Dodecagon Gazebo. Assembly Manual. If you are in the middle of your project and you need assistance Call (717)

Similar documents
Oval Vinyl Gazebo. Assembly Manual

Wooden Rectangle Pergola Assembly Manual

Renaissance Pavilion. Assembly Manual

Sunhouse. Assembly Manual

Heartland Pergola. Assembly Manual

Artisan Vinyl Pergola

V nyl Gazebo truct c it Assembly Instr ons

Octagon Vinyl Gazebo Assembly Instructions

Assembly Instructions

KIT ASSEMBLY INSTRUCTIONS

Octagon Vinyl Gazebo Assembly Instructions For 10 & 12 Models

12x12 Pavilion. Assembly Manual

Country Cabin. Assembly Manual. HomePlace Structures

10 Octagon Cedar Gazebo Assembly Instructions

176 S. New Holland Road Gordonville, PA Tel: Fax: Castle Loft

176 S. New Holland Road Gordonville, PA Tel: Fax: Playhouse Loft

Vinyl Gazebo Instructions

AMISHGAZEBOSHOP.COM VINYL GAZEBO KIT CONTENTS

CAUTION: Before opening the crate place it flat on its side (not up right as show in the photo) Hardware included for assembling your gazebo:

176 S. New Holland Road Gordonville, PA Tel: Fax: Summit Tower

Pine Log Cabin and Cape Cod Playhouse

176 S. New Holland Road Gordonville, PA Tel: Fax: Eagles Nest

The Festival Assembly Instructions

12ft Octagon Bayside Gazebo Assembly Manual

10ft Octagon Bayside Gazebo Assembly Manual

Pacifica Pool House. Assembly Manual. Toll Free: Hours: 9-5 Monday-Friday EST. Package ships as shown. Suncast Corporation

Spring Loaded All Season Roll-Up Doors

EmagiKit. Privacy Pod Plus. Quiet. Easy. Affordable. INSTRUCTIONS ASSEMBLY

Installation Instructions

Sliding Door Kit

8 Ft Wide Enclosure Assembly Guide

12, 14 & 16 Wide Enclosure Assembly Guide

12ft Octagon (Precut) Creekside Gazebo Assembly Manual

10X12 Arched Breeze Pergola Assembly Manual Outdoor Living Today

Straight Stringer Installation Instructions

a.k.a. casegoods instructions

Gambrel Barn with Overhang Manual

Contour Hanger ASSEMBLY INSTRUCTIONS

Bumper Sign INSTALLATION INSTRUCTIONS

Industrial Hanger ASSEMBLY INSTRUCTIONS

Star Barn Manual. Tools Needed:

Pergola Installation Instructions

RLP Flat Track Hardware sliding door hardware/ barn door track

Stag Hanger ASSEMBLY INSTRUCTIONS

SolarWedge. Installation Manual Date Modified: 9/17/07 WARNING SAFETY. Tool List

USER AND INSTALLATION MANUAL FOR THE BALNEA ENCLOSURE


Assembly Instructions 10 X 10 Aluminum Frame Building

ROCKWELL. Two Panel Door. Half X Door. Double X Door. Z Combination Door

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

6X3 Patio Garden Shed Assembly Manual

12-16 Ft Wide Enclosure Assembly Guide

Sliding Door Kit


Baby Grande with Crank, Housing, and Side Rails Installation Instructions

Lange Crank Hoist-a-top Assembly Instructions

Grand Garden Chalet 6X3 Assembly Manual - Costco

Spoked GARRICK HANGER

INSTALLATION GUIDE Locker With Top Shelf Transit Low Roof & Nissan NV Low Roof ( Aluminum )

STYLE BAR & TONNEAU COVER INSTALLATION

Pillar Hanger ASSEMBLY INSTRUCTIONS

WILDING WALLBEDS INSTALLATION INSTRUCTION Side Mount

M10 x 75mm Sockethead Cap Screws. 5mm Fender Washer (12) Included - (8) Required. #10 x 2.5" PH Wood Screws. (30) Included - (24) Required

9 ft Naramata Spa Shelter Assembly Manual Outdoor Living Today

TS-20KD-1010 LOW PROFILE CARGO SCALE INSTALLATION GUIDE

Side Mount INSTRUCTION BOOKLET #C122 BED STYLE: PARK CITY

Luna Cedar Sauna Assembly Instructions

Boxed Shed. QUAKER or A-FRAME SIZES: 6 x 8 6 x 10 T1-11Siding

INSTRUCTION BOOKLET #C21. For Wallbed models: KING SIZE

Rockwell 4-in-1 Sliding Door

Triple Bypass System

INS T A L L A TIO N INS T R U C TIO N S. Ceiling Mount Track System


8x4 SpaceSaver Garden Shed Assembly Manual

MONKEY BARS OVERHEAD RACK INSTALLATION

Gambrel Barn Construction Manual 8x8 through 16x24 Units

Install Instructions. NewAge Steel Welded Tall Locker

7 X 10 X 6 SHELTER 7 X 16 X 6 SHELTER 12 X 10 X 6 SHELTER 12 X 16 X 6 SHELTER

RLP Mini Low Profile V Track Hardware sliding door hardware/ barn door track

Screen Kit For Octagon Gazebo Assembly Manual

6 Passenger Roof Assembly & Installation

SINGLE TRACK BYPASS (patent pending) barn door hardware

Required Tools: Suggested Additional Tools: 1 Cordless Drill with Robertson Bits 1 Ratchet Wrench 1 7/16 or 11mm socket 1 7/16 or 11mm Gear Wrench

Video Wall Installation Instructions 2W X 3H, 3W X 3H

Shed Assembly Instructions

Double Beam Freestanding Pergola Installation Guide

TWIG Hanger ASSEMBLY INSTRUCTIONS

INSTALLATION INSTRUCTIONS INS T A L L A TIO N INS T R U C TIO N S THE MAVERICK HANGER R H

Installation Instructions: VIBRATION ISOLATION RAIL (CPR)

Therma-Tru Door Gallery Setup Instructions Swing Unit with Hardware Kit - Hardware Part # MADGSWU15 (Swing Unit) Part # MADGHKSU10 (Hardware Kit)

Install Guide. view our Install video guide online

INSTALLATION GUIDE. C20-FTM STRAIGHT PARTITION Transit Partition ( Perforated Window, No Access, Steel )

Qwik-Fence Installation Instructions

Chapter 9. Windows and Exterior Doors

Equilibrium Credenza


Cellar Hanger ASSEMBLY INSTRUCTIONS

THANK YOU FOR PURCHASING FROM HERITAGE PATIOS

ROCKWELL 4-IN-1 DOOR. Two Panel Door. Half X Door. Z Combination Door. Double X Door

Kai Installation Instructions

Transcription:

Dodecagon Gazebo Assembly Manual If you are in the middle of your project and you need assistance Call (717) 351-9250

Gazebo Assembly Manual Thank you for your purchase of this Gazebo. This manual is designed to simplify the assembly process, however we strongly recommend having an experienced carpenter involved in the project. Please read through the entire manual before starting! The Gazebo put together for this manual was a 26 Dodecagon. This manual can also be used for other models. It took 5 men, approximately 8 hours using air tools shown below. However, it may take you longer since it will be a new project for you. Take a deep breath and get at it; the satisfaction and enjoyment of this gazebo is only a few hours away. Have fun! You have purchased a product that consists of heavy, bulky pieces. With your purchase, you assume full responsibility to have the necessary manpower and/or equipment available to unload the items. You also agree that any damage that happens to the equipment, product, or individuals during the unloading process, or during the entire construction process, is your responsibility, and neither the seller, nor the manufacturer, will be held liable for any such damage. 20 12 13 14 15 16 17 18 19 3 4 5 6 7 8 9 10 11 1 2 Tools Needed 1. 2 x4 Prop 8. Pen 15. 5/8 Wrench 2. Level 9. Paint Brush 16. Air Socket 3. Pry Bar 10. Measuring Tape 17. 11 Vice Grip Clamp 4. Cordless Drill 11. Electric Cord 18. Hammer 5. Electric Drill 12. 9/16 (Roof) & 5/8 (Floor) Sockets 19. Sharp Utility Knife 6. Flat Head Screw Driver 13. Socket Wrench 20. 2 Large Ladders 10 7. Magic Marker 14. 9/16 Wrench

Hardware & Parts 1/2 x 9 Bolts for Floor 3/8 x 4 Bolts for Roof 3/8 x 3 1/2 Bolts for Floor 3/8 X 3 1/2 Roof Bolts with Acorn Nuts 10 x 2 1/2 White Head For Top and Bottom Rails 10 x 1 1/2 SS Screw For Floor and Post Plate 10 x 1 1/2 SS Screw For Pagoda Angle 7/8 Capper Nails For Shingles 10 x 3 1/2 SS Screrw For Posts 2 1/2 Finishing Nails Cedar Shingles Only 12 Pagoda Angle Brackets 12 Corner Caps For Floor 12 Floor Sections Center Floor Boards 12 Posts Bottom Rails Top Rails Door Way 12 Bottom Roof Sections Pagoda Spindles Pre Cut 12 Pagoda Roof Sections Asphalt Cappers Rubber Slate Cappers Cupola

Unpack Your Gazebo A 26 Dodecagon Gazebo with a Pagoda Roof may come in 3 or 4 pachages. Use a sharp utility knife to cut shrink wrap Use Caution and do not cut into Gazebo Material. Remove Roof Sections and Set down in a clean place. Use a screw gun and the provided square drive bit, remove screws from floor sections. These screws were used for shipping purposes and will not be reused. Remove Board from sides of Floor. These boards and screw were used for shipping purposes and will not be reused. Unpack all Gazebo Parts onto a clean place so that you can easily see and move parts for easy identification.

Floor Layout Find the Center of the area the Gazebo will be Built. Place floor section down one at a time side by side working around. *IMPORTANT* When Placing floor pieces ensure all numbers match side by side as shown above. Remove all floor board with 1 missing screws on each end. (Shown above with red arrow) This will always be the second board from the outside and the rest will be spaced threw out the floor. After removing floor boards locate bolt hole below floor. (Do not install Bolts at this time) Keep all floor boards in there original location by placing it behind there original spot. As shown above.

Post and Floor Assembly Insert Posts into Prepared Post Holes. Do this before you fasten any floor bolts. Ensure that all of the plates located on the top of the posts face outward from the gazebo. Insert (2) 9 Bolts through floor Joists into the pre-drilled holes. Ensure the floor joists are flush and tighten both bolts securely. Attach Post to floor using (8) 3 1/2 SS Screws (4 Per side). Repeat the Previous 5 Steps for all 12 outsides corners before moving forward to the next step. After securing all outside corners, Proceed to insert and tighten all other bolts. Fasten Posts to floor from outside of gazebo using (4) 3 1/2 screws. Install floor boards into there original location and attach using 2 1/4 SS Screws. Counter sink 1/16 below surface.

Fasten Top Rails Place top rails into place temporarily. Locate Doorway in desired location. You will need 2 Men for the following steps. 1 to hold and 1 to place screws (use 2 1/2 white head screws) Place top rail flush with top of Post Plate. Align top rail section center onto post. Place 4 Screws into pre drilled holes. (Or if not pre drilled place evenly as shown above)

Fasten Bottom Rails You can choose to do this section before or after you install the roof. You may find it eaiser to move around while installing the roof if you do not install the bottom rails untill after you complete the roof. Place bottom rails center onto post. Using (4) 2 1/2 White Head Screws. (Space evenly as shown above.) Drive and Counter sink screws 1/16 below surface. WARNING: Do not drive screws to deep. Fasten Corner Caps onto floor joists at each corner. Using (2) 2 1/2 White Head Screws per corner.

Install Roof Sections You will need 4-5 Stong individuals for the following steps. Or use a crane, Pettibone or skidsteer if availible. Lift (1) roof section with a man at each corner and slide onto top rail from outside if possible. Readjust your men and slide it up carfully not to damage any parts. Measure from the floor up to the desired roof hight and cut (4) 2x4 for props. Set ladders in place and slide up the roof section to appropriate roof height and prop it up. Using cut 2x4 s. You can use the old skid for 2x4 props if necessary. Slide another section up and clamp it into place using a c-clamp. We used a 11 vice-grip clamp. Mark the center of the post and line up the 2 section center. Ensure the reveal of the 2x10 roof board is equal on both sides. It is very important that all sections are center. After aligning roof section to each other and centering onto post. Clamp again tightly at base and install (2) 4 Bolts at bottom holes.

Insert Bolts in remaining predrilled holes. Using 3 1/2 studs with acorn nuts and washers. Use 2 1/4 SS Screws to attach post plate to roof section. Fasten Plate with 4 screws per plate. Ensure alignment. Continue to add sections and add roof props as you go to support roof. Add studs, nuts and washers to all sections as you go. After adding the final roof section into place and all bolts and studs are installed and tightened. Fasten Pagoda Angle Brackets with 2 1/2 White Head Screws. Fill ALL holes. Fasten Top rail to roof section using 2 1/2 White Head Screws. In the following locations Place 3 Screws on the outside of rail spaced evenly. Place 2 Screws on the inside evenly spaced. Tighten Screw to counter sink it slightly. DO NOT drive screw threw vinyl material. Please use Caution.

Install Pagoda Roof Before moving forward go to the Install Roof Cappers section and add the roof capper to the first completed roof. After adding roof cappers Align Pagoda spindle section evenly on outside and flush on top. Fasten together with (4) 2 1/2 White Head Screws (2) per side. After adding all Pagoda spindle sections and screwing them together, Lift the first pagoda section up into place as shown. Fasten roof section using (4) 2 1/2 White Head Screws (2) for each side as shown above. Fasten Second Roof Section using a C-clamp and Insert Studs in all predrilled holes and tighten with washers and acorn nuts. Attach roof to spindle section using (3) 2 1/2 White Head Screws Per sections. Fasten Pagoda to first (bottom) roof section using (3) 2 1/2 White Head screws per section.

Install Roof Cappers Trim to fit roof contour. 5 Align center of capper onto roof seam. Fasten with (2) 7/8 Roof Nails or your own roofing nailer. Caution: Do not drive nails through bottom side of ceiling. Install 2nd piece at approx 5 exposure. Cappers have tabs at 5 Trim 1st roof capper. It is easier to trim before the pagoda roof is installed. After Intalling all Shingles to the 1st Roof. Go Back to Install Pagoda Roof Section and continue here after installing the Pagoda Roof. Capper at 2nd Roof Install the same as above exept Install the Shingles every other row first and trim to fit as shown above. After installing every other row then install the remaining rows and trim to fit. This will give an over lap look. Cut tabs off of bottom edge using a scissors or knife. If you have purchased a screen package. Fasten screen on top of cupola hole with a stapler. Trim excess screen matterial.

Finishing Your New Gazebo Congratulations! You are Done. Enjoy your new Gazebo for many Years! Thank You Country Lane Gazebos. Install Cupola. Angle Down Use (6) 2 1/2 White Head Scres (1) for every other section. Go back over all painted section of the Gazebo and touch it up with the provided touch up paint.

w