Roll No. :... Invigilator s Signature :.. CS/B.TECH(EE)/SEM-5/EE-502/ POWER SYSTEM-I. Time Allotted : 3 Hours Full Marks : 70

Similar documents
Fatima Michael college of Engineering and Technology

EL 403 MODEL TEST PAPER - 1 POWER SYSTEMS. Time: Three Hours Maximum Marks: 100

CONTENTS. 1. Introduction Generating Stations 9 40

PRELIMINARIES. Generators and loads are connected together through transmission lines transporting electric power from one place to another.

EE 340 Transmission Lines. Spring 2012

III/IV B.Tech (Regular/Supplementary) DEGREE EXAMINATION

EE 740 Transmission Lines

EE 340 Transmission Lines

DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING QUESTION BANK SUBJECT CODE & NAME : EE 1402 HIGH VOLTAGE ENGINEERING UNIT I

DHANALAKSHMI COLLEGE OF ENGINEERING, CHENNAI 301.

EE 741. Primary & Secondary Distribution Systems

A Study on Electrical Design Considerations of Power Transmission Lines

High voltage engineering

Transmission of Electrical Energy

ROEVER ENGINEERING COLLEGE ELAMBALUR, PERAMBALUR DEPARTMENT OF ELECTRICAL & ELECTRONICS ENGINEERING

ENGINEERING ACADEMY X V

Improving Power Transfer Capability of EHV AC Double circuit Transmission line by Enhancing Surge Impedance Loading level

ELEC Transmission i and

Technical and Economic Assessment of Upgrading a Double-circuit 63kV to a Single-circuit 230kV Transmission Line in Iran

VS JE _D Please read the instructions carefully before attending the Question paper. All Questions are compulsory.

MGVCL VSJE - Question Booklet Code "A"

Impregnants in high voltage cables Surge impedance loading of line

Analysis of lightning performance of 132KV transmission line by application of surge arresters

1. What are the transmission system voltages used in India? 33kV, 66 kv For medium high voltage

Name :. Roll No. :... Invigilator s Signature :.. CS/B.TECH (EIE)/SEM-6/EI-603/ ELECTRONIC INSTRUMENTATION & MEASUREMENT

ELECTRICAL MACHINES III

DEPARTMENT OF ELECTRICAL ENGINEERING DIT UNIVERSITY, DEHRA DUN EA5210: POWER ELECTRONICS

Improving High Voltage Power System Performance. Using Arc Suppression Coils

TRANSFORMERS PART A. 2. What is the turns ratio and transformer ratio of transformer? Turns ratio = N2/ N1 Transformer = E2/E1 = I1/ I2 =K

2015 ELECTRICAL SCIENCE

3. (a) List out the advantages and disadvantages of HRC fuse (b) Explain fuse Characteristics in detail. [8+8]

Impact Assessment Generator Form

PARALLEL GROOVE CLAMPS

Electrical Power Systems

Investigation of skin effect on coaxial cables

Cork Institute of Technology. Autumn 2008 Electrical Energy Systems (Time: 3 Hours)

Utility System Lightning Protection

ABSTRACT 1 INTRODUCTION

Maximum Lightning Overvoltage along a Cable due to Shielding Failure

Protective earthing, protective conductor and automatic disconnection in case of a fault (Fault protection)

8Transmission of power

Session Four: Practical Insulation Co-ordination for Lightning Induced Overvoltages

DC utilization of existing LVAC distribution cables

Active Harmonic Filter (AF3)

Computer Aided Analysis and Design of EHV-AC Transmission line

American Electrical Institute

R10. IV B.Tech I Semester Regular/Supplementary Examinations, Nov/Dec SWITCH GEAR AND PROTECTION. (Electrical and Electronics Engineering)

SPECIFICATION No SS-135/ kv METAL OXIDE SURGE ARRESTERS WITHOUT GAPS

UNIT I TRANSMISSION LINE PARAMETERS

Instruction Manual for Digital Grounding Resistance Meter

PRACTICAL PROBLEMS WITH SUBSTATION EARTHING

Field Instruction. Induced voltages can occur in overhead lines, underground cables, or in switchyards.

The Many Uses of Transmission Line Arresters

Single Line Diagram of Substations

ELECTROMAGNETIC INDUCTION AND ALTERNATING CURRENT (Assignment)

MV network design & devices selection EXERCISE BOOK

Embedded Generation Connection Application Form

Shunt Reactors. Global Top Energy, Machinery & Plant Solution Provider

Overvoltage Protection

Field Instrument Cable. Electrical Noise

Power Quality Solutions

University of Zagreb Faculty of Electrical Engineering and Computing

Notes 3 Explanatory Information 4-10

Level 6 Graduate Diploma in Engineering Electrical Energy Systems

from ocean to cloud LAND CABLE INTERFERENCE MODEL AND CABLE CROSSINGS WITH POWER INTERCONNECTS

ABSTRACTS of SESSION 6

BE Semester- VI (Electrical Engineering) Question Bank (E 605 ELECTRICAL POWER SYSTEM - II) Y - Y transformer : 300 MVA, 33Y / 220Y kv, X = 15 %

Conventional Paper-II-2011 Part-1A

Condition Assessment of High Voltage Insulation in Power System Equipment. R.E. James and Q. Su. The Institution of Engineering and Technology

Article 250 Grounding & Bonding

A New Technology. for Measuring Overhead Line and Cable Impedance Values and the Ground Impedance of Large Substations. Feature

Preface...x Chapter 1 Electrical Fundamentals

Should we transform our lines to HVDC?

Lumped Network Model of a Resistive Type High T c fault current limiter for transient investigations

Unit 2. Single Line Diagram of Substations

2000 Mathematics Subject Classification: 68Uxx/Subject Classification for Computer Science. 281, 242.2

Unit 3 Magnetism...21 Introduction The Natural Magnet Magnetic Polarities Magnetic Compass...21

Simulation and Analysis of Lightning on 345-kV Arrester Platform Ground-Leading Line Models

APPLICATION OF LONG FLASHOVER ARRESTERS FOR IMPROVEMENT OF LIGHTNING PROTECTION AND OPERATING VOLTAGE RELIABILITY OF DISTRIBUTION LINES

Equipment Rack Grounding. Technical Note

Instruction Manual for Digital Grounding Resistance Meter. Table of Contents

The Analysis Results of Lightning Overvoltages by EMTP for Lightning Protection Design of 500 kv Substation

TRAFTOR WINDINGS CHANGING THE RULES TOROIDAL INDUCTORS & TRANSFORMERS SOLUTIONS PROVIDER AND MANUFACTURER

Chapter Moving Charges and Magnetism

Standard Technical Specifications for Electrical Works CABLES AND ACCESSORIES. 11 kv XLPE-Insulated Three-Core Underground Cables

DEPARTMENT OF EEE QUESTION BANK

Circulating sheath currents in flat formation underground power lines

Coaxial Cable Protection

ET 61 - Electrician Theory Examination Marking Schedule

Metal Oxide Varistor Elbow (M.O.V.E.) Surge Arrester

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION

Introduce system protection relays like underfrequency relays, rate of change of frequency relays, reverse - power flow

Transmission System Operations TO1. Interconnection Training Program PJM State & Member Training Dept.

HIGH-FREQUENCY IMPEDANCE CHARACTERISTICS AND HEALTH CONDITION MONITORING OF OVERHEAD POWER LINES. A Thesis. Presented to

SPECIFICATION SS-140/9. 0.6/1 (1.2) kv CONTROL AND POWER UNDERGROUND CABLES WITH PVC OR XLPE INSULATION AND PVC JACKET

MV protection relay. Installation assistance guide. Sepam ranges

When surge arres t ers are installed close to a power transformer, overvoltage TRANSFORMER IN GRID ABSTRACT KEYWORDS

Embedded Generation Connection Application Form

Topic 6 Quiz, February 2017 Impedance and Fault Current Calculations For Radial Systems TLC ONLY!!!!! DUE DATE FOR TLC- February 14, 2017

Module Title: Electrical Installation II Laboratory Sheet:

Transcription:

Name : Roll No. :.... Invigilator s Signature :.. CS/B.TECH(EE)/SEM-5/EE-502/2011-12 2011 POWER SYSTEM-I Time Allotted : 3 Hours Full Marks : 70 The figures in the margin indicate full marks. Candidates are required to give their answers in their own words as far as practicable. GROUP A ( Multiple Choice Type Questions ) 1. Choose the correct alternatives for any ten of the following : 10 1 = 10 i) The values of A, B, C, D parameters for a short transmission line with a series impedance of z are ii) a) z, 0, 1 and 1 respectively b) 0, 1, 1 and 1 respectively c) 1, z, 0 and 1 respectively d) 1, 1, z and 0 respectively. Stranded conductors are used to a) reduce transmission loss b) increase mechanical flexibility c) reduce skin effect d) increase stability of the system. 5204 [ Turn over

iii) The capacitance between any two conductors of a 3-core cable with sheath earthed is 3µF. The capacitance per phase will be a) 1 5 µf b) 6µF iv) c) 1µF d) none of these. Ferranti effect on long overhead line is experienced when it is a) lightly loaded b) on full load at unity power factor c) on full load at lagging power factor d) on overload at lagging power factor. v) A lightning arrester connecting a line and earth in a sub-station a) protects the transmission line against direct lightning stroke b) suppresses high frequency oscillation c) protects the terminal equipment from travelling surges d) none of these. 5204 2

vi) The function of earth wire in a transmission line is to a) prevent earth fault b) provide a safety measure for any high flying objects c) provide a shield to the phase conductors from direct lightning stroke d) provide mechanical strength to the tower. vii) The insulation resistance of a cable of length 10km is 1MΩ. The insulation resistance of a similar cable of length 50km length will be a) 1MΩ b) 5MΩ c) 0 2MΩ d) none of these. viii) Corona loss is less when the shape of the conductor is a) circular b) flat c) oval d) independent of shape ix) The a.c. resistance of a conductor is greater than its d.c. value due to a) skin effect only b) proximity effect only c) Ferranti effect only d) both (a) and (b). 5204 3 [ Turn over

x) ACSR in an overhead transmission line stands for a) Alloy Copper Steel Reinforced b) Aluminium Conductor Steel Reinforced c) All Cooper Steel Reinforced xi) d) None of these. Corona loss increases with a) increase in supply frequency and conductor size b) increase in supply frequency but reduction in conductor size c) decrease in supply frequency and conductor size d) decrease in supply frequency but increase in conductor size. GROUP B ( Short Answer Type Questions ) Answer any three of the following. 3 5 = 15 2. Define the term string efficiency in connection with suspension insulators. What are the different methods of improvement of string efficiency? 5204 4

3. What is meant by transposition of conductors? What is the need of transposition of conductors of an overhead transmission line? 4. What are the advantages of a.c. distribution system over d.c. distribution system? Explain the term ring main distributor with a neat diagram and state its advantages. 5. What sort of information is obtained from a stringing chart? Why is it important? 6. Why are transmission lines classified based on their length? Define regulation of a transmission line. GROUP C ( Long Answer Type Questions ) Answer any three of the following. 3 15 = 45 7. a) Show that the inductance per loop metre of a two-wire transmission line using solid round conductor is given by L= 4"10 #7 % ln D ( ' * H, where D is the distance between the & r $ ) conductors and r " is the GMR of the conductors. 10 5204 5 [ Turn over

b) What is meant by the term bundled conductors? What are the advantages of this type of conductors? 5 8. a) How is efficiency of a transmission line defined? 3 b) A short 3-phase transmission line connected to a 33kV, 50Hz, generating station at the sending end is required to supply a load of 10 MW at 0 8 lagging power factor at 30kV at the receiving end. If the minimum transmission efficiency is limited to 96%, determine the per phase values of resistance and inductance of the line. 12 9. A transmission line has a span of 214m. The line conductor has a cross-section of 9 225cm 2 and has an ultimate breaking strength of 2,500 kg/cm 2. Assuming that the line is covered with ice and it provides a combined conductor and ice load of 1 125 kg/m, while the wind pressure is 1 5kg/m run. Calculate (i) the maximum sag produced and (ii) the vertical sag. Take a safety factor of 3. 10. a) What is meant by the term tariff? 2 b) Explain the following : i) Two-part tariff ii) Maximum Demand tariff iii) Availability based tariff. 6 5204 6

c) A consumer has a maximum demand of 250 kw at 45% load factor. If the tariff is Rs. 100 per kw of maximum demand plus 10 paise per kwh, find the overall cost per kwh. 7 11. a) What is corona? 3 b) What is meant by the disruptive critical voltage and visual critical voltage? 6 c) How can the corona loss be minimised in a transmission line? 3 d) Why are vibration dampers required in a transmission line? 3 5204 7 [ Turn over