Satellite Issues. WRC-19 agenda items 1.5, 1.6, 7. Jack Wengryniuk Chairman, WP 4A

Similar documents
APT Preliminary Views on WRC-19 agenda iitems 1.4, 1.5, 1.6, 7 and 9.1 (Issues 9.1.2, and 9.1.9)

Earth Stations in Motion (ESIM) Studies in the Ka-Band (WRC-19 A.I. 1.5) and other ITU-R relevant issues

ITU-APT Foundation of India NATIONAL WORKSHOP ON WRC-19 PREPARATION 22 nd February 2018, New Delhi

Indonesia s Preparation for WRC-19

World Radiocommunication Conference, 2012

Radiocommunication Bureau (BR)

Appendix A: Resolution 18 (1994) Review of the ITU s Frequency Coordination and Planning Framework for Satellite Networks

PART 1 : From WRC-15 to WRC-19 Setting the basis

WRC-19 Conference Proposals Interface (CPI) User Guide

Agenda Items for WRC-19. Inter-American Telecommunication Commission (CITEL) Permanent Consultative Committee II

World Radiocommunication Conference 2019 and 2023 issues. Eric ALLAIX METEO-FRANCE WMO SG-RFC CHAIRMAN

Preparations for WRC-19 and future agenda items for WRC-23

World Radiocommunication Seminar Harmful Interference to Space Services

Evolving International Regulation on Satellite Services

AGENDA ITEMS UNDER PREPARATION BY SOUTH AFRICA FOR THE WORLD RADIOCOMMUNICATION CONFERENCE 2012 June 2009

Panel Sessions 7 & 8 WRC-15 Agenda items 7 & 9.1 issues (9.1.2, 9.1.3, 9.1.5, 9.1.8)

3rd ITU INFORMATION MEETING ON WRC-12 PREPARATION (Geneva, 7 8 November 2011)

Roundtable on WRC-19 Agenda items 2, 4, 8, 9.1 (issues 9.1.6, 9.1.7) and 10

GUIDELINES FOR THE PREPARATION OF PROPOSALS FOR WRC-19

RESOLUTION 155 (WRC-15)

Results and implications of World Radiocommunication Conference, Omar KA BR/SSD/SSC

WRC-07 Radio Astronomy Preparations CORF Meeting October 15, 2006

Regulations, WRC 2015/2019:

Orbit/Spectrum ITU International Regulatory Framework. ITU Regional Radiocommunication Seminar for the ASIA&PACIFIC Apia, Samoa September 2016

24.25 and 86 GHz. WRC-19 agenda item 1.13 IMT-2020 between. Cindy Cook Chairman, TG 5/1

World Radiocommunication Conference 2019 (WRC-19)

ECC Decision (05)11. Approved 24 June 2005

Harmful Interference to Space Services

PRESENTATION ON WRC-15 ISSUES

Implementation of. on Satellite Services. Yvon Henri

ATTACHMENT 1 to FCC Public Notice DA

ORGANIZACION DE LOS ESTADOS AMERICANOS ORGANIZATION OF AMERICAN STATES

ASIA-PACIFIC BROADCASTING UNION (ABU) POSITION ON WRC-12 AGENDA ITEMS 1.4, 1.10, 1.14, 1.15, 1.17, 1.19, 1.22 AND 1.25

SMALL SATELLITE REGULATION WRC-15 OUTCOME AND RESULTS OF THE ITU-R WP7B STUDIES

STATUS OF ATU PREPARATIONS FOR WRC-19

Agenda Item 1.13 HAPS outside IMT-2000 bands

UPDATES to the. Rules of Procedure. (Edition of 1998) approved by the Radio Regulations Board. Contents

International Maritime Organization

5 National Footnotes to the Table of Frequency Allocations. NF0 ( KHz)

Response of Boeing UK Limited. UK Ofcom Call for Input 3.8 GHz to 4.2 GHz Band: Opportunities for Innovation 9 June 2016

Harmful Interference to Space Services

Technical and Regulatory Studies on HAPS

World Radiocommunication Conference 2019 (WRC-19) Mario Maniewicz Deputy Director, Radiocommunication Bureau International Telecommunication Union

ITU Symposium and Workshop on small satellite regulation and communication systems Prague, Czech Republic, 2-4 March 2015

ATTACHMENT A to FCC Public Notice DA

World Radio Conferences, WRC

5G and IMT Identification - Views from CEPT- Alexander Kühn (CPG-19 Chairman) March 2017

L-band Spectrum Process 27 May Tony Azzarelli 1

ITU RADIO REGULATORY FRAMEWORK FOR SPACE SERVICES

ESIMS - Mobile broadband provision on a global scale: an harmonised regulatory approach

CONSIDERATION OF THE OUTCOME OF WRC-12 AND PREPARATION OF INITIAL ADVICE ON A DRAFT IMO POSITION ON WRC-2015 AGENDA ITEMS

ITU Role, Regulations and Actions to prevent and resolve harmful interference to Space Services

Coordination and Analysis of GSO Satellite Networks

Coordination and notification of terrestrial services

WRC-15: Key Issues. Joaquin RESTREPO Head, OPS Division ITU, Radiocommunication Bureau

Preparation of the APT for WRC-19

RECOMMENDATION ITU-R BO.1834*

ITU activity for Space Science Services

ORBIT/SPECTRUM INTERNATIONAL REGULATORY FRAMEWORK

Visualyse Professional

INTERNATIONAL TELECOMMUNICATION UNION

Agenda Item 5: ICAO position for ITU WRC-15 and preparation on issues pertaining to VSATs Networks. Preparation of WRC-15: Stakeholders & challenges

ITU RADIO REGULATIONS and SMALL SATELLITES

Innovation, Science and Economic Development Canada Spectrum Licensing

International Maritime Organization DRAFT IMO POSITION ON WRC-19 AGENDA ITEMS CONCERNING MATTERS RELATING TO MARITIME SERVICES

WRC-19 Candidate Bands (AI 1.13) Regional Positions

ORGANIZACION DE LOS ESTADOS AMERICANOS ORGANIZATION OF AMERICAN STATES

ARTICLE 11. Notification and recording of frequency assignments 1, 2, 3, 4, 5, 6, 7, 7bis (WRC-12)

Orbit/Spectrum International Regulatory Framework. Challenges in the 21 st century

Orbit spectrum International Regulatory framework

ORBIT/SPECTRUM ALLOCATION PROCEDURES REGISTRATION MECHANISM

UN/NEPAL WORKSHOP on GNSS APPLICATIONS December 2016, Kathmandu, Nepal. Presented by Dominic Hayes. Harmful Interference (HI) related to

Satellite Orbit & Spectrum Resources for Future Innovation WRC-15 OUTCOME

ORGANIZACION DE LOS ESTADOS AMERICANOS ORGANIZATION OF AMERICAN STATES

ARTICLE 22. Space services 1

Cover note to draft ECC/DEC/(06)AA on UWB

PASSIVE MICROWAVE PROTECTION

UPDATES to the. Rules of Procedure. (Edition of 2012) approved by the Radio Regulations Board. Date Part AR/AP RR No. or other reference 1

Alternative BSS earth station antenna radiation pattern for 12 GHz BSS bands with effective apertures in the range cm

World Meteorological Organization PRELIMINARY POSITION ON WRC-19 AGENDA

Report on ITU World Radiocommunication Conference 2015

Xihua University; Chengdu, Sichuan, China: 11 Jan. 2016

SPECTRUM FOR IMT AI 1.1.3

COMMUNICATIONS ALLIANCE LTD

ACHIEVING SPECTRUM HARMONISATION TO DELIVER CONNECTIVITY TO NEXT 1 BILLION Joaquin Restrepo, Chief of Outreach and Publication Services Division, BR/

Problems of limited orbital resources and ITU regulations for satellite services

European Conference of Postal and Telecommunications Administrations (CEPT)

ASMG Positions on the Agenda Items of the

ITU-R World Radio Conference. Bharat Bhatia Regional Director, Asia Motorola

Approved February 2015

NASA Spectrum Management Update: WRC-11 Issues and Objectives and Domestic Concerns

Most important aerospace outcomes of the WRC-15

INTERNATIONAL TELECOMMUNICATION UNION

RSPG Interim Opinion on Common Policy Objectives for WRC-19

ITU and the Radiocommunication Sector

Harmful Interference to Space Services

Bill Kautz U.S. Coast Guard Telecommunications Manager IALA e NAV Committee AIS/COMMS WG Vice Chair

EMC 2008 INTERNATIONAL SPECTRUM MANAGEMENT AND THE ITU. Valery Timofeev 1

Space and Satellite Communications Law. Radio Regulations and Procedures

ITU Global Symposium for Regulators 2014 Manama, Bahrain, 2 5 June ITU activities related to Dynamic Spectrum Access

Transcription:

Document WRC-19-IRWSP-17/8-E 13 November 2017 English only 1 st ITU INTER-REGIONAL WORKSHOP ON WRC-19 PREPARATION (Geneva, 21-22 November 2017) Satellite Issues WRC-19 agenda items 1.5, 1.6, 7 Jack Wengryniuk Chairman, WP 4A

Satellite Issues AI 1.5 - to consider the use of the frequency bands 17.7-19.7 GHz (space-to- Earth) and 27.5-29.5 GHz (Earth-to-space) by earth stations in motion communicating with geostationary space stations in the fixed-satellite service and take appropriate action, in accordance with Resolution 158 (WRC-15) AI 1.6 - to consider the development of a regulatory framework for non-gso FSS satellite systems that may operate in the frequency bands 37.5-39.5 GHz (spaceto-earth), 39.5-42.5 GHz (space-to-earth), 47.2-50.2 GHz (Earth-to-space) and 50.4-51.4 GHz (Earth-to-space), in accordance with Resolution 159 (WRC-15) AI 7 - to consider possible changes, and other options, in response to Resolution 86 (Rev. Marrakesh, 2002) of the Plenipotentiary Conference, on advance publication, coordination, notification and recording procedures for frequency assignments pertaining to satellite networks, in accordance with Resolution 86 (Rev.WRC-07), in order to facilitate rational, efficient and economical use of radio frequencies and any associated orbits, including the geostationary-satellite orbit 2

Agenda Item 1.5 AI 1.5 - to consider the use of the frequency bands 17.7-19.7 GHz (space-to- Earth) and 27.5-29.5 GHz (Earth-to-space) by earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service and take appropriate action, in accordance with Resolution 158 (WRC-15) Issues: Technical characteristics of different types of ESIM, ie. land, aeronautical and maritime General agreement on the characteristics to be used ESIM operating in 17.7-19.7 GHz Generally agreed that introducing ESIM in the FSS downlink band does not change the interference environment for other services Agreement in the 17.7-19.7 GHz band that ESIMs will not claim protection from FS or MS operations Analysis of ESIM sharing with Fixed Service (FS) Multiple studies submitted for each type of ESIM in the 27.5-29.5 GHz band. Results vary and are still being discussed 3

Agenda Item 1.5 AI 1.5 - to consider the use of the frequency bands 17.7-19.7 GHz (space-to- Earth) and 27.5-29.5 GHz (Earth-to-space) by earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service and take appropriate action, in accordance with Resolution 158 (WRC-15) Issues: Analysis of ESIM sharing with Mobile Service (MS) Multiple studies submitted for each type of ESIM in the 27.5-29.5 GHz band. Results vary and are still being discussed Analysis of ESIM sharing with MSS feeder-links Initial study submitted but not yet adequately discussed In-country operation of ESIMs Recognition that operation of ESIMs requires a license by the administration where the ESIM operates Licenses will include technical and operational conditions as required by each administration 4

Agenda Item 1.5 Working document towards draft new Report Report will address ESIM sharing with FS, MS, MSS feeder-links as well as techniques to improve sharing between land based ESIM and FS and MS Working document towards draft CPM text Notwithstanding the need to continue addressing the various sharing issues, there is general consensus that a WRC Resolution, along the lines of Resolution 156 (WRC- 15) for the 19.7-20.2 GHz and 29.5-30.0 GHz bands, could serve as a method to address this agenda item General consensus that operation of maritime ESIMs in these bands would operate under similar regime to ESVs as contained in Resolution 902 (WRC-03) 5

Agenda Item 1.5 Resolution: 158 (WRC-15) ITU-R Responsible Group: WP 4A, next meeting: 20 Feb. 2 March, 2018 Latest Information: Doc 4A/519, Annexes: 10, 11, 12, 13, 21, 22, 28, 29 Ongoing studies to satisfy the agenda item: ESIM sharing with FS in 27.5-29.5 GHz ESIM sharing with MS in 27.5-29.5 GHz ESIM sharing with MSS feeder-links in 19.3-19.7 GHz and 29.1-29.5 GHz 6

Agenda Item 1.6 AI 1.6 - to consider the development of a regulatory framework for non-gso FSS satellite systems that may operate in the frequency bands 37.5-39.5 GHz (spaceto-earth), 39.5-42.5 GHz (space-to-earth), 47.2-50.2 GHz (Earth-to-space) and 50.4-51.4 GHz (Earth-to-space), in accordance with Resolution 159 (WRC-15) Issues: Technical characteristics of different types of non-gso FSS systems and a set of reference GSO FSS parameters Non-GSO FSS systems sharing with GSO networks Multiple studies being considered Protection criteria and sharing approaches being considered via aggregate EPFD or impact to GSO availability Analyze the impact of propagation Effectiveness of various mitigation techniques Non-GSO FSS systems sharing amongst themselves Effectiveness of various mitigation techniques 7

Agenda Item 1.6 AI 1.6 - to consider the development of a regulatory framework for non-gso FSS satellite systems that may operate in the frequency bands 37.5-39.5 GHz (spaceto-earth), 39.5-42.5 GHz (space-to-earth), 47.2-50.2 GHz (Earth-to-space) and 50.4-51.4 GHz (Earth-to-space), in accordance with Resolution 159 (WRC-15) Issues: Protection of EESS passive in 36-37 GHz and 50.2-50.4 GHz Multiple studies being considered, but it appears mitigation measures will be necessary Protection of RAS in 42.5-43.5 GHz, 48.94-49.04 GHz and 51.4-54.25 GHz For RAS in 42.5-43.5 GHz, a worst case study shows exceedances, but needs to be improved with more realistic analysis For 48.94-49.04 GHz and 51.4-54.25 GHz, coordination zones of various sizes around RAS sites will be needed 8

Agenda Item 1.6 Resolution: 159 (WRC-15) ITU-R Responsible Group: WP 4A, next meeting: 20 Feb. 2 March, 2018 Latest Information: Doc 4A/519, Annexes: 1, 14, 15, 16, 23, 30, 31 Ongoing studies to satisfy the agenda item: Non-GSO FSS sharing with GSO FSS Non-GSO sharing with non-gso Non-GSO sharing with EESS and RAS WD- Preliminary Draft New Recommendation outlining non-gso/gso sharing conditions 9

Agenda Item 1.6 Working documents towards draft new Reports on non-gso/gso sharing, non-gso/non-gso sharing and non-gso/passive service sharing Working document towards draft CPM text Method A Expand Article 22 to include epfd limits Method B Expand Article 22 to include regulatory framework to enable non-gso systems based upon a maximum allowable percent increase in GSO unavailability Method C i) Modify RR No. 5.484A to address the coordination between non-gso FSS systems under RR No. 9.12, ii) modify Article 22 to include epfd limits, iii) modify Resolution 750 (Rev. WRC-15) to include unwanted emission power limits in order to protect EESS and SRS systems from non-gso FSS systems 10

Agenda Item 7 AI 7 - to consider possible changes, and other options, in response to Resolution 86 (Rev. Marrakesh, 2002) of the Plenipotentiary Conference, on advance publication, coordination, notification and recording procedures for frequency assignments pertaining to satellite networks, in accordance with Resolution 86 (Rev.WRC-07), in order to facilitate rational, efficient and economical use of radio frequencies and any associated orbits, including the geostationary-satellite orbit Issues: Currently Issues A through K have been identified As is usually the case, some issues are more straightforward, and others more complicated or controversial Focus here is on those that have generated the most discussion within ITU-R, i.e. Issues A, E, F, G 11

Agenda Item 7 Issue A: Bringing into use for non-gso systems WRC-15 invited ITU-R to examine, under AI 7, the possible development of regulatory provisions requiring additional milestones beyond those under RR Nos. 11.25 and 11.44 for non-gso FSS/MSS systems Issues: What does bringing into use mean for non-gso systems? Currently two possibilities being discussed Single satellite into a notified orbital plane for 90 days Single satellite into a notified orbital plane for < 90 days For either case, single satellite must be deployed within 7 years What types of milestones could be developed? Currently one approach with 4 options Two option have 3 milestones with different timing and deployment targets Two other options have [4] milestones, again with different timing and deployment targets Maximum deployment time varies from 12 to [15] years 12

Agenda Item 7 Issue A: Bringing into use for non-gso systems Issues: To what types of non-gso systems should such milestones apply? This is recognized as an issue that needs to be addressed In what frequency bands should such milestones apply? This is recognized as an issue that needs to be addressed Transitional measures for non-gso systems BIU ed before WRC-19 This is recognized as an issue that needs to be addressed 13

Agenda Item 7 Issue A: Bringing into use for non-gso systems ITU-R Responsible Group: WP 4A, next meeting: 20 Feb. 2 March, 2018 Latest Information: Doc 4A/519, Annexes: 7, 33 WD towards draft new Report Preliminary draft CPM text 14

Agenda Item 7 Issue E: Harmonization of AP30B with AP30/30A Should a 15 + 15 year limit of operation be placed on assignments in the List of AP30B as was done for the AP30/30A Plan for Regions 1 and 3? Issues: There is a view that such a time limit is necessary to align AP30B with resolves 1 of Resolution 2 (Rev. WRC-03) There is a counter view that questions the need for harmonization amongst these Plans, which were created for different purposes, and which differ between Region 2 and Regions 1&3 There is also a question as to what becomes of a satellite business that has been established at an orbital location at the end of this 15 or 30 year time period 15

Agenda item 7 Issue E: Harmonization of AP30B with AP30/30A ITU-R Responsible Group: WP 4A, next meeting: 20 Feb. 2 March, 2018 Latest Information: Doc 4A/519, Annex 37 Working document towards draft CPM text 16

Agenda Item 7 Issue F: Concerns with lack of implementation of certain Radio Regulations provisions Are certain RR provisions not being properly implemented by administrations? Issue: There are AP30B filings with global coverage area and much more restricted service area, notwithstanding a NOTE in AP4 data element B.3.b.1 that addresses this issue There are cases of multiple AP30B filings with overlapping service areas being submitted for different orbital locations, notwithstanding No. 2.6bis of AP30B Article 2 Both of these issues are seen by some as causing difficulties for administrations wishing to modify their AP30B national allotments 17

Agenda item 7 Issue F: Concerns with lack of implementation of certain Radio Regulations provisions ITU-R Responsible Group: WP 4A, next meeting: 20 Feb. 2 March, 2018 Latest Information: Doc 4A/519, Annex 38 Working document towards draft CPM text 18

Agenda Item 7 Issue G: Updating the reference situation for Region 1 and 3 networks under RR AP30/30A when provisionally recorded assignments are converted into definitive recorded assignments WRC-15 invited ITU-R to examine this issue, under AI 7, with the aim of finding an appropriate regulatory and technical solution to this issue. Issue: When assignments recorded under 4.1.18-4.1.20 of AP30 are converted to from provisional to definitive, the reference situation of all affected assignments is updated, including those for which agreement has not been given On the one hand, some view this as the only viable means, in some cases, for incoming AP30/30A networks to be definitively recorded On the other hand, others see the updating of the reference situation as inappropriate when specific disagreement still exists 19

Agenda item 7 Issue G: Updating the reference situation for Region 1 and 3 networks under RR AP30/30A when provisionally recorded assignments are converted into definitive recorded assignments ITU-R Responsible Group: WP 4A, next meeting: 20 Feb. 2 March, 2018 Latest Information: Doc 4A/519, Annex 39 Working document towards draft CPM text 20