Assembly Instructions

Similar documents
Assembly Instructions

Track Rack. * Track Racks are not lockable

STRATUS SHELTER. Take bike parking to new heights

ULTRA SPACE SAVER Installation Instructions

Independent Containment System (ICS)

96 (Standard Length)

Ready To Go SimpleSpec tm. Installation Manual. For more information, please visit 3-form.com or call

4Post Server Rack-111 Assembly For Floor Anchored Models

BIKE FILE (301)

OFS ED-6C Instruction Sheet LIGHTGUIDE CROSS-CONNECT Comcode: LGX DISTRIBUTING FRAME INSTALLATION

ULTRA SPACE SAVER SQUARED Installation Instructions

IDR assembly instructions:

Installation Instructions - Model V4JSD 1

#916 CLASSIC 16 GUN CABINET ASSEMBLY INSTRUCTIONS

ALL SEASON PATIO COVER

THE ROGUE TM GRAND RAPIDS TM ASSEMBLY AND INSTALLATION INSTRUCTIONS

TREX POST MOUNT DECKING AND CONCRETE

Open Up Your View With CABLE SYSTEMS

COPPER / FIBER MANAGER RACK INSTALLATION INSTRUCTIONS PX Standard Release A March 2008

Five Column Half Height Rack Base Rack. (Shown with Tabletop)

ASSEMBLY & INSTALLATION INSTRUCTIONS

Oxford Stalls Installation Instructions

AWNING / PATIO COVER INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS VENETIAN 84" SLIDING SHOWER DOOR SYSTEM (180º INSTALLATION)

86-1/2" TRACK INSTALLATION GUIDE

Installation Instructions

Strata. urniture. Adriana Instructions. Parts in the Arm Box: Parts in the Body Box: Watch our assembly videos at

Simotec. 13.i

KOLO SHELTER Installation Instructions Parts List

Assembly Instructions for 12x16 Floating Dock

DX-TVMLPTB03. Low-Profile TV Wall Mount ASSEMBLY GUIDE. For either wood-stud or concrete wall installations

Greenhouse Assembly Instructions

Pickup Box Utility Rack Package Installation (Instruction ID: )

Real Life Ninja Complete Starter Pack (14ft. Warped Wall) Assembly Instructions

Medium HoneyBadger Chase Rack Installation Instructions

Clopay Models 835/837 Sliding Door System Installation Guide

Strata. urniture. Addison Instructions. Parts in the Arm Box: Parts in the Body Box: Watch our assembly videos at

AWNING SYSTEM INSTALLATION INSTRUCTIONS ALL VERTICAL WALLS

THE ROGUE TM FUNSLIDE TM

Extensive cable management on a footprint that fits on a 24-inch floor tile.

Wine Rack Assembly Instructions. Ten Column Display Rack

Powerware 9155 UPS Seismic Kit Installation Instructions

PPM-5710 JK HEAVY DUTY SKID PLATE ASSEMBLY Version 2.0

TIRE RACK INSTALLATION INSTRUCTIONS Dodge Sprinter

BSM, GSM & GSS. Joint Kit Instruction. (Modified for IMPACT) (NSF Certified) Curved Glass Fresh Meat Delicatessen and Seafood Merchandisers

Installation Instruction

BioPrism Solid Surface

Strata. urniture Watch our assembly videos at Denali Arms. Parts in the Arm Box: Hardware in this Box:

CTTR Tire Rack Required tools

WALL MOUNT LOCKER ASSEMBLY. 208 Chestnut St, Reading, PA (610)

TABLE OF CONTENTS REQUIRED TOOLS

INSTALLATION MANUAL H A

Cabinet Mount Lifter Instructions

Strata. urniture. Mission Rim Instructions. Parts in the Arm Box: Parts in the Body Box:

3,500/4,500lb. Vertical Cable Feighner Lift

BASEBALL FOUL POLES SURFACE MOUNTED

OWNERS MANUAL MODEL F660 HIP SLED

31082 INSTALLATION INSTRUCTIONS

Star Trac Turbo Trainer Assembly & Setup

SatNOGS. SatNOGS Rotator v3 Mechanical Assembly. This is the assembly guide for the third version of the SatNOGS Rotator.

Assembly & Installation Instructions FOR VEHICLE MOUNT KIT USING VEHICLE CENTER MEMBER

x2 1/4 (6mm) Floor Anchor

Hinge Door&Inline Panel-Recess

INSTALLATION INSTRUCTION RRU DOUBLE LIGHT POLE MOUNT

4-Piece Table Tennis Table

Ledger Board Lean-to Instruction Manual

Depending on the size you ordered you will have either 5 Foot sections which will build the 10 Foot frame or 6 Foot sections which will build the 12

Fig. 2 DORMA-Glas Stand/Issue 02/03 Seite/Page 1/7

USSC LLC 4 ONE LLC FIELD MODIFICATION INSTRUCTIONS

PFW Installation Guide Installationsanleitung, Guía de Instalacíon, Guida de Installazione, Guide d Installation, Installatie gids

English/French 06/04

Equilibrium. Conference Table. Installation Instruction. Revision B 11/07/16

1 of 12 5/24/2015 9:43 AM

MX8 SERIES 6-1/4 HANDRAIL W/ VINYL HANDGRIP

PFW 6851 Display Wall Mount, Turn & Tilt 80 kg INSTALLATION INSTRUCTIONS

User Instructions Multiline Otter Scoreboard Caddy Assembly

Locker Pedestal Installation Instructions

Rugged Ridge 2 Receiver Hitch Kit (J21068)

Qwik-Fence Installation Instructions

Side DuraRac Installation Instructions

Sliding Door Kit

St. Tropez Canopy Assembly Instructions

(Toll Free); 7am-7pm Pacific Time, Monday-Saturday. Assembly instructions for: MARISSA S ADVENTURE LOFTS

ASSEMBLY & INSTALLATION INSTRUCTIONS

PORCH-LOC INSTALLATION INSTRUCTIONS

Allora ALCOVE ENCLOSURE INSTALLATION BEFORE INSTALLATION CHECK THAT YOUR ALLORA SHOWER ENCLOSURE SYSTEM IS UNDAMAGED

Gardman Lean-to Greenhouse Assembly Instructions

ASSEMBLY AND INSTALLATION INSTRUCTIONS

1: profile cross section. FD- profile. for sidewalls + backwalls. eaves profile. curved roof profile. Z - profile (alongside frame) L 60 x 60

Allow 60 from door face

Katerack Wagon Shelving System

BEST PRACTICE GUIDE. Socket Bases. Working with Concrete Slabs

Wooden Frame Type Instruction Manual

MODEL T28173/T28174 ROLLER TABLES INSTRUCTIONS

NX8 SERIES 6-1/4 HANDRAIL W/ VINYL HANDGRIP

08+ KAWASAKI KLR PD NERF

Version 2016_1.1 VICTORIAN ASSEMBLY INSTRUCTIONS. Victorian Vi-23, 34, 36

aluminium profile system

Lab Style Table Frame Part No Assembly Guide Automation Technology

CRYSTEEL S. this manual must be included with the vehicle after completing the installation.

Transcription:

Storage attery Systems, LLC N56 W16665 Ridgewood Dr. Menomonee Falls, WI 53051 www.sbsbattery.com stationary@sbsbattery.com Toll Free: 800-554-2243 Assembly Instructions For seismic 1-Tier or 2-Step battery racks with welded uprights efore you start with the assembly of the rack, check the packages delivered against rack parts list to ensure you have received the correct items and quantity. It is not possible to insert missing pieces at a later date. 2-Step Seismic Rack The rack system and the order of assembly is illustrated in the diagrams. All screws must be tightened to a torque of 20 Nm [ 27 ft lb ]. Do not over tighten. 1-Tier Seismic Rack

Parts Description 55 2.17 40 1.57 Rack Frames/Uprights 45 1.77 39.37" 62.60" H 750 29.53 600 23.62 900 35.43 1200 47.24 1500 59.06 ottom and Side Rails 55 2.17 40 1.57 6.30" 2-Step Frame L Part# EQ-SGX2 1-Tier Frame 17.68" Part# EQ-PGX1 3.94'' Ø0.79" 600 23.62 40 1.57 600 23.62 45 1.77 h type rails 750 29.53 45 1.77 C type rails 35.43" 47.24" 750 29.53 900 35.43 ET0072 ET0102 900 35.43 1200 47.24 1200 47.24 1500 59.06 1500 59.06 E0064 Part# 904=Qty.4 900mm (35.43in.) "h" type rails 0.5 904=Qty.2 900mm (35.43in.) "h" type rails Part# 904C=Qty.4 900mm (35.43in.) "C" type rails 0.5 904C=Qty.2 900mm (35.43in.) "C" type rails E0034 End Holder Part# E0064 Cross race Part# E0714 End Holder Part# E0034 E0714 E0974

Avai l abl eonl i ne Not e:i fyouneedar acki nf or mat i ondat asheet,pl easecont actssat : st at i onar y@sbsbat t er y. com,orvi si twww. sbsbat t er y. com/ sei smi cr acks. Pl easehaveyourr ackpar tnumberr eady. 09-15-SRM1TR

Step 1 - Determine side rail location and move side rail connectors to correct location A X race C A X race C A X race C D* L 17.68" *There is no D mounting hole on 2-Step upright Side Rail Positioning Hole attery Height STT attery Type A 23.1-29" STT2V600 17.1-23" STT2V350 - STT2V490 C 10.6-17" STT12V50 - STT2V300 D 8-10.5" 3.94'' 35.43" 47.24" Ø0.79" Step 2 - and 2 nuts M8. Assemble Cross races using 2 bolts M8x20, 4 toothed lock washers and 2 nuts M8. Length L see specific rack drawing Length L is determined by the distance between the uprights. Measurements are listed in the table. Reference your specific rack footprint drawing. Center distance A of supports Length L of brace C/C 600 mm [ 23.62"] 710 mm [ 27.95"] 750 mm [ 29.52"] 841 mm [ 33.11"] 900 mm [ 35.43"] 977 mm [ 38.46"] 1050 mm [ 41.34"] 1117 mm [ 43.98"] 1200 mm [ 47.24"] 1259 mm [ 49.57"] 1350 mm [ 53.15"] 1403 mm [ 55.24"] 1500 mm [ 59.06"] 1548 mm [ 60.94"] All screws must be tightened to a torque of 20 Nm [27 ft lb] Do not over tighten.

Step 3 - Rack Assembly Place uprights in a vertical position and mount the cross braces according to the distance between uprights, as defined in the specific rack drawing. Ensure rack is square. Assemble near final installation location. A Tighten all bolts in upper lengthways and end rails to a torque of 20 Nm [27 ft -lb] Do not over tighten Optional: SS Spill Containment System Installation If an SS spill containment system is ordered the rack will be installed inside the polypropylene spill pans. Polypropylene is extremely strong and acid resistant and can support up to 15,000 lbs per square inch without degradation of the material. SS supplies different size spill pans that are butted together in different combinations to form different spill containment system lengths and widths. Flexible connectors are supplied to connect the pans together. Arrange the pans so that the spill containment joints do not line up with the rack uprights/frames.if the rack and spill containment is to be anchored to the floor you must assemble and place the spill containment system under the rack before marking the anchor holes. After the anchor holes are marked drill through the pans with an appropriate sized standard drill bit and then drill into the concrete floor with a masonry bit. Insert anchor bolts (supplied by others) and tighten. If desired caulk hole/bolt with silicon (supplied by others) to create a 100% leak proof spill containment system. Optional acid absorbing/neutralizing pillows can be placed in the spill system after the battery installation is complete.

Step 4 - Mounting Frame to Floor Place assembled frame in position and align. Use Place chalk frame line if room necessary. and align. Place frame in room and align. Attention: Uprights must be at a right angle to the longitudinal axis of the frame. 90 We recommend the following procedure: 100 [4 ] 100 [4 ] 1. Place the battery rack in the final resting place, paying attention to other equipment and walls. We recommend 4" of spacing from any equipment and walls. Pay attention to torque rating floor anchor bolts. 2. Mark the holes and drill. Frames can accept anchor up to 3/4" (supplied by others). Move rack if needed to insert anchors. 3. Drive the anchor into the drilled hole, tapping it lightly with a hammer while keeping the nut flush with end of bolt. 4. Tighten nut, ensuring that the washer rests against the foot profile. Torque according to anchor instructions. Step 5 - Assembling Rails "C" type rails Assembly with a 1-Tier frame h-profiles are mounted in the center of the support, with a gap the width of the battery. Pay attention to the battery width. "h" type rails "C" type rails "h" type rails Assembly with 2-Step frame First arrange two c-profiles close together in the center of the support, then mount an h-profile at a gap the width of the battery respectively. All screws fixing the rails must be tightened to a torque of 8 Nm [11 ft-lb] Do not over tighten.

Mount ottom Rails Guide bolt M8x16 with washer from below through the longitudinal hole in upright, and screw it into the anchor plate. Note: "C" type rails can be tightened however "h" type rails should be installed loosely to allow width adjustment. hole in support, and screw it into the anchor plate Anchor Plate Washer Screw M8x16 Connecting Plate Washer Screw M8x16 For racks which consist of more than two uprights, a connection plate must be used at the intersection of two rails. Step 6 - Inserting Side Rails Insert side rails and screw down lightly at intersections.

Step 7 - Aligning and Tightening ottom Rails We recommend using 1 or 2 batteries to help align bottom rails and to ensure proper spacing. The rails (h-profiles) must support the elements depth on the frame without room to maneuver. if necessary adjust the position of the h-profiles. Once aligned, torque bottom "h" type rails to 8Nm (11ft - lbs) Step 8 - Inserting attery in Rack Insert batteries, (cells and/or blocks). atteries must be placed closely to one another. SS recommends 1/2" spacing between batteries. Using a 1/2" spacer helps while loading batteries. ys rails Step 9 - Inserting Top End Rails Plastic Cap Plastic Stoppers Pre-assemble holder. holder. To To this this end use end bolt use M8x20, bolt M8x20 toothed toothed lock washer lock washer and anchor and anchor plate. plate. Guide pre-assembled holder to to the upper the upper lengthways lengthways rails, rails, as shown as in shown the diagram. in the diagram. Insert upper upper end end rails, rails, push them push up to them battery up to and the screw battery everything and down. screw End everything rails must down. touch battery End rails must touch battery with no with no room to move. If necessary, room for maneuver. If necessary, re-adjust end re-adjust end rails. rails. Tighten all screws in upper lengthways and end rails to a torque of 20 Nm [27 ft-lb] Do not over tighten Finally cover all screws with plastic caps and close all openings in the stands with plastic stoppers.