Aegis Heavy Capacity 20K Floor Scale

Similar documents
INSTALLATION GUIDE. Version 2.0

TS-20KD-1010 LOW PROFILE CARGO SCALE INSTALLATION GUIDE

Pro-Weigh 84/SS/FLP Lo Pro 90 / SS Installation Guide. Version 1.0

Model: SS660-OB Stainless Steel Floor Scale Series. Installation, Set-Up and Operation Manual

Trident Precast Concrete Deck Truck Scale

Model: SS660-PT-R Stainless Steel Poly-Top Floor Scale Series. Installation, Set-Up and Operation Manual

Wildeck Overhead Safety Gate. General

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

MSP-WRTIDSKY1 Light Weight Suspended Ceiling Kit for use with Island Display Skybox

Stainless Steel Bench Stand

ALUMINUM POLE VAULT STANDARDS SPECIFICATIONS

TURBOTWISTER TM ASSEMBLY AND INSTALLATION INSTRUCTIONS

18000 HDL FOUR POST LIFT LB CAPACITY INSTALLATION AND OWNER'S MANUAL

TURBOTWISTER ASSEMBLY AND INSTALLATION INSTRUCTIONS

OB1U INSTALLATION INSTRUCTIONS. Interactive Flat Panel Over White Board Mount

7141 & NATIONAL POLE VAULT STANDARDS SPECIFICATIONS

Linear Hook- on Worksurfaces

ATTENTION. 4. Do not over tighten the hydraulic fittings. This will cause leakage and will not be covered under warranty.

INSTALLATION INSTRUCTIONS

DOCK WEDGE - STANDARD

LEG CURL IP-S1315 INSTALLATION INSTRUCTIONS

Football Goal Posts MODEL SERIES: FGP400 and FGP600 series

THE ROGUE TM FUNSLIDE TM

Copyright Black Box Corporation. All rights reserved Park Drive Lawrence, PA Fax

Please read and understand the OnBoard Timpani Cart Owner s Manual before using the Timpani Cart.

WARNING. Failure to observe these instructions could lead to severe injury or death.

Closet Carousel Installation Instructions. Models TKA 5 Through TKA 14 Equipped with Footswitch Controls

CABANA / PAVILION ASSEMBLY ALUMINUM FRAME MODELS

HD installation guide

THE CASCADE & SLINGER FUNSLIDES

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

7 X 10 X 6 SHELTER 7 X 16 X 6 SHELTER 12 X 10 X 6 SHELTER 12 X 16 X 6 SHELTER

Phone #: (360) Online Tech Support: Web:

ClearSpan PolyMax Windbreak Wall

Please read BOTH these Installation Instructions and the General Towing Instructions before attempting to install or operate this equipment.

VERTICAL PLATFORM LIFT

SM-RAZOR-F-M/L/XL. Strong Low Profile Fixed Mount for Ultra-Thin Flat-Panel TVs INSTALLATION MANUAL

installation guide

NOTE: FABRIC SOLD SEPERATELY FOR 28', 30', & 32' CANOPIES ADDITIONAL KIT CANOPY FRAME EXTENSION IS REQUIRED.

EllisSaw.com. EllisSaw.com P.O. Box Verona, WI

INSTRUCTIONS INSTRUCCIONES CONSIGNES

WARNING VW Jetta New Installation Instructions BX3823. Serial Number

Downtown Rack. Custom logo option available

HEAVY DUTY WEIGH FEET KIT. Installation Instructions

H2-50 Hydrogen Generator Field Update

Installation Instructions Kit, Base Rail Bracket Part # 31413

WeatherShield Covered Walkway and Connect-A-Building

INSTALLATION INSTRUCTIONS FOR PLASCORE NARROW STILE DOORS

DX-TVMLPTB03. Low-Profile TV Wall Mount ASSEMBLY GUIDE. For either wood-stud or concrete wall installations

Clean-Roll. Installation Manual. [Revision: January 10, 2013, , Rytec Corporation 2004]

SM-RAZOR-T-M/L/XL. Strong Low Profile Tilt Mount for Ultra-Thin Flat-Panel TVs INSTRUCTION MANUAL

PLANISHING HAMMER STAND OWNER S MANUAL

MM340 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

Open shipping crate and separate all of the different parts. Over The Top Shelters LLC

BW-100 Door Upgrade

ASSEMBLY AND INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Presented By. NicolScales.com Contact Us

Parts list Instruction guide Warnings Please read carefully before assembling and using product.

VARIABLE TERRAIN STAGE AND RISER SYSTEM

ASSEMBLY INSTRUCTIONS FOR SOFTOP SHADE COVER

HQ Hideaway. Installation and Operation Version 2.2, April 2015 Part # QT40100

INSTALL INSTRUCTIONS WELCOME TO THE NEWAGE PERFORMANCE CABINETRY SERIES NEWAGE STEEL WELDED CABINETRY

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

Installation Instructions

Rugged Ridge Front Bumper Winch Plate JK

Desk/Wall-Mount Rack

Track Rack. * Track Racks are not lockable

Installation Instructions

BX1965 Installation Instructions 2004 Chrysler Sebring Convertible

ASSEMBLY INSTRUCTIONS FOR 2B3004 DELUXE EURO CLUB SOCCER GOAL

PLAYLAND 72 SPIRAL SLIDE 3.5 Posts, 3.5 Posts / 48 Grid and 5 Posts

Original Gallery System

THE AquaBlast & RocketRide FUNSLIDES

VERTICAL PLATFORM LIFT

TYPHOON ASSEMBLY AND INSTALLATION INSTRUCTIONS

TV WALL MOUNT ASSEMBLY GUIDE RF-TVMLPT01V2


baseplate GMC Adadia & Buick Enclave

MM540 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

U.S. Rack, Inc Falcon Drive, Madera, CA APR17 INSTALLATION AND USE INSTRUCTIONS for SIDE-MOUNT LADDER RACK


PORTABLE ADJUSTABLE BASKETBALL SYSTEM

Installation instructions AZ120 (Anchor foot with placement hinge, to be embedded: type Albatros)

TURBOTWISTER ASSEMBLY AND INSTALLATION INSTRUCTIONS

Large Wood Windmill Assembly Instructions

MC CHANGER CABINET INSTALLATION INSTRUCTIONS

Model : TLX-350FM. TV Mount Installation Guide

Please read BOTH these Installation Instructions and the General Instructions prior to installing or operating this equipment.

INSTALLATION INSTRUCTIONS

southpaw enterprises, inc.

GearBoss AirPro Locker

WeatherShield Daddy Long Legs Canopy

Full-Motion TV Mount - 47" to 90" Installation Guide

Gared Pro-S Portable Backstop

Installation and Leveling Instructions for Micro/Level Wedge Style Isolators

Super Shot Adjustable Basketball System

Side Mount INSTRUCTION BOOKLET #C122 BED STYLE: PARK CITY

ShorePort PWC Lift Instructions " x 138" Sandstone ShorePort " x 138" White ShorePort " x 138" Tan ShorePort

Toll Free: INSTALLATION MANUAL. Copyright 1996 Revision 1 November 2004

Transcription:

Installation Manual Aegis Heavy Capacity 20K Floor Scale Model(s): PLF-6200-H Series PLF-6200-HQ Series 2002 by Fairbanks Scales Inc. All rights reserved 50224/ SJ4799 Issue 2 08/02

Amendment Record Aegis Heavy Capacity 20K Floor Scale 50224 / SJ4799 Manufactured by Fairbanks Scales Inc. 821 Locust Kansas City, Missouri 64106 Created 1997 Issue 1 1/97 New Product Issue 2 8/02 Updated technical information Disclaimer Every effort has been made to provide complete and accurate information in this manual. However, although this manual may include a specifically identified warranty notice for the product, Fairbanks Scales makes no representations or warranties with respect to the contents of this manual, and reserves the right to make changes to this manual without notice when and as improvements are made. 50224 / SJ4404 2 08/02 Issue 2

Table of Contents Section 1: General Information A. Introduction.. 4 B. Description 4 Section 2: Installation A. Installation Procedures 5 Section 3: Accessories A. Bolt down Plates.. 9 B. Ramps 9 C. Pit Frames 10 Section 4: Service and Maintenance A. Load Cell Replacement.. 12 B. Junction Box/ QMB Replacement 12 C. Foot Assembly Replacement 13 Section 5: Parts A. Parts List.. 14 Appendix I: Model Matrix 16 Appendix II: Accessories 17 Appendix III: Pit Frame Drawing 18 50224 / SJ4799 3 08/02 Issue 2

Section 1: General Information A. Introduction The Aegis Heavy Capacity (HC) floor scale is available in four sizes and is constructed of mild steel. All sizes and models have a capacity of 20K lbs. Note: It is the owner's responsibility to document, notify, and follow-up regarding shipping damage with the shipper or hauler. B. Description The scale platform is shipped in a crate, fully assembled and wired. Aegis Heavy Capacity (HC) sizes range from 4' x 4' to 6' x 8' with all sizes and models having a capacity of 20K lbs. Approximate height is 5 ¼". The Aegis Heavy Capacity (HC) scale is available with an analog or Intalogix interface. The analog series uses a standard junction box for interfacing to most analog indicators, and the Intalogix series utilizes a quad multiplexer box (QMB) for interfacing to an Intalogix Technology indicator. Both types are equipped with a twenty five (25') interface cable. All junction boxes are constructed of stainless steel and all models have threaded holes in the decks for attaching eyebolts to facilitate installation and cleaning. Specifications and sizes are included in a chart in Appendix I. 50224 / SJ4404 4 08/02 Issue 2

Section 2: Installation A. Installation Procedures 1. Select a location that is level and will fully support the weight of the platform plus a full capacity load. 2. Remove the top of the crate and all packing/banding material. 3. Screw two (2) eyebolts into the threaded adapters in the platform top and use a forklift or other lifting means along with chains, cables, or nylon straps to remove the scale from the crate bottom. Caution: Do NOT use hooks. Failure to use the proper lifting tools may result in personal injury. 4. Set the scale so that the interface cable exits in a direction where it can be protected. If possible, use a cable protector to reduce trip hazards and to protect the interface cable from being damaged. 5. Level the scale by first loosening the lock nut on the foot assembly. Use a screwdriver to turn the threaded leg of the foot assembly. Retighten the lock nut to 75 ft/lbs when finished. 6. Wire the scale cable to the proper type indicator as follows: a. Using an Analog Interface (Junction Box 67171): Load Cell Wire Color Function Analog Instrument Black (-) Excitation (-) Excitation Red (+) Excitation (+) Excitation Yellow Shield Shield Green (+) Signal (+) Signal White (-) Signal (-) Signal 50224 / SJ4404 5 08/02 Issue 2

b. Using an Intalogix Technology interface (QMB 15291): QMB Intalogix Terminal Wire Color Function Technology Inst 1 Green (-) Excitation 1 2 Red (+) Excitation 2 3 Black Ground 3 4 White D out 4 5 Brown D In 5 6 Blue EOC 6 7 Orange SCLK 7 8 Yellow CS 8 9 Violet Temperature 9 10 Gray/Shield Chassis 10 Note: Calibrate the Intalogix platform/ indicator. Follow the appropriate indicator service manual to ensure a good calibration. 7. Adjust the analog interface indicator to the platform. First, ensure all corners are within 1 division of each other at 25% of rated capacity. Follow the appropriate indicator service manual to ensure a good calibration. To do this: A. Perform a coarse platform calibration which is close to the actual weight. B. Identify the platform's corner numbers. 2 3 Top View 1 4 50224-1 50224 / SJ4404 6 08/02 Issue 2

C. Place a concentrated weight (25% of platform capacity) on corner 1, then move to corner 2, corner 3, and corner 4, noting the displayed reading on each corner. Note: As you move the weight(s) from corner to corner, do NOT zero the scale, you are only adjusting the corners to be the same, not a correct calibration vaue. D. If corners require adjustment: 1) Place the concentrated weight on the corner displaying the lowest weight and use the appropriate potentiometer to change the displayed weight to read the same as the highest reading by turning the potentiometer CW. Repeat while rechecking all corners until there is no error. Perform a Zero reference check with an unloaded platform and repeat the corner test to ensure all readings are the same before proceeding 50224-4 Note: Junction box assembly 67171 has four extended range, multi-turn potentiometers, one for each load cell. If you have difficulty adjusting the platform corners, turn all potentiometers to the fully CCW position until clicking is heard when turned. With the weight on the lowest reading corner, turn the corresponding potentiometer CW to indicate the same as the highest reading corner until the platform is properly adjusted. 50224 / SJ4799 7 08/02 Issue 2

E. When the corners are the same in reference to each other: 1) Remove all weights 2) Zero the indicator 3) Perform a final calibration with test weights 4) Follow the appropriate indicator service manual to ensure a good calibration. 50224 / SJ4404 8 08/02 Issue 2

Section 3: Accessories Accessories: Bolt-down plates, Ramps, Bumper-Guards, and Pit-frames are installed as follows: A. Bolt-Down Plates: Bolt down plates are used to keep the scale from sliding or moving when loads are applied. The plates are bolted via anchors at each of the scales feet. To install: 1. Place the platform in position 2. Place the bolt-down plate under the foot, plate edge extending out from under the scale. 3. Drill the two holes using a hammer drill. Insert anchors with the nut and washer already ON. Tap the anchor into the hole then tighten the nuts securely. Repeat this process for each plate used. Note: If ramps are NOT installed and bolt-down plates are required, then a set of four bolt-down plates are required. B. Ramps: Each ramp accessory comes with two integral bolt-down plates and four anchors. Installation: 1. Place the ramp in position, then lift and set the platform feet into the boltdown plate holes. 2. Drill the two holes using a hammer drill. Insert anchors with the nut and washer already ON. Tap the anchor into the hole then tighten the nuts securely. If two ramps are installed, NO other bolt-down plates are needed If one ramp is installed then a set of two bolt-down plates are needed Only two ramps total may be installed on opposite sides of a scale platform. 50224 / SJ4799 9 08/02 Issue 2

C. Pit Frames: The pit frame accessory is a one-piece welded unit with no additional welding required. This accessory is designed for in-floor applications. In general, a hole is cut in the concrete, the pit-frame accessory is installed in the hole, then concrete is poured around and under the frame. Once cured, the scale platform is set into the frame and installation can be completed. Heavy duty frames are available in mild steel for all Aegis Heavy Capacity (HC) floor scale sizes. The concrete work and frame setting is usually done by a contractor, with a scale technician completing the project by setting and installing the scale. Caution: Heavy duty frames require substantially more concrete work and preparation than standard duty frames. Rebar and properly rated concrete is required to accept the pier loading which a 20K scale will have. Use drawing, 21897, included in this manual in Appendix III. 1. Place the pit frame in the approximate position it will occupy on the floor. 2. Mark out the position of the hole to be made. The hole MUST be a minimum of 12" larger than the pit frame on all sides. Should pit drainage be required, slope the pit floor to an installed drain while maintaining a level area at each corner. Use the drawing in Appendix III for measurements. 3. The hole will have to be deep enough to accommodate the pit coping, plus the thickness of the pit floor. Use the drawing in Appendix III for measurements. 4. Once the properly sized and prepared hole has been cut in the concrete floor, use these steps to help set the frame properly. Set the frame in the hole supported at about the correct height. Set two 2 x 4's on edge (longer than the width of the hole) across the opening Use soft wire and make 2 loops by twisting wire around each 2 x 4 and the frame With the frame supported by the wire and 2 x 4's, use a level to set the frame flush with the surrounding floor, level, and at the correct height by twisting or untwisting the wire Use the drawing in Appendix III for measurements, concrete specifications, rebar placement, and amount of convrete 50224 / SJ4799 10 08/02 Issue 2

2 x 4 Wire Frame Assy Pit Drain 477a Make sure the conduit for the scale cable is in place and secured into the frame opening Pour the concrete around and under the frame ensuring a smooth and level finish If a drain is required, form the pit (using the drawing in Appendix III) to place a slope in the pit floor to the drain. Cure to a minimum of 2000 psi before cutting wire. Pull the cable through the conduit before placing the scale platform in the frame Level the platform before installing the instrumentation 50224 / SJ4799 11 08/02 Issue 2

Section 4: Service and Maintenance A. Load Cell Replacement: 1. Remove power to the indicator. 2. Remove the platform access cover then the junction box cover and disconnect the failed load cell cable at the junction box. Loosen the gland bushing and tie a string or wire to the end of the cable to act as a pull wire. Check for all cells to have wire markers on the cable ends. If not, identify cells with wire markers or other means. Disconnect the faulty load cells' wires from the terminal block. 3. Lift the platform end with a forklift or heavy pry bar using wood blocks for safety. 4. Remove the load cell mounting bolts (use a 1 1/8" socket), and remove the load cell, pulling the load cell cable through the scale while leaving a pull string/wire in the scale. 5. Remove the foot assembly from the old cell and install on the new load cell, using anti-seize on the bolt threads. 6. Disconnect the pull string/wire from the old cell's cable and attach to the new load cells cable end. Pull the cable of the new load cell through to the junction box. Mount the load cell using anti-seize on the mounting bolts, torque to 250 ft/lbs. 7. Lower the scale to the surface removing the safety blocks. 8. Ensure that the weight is shared evenly by all four (4) feet. Tighten all lock nuts to 75 ft/lbs. Connect the load cell wires into the junction box, tighten the box gland bushing(s) then test and calibrate the scale. Replace the box cover and torque all screws to 18-20 in/lbs. Replace the platform access cover. 9. Recalibrate as necessary. 10. Load Cell Specifications: Specifications Mild Steel Material: Tooled Steel Resistance: 350 Ohm Rated Output: 3mV/V Safe Overload: 150% (non-shock) Threaded Hole Size: ¾" -16 B. Junction Box/QMB PCB Replacement: 1. Remove power to the indicator 2. Open the platform access cover, then the box cover 3. Loosen all gland bushing nuts 4. Check that all load cells have wire markers on the cable ends. If not, identify the 50224 / SJ4799 12 08/02 Issue 2

load cells with wire markers or other means. Disconnect the load cells' wires from the terminal blocks. Disconnect the home-run wires. 5. Remove the PCB, clean the box, then install the new PCB. 6. Reconnect all load cell and home-run wires to the new PCB 7. Tighten all gland bushing nuts Note: For analog systems, Leave the box cover OFF until all corner adjustments are completed. 8. Replace the box cover and torque all screws to 18-20 in/lbs. Replace the platform access cover. 9. Recalibrate as necessary. C. Foot Assembly Replacement: 1. Lift the platform end with a forklift or heavy pry bar using wood blocks for safety. 2. Loosen the lock nut and remove the old foot assembly. 3. Use anti-seize on the new foot threads and screw into the load cell. 4. Lower the scale to the surface removing the safety blocks. 5. Ensure that the weight is shared evenly by all four (4) feet then torque the lock nut to 75 ft/lbs. 50224 / SJ4799 13 08/02 Issue 2

Section 5: Parts A. Mild Steel Platforms, Intalogix and Analog Types: Item Part# Description Models 1 See Appendix I Platform Weldment See Appendix I 2 67171 Junction Box Analog 96141 PCB for Junction Box Analog 2 15291 QMB Box Intalogix 15635 PCB for QMB Box Intalogix 3 11240 Capacity Label (20K) All 5 11225 NamePlate All 10 12838 Cable Assembly Analog 11 5488 1 ¾" - 16 Hex Jam Nut All 12 14118 Load Cell Shim All 13 67198 Foot Assembly All 14 58857 10K Load Cell All 15 54528 ¾"-10 x 2 ¼" Hex Hd Bolt All 17 14722 5" Velcro Hook (use with loop) All 18 14722 5" Velcro Hook (use with loop) All 19 54203 SS Hex Nut 10-24 (for ground) All 50224 / SJ4799 14 08/02 Issue 2

heavy capacity aegis 50224 / SJ4799 15 08/02 Issue 2

Appendix I: Model Matrix A. Analog Mild Steel Series: Product # Size Capacity Platform Weldment 64096 4' x 4' 20K 59066 64095 5' x 5' 20K 59065 64093 5' x 7' 20K 59063 64094 6' x 8' 20K 59062 B. Intalogix Mild Steel Series: Product # Size Capacity Platform Weldment 71079 4' x 4' 20K 59066 64100 5' x 5' 20K 59065 64098 5' x 7' 20K 59063 64099 6' x 8' 20K 59062 50224 / SJ4799 16 08/02 Issue 2

Appendix II: Accessories A. Mild Steel Ramps and Pit Frames: Size Capacity Ramp Pit Frame 4' x 4' 20K 64153 64152 5' x 5' 20K 64111 64142 5' x 7' 20K 64111 64138 6' x 8' 20K 64112 64139 B. Mild Steel Bolt-Down Plates, Eyebolts, and Hole plugs: Size Capacity Bolt-Down Plates Eyebolts Hole Plugs ALL ALL 64144 (Set of 4) 70895 (2) 70896 (2) 64143 (Set of 2) 50224 / SJ4799 17 08/02 Issue 2

Appendix III: Pit Frame Drawing 50644-2 50224 / SJ4799 18 08/02 Issue 2