Panel Sessions 7 & 8 WRC-15 Agenda items 7 & 9.1 issues (9.1.2, 9.1.3, 9.1.5, 9.1.8)

Similar documents
APT Preliminary Views on WRC-19 agenda iitems 1.4, 1.5, 1.6, 7 and 9.1 (Issues 9.1.2, and 9.1.9)

Appendix A: Resolution 18 (1994) Review of the ITU s Frequency Coordination and Planning Framework for Satellite Networks

ATTACHMENT 1 to FCC Public Notice DA

Notification and recording of frequency assignments in Space Services

Notification and Recording of Frequency Assignments in Space Services

Implementation of. on Satellite Services. Yvon Henri

ARTICLE 11. Notification and recording of frequency assignments 1, 2, 3, 4, 5, 6, 7, 7bis (WRC-12)

GUIDELINES FOR THE PREPARATION OF PROPOSALS FOR WRC-19

INTERNATIONAL TELECOMMUNICATION UNION

Satellite Issues. WRC-19 agenda items 1.5, 1.6, 7. Jack Wengryniuk Chairman, WP 4A

ASMG Positions on the Agenda Items of the

Frequency Registration for Small Satellite Missions

Radiocommunication Bureau (BR)

UPDATES to the. Rules of Procedure. (Edition of 1998) approved by the Radio Regulations Board. Contents

World Radiocommunication Conference, 2012

ITU RADIO REGULATIONS and SMALL SATELLITES

Technical & Regulatory Examination of Coordination (Non-Plan Service)

ORBIT/SPECTRUM ALLOCATION PROCEDURES REGISTRATION MECHANISM

WRC-19 Conference Proposals Interface (CPI) User Guide

Implementation of WRC-15. for Space Services. Hon Fai Ng. Space Services Department

Receivability. Request for Coordination

3rd ITU INFORMATION MEETING ON WRC-12 PREPARATION (Geneva, 7 8 November 2011)

Innovation, Science and Economic Development Canada Spectrum Licensing

INTERNATIONAL TELECOMMUNICATION UNION

Cost Recovery. for satellite network filings. Akim Falou-Dine

World Radiocommunication Conference 2019 (WRC-19) Mario Maniewicz Deputy Director, Radiocommunication Bureau International Telecommunication Union

Agenda Item 5: ICAO position for ITU WRC-15 and preparation on issues pertaining to VSATs Networks. Preparation of WRC-15: Stakeholders & challenges

ITU Radio Regulations. ITU Radiocommunication Bureau

Technical & Regulatory Examination of Coordination Requests

Earth Stations in Motion (ESIM) Studies in the Ka-Band (WRC-19 A.I. 1.5) and other ITU-R relevant issues

ORBIT/SPECTRUM MANAGEMENT BASICS FOR SATELLITE SYSTEMS

SMALL SATELLITE REGULATION WRC-15 OUTCOME AND RESULTS OF THE ITU-R WP7B STUDIES

Agenda Items for WRC-19. Inter-American Telecommunication Commission (CITEL) Permanent Consultative Committee II

Orbit/Spectrum ITU International Regulatory Framework. ITU Regional Radiocommunication Seminar for the ASIA&PACIFIC Apia, Samoa September 2016

World Radiocommunication Conference 2019 (WRC-19)

Roundtable on WRC-19 Agenda items 2, 4, 8, 9.1 (issues 9.1.6, 9.1.7) and 10

ACHIEVING SPECTRUM HARMONISATION TO DELIVER CONNECTIVITY TO NEXT 1 BILLION Joaquin Restrepo, Chief of Outreach and Publication Services Division, BR/

RESOLUTION 155 (WRC-15)

Space Workshop Advance Publication Information (API)

Preparations for WRC-19 and future agenda items for WRC-23

ITU Symposium and Workshop on small satellite regulation and communication systems Prague, Czech Republic, 2-4 March 2015

Agenda Item 1.13 HAPS outside IMT-2000 bands

Results and implications of World Radiocommunication Conference, Omar KA BR/SSD/SSC

Coordination and Analysis of GSO Satellite Networks

WRC-19 Candidate Bands (AI 1.13) Regional Positions

ITU-APT Foundation of India NATIONAL WORKSHOP ON WRC-19 PREPARATION 22 nd February 2018, New Delhi

ASIA-PACIFIC BROADCASTING UNION (ABU) POSITION ON WRC-12 AGENDA ITEMS 1.4, 1.10, 1.14, 1.15, 1.17, 1.19, 1.22 AND 1.25

Orbit/Spectrum Allocation Procedures

UPDATES to the. Rules of Procedure. (Edition of 2012) approved by the Radio Regulations Board. Date Part AR/AP RR No. or other reference 1

Harmful Interference and Infringements concerning terrestrial services. Ben Ba Head, TPR Division ITU Radiocommunication Bureau

Harmful Interference to Space Services

Satellite Orbit & Spectrum Resources for Future Innovation WRC-15 OUTCOME

ITU RADIO REGULATORY FRAMEWORK FOR SPACE SERVICES

World Radio Conferences, WRC

Report on ITU World Radiocommunication Conference 2015

Orbit/Spectrum International Regulatory Framework. Challenges in the 21 st century

NASA Spectrum Management Issues Presentation to CORF

Orbit spectrum International Regulatory framework

WRC-15: Key Issues. Joaquin RESTREPO Head, OPS Division ITU, Radiocommunication Bureau

ITU Role, Regulations and Actions to prevent and resolve harmful interference to Space Services

BR IFIC, Space Website and Preface (Space Services)

L-band Spectrum Process 27 May Tony Azzarelli 1

Status of CITEL Preparations for WRC-15

PRESENTATION ON WRC-15 ISSUES

Radiocommunication Bureau (BR)

Orbit Spectrum Allocation Procedures ITU Registration Mechanism

Procedures for the management of satellite network filings

Footnotes to National Frequency Allocation of Japan (Column 4)

An Introduction by. Motorola Solutions India. Bharat Bhatia

Harmful Interference to Space Services

Spectrum Management Framework

Evolving International Regulation on Satellite Services

Regulations, WRC 2015/2019:

Executive Overview of World Radiocommunication Conference 2015 (WRC-15)

Outline. What is WAIC. Why is WAIC Important. Regulatory Process Update Status of ITU Documents Proposal CPM Text Topics.

NASA Spectrum Management Issues Presentation to CORF

International Committee on GNSS (ICG) Working Group A Compatibility Sub Group Report

World Radiocommunication Seminar Harmful Interference to Space Services

CONSIDERATION OF THE OUTCOME OF WRC-12 AND PREPARATION OF INITIAL ADVICE ON A DRAFT IMO POSITION ON WRC-2015 AGENDA ITEMS

Satellite Regulatory Framework in Japan

Technical and Regulatory Studies on HAPS

European Law as an Instrument for Avoiding Harmful Interference 5-7 June Gerry Oberst, SES Sr. Vice President, Global Regulatory & Govt Strategy

The electronic version (PDF) of this article was scanned by the International Telecommunication Union (ITU) Library & Archives Service.

The SKA, RFI and ITU Regulations. Tomas E. Gergely National Science Foundation, Arlington, VA, USA

5G and IMT Identification - Views from CEPT- Alexander Kühn (CPG-19 Chairman) March 2017

Digital Terrestrial Television and the Digital Dividend: The importance of frequency coordination to minimize interferences

International Maritime Organization DRAFT IMO POSITION ON WRC-19 AGENDA ITEMS CONCERNING MATTERS RELATING TO MARITIME SERVICES

Current practice and procedures for notifying space networks currently applicable to nanosatellites and picosatellites

Satellite trends. Technical and business technology. and regulatory challenges

Footnotes to National Frequency Allocation of Japan (Column 4)

International Maritime Organization

Outcome of World Radiocommunication Conference, 2015

Carrier to Interference (C /I ratio) Calculations

ORBIT/SPECTRUM INTERNATIONAL REGULATORY FRAMEWORK

ECC Decision (05)11. Approved 24 June 2005

October 17, Spectrum Management and Telecommunications Policy. International Agreements. Aussi disponible en français

IARU Positions on WRC-15 Agenda Items

ITU at a glance. 20 countries founded on 17 May 1865 the International Telegraph Union (ITU)

Consultation on the Use of the Band GHz

Efficient use of Satellite Resources through the use of Technical Developments and Regulations

Transcription:

Document WRC-15-IRWSP-15/11-E 3 September 2015 English only 3 rd ITU INTER-REGIONAL WORKSHOP ON WRC-15 PREPARATION (Geneva, 1 3 September 2015) Panel Sessions 7 & 8 WRC-15 Agenda items 7 & 9.1 issues (9.1.2, 9.1.3, 9.1.5, 9.1.8) Khalid Al Awadhi International Telecommunication Union

Issue A of WRC-15 AI 7 Informing the Bureau of a suspension under RR No. 11.49 beyond six months Method A1: NOC OR Method A2: modification to RR No. 11.49 to provide a regulatory mechanism to clarify the issue, with two options: - Option A: Day-for-day reduction in the suspension period after 6 months, or - Option B: Day-for-day reduction in the suspension period after 6 months up to 12 months * followed by two times reduction thereafter * The 12 months period can be changed 3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 2

Issue A of WRC-15 AI 7 Regional Positions Method APT ASMG ATU CEPT CITEL RCC Method A1: NOC Method A2: Option A Day-forday reduction Method A2: Option B Day-forday reduction and then two times reduction Oppose 3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 3

Issue B of WRC-15 AI 7 Publication of information on bringing into use of satellite networks at the ITU website Clarifying the BR s action through one of the following: Method B1-Option A: implement amendments to RR Nos. 11.44B, 11.49 and 11.49.1 Method B1-Option B: Same as previous + stating that BR publish the info as received Method B2-Option A: implement amendments to RR Nos. 11.44B, 11.49 and 11.49.1, availing the BIU info at ITU-R website, and including the information in a Special Section (Res. 49) Method B2-Option B: Same as previous + stating that BR publish the info as received Method B3: Identify the BR actions required, and include in minutes of WRC-15 3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 4

Issue B of WRC-15 AI 7 Regional Positions Method APT ASMG ATU CEPT CITEL RCC Method B1 Option A Method B1 Option B Method B2 Option A Method B2 Option B Method B3 Remarks Additional Measures Necessary to MOD Art. 11 3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 5

Issue C of WRC-15 AI 7 Review or possible cancellation of the advance publication mechanism for satellite networks subject to coordination under section II of Article 9 of the Radio Regulations Method C1: NOC OR Method C2: Cancellation of the current API mechanism - Option A: suppress the need for API - Option B: Automatically generate API by BR as soon as CR/C received OR Method C3: Review of API mechanism - Option A: Reduce the two-year validity period for an API (without CR/C) - Option B: Suppress the minimum period of six months between API and CR/C 3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 6

Issue C of WRC-15 AI 7 Regional Positions Method APT ASMG ATU CEPT CITEL RCC Method C1 - NOC Method C2 Option A Method C2 Option B Method C3 Option A Oppose Method C3 Option B Remarks Consider ation for other solutions 3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 7

Issue D of WRC-15 AI 7 General use of modern electronic means of communications in coordination and notification procedures Method D: Conclusion towards amendments to Resolutions 907 (WRC-12) to include the use of modern electronic means, and to Resolution 908 (WRC-12) to expand its scope to all kind of satellite network filings and to request the BR to analyze whether it is possible to have a single consolidated interface for both the submission of satellite network filings and the related correspondence Method APT ASMG ATU CEPT CITEL RCC Method D 3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 8

Issue E of WRC-15 AI 7 Failure of a satellite during the bringing into use period Different possible conclusions: Method E1: adding a footnote to RR No. 11.44B: if failure during BIU, frequency assignments brought into use Method E2: Same as previous + adding a footnote to RR No. 11.49: if failure during BBIU, frequency assignments brought into use Method E3: NOC Method E4: additional provision RR No. 11.44.3 allows to extend for 3 years the date of bringing into use from the date of the failure Method E5: consideration by the RRB on a case-by-case basis, based on BR report Method E6: If no decision from BR within three months: BR develop report and submit to the RRB 3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 9

Issue E of WRC-15 AI 7 Regional Positions Method APT ASMG ATU CEPT CITEL RCC Method E1 Oppose Method E2 Oppose Method E3 - NOC Method E4 Oppose Method E5 Method E6 3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 10

Issue F of WRC-15 AI 7 Modifications to RR Appendix 30B in relation to the suspension of use of a frequency assignment recorded in the MIFR Conclusion towards aligning provisions of App 30B with Article 11, APP 30 & 30A, by extending the period allowed for suspension of the use of a frequency assignment to space station to three (3) years Method APT ASMG ATU CEPT CITEL RCC Single Method 3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 11

Issue G of WRC-15 AI 7 Clarification of bringing into use information provided under RR Nos. 11.44/11.44B Conclusion towards new regulatory provisions: - enables BR to seek clarification from the notifying administrations under RR Nos. 11.44 and 11.44B - allow BR to validate the information provided under RR No. 11.44 - for GSO station: ensure information provided under RR No. 11.44B correspond to the deployed space station with transmission capability Method APT ASMG ATU CEPT CITEL RCC Method G 3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 12

Issue H of WRC-15 AI 7 Using one space station to bring frequency assignments at different orbital locations into use within a short period of time Different possible conclusions: Method H1: NOC + enquire from Admin about BIU and make info available: a) Previous orbital position of satellite b) satellite network BIU ed by this satellite at previous location c) The reason for its relocation. - Option A: include in the minutes of the Plenary of WRC-15 - Option B: new WRC Resolution detailing the above Method H2: NOC 3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 13

Issue H of WRC-15 AI 7 Using one space station to bring frequency assignments at different orbital locations into use within a short period of time Different possible conclusions: Method H3: extend the period of BIU from 90 days to 12 months + use space monitoring facilities to verify Method H4: reducing the time available for suspension to the cumulative number of days that the satellite network has been in use, up to a limit of three years Method H5: Administrations include the following information as part of confirmation of the BIU of frequency assignments to a satellite network: a) Previous orbital position of satellite b) the date the satellite left the previous orbital position c) the name of the ITU filing(s) used by the in-orbit satellite at the previous orbital position. 3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 14

Issue H of WRC-15 AI 7 Using one space station to bring frequency assignments at different orbital locations into use within a short period of time Different possible conclusions: Method H6: A new resolution based on: - Indicate if newly-launched satellite or in-orbit - Explanation of abusive satellite hopping - If in-orbit satellite: BR request clarifications - BR accepts the BIU or refers to RRB - RRB makes the decision 3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 15

Issue H of WRC-15 AI 7 Regional Positions Method APT ASMG ATU CEPT CITEL RCC Method H1 Option A Method H1 Option B Method H2 - NOC Method H3 Method H4 Method H5 Method H6 Remarks No Additional restrictions 3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 16

Issue I of WRC-15 AI 7 Possible method to mitigate excessive satellite network filings issue Possible conclusions for excessive CR/C filing issue: Method I1.1: Initial notification and due diligence information without Bureau examination Method I1.2: Initial notification and due diligence information with Bureau examination Method I1.3: Optional submission to initial notification information Method I1.4: NOC Possible conclusions for excessive API filing issue: Method I2.1: NOC Method I2.2: Suppression of the current API mechanism Method I2.3: removal of six months requirement between API and CR/C 3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 17

Issue I of WRC-15 AI 7 Regional Positions Method APT ASMG ATU CEPT CITEL RCC Possible conclusions for excessive CR/C filing issue Method I1.1 Method I1.2 Method I1.3 Method I1.4 NOC Possible conclusions for excessive API filing issue: Method I2.1 NOC Oppose Method I2.2 Method I2.3 3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 18

Issue J of WRC-15 AI 7 Removal of the link between the date of receipt of the notification information and the date of bringing into use in RR No. 11.44B Method J1: Conclusion towards eliminating from RR No. 11.44B the only instance where the notification information for a frequency assignment to a space station in the geostationary-satellite orbit is not in conformity with RR No. 11.44B because of the requirement to confirm the notified date of BIU within 120 days of this date OR Method J2: NOC Method APT ASMG ATU CEPT CITEL RCC Method J1 Method J2 NOC 3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 19

Issue K of WRC-15 AI 7 Addition of a regulatory provision in RR Article 11 for the case of launch failure Method K1: Conclusion towards An additional provision of RR No. 11.XX to regulate any launch failure of a satellite that such failure makes the satellite unable to start BIU or BBIU of a notified frequency assignment Method K2: An alteration of this previous regulation is to make it on a case-by-case basis by the RRB OR Method K3: NOC 3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 20

Issue K of WRC-15 AI 7 Regional Positions Method APT ASMG ATU CEPT CITEL RCC Method K1 Method K2 Method K3 NOC Remarks the extension of timelimit 3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 21

Issue L of WRC-15 AI 7 Modification of certain provisions of Article 4 of RR Appendices 30 and 30A for Regions 1 and 3 namely replacement of tacit agreement with explicit agreement or alignment of those provisions of RR Appendices 30 and 30A for Regions 1 and 3 with those of Appendix 30B Method L1: Modify the corresponding provisions of RR Appendices 30 and 30A in such a manner that the notion of tacit agreement be replaced by explicit agreement. OR Method L2: Harmonization of the provisions in Article 4 of both RR Appendices 30 and 30A with the corresponding provisions of Article 6 of Appendix 30B OR Method L3: NOC 3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 22

Issue L of WRC-15 AI 7 Regional Positions Method APT ASMG ATU CEPT CITEL RCC Method L1 Method L2 Method L3 NOC Remarks studies 3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 23

Issue 9.1.2 of WRC-15 AI 9.1 Studies on possible reduction of the coordination arc and technical criteria used in application of No. 9.41 in respect of coordination under No. 9.7 Proposed Conclusions on Resolves 1 (technical criteria) Option 1A - Retain RR Nos. 9.7, 9.41 and 11.32A essentially unchanged - Change trigger criteria from ΔT/T to C/I=C/N + X db, where X is less than 12.2 db (the value corresponding to 6% ΔT/T) - RR No. 11.32A would use the same C/I criteria as above Option 1B - NOC to current RR App. 5 identification of coordination requirements - Change threshold levels for application of RR No. 9.41 for some frequency bands - Replace C/I in RR No. 11.32A with uplink/downlink PFD masks for some frequency bands Option 1C - Same as Option 1B, with PFD thresholds outside the Coordination Arc Option 1D: NOC 3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 24

Issue 9.1.2 of WRC-15 AI 9.1 Studies on possible reduction of the coordination arc and technical criteria used in application of No. 9.41 in respect of coordination under No. 9.7 Proposed Conclusions on Resolves 2 (Coordination Arc) Option 2A: Reduce coordination arc as: - 6/4 GHz band ±8⁰ reduces to ±6⁰ - 14/10/11/12 GHz band ±7⁰ reduces to ±5⁰ - 30/20 GHz band NOC to ±8⁰ Option 2B: Reduce coordination arc as: - 6/4 GHz band ±8⁰ reduces to ±6⁰ - 14/10/11/12 GHz band ±7⁰ reduces to ±5⁰ - 30/20 GHz band ±8⁰ reduces to ±6⁰ Option 2C: NOC 3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 25

Issue 9.1.2 of WRC-15 AI 9.1 Regional Positions Method APT ASMG ATU CEPT CITEL RCC Resolves 1 (technical criteria) Option 1A Option 1B Option 1C Option 1D NOC Resolves 2 (Coordination Arc) Option 2A Option 2B Option 2C NOC Remarks Alteration 3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 26

Issue 9.1.3 of WRC-15 AI 9.1 Use of satellite orbital positions and associated frequency spectrum to deliver international public telecommunication services in developing countries Two possible conclusions: Option A: NOC Option B: Revise Resolution 11 (WRC-12) in order to continue with the studies as it may be required for resolves 2 of Resolution 11 (WRC-12) to continue even after WRC-15 Method APT ASMG ATU CEPT CITEL RCC Option A - NOC Option B Remarks Supress Res 11 (WRC-12) Alteration 3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 27

Issue 9.1.5 of WRC-15 AI 9.1 Consideration of technical and regulatory actions in order to support existing and future operation of fixed-satellite service earth stations within the band 3 400-4 200 MHz, as an aid to the safe operation of aircraft and reliable distribution of meteorological information in some countries in Region 1 Conclusion towards modification to Resolution 154 (WRC- 12), calling for relevant administrations in Region 1 to use special care in the coordination, assignment, and management of frequencies taking into consideration the potential impact on the FSS earth stations used for satellite communications related to safe operation of aircraft and reliable distribution of meteorological information in the frequency band 3 400-4 200 MHz. Consideration may be given to modifying RR No. 5.430A to include a reference to the modified Resolution 3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 28

Issue 9.1.5 of WRC-15 AI 9.1 Regional Positions Method APT ASMG ATU CEPT CITEL RCC Single conclusion Remarks Alteration 3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 29

Issue 9.1.8 of WRC-15 AI 9.1 Regulatory aspects for nanosatellites and picosatellites The ITU-R Study Groups have concluded that additional efforts should be undertaken by the BR, administrations, and others to help increase knowledge and raise awareness about the applicable regulatory procedures for satellite networks among those entities involved in development and launch of nanosatellites and picosatellites. Another relevant response to this issue could be to consider modifications to the regulatory procedures for notifying satellite networks to accommodate nanosatellite and picosatellite missions 3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 30

Issue 9.1.8 of WRC-15 AI 9.1 Regional Positions APT ASMG ATU CEPT CITEL RCC views Retention of Res 757 (Rev.WRC- 12) with Modifications new agenda item, but no additional complications Simplified regulatory procedures propose a new ITU-R Resolution NOC + no need for new Agenda Item Can have new agenda item, but no additional complications 3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 31