Emerging Subsea Networks

Similar documents
Emerging Subsea Networks

MAERSK SUPPLY SERVICE. Actively taking part in solving the energy challenges of tomorrow

from ocean to cloud DUAL-CONDUCTOR CAPABILITIES IN WET PLANT DESIGN QUALIFICATION SEATRIALS

Marine Construction Support & Dimensional Control

Deep. Navigating the. High Accuracy Positioning Support for Deep Water Construction. Copyright Journal of Ocean Technology 2017

Subsea Positioning In deep water

Mooring Capabilities. Angola Brazil Egypt Equatorial Guinea Malaysia Mexico Norway Singapore United Kingdom United States

Mooring Capabilities. Angola Brazil Egypt Equatorial Guinea Malaysia Mexico Norway Singapore United Kingdom United States

Angola Brazil Mooring Egypt Equatorial Guinea Capabilities Malaysia Mexico Norway Singapore United Kingdom United States

Offshore Support Vessels Located in the US Gulf of Mexico in March 2018

Pressurised Subsea Pipeline Repair Recent Case Studies

Vincent/Enfield Conductor and Flowbase Installation Review. Roy Grant, TSMarine

Technological and Logistical Challenges during Construction & Installation of Deepwater Mega Subsea Development in West Africa

OBSERVATORY SERVICING AND MAINTENANCE

Emergency Pipeline Repair Systems; A Global Overview of Best Practice

MOORING SOLUTIONS IN ASIA PACIFIC A SINGLE, LOCAL SOURCE OF MOORING, POSITIONING AND RIG MOVING SERVICES

Survey Operations Pipeline Inspection

REPLACING FULL MOORING SYSTEM FOR COOEC IN THE SOUTH CHINA SEA

Onshore & Offshore Engineering and Management of Subsea Cables and Pipelines

RENEWABLE ENERGY SOLUTIONS. oceaneering.com

INTEGRATED SERVICES AND PRODUCTS ACROSS THE FIELD LIFE CYCLE

WORLD CLASS through people, technology and dedication WORLD CLASS through people, technology and dedication

Increased Safety and Efficiency using 3D Real-Time Sonar for Subsea Construction

Lessons Learned From Template Installation in Harsh Environments. T.Jacobsen, T.Næss Subsea 7

Richard Rickett, General Manager Engineering and Procurement - March Case Study

SUBSEA TREES INSTALATION IN DRAGON FIELD MARISCAL SUCRE PROJECT, PHASE I

Solutions for a blue planet

Ecosse Subsea Systems. Subsea Springboard 2017 David Hunt

Subsea Pipeline IMR. PT Hallin Marine June 18 th, 2014!

WORLD CLASS through people, technology and dedication

MARKSMAN DP-INS DYNAMIC POSITIONING INERTIAL REFERENCE SYSTEM

ETSU V/06/00187//REP; DTI Pub/URN 01/799 (for Ove Arup reference:

Getting to Grips with Offshore Handling and Assembly of Wind, Wave and Tidal Devices

marine, construction, drilling, floating production, decommissioning and renewables industries.

saipem limited Statoil 2/4S Removal Project GASSCO HSE Summit Removal of the Statoil 2/4 S Platform 23 rd October 2014

i-tech SERVICES DELIVERING INTEGRATED SERVICES AND PRODUCTS ACROSS THE FIELD LIFE CYCLE

SiRCoS Submarine pipeline repair system. Carlo Maria Spinelli - Bratislava, September 2008

Using Norwegian competence from oil and gas subsea operations towards the development of ocean mining operations

Offshore Cable Installation. November 2010 John Davies Global Marine Systems Limited

INTEGRATED SUBSEA PRODUCTION SYSTEMS Efficient Execution and Cost-Effective Technologies Deliver Project Success. Deepsea technologies

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015

InterMoor Innovation in Action. InterMoor: USA Mexico Brazil Norway Singapore & Malaysia UK West Africa

Developments in Deepwater Handling Systems. Gregor McPherson, Caley Ocean Systems

UNDERSEA INFORMATION PIPELINE SOLUTIONS FOR OFFSHORE OIL & GAS FIELDS

Local Contribution to the Aasta Hansteen development

BASELINE SURVEY, VISUAL - STANDARD

VIRTUS CONNECTION SYSTEMS Advanced Diverless Connection Solutions for any Subsea Field Application

Surveyors in The Oil & Gas Industry. Walter Jardine Lead Surveyor, BP North Sea Region Hydrofest 13 April 2011

Capital Marked Presentation. Dof Subsea Atlantic Region

Goliat FPSO Marine Installation Execution Highlights and Learnings

ENGINEERING INNOVATION

UTILIZATION OF AN ACTIVE AND/OR PASSIVE HEAVE COMPENSATION IN THE EQUIPMENT OF DYNAMIC POSITIONING VESSELS

Engineering. Drafting & Design. Regulatory Interface. Project & Construction Management. Marine Operations Services

Oil & Gas T T S O I L & G A S.

Automation at Depth: Ocean Infinity and seabed mapping using multiple AUVs

Latest Evolution of Vessel Lay Equipment, to Meet the Challenges of Deepwater Installations. SUT Perth, 14 th February 2018

IMPLEMENTATION OF CABLE HEAD REMOTE SWITCH UNIT TO INCREASE EFFICIENCY AND PRODUCTIVITY OF ONBOARD TESTING IN THE ABSENCE OF LAND INSTALLATIONS

Introductory remarks

Emergency Pipeline Repair Solutions and Future Contingency Planning

MOBILISATION SUPPORT. Joint Competency Statement

Subsea UK Neil Gordon Chief Executive Officer Championing the UK Subsea Sector Across the World

Subsea STP Buoy Mooring

FIBRE FOR DEEP OFFSHORE OIL & GAS OPERATIONS

A marginal field (re-)development using several alternative methodologies 1

Innovative Subsea Engineering

Pipeline Inspection and Environmental Monitoring Using AUVs

Cathodic Protection & Monitoring

Wave & Tidal Safety & Construction Guidelines

Managing Offshore Field Development & Marine Asset October 2017 Dubai, United Arab Emirates

The Oil & Gas Industry Requirements for Marine Robots of the 21st century

Doing More With Lightweight. Well Intervention Subsea Europe Drummond Lawson. London, 30 th October Managing Director

Unique Group employs over 500 people worldwide through its six multi-site divisions: Survey Equipment. Marine & Subsea. Diving & Life Support

SWiG Subsea Wireless Group - Presentation to API

DP MAINTENANCE INTRODUC INTR TION T TION O SENS T OR O SENS S OR

Lowering The Cost Of Marine Energy With Affordable Subsea Connection Solutions

Ranger USBL Acoustic Positioning System for DP Reference and Survey

A NOVEL APPROACH TO NON-PIGGABLE SUBSEA PIPELINE INSPECTION

James Fisher Offshore. Your specialist partner in the delivery of subsea and topside projects.

Kinsale Area Gas Fields Decommissioning Project Information Leaflet

The potential for windpower in the Baltic Sea

THE RIGHT START FOR OFFSHORE FIBRE CONNECTIVITY

Teledyne Marine Oil and Gas.

Advancing Global Deepwater Capabilities

Advances in Subsea Integrity Monitoring Systems. Ross Macleod Business Development Director, Ashtead Technology

SIMON HINDLEY MENG, AMRINA MANAGING DIRECTOR, NAVAL ARCHITECT

Sponsored by. Created and produced by

Construction Survey Positioning Systems Wideband Fusion LBL and USBL

Autonomous Underwater Vehicles

SUBSEA LIFETIME EXTENSION OF A WELLHEAD PLATFORM

OFFSHORE ANALYSIS & RESEARCH SOLUTIONS HOUSTON PETROLEUM SURVEYORS GROUP PERSONNEL DATA PROCESSING PARTNERSHIPS

Reducing Risk and Improving Weather Window in Offshore Lifting Operation

Esso offshore projects

SUMMARY REPORT AND RECOMMENDATIONS ON THE PREVENTION OF MARINE OIL POLLUTION IN THE ARCTIC.

Dimensional Survey Company

ROVO 2201 (ROV Operations)

More with Less ROV Solutions to Offshore Challenges

Survey Sensors. 18/04/2018 Danny Wake Group Surveyor i-tech Services

Marine Well Containment Company Outer Continental Shelf Summer Seminar

FLANGE INTEGRITY MANAGEMENT

Subsea Tooling Services UK Ltd Engineered Subsea Solutions

Transcription:

INSTALLING SUBSEA STRUCTURES A SUCCESSFUL CABLE END MODULE CASE STUDY Paul Deslandes (Global Marine Systems Limited), Wayne Smith (Global Marine Systems Limited) Email: paul.deslandes@globalmarinesystems.com Global Marine Systems Ltd, New Saxon House, 1 Winsford Way, Chelmsford, Essex, UK CM2 5PD Abstract: There is a growing trend towards the installation of Cable End Modules (CEMs), which allow subsea rather than on-platform termination of fibre optic cables. However, installing these subsea structures is not without its challenges. This paper addresses the potential issues an installer may face and additionally demonstrates how a CEM in practice may be installed through a case study example from a recent North Sea installation. 1. INTRODUCTION A Cable End Module (CEM) increases flexibility for offshore oil and gas platforms by delivering the potential to quickly connect fibre optic cables and subsea equipment without having to cut cables, thus offering a plug and play concept. CEMs can operate as deep as 3,000 metres and provide an operating life of circa 25 years. A typical CEM measures 4 metres x 4 metres in plan and 1.5 metres height with a weight of 15 tonnes (in air). 2. PLANNING SUBSEA MARINE OPERATIONS Project Engineering and planning is the key to the successful installation of subsea structures such as CEMs, and all projects of this type start with the same planning process. The basic principles consist of: Design brief, regulations, standards and specifications, Scope of Work, Object particulars High level procedure (vessel/asset selection & limitations), Detailed design basis, Review against capabilities In addition a DTS (desk top study) will be undertaken to establish the correct cable route from the CEM to the end resting place of the cable spur on the seabed. This study forms the foundation for the FEED (front end engineering design) study. To facilitate this process, geographical information system software is leveraged to help manage and analyse geographically referenced data, giving quick access to millions of kilometres of as-laid cable data, along with the locations of pipelines, subsea structures, fishing grounds and even must-avoid locations such as munitions dumps. One of the key areas for review is consultation with the operator to ensure the planned installation location and operations do not interfere with existing or planned infrastructure within the field. The Project Engineer utilises the DTS where the proposed route is then subject to a dedicated marine hydrographic survey, and permitting procedures. The cable is then laid along with any other plant such as branching units and CEMs. Copyright SubOptic2016 Page 1 of 7

3. CABLE END MODULES The CEM consists typically of a top assembly, and a mud-mat foundation. The top assembly houses the cable termination, fibre optic termination unit (FOTU), jumper storage barrels and fibre optic jumpers including connectors and associated parking positions. branching out a 24-fibre submarine cable in groups of four, six or eight fibres. Today s CEMs achieve all these objectives and can even accommodate diverse cable designs and connectors. The FOTU has been developed which provides a pressuretight interface for up to three connectors and fibre optic elements. 4. CEM SOLUTION A recent success story is the T&I (transportation and installation) of a CEM in the North Sea, which was not without its challenges. Here, Project Engineers were tasked with demands that included preplanning, interfacing with project stakeholders, design engineering and precision installation. Illustration 1. Typical Cable End Module The fibre optic jumpers are then connected subsea to an adjacent structure with either divers or ROV (dependant on water depth). Illustration 2. Typical Fibre Optic Jumper Connectors The idea of fibre optic cable that could be connected underwater originally arose from military requirements (vessel detection systems); however, the technology fulfilled a real need in the offshore industry. For the design premise, CEMs had to be stable on the seabed, operable at extreme depths and capable of When the contract was awarded, the initial concept design for the CEM was very different to what was finally deployed. Indeed, the early involvement of Project Engineers in the design phase was a key part of this platform-to-platform fibre optic communications project. The design changes requested by the Project Engineers were important to allow successful installation given the tight parameters set by the client. Essentially, the CEM had to be installed within a set distance of a pre-installed SSIV (subsea isolation valve) to allow jumper cables to be connected by divers at a later date. Additionally, the operation was to be performed in close proximity to surrounding structures, which added further complications to the offshore execution. Interfacing with a multitude of stakeholders is always an important element in any project but particularly when different companies are responsible Copyright SubOptic2016 Page 2 of 7

for design, fabrication, installation and hook-up. Throughout the design process, the Project Engineers were involved in review meetings with all parties, including the field owner, and visited the fabrication yard to ensure the changes incorporated were satisfactory. The team was also able to offer its expertise to design the installation rigging, which allowed the methodology for subsea release to be developed. When engineering the rigging for subsea deployment, it is important to have a contingency for subsea release in the event that the primary system does not work. For this project, a primary, secondary and tertiary method for releasing the CEM rigging was engineered, although the primary method, using ROV hooks, worked successfully as planned. 5. CEM LIFTING Subsea lifting is complex and it involves technology, working procedures, weather evaluations, competence, organisation and management. Present rules, regulations and standards for offshore lifting appliances are based mainly on the risks associated with cranes of moderate capacity and lifting operations to and from supply vessels. Recommended Practice DNV-RP-H201 1 Lifting Appliances used in Subsea Operations released in November 2014 is a joint industry project, established to develop common ground covering design, manufacturing, maintenance and operational aspects associated with lifting appliances intended for subsea lifting operations. In the context of this Recommended Practice a subsea lifting operation means installation or removal of objects underwater. An object will 1 Recommended Practice DNV-RP-H201 - Lifting appliances used in subsea operations November 2014 normally be lifted through the splash zone, lowered to and landed on the seabed, or vice versa. Often the removal of the subsea structure is an element of the process whereby little time is spent typically but this should be addressed as part of the design process from an early stage. Subsea lifting is typically divided into deployment and recovery. Every subsea lifting operation should be broken down into discrete, well defined steps. A step is typically a checkpoint or an important step carried out by a competent person before progressing to the next step. The phases for deployment are described below (these can be typically reversed for recovery): 1. Pre-lift 2. Lift-off 3. Overboard 4. Splash zone 5. Lowering 6. Landing Pre-lift, lift-off from deck and overboarding The challenge during this phase is to maintain sufficient control over the horizontal motion of the object e.g. avoid uncontrolled swinging and limit the vessel motions. In general before lift-off the list below should be checked as a precaution: Function test any subsea release systems. Any ROV markings on the asset should be checked for suitable location, orientation and visibility for subsea application. Operational limits shall clearly be defined for all subsea operations. Requirements for weather forecasting. Crane AHC should be checked and tested. Copyright SubOptic2016 Page 3 of 7

Any cutting of seafastenings should be such that no/limited vertical restraint on lift-off. Height under hook including remaining seafastenings and rigging. Loose items removed. Trial lift / inshore typically as part of the mobilisation. Positioning devices, transponders calibrated and verified for use. Relevant areas restricted before commencing lifting operations. Tag lines/tugger lines attached to prevent horizontal movement. Landing area should be inspected by ROV. Rigging design should have taken into account accidental or disconnection of the load during lifting. Lifting through the splash zone The challenge during this phase is to ensure slack slings is reduced to a minimum with a shift in the centre of buoyancy. In general the following items should be considered: Slamming loads in splash zone Shift/tilt of object Time needed for equalisation Visual observations Tag lines/tugger lines release Lowering through the water column The challenge during this phase is to ensure a controlled deployment to the seabed maintaining heading and position. In general the following items should be considered: Lowering at defined speed Snagging of lines to be avoided The load lifting appliance increase due to depth Monitoring with ROV Lowered to safe height above seabed before set down Dynamic forces on rigging For deep sea deployment, resonance should be considered Landing The challenges during this phase is not only to ensure accurate placement but also contingency methods for release of the rigging from the subsea structure in the event of primary failure. In general the following items should be considered: Inspect by ROV for positioning and tolerances Landing to be performed with defined allowable speed Orientate structure with correct heading Installation subject to client signoff Suction loads A point of no return and contingency measures for release Lift rigging release For potential vessel run-off a quick release function for the rigging Non-engineered lifts or routine lifts are considered everyday lifts without specific supporting documentation. For non-engineered lifts, a simplified approach by applying a conservative dynamic factor to compensate the lack of detailed engineering may be sufficient. DNV s Standard for Certification No.2.22 Lifting Appliances 2 suggests applying a minimum design dynamic factor of 1.7 for significant wave heights up to Hs=2.0m, however, this approach may be 2 DNV s Standard for Certification No.2.22 Lifting Appliances October 2011 Copyright SubOptic2016 Page 4 of 7

insufficient, and an engineered lift approach shall be applied. The engineered lifts as was the case for the CEM deployment; these are well planned and prepared operations. For lifting appliances subjected to engineered lifts, de-rating of the lifting capacity shall normally be provided and the actual static and dynamic loads shall not exceed the derated capacity for the specific sea condition. Of course, each lift has its own installation factors to consider, especially if subsea structures are involved. Here, crane lifting capacities, water depths and motion compensation systems, come into play. In addition, dynamics, inertia, added mass, buoyancy, drag, rigging weight and seabed suction must also be considered. 6. CEM POSITIONING A further important aspect of installing subsea structures is positioning on the seabed. On this particular project, tolerances of ±2.5m for position and ±2.5 for heading. Image 3. Subsea Installation in Close Proximity to Offshore Platforms The primary method used for subsea positioning was using a Sonardyne Ranger 2 wideband USBL (ultra-short baseline) System. The system was used to track transponders attached to each corner of the CEM while template tracking software EIVA Navipac was used to ensure precise placement and was checked with the ROV taking fixes on the corners to verify the position. To correctly position the CEM on the seabed the project used a combination of accurate surface and sub-surface positioning systems. Surface positioning used two independent C-NAV DGPS receivers and a Cyscan laser positioning system, backed up by a taut-wire. DP (Dynamic Positioning) capability of a Vessel is an important aspect of subsea lifting operations in particular when the installation vessel is alongside platform structures and directly above an existing subsea network as was the case with the CEM deployment. Image 4. Typical Transponder on a Subsea Structure Copyright SubOptic2016 Page 5 of 7

Of course, contingency plans are also a pre-requisite when it comes to positioning subsea structures, and on this project the secondary method in place was a second USBL system, while a third strategy was the deployment of pre-installed sandbags to box-in the target area for landing the CEM. The CEM was installed successfully in April 2015, with installation tolerances of 0.2m. Positioning this subsea structure accurately was a crucial part in the overall delivery of the project, and relied heavily on sound project engineering both in the planning phase and subsequently during offshore installation operations. An increase in demand for extensive monitoring networks and subsea observatories for scientific research to help governments make informed decisions about the future has led to a further demand by the University of Victoria, Ocean Networks Canada is to install further subsea nodes off the West Coast of Canada. In May 2016 the University are planning to install four cables in total which will each feature a mud-mat at each end that helps secure the cable in-place. Each node will weigh approximately 2 tonnes each and will be required to be positioned in water depths close to 2,500m. 7. NODE INSTALLATION Similar subsea structure installation projects include the T&I of subsea nodes for research purposes at a subsea laboratory that provides live data to the ocean research community off the coast of British Columbia, Canada. A DTS was first completed to identify the optimum location for node and sensor positioning, which was followed by system installation. The first phase involved the deployment of 40km of cable and two node bases in offshore waters. At the ocean observatory site, the second phase was completed with the installation of nodes at three previously identified sites, located 95 metres, 175 metres and 300 metres water depth respectively. The success of the project relied on the provision of an end-to-end solution, from initial surveys through to the installation of the fibre optic cable system. The process included DTS, route engineering, shore end installation, main lay operations and post-project reporting. Image 5. Subsea Node used in VENUS system 8. CONCLUSION Subsea structure installation projects demand sound planning, a flexible approach and need to fully engineer solutions, including contingency throughout the operational process. It is considered essential that marine operations and in particular subsea activities, including all support activities are planned in consultation with the DNV standards in relation to Practices for Lifting Appliances and Standards for Certification. As well as adhering to these Copyright SubOptic2016 Page 6 of 7

standards, it is also recommended that the plans are thoroughly risk assessed at conceptual design stages through to detailed design and offshore operations. The objective of DNV-RP-H101 Risk Management in Marine and Subsea Operations 3 aim is zero accidents, incidents or losses through promoting safe, robust and efficient operations, and through application of the principles of ALARP (as low as reasonably practical). This standard promotes a systematic approach to manage risk from when a concept for a marine operation is realised, through the project period, until the operation is completed. DNV recommends a basic step process for management of risks within marine operations: Establish Process Plan Establish Acceptance Criteria Overall Assessment and Categorisation Risk Identification Activities Risk Reducing Activities Following this DNV standard for subsea operations allows a detailed planning, cohesive approach, linking with all necessary stakeholders and ensuring project delivery and execution are completed safely, on time and to budget. 3 DNV-RP-H101 Risk Management in Marine and Subsea Operations January 2003 Copyright SubOptic2016 Page 7 of 7