FIG. #1 - ASD & USD 180/280 Shower Door Assembly

Similar documents
FIG. #1 - ASD-90 & USD-90 Shower Door Assembly

Figure #1 - VSNEO Shower Door Assembly

3/16 FRAMED SWING DOOR WITH SINGLE INLINE PANEL OR TWO INLINE PANELS

Page 1. FIG. #1 - Shower Door Assembly SHOWER & BATH ENCLOSURES BUILT TO LAST A LIFETIME HANDLE ASSEMBLIES REMOVED FOR CLARITY.

3/16 OR 1/4 FRAMELESS SWING DOOR WITH SINGLE INLINE PANEL OR TWO INLINE PANELS

Figure #1 - ATE-ASE & UTE-USE Shower Door Assembly

SLIDING TUB / SHOWER ENCLOSURE WITH STATIONARY 90º PANEL

Installation Instructions Models: SESD180, DESD180, MESD180 1/4" Semi-Frameless Door and 3/8" In-Line Panel

3/16 FRAMELESS SERIES BY-PASS TUB AND SHOWER ENCLOSURES #3344, 3345, 3037

1/4 FRAMELESS DOOR WITH INLINE PANEL 1413A-1713A-1813A

QCI0029 REV. 1 Page 1 of 11 Certified 07/06/05

UNIT No FRAMELESS PIVOT SHOWER DOOR

Installation Instructions with 90 Degree Return Panel -- Model E-DP9. Model Semi-Frameless Door & Panel

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233

675 Quick N Stall Neo Angle Framed Hinge Shower Enclosure

Semi-Frameless Hinged Door With Panel And Return

INSTALLATION INSTRUCTIONS. UNIT No. 160/760 THIN-LINE SHOWER ENCLOSURE

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5232

392CV SERIES Stickstall

Double Swing Door With Header QCI5114

INSTALLATION INSTRUCTIONS

FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274

300C6 CONTINUOUS HINGE SEMI-FRAMELESS DOOR KIT

UNIT No. 135/735 THIN-LINE SHOWER ENCLOSURE

Frameless Inline Door With Return QCI5263

INSTALLATION INSTRUCTIONS. Unit No. 126, 726 Classic Pivot Panel/Door/Panel Shower Enclosure

Unit No. 135, 735 Deluxe Pivot Inline Door & Panel Shower Enclosure

Unit No. 135, 735 Deluxe Pivot Inline Door & Panel Shower Enclosure

EUROVIEW I \ IMST. Installation Instructions. Continuous Hinge Shower Enclosure , \ Model. 1. Model Number 2. Part Number 3. Part Description 4.

A-935 RODA WALL MOUNT HINGES

INSTALLATION INSTRUCTIONS

300 CV Series. Semi-Frameless Hinged Door. 202 Anderson Ave., Belvue, KS Phone: Fax:

Unit No. 1413NP, 1713NP, 1813NP Infinity Continuous Hinge Frameless Door & Inline Panel with No Post Shower Enclosure

STEAM TIGHT. Installation Instructions 200S/250S. SCFMDPP Parts Pak Includes: Letters C,D,E,J,S,V,W,X,Y,BB,CC,DD

1/4 FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE

Frameless Inline Door QCI5250

Frameless Inline Door QCI5254

UNIT No. 15 & 16 SHOWER DOOR INSTALLATION INSTRUCTIONS

794 SERIES STIKSTALL TM SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

791 SERIES STIKSTALL TM SHOWER ENCLOSURE

STEAM TIGHT. Installation Instructions 400S. SCFMDPP Parts Pak Includes: Letters B,C,F,G,H,T,W,X,Y,AA,BB,CC,DD,EE

794 series stikstall tm shower enclosure

738 SERIES PIVOT SHOWER DOOR

713C-GP. Pivot Door. Technical Assistance is available Monday - Friday, 8:00 a.m. - 5:00 p.m. (Central Time) (Toll Free) 713C-GP 8/06

1/4 FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE 1400A-1700A-1800A

UNIT No. 1415NP / 1715NP / 1815NP INFINITY FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE WITH NO INLINE POST

Double Frameless Swing Door QCI5247

FRAMED PANEL / DOOR / PANEL CONTINUOUS HINGE SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

Frameless Heavy Glass Door with Wall Mount Hinges

tile redi redi DOOR Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE:

394 SERIES STIKSTALL TM SHOWER ENCLOSURE

INSTALLATION INSTRUCTIONS. Deluxe Continuous Hinge Inline Door & Panel Shower Enclosure QCI5230

463-GP. Swing Door. Technical Assistance is available Monday - Friday, 8:00 a.m. - 5:00 p.m. (Central Time) (Toll Free) 463-GP 5/06

391 SERIES STIKSTALL TM SHOWER ENCLOSURE

Frameless Heavy Glass Door with Header

394CV Series. Neo Angle Shower Enclosure. 202 Anderson Ave., Belvue, KS Phone: Fax:

Continuous Hinge Frameless Single Swing Shower Enclosure QCI-5214

Installation Instructions Models: TRTE290 / TRSE290 ECTE290 / ECSE290 3/8" Frameless Slider with 180 & 90 Panels

Installation Instructions Models: TRTE180 / TRSE180 ECTE180 / ECSE180 3/8" Frameless Slider & 180 Panel

flf( f(f! Figure 2 i/f!

Installation Instructions Models: TRTE290 / TRSE290 ECTE290 / ECSE290 3/8" Frameless Slider with 180 & 90 Panels

Unit No. 1400, 1700, 1800 Infinity Continuous Hinge Frameless Swing Door Shower Enclosure

Frameless Bypass Slider

Frameless Bypass Slider

Frameless Fixed Panel Slider

620 Freestyle/Style Swing Door

Installation Instructions Models: TRBTE / TRBSE ECBTE / ECBSE 3/8" Frameless Slider

Frameless Door QCI5284

Frameless Inline Door QCI5248

Deluxe Continuous Hinge Framed Door & Inline Panel with Return Panel Shower Enclosure

Model 5400H / 7000H Illustrated Installation Instructions

Frameless Fixed Panel Slider QCI5279

890 SERIES PIVOT STEAM DOOR

Heavy Wall Applied Stop Tube Frame and Door Installation

L e g e n d Inline panel shower enclosure installation Instructions (400 Series)

Frameless Inline Door With Return QCI5128

INSTALLATION INSTRUCTIONS 960 RODA GLASS TO GLASS HINGES ANGLED FRAMELESS PANEL / DOOR / PANEL CELESTA DRESDEN TRESOR

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

935 RODA VINESSE NEED INSTALLATION HELP? DOUBLE ROLLERS FRAMELESS DOOR INSTALLATION INSTRUCTIONS QCI XX/XX/XXXX. Call BASCO ( )

tile redi redi DOOR Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE:

Model 2400/4000 Illustrated Installation Instructions

846-GP. Neo-Angle Enclosure. Technical Assistance is available Monday - Friday 8:00 a.m. - 5:00 p.m. (Central Time) GP 12/05

INSTALLATION INSTRUCTIONS 935 RODA GLASS TO GLASS HINGES FRAMELESS DOOR / PANEL CELESTA DRESDEN GEOLUX TRESOR VONSE

950 RODA WALL MOUNT HINGES PRECERIA INSTALLATION INSTRUCTIONS. NEED INSTALLATION HELP? Call BASCO ( ) FRAMELESS DOOR

SEMI-FRAMELESS DOOR WITH GLASS PANEL & BENCH GLASS

SERIES: CONFIGURATION: MOUNTING PACKAGE: 1200 Door-Door Frameless, sliding door

ProLine PL60 - PL70 - PL80 RETURN PANEL SUPPLEMENT

1/4 FRAMELESS SLIDING DOOR FOR TUB OR SHOWER 4400A-4500A

792 SERIES STIKSTALL TM SHOWER ENCLOSURE

Thermally Broken Framing and Door Installation

FIXED SHOWER SCREEN For Wall Mount Hinges QCI5283

1038 SERIES DELUXE FRAMELESS PIVOT SHOWER DOOR

ProLine PL80 HEAVY FRAMELESS BYPASS BATH ENCLOSURE

ProLine PL60 HEAVY FRAMELESS BYPASS BATH ENCLOSURE

FRAMED SLIDING DOOR FOR TUB OR SHOWER ENCLOSURE 6150A-7150A

Model 6100 Illustrated Installation Instructions Contractors Wardrobe

FRAMED SLIDING DOOR FOR TUB OR SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

EUROVIEW FRAMELESS GLASS ENCLOSURES I \ IMST ., \ Installation Instructions. Continuous Hinge Shower Enclosure , \ Model

4-lite Patio Door. Installation Instructions

Transcription:

FIG. #1 - ASD & USD 180/280 Shower Door Assembly USD180 / 280 Euro Stall Header #1020 16 16 1 16 4 ASD180 / 280 Accent Stall Header #1021 5 3 8 6 7 8 Hinge Assembly: 2220, 2201, 2185, 2271, 2213 18 22 17 Please refer to Fig. #2 for detail and orientation of handle assembly. 22 Hinge Assembly: 2220, 2201, 2185, 2271, 2213 22 14 13 3 15 21 9 13 13 11 10 2 11 Page 1

FIG # 2 - Shower Door Side View Stall Header,1 Header Filler,3 Glass Door Panel,17 Inside Handle, 12 Outside Handle, 12 Drip Deflector,9 Side-Lite Glass Panel,18 Curb Seal,20 Glass Holes Outside Handle Assembly, 12 Handle Assembly Plastic Grommets #6-32 X 1 1/2 Fhphms Glass Door Panel #17 Inside Handle Assembly, 12 Door Sweep,21 Curb Filler,3 Stall Curb,2 Setting Block,10 #10-24 X 9/16" PHPHMS,15 Inside Handle, 12 Wall Anchor,14 #6 X 3/8 PHPHSMS,16 #6 X 3/8 PHPHSMS,16 #8 X 1/2 PHPHTEK,22 #8 X 1/2 PHPHTEK,22 180 Post,5 Wall Channel,4 Latch Jamb,6 B Hinge Jamb,7 A Hinge Vs-3 Glazing Vinyl,19 Wall (Ref ) FIG. #3 - Shower Door Assembly - Top View Outside Handle, 12 #8 X 1-1/2" Leading Edge FHPHSMS,13 of 180 Post Jamb Filler,8 3/16" Max. Wall Anchor,14 Jamb Filler,8 #8 X 1-1/2" Handle Top Cap FHPHSMS,13 Page 2 Wall (Ref )

Fig. #4 - Stall Curb Filler Stall Curb, 2 Fig. #5 - Notching Top of Hinge Jamb,7 Fig. #6 Jamb Filler Jamb Filler,8 Nickel Curb Filler,3 Foam Curb Plug, 11 Fill Recess With Sealant Stall Curb,2 Notch Here Fig. #7 Header Filler #1025 Measurements Inside Shower Outside Shower Notch 1/2" 3/16" Notch 1/2" Note: Measure Latch Jamb Header / Curb Filler, 3 6141 - ASD & USD 180/280 Parts List Page 3 Hinge Jamb ITEM# PART# DESCRIPTION QTY. ITEM# PART# DESCRIPTION QTY. 1 1020/1021 Stall Header 1 8 1003 Jamb Filler 2 2 1022 Stall Curb 1 9 1009 Drip Deflector 1 3 1025 Header/Curb Filler 2 10 2203 Setting Block 1 4 1026 Wall Channel (ASD280: 2 ea) 1 11 2204 Foam Curb Plug 2 5 1031 180 Post (ASD280: 2 ea) 1 12 Fig. #2 Handle Assembly 1 6 7 Hinge Jamb Assembly 1001 Latch Jamb 1 13 2101 #8 X 1-1/2 FHPHSMS 6 4015 Latch Jamb Vinyl 1 14 2217 3/16 Wall Anchors 6 1002 Hinge Jamb 1 15 2111 #10-24 X 9/16 PHPHMS 6 4015 Hinge Jamb Vinyl 1 16 2102 #6 X 3/8 PHPHSMS 8 2220 Hinge 2 17 7004 Glass Door Panel 1 2201 Hinge Pin 2 18 7006 Side-Lite Panel (ASD280: 2 ea) 1 2185 #8-32 X 7/16 Truss Head 2 19 4013 VS-3 Glazing Vinyl (ASD280: 8 ea) 4 2271 3/16 Grommet 2 20 4011 VS-1 Curb Seal 1 2213 Hinge Bushings 4 21 4018 VW-2 Bottom Sweep 1 22 2110 #8 X 1/2 PHPH TEK 6

6141 - ASD & USD 180/280 Assembly Instructions These installation instructions must be followed to ensure proper operation of the door and to reduce the risk of serious injury. Any deviation from these instructions can result in a serious safety hazard. All exposed ends of aluminum that are rough, sharp or jagged due to the metal being cut, drilled or damaged should be de-burred, smoothed or rounded by the installer before installation. Failure to do so could result in serious injury to the user of the enclosure. Any part of the swinging glass panels hitting any unprotected bathroom obstruction or metal or glass component of the shower door itself, may indicate improper installation and could lead to serious injury. Installers must correct the deficiencies before allowing the door to be used. SPECIAL NOTE: Drilling holes and anchoring horizontal sills and curbs to thresholds and tub decks is discouraged and is left to your discretion. Using masking tape or double-sided tapes to hold these components down during installation is recommended to minimize the potential for water leaking underneath flooring and onto ceilings below. These instructions do not recommend drilling holes on horizontal surfaces for this reason. Deviating from recommended installation instructions voids the Agalite Lifetime Warranty. The Agalite Model AS-280 is installed in the same way as Model AS-180 with a few minor modifications. These instructions will guide you through the installation of the the model AS-180, but will make special notations where the necessary modifications for the AS-280 are made. Please be aware of these deviations. STEP 1 - STALL CURB: On the centerline of the tub or shower sill, measure the wall to wall net opening, 1/2" above the sill. From this measurement deduct 1/16" and cut stall curb (ITEM #2) to length. NOTE: Your curb section may already be cut to size from the factory. Set curb section in place over centerline and mark curb location at each wall. NOTE: Ensure weep holes are oriented to the inside of the shower. Insert one Foam Curb Plug (ITEM #11) into each end of stall curb, recessing them approximately 1/8". Refer to FIGURE #4. Fill each recess with sealant and position the stall curb over the centerline and temporarily hold in place with strips of masking tape. Insert one Setting Block (ITEM #10) into the stall curb where the side-lite panel will set. With a screwdriver, push each Foam Curb Plug into each wall to seal the curb ends. STEP 2 - WALL CHANNEL: Center the Wall Channel (ITEM #4) on the Side-Lite Panel side of the Stall Curb and against the wall with open edge of channel facing away from wall. Refer to FIGURE #3. Plumb the wall channel, then using the wall channel's pre-drilled holes as a template, mark the three installation holes on the wall. Remove wall channels and drill holes into the wall with a 3/16" drill bit. (Use carbide tipped bit if going into tile or other types of masonry material). Insert three wall anchors (ITEM #14). Reposition the wall channel, align the holes, and secure with 3- #8 x 1-1/2" FHPHSMS, (ITEM #13). AS-280: Repeat above step with second Wall Channel at opposite wall. STEP 3 - SIDE-LITE PANEL: Insert the Side-Lite Glass Panel (ITEM #18) into the curb and slide into the wall channel. NOTE: If obscure, frosted or pebbled glass is used, ensure that the rough side of the panel faces to the outside. Insert the 180 post into the curb and over the edge of the glass panel. Adjust door opening by first noting what size door you have been supplied with your unit. It will be marked on the front of the door carton with a designation of ASD - then a door size. (EXAMPLE: ASD - 24). Take your door size and add 1/4" to it. This is the minimum dimension that you must have between the leading edge of the 180 post and the wall. Please note reference points A and B in FIGURE #3. Move the bottom of the 180 Post to this position. With a level, plumb the 180 Post and temporarily hold the post in place by glazing the top of the post with a few inches of the VS-3 Glazing Vinyl (ITEM #19). (NOTE: Do not cut the glazing vinyl at this time). At this point, it is necessary to determine if the Side-Lite Glass Panel is far enough into both vertical posts for proper glazing. 1/4" is the minimum penetration into each post. If this minimum penetration is not met, the 180 Post must be moved further onto the Side-Lite Glass panel to achieve the necessary coverage. The door assembly will cover any discrepancy. AS-280: Repeat above procedure for second Side-Lite Glass Panel and the 180 Post. Reference points A and B will be between the leading edges of the two 180 Posts instead of the 180 Post and the wall. Page 4

6141 - ASD & USD 180/280 Assembly Instructions Cont. STEP 4 - CURB FILLER: Measure between the leading edge of the 180 Post and the wall and cut the Curb Filler (ITEM #3) to this dimension. Please refer to reference points A and B in FIGURE #3. With the Curb Filler water dam to the outside of the shower, firmly snap filler into place between the 180 Post and the wall. Refer to FIGURE #2 for proper orientation. The door assembly will be installed on top of the Curb Filler. Install one Jamb Filler (ITEM #8) at the wall opposite the Wall Channel. This jamb will support either the Hinge Jamb or the Latch Jamb, depending on your requirements. Start by setting the Jamb Filler on top of the Curb Filler with the open edge of the channel facing away from the wall. Use an ordinary nickel (5 ) to space the bottom of the Jamb Filler back from the vertical water dam on the Curb Filler. Refer to FIGURE #6. This is necessary to allow clearance for either the Hinge Jamb or the Latch Jamb later on. With the bottom properly spaced, use a level and plumb the Jamb Filler. Use the factory holes as a template and mark the hole locations onto the wall. Remove the filler and drill the holes using a 3/16" drill bit. Insert 3- Wall Anchors (ITEM #14) into the holes. Realign the filler with the holes and secure with 3- #8 X 1-1/2 FHPHSMS (ITEM #13). AS-280: The measurement taken for the Curb Filler will be between the leading edges of the two 180 Posts with the Curb Filler being snapped in between them as well. Disregard the text that instructs you to attach the Jamb Filler to the wall. STEP 5 - STALL HEADER: Measure wall to wall at the top of the vertical posts. Subtract 1/16" and cut the Stall Header (ITEM # 1) to this length. Set header in place over the top of all the verticals. Verify that the 180 post has not moved from your A to B dimension at the curb, then tap the top of the post into place. Use a level to make sure that post is plumb. From the inside of the shower, attach the header to the top of the Wall Channel and the 180 post only by drilling through the header into the vertical posts with a #32 wire gauge drill bit and securing with 2- #6 x 3/8" PHPHSMS (ITEM #16). The Header over the Jamb Filler must be left unsecured at this time. Be very careful not to drill or screw into the glass panel. The panel can be moved side to side while drilling. After attachment is complete, center the side-lite panel between the posts and glaze with 4 pcs. of VS-3 vinyl (ITEM #19). NOTE: The vinyl seals are designed to be tight to provide maximum water protection, and minimize shrinkage due to temperature extremes. If it becomes difficult to push the vinyl in place, lubricate it with glass cleaner. This will allow easy installation then will evaporate leaving the vinyl tight and smooth. SPECIAL NOTE: Do not use any type of grease, oils, or silicone sprays as these will harm the vinyl and compromise safety as well as water protection. Finish this step by installing the remaining Jamb Filler(s) to the 180 Post(s) as follows: Position the closed edge of the Jamb Filler(s) to the 180 Post(s) as shown in (FIG. #3), with the bottom of the Jamb Filler(s) setting on top of the Curb filler. Secure the Jamb Filler(s) to the 180 Post(s) with 3- #10-24 X 9/16 PHPHSMS (ITEM #15). AS-280: Notice that both Jamb Fillers should be in position at this time. STEP 6 - DRIP DEFLECTOR: Take the Door Bottom Sweep (ITEM #21) and slide it into the bottom of the Drip Deflector as shown in FIGURE #5. A mild solution of soapy water will help if the sweep is difficult to pull through. The vinyl sweep has a memory when it is stretched, so be sure to work the sweep back and forth after it is drawn into the deflector. Trim the vinyl leaving 1/4" of the Door Sweep protruding from each end. Set the door assembly on its top on a cushion or pad, so that the bottom of the door is up. Set the Drip Deflector (ITEM #9) over the bottom edge of the door with the deflector portion to the inside of the shower. With a mallet or block of wood, gently tap the deflector over the edge of the door panel as far as it will go. In most cases, the glass thickness is enough to hold the Drip Deflector in place for the life of the door. In some circumstances the glass may be slightly thinner, depending on the type of glass being used, or the manufacturer of the glass its self. In these cases, the corners of the Deflector may be pinched to hold the Deflector in place, or simply inject a small amount of caulking into the channel where the glass will fit to maximize the holding power of the Deflector. NOTE: Only a small amount of caulking is necessary, too much caulking will be squeezed out during adjustment. It will be readjusted later. Make sure that the Drip Deflector does not protrude past the edge of the glass on the handle side. Debur and round the exposed ends of the drip deflector. STEP 7 - DOOR ASSEMBLY: Measure from the top horizontal surface of the Curb Filler, (the surface that the Jamb Fillers are setting on), to the bottom of the header. Page 5

6141 - ASD & USD 180/280 Assembly Instructions Cont. STEP 7 - DOOR ASSEMBLY Cont: Then trasfer the measurement to the jamb and make a mark on the Hinge Jamb Barrel. Using a hacksaw, notch the Hinge Barrel that is at the top of the hinge jamb down to the mark you made,. This procedure can be performed while still attached to the glass panel. Refer to FIGURE #5 before cutting the Hinge Jamb Barrel. The ASDJ door is designed to adjust upward in width from a tight position a total of 1". EXAMPLE: An ASDJ-24 door will fit a net opening of 24" tight up to 25" totally expanded out. The net opening for this model is the dimension between the leading edge of the 180 Post and the wall (the same dimension that the Curb Filler was cut to). Adjustment should be made by adjusting the Hinge Jamb first, then the Latch Jamb, equally off both Jamb Fillers. Slide the door assembly over the appropriate Jamb Filler and move it to the determined dimension off the wall or 180 Post. Use a small level placed along the top horizontal edge of the glass to level the door. From the inside of the shower, drill through the top pilot hole in the Hinge Jamb into the Jamb Filler using a #32 wire gauge drill bit. Secure the top hole with one #8 X 1/2 PHPHSMS (ITEM #16). The door will hold in place with only the top screw installed. Next, re-level the door and drill through the middle and bottom holes with a #32 wire gauge drill bit then secure with two #8 X 1/2 PHPHSMS (ITEM #16). AS-280: Net door opening is between the two 180 Posts instead the post and the wall. The length of the Curb Filler still represents the net door opening. STEP 8 - LATCH JAMB: Slide the Latch Jamb in place over the appropriate Jamb and up into the header. Do not secure the Latch Jamb at this time. Move the door to the closed position, pulling the Latch Jamb off enough so that it stops the door. With the door closed, the reveal between the vertical glass edge of the door and the Latch Jamb is a maximum of 3/16" for the handle catch to work properly. A 1/8" is ideal. Please refer to FIGURE #3, for adjustment detail. From the inside of the shower, drill through the factory holes in the Latch Jamb, into the Jamb Filler using a #32 wire gauge drill bit. Secure the Latch Jamb with three #8 X 1/2 PHPHSMS (ITEM #16) AS-280: Procedure is the same. STEP 9 - HANDLE ASSEMBLY: Take the Inside Handle assembly, (the one with the bullet catch and adjustment screw), and insert two #6-32 X 1 1/2" FHPHMS, into the two screw holes in the Handle. Slide one Plastic Grommet over each threaded portion of each screw. WARNING: This shower door should not be installed without grommets. The grommets prevent the glass from touching the metal screw. If the metal touches the glass, the glass can break and create a serious safety hazard. With the door in the open position, from the inside of the door, insert the Handle assembly through the corresponding holes in the glass panel. Holding the assembly in place, set the Outside Handle assembly in place over the holes and tighten the screws. Adjust the catch mechanism as necessary by turning the Phillips head screw on the inside Handle assembly. Finish the installation by adjusting the Drip Deflector as follows: Close the door and from either the inside or the outside, use a block of wood to tap the deflector down so that the Door sweep is approximately 1/16" above the Curb Filler s horizontal surface. The deflector does not need to be tilted to function. Refer to FIGURE #2. STEP 10 - HEADER FILLER: Measure between the Hinge Jamb and Latch Jamb at the header, then cut the Header Filler (ITEM #3), to this dimension. Notch ends both to fit. Refer to FIGURE #7. STEP 11 - CAULKING: First, seal each end of the Drip Deflector with caulk, then run a bead of caulking the full length on the inside of the shower where each Jam Filler meets the wall and across the bottom where it meets the shower base. Page 6

6141 - ASD & USD 180/280 Assembly Step-Up Instructions STEP 1 MEASURE Measure between wall and step up, subtract 1/16" and cut Stall Curb (#2) to length. Set in place on threshold. Figure A: Cut Curb Filler (#3) to same length as Stall Curb and snap into place. Hold Stall Curb in place with strips of masking tape. Figure B: Insert Setting Block (#10) into Stall Curb to support Side-lite panel. STEP 2 - ATTACH JAMB FILLER Figure A: Attach Jamb Filler (#8) to 180 Post, (#5), with 3- #10-24 x 9/16" PHPHMS, (#15). NOTE: These jambs will not be flush at the top. Set attached jambs in place and plumb with a level. Set Panel Sill in place lined up off of attached post. Hold in place with strips of masking tape. Remove attached post. Figure B: Set Vertical Panel Sill in place on stall curb, plumb and secure to buttress face. Next, set Horizontal Panel Sill in place and secure. Seal end of Panel Sill at wall with caulking. STEP 3 - WALL CHANNEL Figure A & B: Set Wall Channel in place on top of Panel Sill, plumb and secure to wall. Insert Setting Blocks and install Side-lite panel. STEP 4 - RE-INSTALL Figure A: Re-install post and secure to buttress face. Figure B: Install 180 post. Temporarily hold in place over panel edge with masking tape. Figure A & B: Measure wall to wall at top of posts, subtract 1/16" and cut Header to length. Install header over 180 Post and wall channel. Secure Header with 2- #6 x 3/8" PHPHSMS from the inside of shower. Glaze Side-lite panel. STEPS 6-11 To finish Insatallation. Follow steps 6-11 on page 5 and 6 of the 6141 Installation Instruction. #1021 STALL HEADER #1021 STALL HEADER #1026 WALL CHANNEL #1031 180 POST #1026 WALL CHANNEL #1031 180 POST # 1022 STALL CURB #1016 PANEL SILL FIG. A # 1022 STALL CURB #1026 PANEL SILL #1026 PANEL SILL FIG. B Page 7