Fire proof sliding doors REI leaf, 2 leaves

Similar documents
Blind, Sliding, Glazed Doors. Fire Proof Closures

Table of Contents. B. Base Tool Changer...2 MC-6 Manual Tool Changer...2

Important Notice. caution: Use proper lifting equipment and correct procedures to avoid injury.

Thank you for purchasing our product! *Please read these instructions and follow them step by step.*

ASOLA - THETA ISTRUZIONI DI MONTAGGIO FITTING INSTRUCTIONS INSTRUCTIONS DE MONTAGE INSTRUCCIONES DE MONTAJE MONTAGEANLEITUNG. IMPBAT Rev.

HD installation guide

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

9 X 12 FIXED TYPE ALUMINUM WINDOW BARS INSTALLATION INSTRUCTIONS Import Note : 9 X 12 Spacing Fixed Type Installation is covered in this Instruction.

Model Series T o r s i o n

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

Table of Contents. B. Base Tool Changer...2 MC-16 Manual Tool Changer...2

SINCE 1922 P UBLICATION N O

300 Series Racks. 19" Wide Opening Stand-Alone Wall Cabinet with Adjustable Rails. Applications. Features. In The Box. Options

PFT CABLE GYM INSTRUCTION MANUAL

Table of Contents. B. Base Tool Changer...2 MC-36 Manual Tool Changer...2

OPERATION AND MAINTENANCE MANUAL. mcr TLB ECO GATES

Phone # La Jolla Doors. Block Frame Installation Manual Aluminum Frame with either Vinyl or Aluminum Panels

installation guide

INSTALLATION TORSION SPRING FRONT OR REAR MOUNT LOW HEADROOM. 1 Cutting Vertical Track. 2 Fully Adjustable Jamb Brackets

Installing Your Electronic Deadbolt

Rolling Curtain door Manual

How to operate (folding)

STEP 1 STEP 2 LEVELER KIT OPTION MOBILE CASTER KIT OPTION

Daily Maintenance. 2. Insert bobbin cases in to rotary hooks. Make sure bobbin thread is not over 2 inches long. Close bobbin case covers.

Hydrajaws Safety Lifeline Tester

In-Tube Motorized SCREEN-PRO. All Season Roll-Up Doors IN-JAMB MOUNTING METHOD INSTALLATION INSTRUCTIONS READ THIS FIRST

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

Installation Instructions

HAS MODULAR TELESCOPIC LANDING DOOR INSTALLATION MANUAL

Series 1600 WeatherGuard Dock Enclosure

Owner s Manual LSP38 38 Lawn Sweeper

3 BRACKET TO GUIDE ATTACHMENT. RIGHT END Figure 1. EXTENDED BRACKET (for doors taller than 8-8 ) SERIES 650. RIGHT END COTTER PIN Figure 6

CRYSTEEL S. this manual must be included with the vehicle after completing the installation.

9 X 9 REMOVABLE TYPE ALUMINUM WINDOW BARS INSTALLATION INSTRUCTIONS Import Note : 9 X 9 Spacing Removable Type Installation is covered in this

CRCODE-202. Mechanical Lock. Instruction and Programming Manual. Before Installing:

Copyright Black Box Corporation. All rights reserved Park Drive Lawrence, PA Fax

MODEL 2EA/2EB DOOR INSTALLATION INSTUCTIONS

SPIDA SAW OPERATIONS MANUAL

Passive Panel Replacement

Repair manual. Fifth-wheel coupling JSK 38/50

Fixed Upper Sash Replacement Guide for Andersen 400 Series Woodwright Springline Single-Hung Windows

N35 ALUMINIUM ROLL-UP DOOR INSTALLATION MANUAL

This product is designed for a water supply pressure range of 20 psi (137kPa) minimum to 80psi (550 kpa) maximum.

OPERATION AND MAINTENACE MANUAL. mcr ALPE EI 120

southpaw enterprises, inc.

C. Samples for Initial Selection: Manufacturer's color charts showing the full range of colors available.

Heavy and Medium Duty Fire Doors

ACORNWIRE.COM MESH PARTITIONS DIVISION 10 - SPECIALTIES WIRE MESH PARTITION FOLDING GATE

Installation Instructions for Vista Air Vertically Folding Walls

Installation Guide Installation Kit for Mounting Philips MP20/30/40/50 on Datex-Ohmeda Aisys Anesthesia Machine

Midmark Care Exchange 6282 Standard Duty Wall Mounted Workstation

MIRAGE-X / BELLA. Shower Door Installation Instructions

INSTALLATION MANUAL GIOTTO SCREEN

Vinyl Windows and Doors Manufactured by VPI Quality Windows

READ CAREFULLY - FAILURE TO FOLLOW INSTRUCTIONS AND SAFETY RULES MAY RESULT IN SERIOUS INJURY

English. Operating manual. Tipping bucket rain gauge HD Keep for future reference. Companies / Brands of GHM

Spring Loaded SCREEN-PRO. All Season Roll-Up Doors IN-JAMB MOUNTING METHOD INSTALLATION INSTRUCTIONS READ THIS FIRST

Sash Replacement Guide for Andersen 400 Series Tilt-Wash Transom Windows

Please read and understand the OnBoard Timpani Cart Owner s Manual before using the Timpani Cart.

H B K A Symbol Shape Material Article Description Article Nr. kg/eh L svz vrame fire 8050L-FI ,60 36

INSTALLATION MANUAL FORTRESS SERIES

BREAK-OUT SYSTEM FOR SLIDING DOOR ASSEMBLED MANUAL

ESA-300 Full Breakout

Gared Pro-S Portable Backstop

Ultimate Products, Inc.? 2319 Laurelbrook Street? Raleigh, NC 27604? USA Toll-Free: (800) ? Fax: (919)

S E L E C T I O N. Arm Curl. User manual

Fifth-wheel coupling JSK 38/50

K15.12 ROLLENBAND K15 DOORS

INSTALLATION, OPERATION, LUBRICATION, AND MAINTENANCE OF NO. S B18 AND B24 SMOOTH ROLL CRUSHERS

GLOSSARY OF TERMS SECTION 8

Panel Assembly and Installation

These Installation Instructions are valid for antennas in the following version:

READ CAREFULLY - FAILURE TO FOLLOW INSTRUCTIONS AND SAFETY RULES MAY RESULT IN SERIOUS INJURY

Model 7100 Series. T o r s i o n, R e a r M o u n t L o w H e a d r o o m

PHONE: FAX:

Please read these instructions before use and keep for future reference

Installation - Sub Cills

INSTALLATION LOW HEADROOM EXTENSION. 1 Cutting Vertical Track. 2 Quick Install Jamb Brackets

Profiles for floors of same height Proclassic Proclassic F

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

Assembly instructions

How To Measure Your Finished Opening

HENDERSON. Securefold R-Loc Non-Mortice 100kg. Fitting Instructions for top hung exterior folding doors with NON-MORTICE HINGES SYSTEM CAPACITY

Care Instruction: Wash vehicle roof prior to installing Rhino Tracks.

SECURIFIL Gleeson Roofing Supplies LTD

Front axle components, overview

ICU TRACKLESS SLIDING DOOR

Hawko LED Flex & Accessories Installation Instructions

CROWN IMPERIAL ASSEMBLY INSTRUCTIONS

READ CAREFULLY - FAILURE TO FOLLOW INSTRUCTIONS AND SAFETY RULES MAY RESULT IN SERIOUS INJURY

Installation Guide. Rockfon Eclipse

Models 105, 110, 106, 116, 310, 311, 314 and 316

Important Notice. CAUTION: Use proper lifting equipment and correct procedures to avoid injury.

6400, 8400 and 9400 Series Sliding Patio Door

IPA BESLAG FOR SCHÜCO ALU INSIDE NORDIC A/S J. PETERSENS BESLAGFABRIK JACOB PETERSENSVEJ 9, DK-9240 NIBE TEL: (+45)

Side and rear window, assembly overview

SECTION HOLLOW METAL DOORS AND FRAMES

Profiles for wooden and laminate floors Unisystem Plus - Unisystem

Operating Manual. for CUTTING, PERFORATING, BENDING SLB120

Transcription:

Portoni scorrevoli REI 120: Istruzioni di montaggio Fire proof sliding doors REI 120-1 leaf, 2 leaves Mounting Instructions General Information Maintenance SEPTEMBER 2011 NOVOFERM SCHIEVANO s.r.l. 35012 Camposampiero Padova (Italy) Via A. Volta, 1 Ph. +39 049 9315111 Fax +39 049 9301877 e-mail: export@novoferm.it www.schievano.it 1

Fire proof sliding doors REI 120: mounting instructions a) Check if order sizes are the same of the wall size. In case of more sliding doors, distribute the materials following the code indicated on each component. b) Check verticality and square of structural wall, verify if the floor is plane in correspondence of the wall and the side of rest panel in opening position. c) Fix the closing jamb (1) [ref. (27) in case of sliding with back counterbalance] with expansion dowels, position it to 2 cm from the hole. We suggest to fix also a dowel in the floor. Bind the spin of same mounting in collision case. [In case of sliding door 2 leaves, position the guide and make the references, written on the guide, equal to the wall opening and use the counterbalance covering (26) in order to determine the height from the floor.] d) Fix the superior guide (2) by dowels (not in the equipment) laying it down on the jamb (1). In case of door closing by thermofuse, the guide must be horizontal. In case of door closing by electromagnet, fix the guide in the opposite side of the closing point 2-3 cm up. e) Assemble the door panels (3) on horizontal floor (pay attention not to spoil them) and stop them to the C shape profiles, bottom and top (4) by means of supplied screws (5). Mount the thermal gasket (23) as per scheme. f) Fix the top horizontal labyrinth (6) on the door. g) Mount the wheels (7) on the supports joined to the C top profile (4). h) Turn until the panel arise the vertical position, attach the wheels to the guide (2), already fixed. i) Regulate the height of the door to assure an height of slide from floor of 1 cm (+/ 5 mm) during movement. j) Slide the door panel over the wall light until the position of the wheel of the bottom guide appears (8). Fix the wheel with the expansion dowel equipped. Verify that it maintains the panel in vertical position. k) Position the stirrup door wheel of the counterbalance (9) with the plate in equipment (10) by the bolts (11). l) Apply the stirrup of the thermofuse (12) if any, use the plate (10) and the bolts (11). In case of mq. > 10, fix the guide with one more point of welding, and then with cold galvanizing. m) In case of thermofuse (14), mount the rope (13) as per scheme 1 and stop it in the stirrup (12)). [In case of sliding door 2 leaves see drawing enclosed] n) In case of electromagnet, mount the rope (13) as per scheme 2 and stop it in the stirrup of the front wheel with the clips. o) Regulate the counterbalance (15) with the plates (16) in equipment. p) Mount the front detention (17), equipped of rubber, and regulate it until the sliding panel is blocked. Maintain 5 mm between the panel and the closing point. q) Install the back detention (18) and weld it to the guide. When completely opened, the panel has to be over the opening. r) Fix the flame labyrinth (18) and following the back steel covering (20) with the screw in equipment (21). s) Mount the gasket (23) and fix the vertical and horizontal flame labyrinths (22). t) Install the electromagnet, the shock absorber and/or continuous shock absorber as per scheme. u) Fix the counterbalance covering (24) with the equipped screws (21). v) Mount the top covering guide (25). In case the covering has made up of more pieces, we suggest to fix it to the stirrups of the covering. 2

Standard closing point 3

4 Flat closing point (back counterbalance)

Sliding door 2 leaves (back counterbalance) 5

Scheme Standard closing point Flat closing point Scheme 1 Closing with thermofuse Scheme 2 Closing with electromagnet 6

Details A: Mounting of continuous shock absorber B: Mounting of shock absorber C100-C50 C: Regulation of counterbalance D: Mounting/regulation of the wheels 7

General Information Do not employ fixed elements to keep the door opened. The opening of the mobile leaf could be maintained only with devices accepted from the manufacturer. Except special agreement while ordering, the doors have to be placed in closed buildings. The cleaning of the surface is performed with cleansers of normal domestic use, avoiding the use of abrasive, aggressive substances or solvents. Usually, doors are painted with finish epoxy at 180. Prior of any further paint, we suggest a deep cleaning of surface with light sand-paper and then application of a primer. In any case the application of nitro varnishes is dissuaded. MAINTENANCE DESCRIPTION. Grease and regulate the wheels Verify that the leaf maintains an height between 5 and 15 mm from floor. On the contrary, make the regulation: take out the upper covering guide (25), unscrew the bolts and regulate the vertical screws. Registration of closing system The working of the closing system by electromagnet is clear. In case of thermofuse (14), uncouple it from its place. If door does not close, verify the mechanism by taking out the covering (26). Check leaf space, check leaf The leaf and the labyrinths must have no deformation, no corrosion, no perforations. Check thermal gasket The thermal gasket must be adherent in all points, see ref. (23). Regulate the self-closing mechanism In case of high speed while closing, check if mechanism is safe, and regulate it (see page 7). Substitute damaged components The accessories for fire proof doors must be bought from specialised dealers. No responsibility in case of improper applications. TIMING DESCRIPTION PERIOD Light usage Medium usage Intensive usage Check self-closing mechanism Each month Check self closing system Check slide mechanism and bad sliding Every six months Every three months Every month Regulation of shock absorbers Verify fixing bolts Every year Every six months Every three months Check electric operator (transmission cable or strap tension and setting tension Every year Every six months Every three months spring, lubricating level, verify surface, e, adherence of the electromagnetic brake) Verify the pads. Verify possible strain lock. Every four years Every two years Every year Check gaskets. Substitute worn parts Substitute damaged or tampered When necessary When necessary When necessary components. As indicative parameters, you could consider the following scheme to identify the type of usage of the door. Light usage = 1-3 daily openings Medium usage = 2-5 daily openings Intensive usage = 4-10 daily openings The above parameters have been calculated on doors with size approx. 16 mq; in case of different size increase or diminish the cycles of opening/closing; for size over 25 mq the daily usage is not proper (we suggest periodic maintenance). The maintenance program must be personalised in case of particular conditions (such us public parking, etc.). In case of sliding doors normally not opening, we suggest a monthly checking of the self-closing system, in order to evidence greater frictions between the mechanical components. La ditta Novoferm Schievano srl si riserva il diritto di modificare in qualsiasi momento le caratteristiche dei prodotti descritti nel presente catalogo. 8

1 3 A 2 vista da A