures and ves sels. Figure 1-4. Accommodates Minor, Irregular Support Surfaces Figure 1-2. Accommodates Thermal Expansion and Contraction Re fer to Ta ble 1-1 for com plete KDH-1B spec i fi ca tions (page 1-4). Page 1-1

1.3 KDH-1B ACCESSORIES Ac ces sories de scribed and il lus trated in clude the com - monly used types. For in for ma tion con cern ing spe cial re quire ments, con tact BLH. 1.3.1 Simulated Weigh Modules 1.3.3 Assembly KDH-1B mod ules are avail able fully as sem bled or in kit form. Units shipped as kits must be as sem bled ac cord - ing to in struc tions pre sented in Sec tion II, para graph 2-2. Sim u lated Weigh Mod ules are steel weldments with the same mount ing di men sions as the cor re spond ing KDH-1B to be used in place of the KDH-1B dur ing the in stal la tion pro cess (Fig ure 1-5). Use of a Sim u lated Weigh Mod ule elim i nates the risk of dam age to the pre - ci sion KDH-1B due to stray weld ing cur rents and/or me chan i cal im pact. 1.3.2 Thermal Insulation Pads Ther mal in su la tion pads (Fig ure 1-6 and out line draw - ing page 1-3) re duce heat con duc tion from a heated ves sel to the KDH-1B al low ing beam tem per a ture to re - main close to am bi ent for max i mum ac cu racy. The pads are made from rigid glass-cloth lam i nate with ex tremely low ther mal con duc tiv ity. Use of the in su la tion kits is rec om mended when tem per a ture at ves sel sup port sur - face ex ceeds 130 de grees Fahr en heit (54 de grees Cel sius). Figure 1-6. Thermal Pad Kits Figure 1-5. Simulated Weigh Module Page 1-2

1.4 KDH-1B DIMENSIONS Page 1-3

Gen eral: Ca pac ity 200k and 300k pounds Loading Specs in %R.O. 200k 300k Safe Load 150% 150% Ul ti mate Load 300% 300% Safe Up lift 100% 100% Ul ti mate Up lift 110% 155% Safe Sideload (Ax ial) 20% 50% Ul ti mate Sideload (Ax ial) 40% 105% Safe Sideload (Trans verse) 85% 55% Ul ti mate Sideload (Trans.) 170% 110% In put Re sis tance 700 ohms + / - 7 ohms Out put Re sis tance 700 ohms + / - 7 ohms Rated Out put 2.0 mv/v + /- 0.1% mv/v Zero Bal ance 1% R.O. (Rated Out put) Com bined Er ror (best fit) 0.1 % R.O. Creep (20 min utes) 0.03% R.O. Re peat abil ity 0.02% R.O. Rec om mended Ex ci ta tion 10 V ac or dc (20 V max.) Safe Tem per a ture Range -34.4 to 104.4 o C (-30 to 220 o F) Com pen sated Range -1 to 54 C (30 to 130 F) Tem per a ture Ef fects (30-130 F) Zero Bal ance 0.0025% R.O. per o F Span 0.0015% Read ing per F Ma te rial: Beams & Brackets Ul tra High Strength Steel En vi ron men tal Class & NEMA 6, IEC IP 67 Mois ture Pro tec tion IEC 68-2-4... Test D, 200 Cycles (min) Table 1-1. KDH-1B Specifications De flec tion Un der Load and Unit Weight: CA PAC ITY DE FLEC TION WEIGHT 200,000 lb 0.029 in. 260 lb 300,000 lb 0.050 in. 355 lb Cor ro sion Pro tec tion: KDH-1B zinc chromate beam painted hard ware Ter mi na tion: 200k, 300K 10 m (32 ft, 10 in.) ca ble with con duit fit ting Doc u men ta tion List Out line Draw ing BLH # 472456-3 NOTE: Many per for mance spec i fi ca tions are proven on a sta tis ti cal sam ple ba sis. BLH is con tin u ally seek ing to im prove prod uct qual ity and per for - mance. Spec i fi ca tions may change ac cord ingly. 1.5 WARRANTY POLICY Viahay BLH war rants the prod ucts cov ered hereby to be free from de fects in ma te rial and work man ship. BLH s li a bil ity un der this guar an tee shall be lim ited to re pair ing or fur nish ing parts to re place, f.o.b. point of man u fac ture, any parts which, within one (1) year from date of ship ment of said prod uct(s) from BLH s plant, fail be cause of de fec tive work man ship or ma te rial per - formed or fur nished by BLH. As a con di tion hereof, such de fects must be brought to BLH s at ten tion for ver - i fi ca tion when first dis cov ered, and the ma te rial or parts al leged to be de fec tive shall be re turned to BLH if re - quested. BLH shall not be li a ble for trans por ta tion or in stal la tion charges, for ex penses of Buyer for re pairs or re place ments or for any dam ages from de lay or loss of use for other in di rect or con se quen tial dam ages of any kind. BLH may use im proved de signs of the parts to be re placed. This guar an tee shall not ap ply to any ma te - rial which shall have been re paired or al tered out side of BLH s plant in any way, so as in BLH s judg ment, to af - fect its strength, per for mance, or re li abil ity, or to any de fect due in any part to mis use, neg li gence, ac ci dent or any cause other than nor mal and rea son able use, nor shall it ap ply be yond their nor mal span of life to any ma te ri als whose nor mal span of life is shorter than the ap pli ca ble pe riod stated herein. In con sid er ation of the for go ing guar an tees, all im plied war ran ties are waived by the Buyer, BLH does not guar an tee qual ity of ma te - rial or parts spec i fied or fur nished by Buyer, or by other par ties des ig nated by buyer, if not man u fac tured by BLH. If any mod i fi ca tions or re pairs are made to this equip ment with out prior fac tory ap proval, the above war ranty can be come null and void. 1.6 FIELD ENGINEERING Im proper KDH-1B in stal la tion or op er a tion may re sult in mod ule, ves sel, or fac tory dam age. Please fol low in - struc tions care fully. Vishay BLH will not ac cept any li a bil ity for faulty in stal la tion and/or mis use of this prod - uct. Au tho rized Field Ser vice En gi neers are avail able around the world to in stall KDH Weigh Mod ules and/or train fac tory per son nel to do so. The field ser vice de - part ment is the most im por tant tool to as sure the best per for mance from your ap pli ca tion. Call (Factory Number) (781) 298-2200 Ask for Field Service Canada (416) 251-2554 (800) 567-6098 Page 1-4

SECTION II Installation 2-1. GENERAL Tips, tech niques, and pro ce dures for in stall ing to tal weigh sys tems are pre sented in the BLH Elec tronic Weigh Sys tems Hand book (HDBK 002-1). This man ual deals only with KDH-1A Weigh Mod ules. IM POR TANT: BLH strongly rec om mends that the user read this sec tion com pletely prior to start ing in stal la tion as each suc ces sive step de pends upon sat is fac tory com ple tion of all prior pro ce dures. 2.2 ASSEMBLY INSTRUCTIONS (For Units in Kit Form) When KDH-1B mod ules are pur chased in kit form, as - sem bly is re quired be fore in stal la tion. To as sem ble a KDH-1B kit, fol low the four steps pre sented in Fig ures 2-2 (page 2-2) and 2-3 (page 2-3). Once KDH-1B mod - ules are fully as sem bled, pro ceed to para graph 2.3 on page 2-4. NOTE: KDH-1B Weigh Mod ules are de picted in this man ual with the top mount ing plate above. Modules also can be installed with beam mount ing plate above (in verted 180 ). Figure 2-1 The KDH-1B Weigh Module Page 2-1

Figure 2-2. KDH-1B Assembly Instructions Page 2-2

Figure 2-3. Assembly Instructions Continued Page 2-3

2.3 KDH-1B WEIGH MODULE INSTALLATION INSTRUCTIONS This pub li ca tion pro vides me chan i cal and elec tri cal in - stal la tion in struc tions for KDH-1B Weigh Mod ules (Fig ure 2-1). KDH-1B Weigh Mod ules are low pro file weight trans ducer de vices de signed for sim ple me - chan i cal in stal la tion. Each mod ule con tains a dou ble ended shear beam type trans ducer and mount ing hard - ware which typ i cally al lows in stal la tion un der pro cess and in ven tory ves sels with out stay and check rods. Four bolts (cus tomer sup plied) se cure the KDH-1B mod ule to a foun da tion or base, and four bolts (cus - tomer sup plied) at tach the mod ule to the ves sel/de vice. Cus tomer sup plied bolts should be ANSI grade 8.8 or stron ger. KDH-1B in stal la tion in struc tions re fer to spe cific parts of the KDH-1B Weigh Mod ule. Use the KDH-1B mod ule di a gram (Fig ure 2-1) to iden tify parts and part lo ca tions. 2.3.1 Step by Step Installation Instructions 2.3.1.1 Po si tioning: KDH-1B Weigh Mod ules should be ori ented so that the main axis of the mod ule is per pen dic u lar with the di ag o nals of the ves sel or struc ture. For ex am ple; on an up right cy lin dri cal ves sel, the di rec tion of free move ment of the mount ing plate should face the cen ter of the ves sel. On hor i zon tal ves sels, the di rec tion of free move ment of the mount ing plate should be par al lel to the main axis of the tank. Ori enting the mod ules in this way pro vides a check less in stal la tion while al - low ing ther mal ex pan sion/con trac - tion of the ves sel (See Fig ure 2-4). Plan View Upright Cylindrical Tank 2.3.1.2 Base Mount ing Sur face Prep a ra tion: The base of the weigh mod ule must be uni formly sup - ported and level. On a struc tural steel sup port us ing through bolts, or a con crete pad us ing studs, the bolt spac ing should be ac cu rate to within 0.05 in. of the bolt pat tern spec i fied in the out line draw ing di men sions. Grade 8.8 (or stron - ger) studs or bolts must be used. Do not weld the weigh mod ules in place. 2.3.1.3 Top Mount ing Sur face Prep a ra tion: Pre-drill holes in the leg or gus set of the ves sel to match the bolt pat tern of the mount ing plate (see 1.4 KDH-1B Di men sions). Al low for nor mal bolt clear ance and ad just ment. Use grade 8.8 (or stron ger) bolts of suf fi cient length. Beam and yoke mount ing plates are drilled but NOT tapped. Mount ing plates re quire nuts and through bolts. Do not weld mount ing plates to the ves sel leg or gus set. 2.3.1.4 Me chan i cal In stal la tion (Fig ure 2-5, next page): Raise the ves sel and in stall the weigh mod ules in place on the base mount ing sur faces. Be fore bolt ing down, be sure that the base sur - face of the weigh mod ule is uni formly sup ported and level. Lower the ves sel onto the KDH-1B top plates and bolt in place. Avoid drop ping the ves - sel or ap ply ing an im pact load to the weigh mod ules. Tighten mount ing bolts to the bolt man u fac - turer s rec om mended torque spec i fi ca tion. Fol low ing in stal la tion, do not per form arc weld - ing on the ves sel or any sup port struc ture elec - tri cally in con tact with the weigh mod ule. Plan View Hor i zon tal Tank Figure 2-4. KDH Weigh Module Orientation Page 2-4

2.3.1.5 Elec tri cal In stal la tion: The wir ing color code is pre sented in Sec tion 1.4 KDH-1B Di men - sions. KDH-1B Weigh Mod ules are equipped with 1/2-14 NPT threaded fit tings for con duit con - nec tion, if de sired. The stan dard ten me ter KDH-1B ca ble con tains four con duc tors with an over all foil shield. Each con duc tor has tinned leads for easy con nec tion to a BLH sum ming junc tion box or trans mit ter. Ex cess ca ble can be coiled up in side the sum ming unit or trans mit ter en clo sure. If the ca ble length is cut, the rated out put in creases by ap prox i mately 0.003% per foot at 70F. To achieve ex tra pro tec tion from light en ing dam age, BLH rec om mends a ground strap be tween the ves sel and earth ground. These in struc tions are typ i cal for weigh sys tem ap pli ca - tions with in dus trial weigh ves sels, such as tanks, bins, or hop pers. How ever, the pro ce dures are also ap pli ca - ble, in part, to the use of KDH-1B mod ules in weigh frames and scales. 2.3.2 Shimming for Load Distribution With empty ves sel weight rest ing on the mod ules and ex ci ta tion volt age ap plied, mea sure out put of each mod ule with a DVM (dig i tal volt me ter). Each mod ule must in di cate some out put rep re sent ing weight of empty ves sel. Read ings would nor mally be from 1-10mVdc. No mod ule should in di cate less than 10% of empty ves sel weight; ide ally, each mod ule should carry an iden ti cal share (ves sel weight/num ber of mod ules) of to tal weight. Any mod ule with out put less than an equiv a lent 10% of ves sel weight must be shimmed be tween the up per mount ing plate and ves sel mount ing point. If gap ex ists be tween KDH-1B and beam, de ter mine gap size, raise ves sel, loosen mount ing bolts, and add shim ma te rial equal to mea sured gap plus.015-.030. Tighten mount - ing bolts and lower ves sel GENTLY onto mod ule. Re check elec tri cal out put for proper dis tri bu tion and in - sert shims wher ever needed. If no gap was mea sured as de scribed above, but 1 or 2 mod ules had lit tle or no out put, in sert a trial shim of.015-.030 thick ness at mod ule with low est out put and re check all mod ules for proper weight dis tri bu tion. Re peat shim ming pro cess un til all mod ules have out - puts within 20-30% of each other. 2.3.3 Installation Examples Pages 2-4 and 2-5 pro vide ex am ples of hor i zon tal and ver ti cal tank in stal la tions. Figure 2-5. KDH Installation Assembly Diagram Page 2-5

Page 2-6

Page 2-7

SECTION III Operation 3.1 TEMPERATURE CONSIDERATIONS KDH-1B weigh mod ules per form best when op er ated within their com pen sated tem per a ture range of +30 to +130 de grees fahr en heit. Max i mum op er at ing tem per a - ture range with out dam age is -30 to +220 de grees fahr en heit. When am bi ent tem per a tures at the KDH-1B weigh mod ule ex ceed the com pen sated tem per a ture range, spe cial pre cau tions must be taken to en sure that ac tual mod ule tem per a ture is held within spec i fied lim its. These pre cau tions are nec es sary whether or not the mod ule is be ing op er ated. Ther mal pads can be used to re duce con duc tive heat ing. (Ref. para. 1.3.2) 3.2 LOAD CONSIDERATIONS KDH-1B weigh mod ules can be pe ri od i cally loaded up to 150% of rated load with out ad verse ef fects. CAU TION A static over load in ex cess of the Over load Rat ing may per ma nently af fect the ac cu racy and per for mance of the mod ule. Peak vi bra tory load ings should be lim ited to 100% of rated ca pac ity to pre clude pre ma ture fa tigue fail ure of the mod ule. Shock loads should be avoided or oth er wise at ten u ated by means of re sil ient pads or mounts. Weigh sys tems de signed with out re gard to sig - nif i cant shock loads may lose cal i bra tion or even dam age the mod ule be yond re pair. Warning: Shock loads should be avoided or otherwise attenuated by means of resilient pads or mounts. Weigh systems designed without regard to significant shock loads may lose calibration or even damage the module beyond repair. Page 3-1

SECTION IV Maintenance 4.1 CALIBRATION KDH-1B mod ules are care fully checked and cal i brated at BLH be fore ship ment. The ac cu racy of the in stru - ments and stan dards used for cal i bra tion are trace able to NIST. A data and cal i bra tion sheet is fur nished with each KDH-1B mod ule sup plied by BLH. The data in - cluded on this sheet can be used as a ref er ence where in de pend ent cal i bra tion checks are per formed. Cal i bra tion can be ac cu rately checked by ap ply ing the rated load to the mod ule and then com par ing the out put with the orig i nal data on the cal i bra tion cer tif i cate. Cal i - bra tion should be checked when ever the beam is thought to have been over loaded be yond its safe over - load rat ing (150%). Note that KDH-1B per for mance can not be changed through ex ter nal ad just ments and any mod ule dis play ing cal i bra tion er ror should be re - turned to BLH for ser vice. Sys tem cal i bra tion in struc tions are in cluded in the dig i - tal in di ca tor/trans mit ter op er a tor s man ual. 4.2 MAINTENANCE/TROUBLESHOOTING When it is nec es sary to de ter mine if a KDH-1B cir cuit is op er a tive, the ves sel does not have to be lifted off the mod ule in ques tion. Sim ply read across the out put leads (red & white) with a dig i tal volt me ter with power ap plied to the mod ule. The read ings should be some - what sim i lar, nor mally in the 0-30 mv range. Any rad i cal de par ture from these fig ures are usu ally in dic a tive of a fail ure. To de ter mine the cause of in cor rect op er a tion of the mea sur ing sys tem, per form the fol low ing in spec tions: a. Check in stru ment power and fuses. b. Check that con nec tions to the in stru ment are cor - rect and tight. c. Check in stru ment per for mance in de pend ently fol - low ing rec om mended pro ce dure. d. Check con ti nu ity of in ter con nect ing leads. e. Check junc tion box con nec tions (where used). f. Check for proper ex ci ta tion volt age. g. Check out put of each mod ule for com pa ra ble out - put lev els. h. In su la tion re sis tance checks: KDH-1B must be dis con nected for leak age test (mea sured val ues should ex ceed 5 x 10 9 ohms). 1) Ground to a lead of the in ter con nect ing ca ble. 2) Mod ule case to a lead of the ca ble. 3) Mod ule case to the shield of the ca ble. j. In put/out put re sis tance check. Dis con nect the mod ule ca ble leads from the in stru ment or junc - tion box. Mea sure the re sis tance be tween the in put leads and be tween the out put leads. Re sis - tance should be as spec i fied. OHM ME TER USED SHOULD NOT APPLY MORE THAN 20 VOLTS TO THE BEAM BRIDGE. Re sis tance read ings other than those listed in the spec - i fi ca tions in di cate a fail ure within the unit. DO NOT at tempt to re pair; faulty mod ules re quire fac tory ser - vice. Con tact the lo cal sales of fice or BLH di rectly for RE TURN AU THO RI ZA TION. Upon ex am i na tion of the mod ule at the fac tory, a full re port on the con di tion with a quo ta tion on re pair cost and de liv ery will be sub mit ted to the cus tomer. Page 4-1

blhnobel.com