Tim Cox, Joe Gilbert, Arcadis U.S., Inc.

Similar documents
Dewatering. Deep Wells Vacuum Wellpoints Eductor Wells Artesian Conditions System Design Water Treatment.

Casing while Drilling. Enhanced Casing Installation

An Introduction to Oil & Gas Drilling and Well Operations

Baker Hughes Incorporated

A Wireless Compact Repeat Formation Pressure Tester Tool (MFT) Peter Williams Technology Champion

When a drilling project is commenced, two goals must be achieved:

HDD Training. HDD Construction Process. Mark Miller, PE Jon Robison, PE

PRODUCT OVERVIEW NEXT-GENERATION (NXG) SOLUTIONS FOR THE OIL AND GAS INDUSTRY

The Lease Pumper s Handbook. Chapter 4 Understanding the Oil Well. Section B DRILLING OPERATIONS

This figure shows the difference in real time resolution of azimuthal resistivity data

3/14/2015 Contacted and Solicited bids from construction vendors to build location. (San Jan, Orbit, Sweat, Storm).

Moduels in PetroTrainer. PetroTrainer. How PetroTrainer is used

TRENCHLESS CONSTRUCTION METHODOLOGIES

Pump Rental & Services TRUSTED SOLUTIONS FOR ANY DEWATERING NEED

Bridging the Gap Between Drilling and Completions

Comparison of Concentric Reamer Technology to Eliminate Wellbore Threading in Deepwater Wells Chris Lenamond and Augusto Silva, Schlumberger D&M

For crossing under a railroad, contact the specific railroad company's engineering department.

Tristone Capital Energie '08 Conference. May 14, 2008

Multipole Sonic-While-Drilling Technology Delivers Quality Data Regardless of Mud Slowness

Understanding Complex Well Restrictions. Access assurance for intervention operations

ROTARY STEERABLE SYSTEMS TO REDUCE THE COST AND INCREASE THE ENERGY VALUE OF DRILLING DIRECTIONAL WELLS IN OLKARIA GEOTHERMAL FIELD

AADE-05-NTCE-39. Slender Well Plan for Lower Cost and Improved Safety. Nader Sheshtawy and Adel Sheshtawy, TRI-MAX Industries

Appendix B Drilling Methods

Session 10 Dimensions, Fits and Tolerances for Assembly

Raiseboring Tools. Product Overview

IDEAS E-Learning Course

Schlumberger and Smith International, Inc. to Merge. March, 2010

Advanced Well Completion Design. 30 Sep - 04 Oct 2018, Dubai. REP logo, PMI & PMP are registered trademarks of Project Management Institute, Inc.

Ladiz Niroo Company (Joint Stuck) Supplier of Drilling Equipment. Drilling Catalogue

CS3 represents manufacturers of products for use in the municipal waterworks industry.

Suspended Subsea Well Monitoring CaTS TM Wireless Technology. Donald Horsfall RPLM (ECIS)

About Devico THE SMART WAY QUALITY ASSURANCE CREATIVE SOLUTIONS

Fundamentals of Drilling Course Outline. (1)Basics of Rotary Drilling Rotary Operations/Coring

INNOVATIVE CASING DRILLING TECHNOLOGY IMPROVED THE ABILITY TO SET THE CASING DEEPER THROUGH PROBLEMATIC ZONE IN INDONESIA GEOTHERMAL OPERATION

Casing while Drilling. Advanced Casing Deployment Drillable Casing Technology

Tomorrow's Energy Designed Today TECHNOVA

A Case for Nanomaterials in the Oil & Gas Exploration & Production Business

Chapter 02. Casing and Tubing

EUOAG Workshop. Workshop on decommissioning of offshore installations Challenges, options and lessons learned PP&A

Pilot Well Academy Popina Bogdan Marian Drilling geologist engineer

Welltec Pareto Offshore Conference September 4, 2013

Riserless Subsea P&A. Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N

Syllabus CH EN 6181 Drilling and Completions Fall 2015

Oil and Gas UK Well Integrity Guidelines

Comparing Guided Auger Boring Techniques under Challenging Conditions

Appendix F Lock-Down Sleeve Decision. Appendix F Lock-Down Sleeve Decision

ECDM System. November, Security Classification: Restricted - Status: Draft

PERFORM WITH PRECISION WELDED DOWEL ASSEMBLY LOAD TRANSFER PRODUCTS CONCRETE CONSTRUCTION SOLUTIONS BROCHURE

COILED TUBING & E-COIL SERVICES COIL DRILLING TECHNOLOGIES

Long-Distance Grouting, Materials and Methods Grouting Conference Christopher R. Ryan 1 Steven R. Day 2 Donald W. McLeod 3

Advanced Well Completion Design

DrillWell Drilling and Well Centre for Improved Recovery

Single / Dual Barrier HP Drilling Risers

SELF-ALIGNING PLASTIC INCLINOMETER CASING IN BOREHOLES. Model GEO-LOK. Roctest Limited, All rights reserved.

Sonic Tooling the Geoprobe Way

AUGER TOOLS. www. .com MINERAL EXPLORATION ENVIRONMENTAL GEOTECHNICAL GEOTHERMAL ROTARY SONIC HDD

& 1 2 ) CEMSTAND... 4 CFA-LC 4 CFA-PL (CFA 5 CFA-TC (CFA

Right Tool, Right Place, Right Time

DE123 Advanced Drilling Practice Technology

Geoprober Drilling Moving from Ideas To Reality (Status August, 2005)

COILED TUBING DESIGN & OPERATIONS

The method uses a combination of drilling techniques and specialized logging services and tools. These are:

Sharewell, LP. LoTorque Hole Opener

KS 14 PUNA Geothermal Venture: Flawless Execution of Aerated Mud Drilling with Mud Motor in Hostile Environment

Casing Recovery. Pre-Job Meeting

This instruction sheet will assist in the Cadman 6010 Hose Caddy tongue pin upgrade.

Dependence of Predicted Dewatering on Size of Hydraulic Stress Used for Groundwater Model Calibration

Expro Perforation Services

Grouting. Recommendations for cementitious grout for NC-Bolt and Pc-Bolt. Rev. 04/18

Newly Developed Automatic Fluid Level Control System

BOREHOLE POSITIONING TECHNOLOGY

NAPESCO FISHING & RENTAL DIVISION. Workshop Facilities

Cost Effective Alternative to Cased Hole Bond Logging: Full Waveform Capture using Open Hole Sonic Tool

Holemaking Products & Accessories

From late-life reservoir management through to final permanent abandonment, we create bespoke solutions to meet your specific well requirements.

Hunting PLC Annual Results 2010

DE120 Successful Well Completion and Workover Practices:

Comprehensive Plug and Abandonment Systems

Emergency Pipeline Repair Systems; A Global Overview of Best Practice

New Instrumentation technologies

WAL-MART SUPERCENTER # ; Milwaukie, OR: SPECIFICATIONS. Revisions to Specification Fence

Acquisition of GEODynamics. December 13, 2017

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

Casing and Completion Technologies. Run casing strings & completions without string rotation without wiper trips without risk

SECTION MANHOLES

The deepwater offshore drilling industry is

Drill Bits & Hole Saws

Marginal Project Development

ISO INTERNATIONAL STANDARD. Rotary core diamond drilling equipment - System B - Part 1: Metric units. First edition

Exit point. Can you do it?

HIGHER PERFORMANCE IN ROCK-BOLTING TECHNOLOGY BY USE OF IMMEDIATE-BEARING GROUTED BOLTS

SonicScope MULTIPOLE SONIC-WHILE-DRILLING SERVICE

Welleader Rotary Steering Drilling System

Drilled Shaft Inspector CBT Lesson 2 Equipment and Tools Welcome to the Drilled Shaft Inspector Course. This is Lesson 2, Equipment and Tools.

DAM FOUNDATION GROUT MONITORING SYSTEM. Brendan Harkins 1, EIT. Brian Kenny 2, EIT. Chris Hils 3 ABSTRACT

Installation Instructions For Slider Casement Air Conditioners

Kuala Lumpur 3 October 2012 State of the Industry of Riserless Light Well Interventions (RLWI)

PART MATERIALS. Section Fencing Materials. Description

DRILL BITS & THREAD REPAIR DRILL BITS

(A) Material used in the drilling process or well construction shall meet these requirements.

Transcription:

SELECTION AND IMPLEMENTATION OF A POST-CLOSURE MINE DEWATERING SYSTEM CHEVRON MINING INC, QUESTA MINE, NEW MEXICO Tim Cox, Joe Gilbert, Arcadis U.S., Inc. Mine Design, Operations, and Closure Conference Butte, Montana May 2017

Presentation Outline Background Mine Dewatering Alternatives and Evaluation Selection of Dewatering Alternative Borehole Drilling Well Installation and Perforation Water Conveyance Summary

The Questa Mine Surface Open Pit and Underground Molybdenum Mine, near Taos, New Mexico Began as an underground mine in the early 1900 s, Open Pit in the mid 1960 s, then back to underground mining in the mid-1980 s

Background Previous underground mine dewatering included pumping via a decline (6,000 ft) to the surface The mine was closed in June of 2014, which included permanent closure of the underground workings A new surface-based method of maintaining water levels in the underground mine was needed Decline Hazleton Pump at the bottom of the Decline

Mine Dewatering Alternatives Installing Pumps in Existing Shaft #1 Installing Pumps In Existing Shaft #2 New System in the Decline New Well Field

Evaluation of Dewatering Alternatives The four alternatives were evaluated for: Capital Expenditures (CAPEX) Operational Expenditures (OPEX) Pump and piping considerations Safety of the system Timing for closure of the underground Likelihood of overall success

Dewatering Alternatives Decline Pumping for Shafts #1 or #2 New Well Field

Selected Approach New Dewatering Well Field Capital costs comparable or less than other alternatives Lower operational costs Reliable technology - well and pump components Could be installed quickly, allowing the underground mine to close sooner Required no personnel in the underground mine Used proven drilling technologies

New Dewatering Well Field The location of the well field was near Shaft #2 Three wells equipped with electronic submersible pumps would be installed in the lowermost Haulage Level of the underground mine Shaft #2 Three wells were installed to provide redundancy Well screens and pump depths coincide with the lowermost Haulage Level, approximately 1,200 feet below grade DWW-3 DWW-2 DWW-1 White = Lowermost Haulage Level Blue = Upper Grizzly Level

Dewatering Well Drilling Plan Advance borehole using conventional mud rotary and reaming techniques through unconsolidated material and weathered bedrock Drilling Rig Pilot borehole driven using real-time measurement-while-drilling (MWD) instrumentation and directional tooling Ream piloted borehole to prescribed diameter to the Haulage Level Below the Haulage Level, the borehole was advanced using air/foam mud mixtures PDC Pilot Bit

Borehole Drilling Pilot boreholes used realtime directional drilling to ensure that the borehole was advanced into the Haulage Level within a 4- foot diameter target 10.75-inch pilot bit and 17-inch reaming reamer in the Haulage Level

Well Casing Installation 9.625-inch LTC production casing and guide shoe inside 18-inch surface/ conductor casing Cement baskets were placed at intervals after review of caliper logs The upper 500 feet of borehole annulus was grouted Casing and Guide Shoe

Drilling Lessons Learned Collaboration among Chevron Mining Inc., Chevron s Midcontinent Business Unit Drilling & Completions, and Arcadis was critical in developing a sound drilling and well installation plan Pilot hole and MWD was instrumental in establishing borehole trajectory Two reams were needed due to bedrock geology A shock sub used in the borehole assembly that increased penetration rates A caliper tool and log was used to locate placement of cement basket, and minimized the amount of grout used

Well Perforation Wells casings were perforated at the interval within the Haulage Level, about an 18-foot long interval Prior to perforation, wells were fitted with a bridge plug, filled with water, and then perforated Wells were perforated using an 18foot long perforation gun, 216 perforations or a 12-shot per foot geometry Unfired Perforation Gun

Pump Installation The historical inflow to the underground mine was 250 gpm each well was designed to pump at that rate 14-stage Baker Hughes HC10,000 electrical submersible pumps were installed with 4.5-inch coupled, internally plastic coated tubing Each pump was fitted with a well lift gauge (transducer) to measure water levels Pumps were placed just below the Haulage Level Pump Assembly Prepared for Installation

Water Conveyance The three wells are connected to a manifold and HDPE discharge pipeline The discharge pipeline conveys water from the well field down to an existing pump station where it is pumped up to the former mill for treatment

Summary The new well field met all evaluation considerations and lead to the successful and timely shut down of the underground mine A collaborative effort combining directional and conventional drilling techniques ensured that each borehole reached its target The new dewatering system allows for safe, surface-based, and long-term management of water levels The wells were started in August 2016 and are successfully pumping to manage water in the underground mine