Colossus Minerals Development Remains On Schedule for Initial Production In Second Half of 2013

Similar documents
September 2017 PGM:TSX-V

Core Gold 2017 Gold Production

LUNDIN GOLD UNDERGROUND MINE DEVELOPMENT INTO HARD ROCK AT FRUTA DEL NORTE

SEMAFO: Good Reconciliation to Reserves Continues at Zone 9

SEMAFO: Construction of Boungou Mine 91% Complete. Commissioning Advancing to Plan

NEW LIBERTY GOLD MINE: GOLD RECOVERIES IMPROVING

HIGH GRADE INTERCEPTS FROM LISEIWI PROSPECT, BLOCK 14

Fura Gems Flagship Colombian Emerald Mine Begins Production

AMERICAS SILVER CORPORATION PROVIDES FIRST QUARTER PRODUCTION AND COST UPDATE INCLUDING RECORD LOW CASH COSTS AND ALL IN SUSTAINING COSTS

Star Orion South Diamond Project

January 11, 2012 #

Quarterly Review Yanfolila Gold Project Gearing up for Production

Overview. One of Canada s largest integrated energy companies. Headquarters in Calgary, Alberta. Permanent Employees: ~5,000

Star Orion South Diamond Project

Carrapateena project update. Myles Johnston, General Manager Carrapateena

NEWS RELEASE SILVERMEX RESOURCES CORPORATE UPDATE AND 2011 BUDGET

Prophecy Returns Silver, Zinc, Lead Assays from Latest Pulacayo Chip Sampling Programs

Corporate Presentation August 2015

Excellent Metallurgical Recovery Results & Update on Priority Drilling at Great Western Gold Project

Corvus Gold, Drills g/t Gold, West Zone Stepout Hole, Mother Lode Project, Nevada

MEDIA RELEASE OCEANAGOLD REPORTS SIGNIFICANT INCREASE IN MINERAL RESOURCES FOR THE MARTHA PROJECT AT WAIHI

Kaizen Discovery prepares to commence exploration program at the Pinaya Copper-Gold Project in Peru. Update on exploration projects in BC and Nunavut

RAVENSTHORPE NICKEL OPERATIONS

For personal use only

The Road to Production

( Horizonte or the Company ) HORIZONTE SUBMITS MINE PLAN TO BRAZIL S NATIONAL MINING AGENCY

Drilling commences at Sertão following review of historical data

ASIAN MINERAL RESOURCES CONTINUES STRONG OPERATIONAL PERFORMANCE; STRONG EM CONDUCTORS IDENTIFIED AT KINGSNAKE EXPLORATION PROSPECT

Delivering the Turnaround. Leigh Junk - Managing Director February 2018

BISIE PROJECT UPDATE AND ALPHAMIN APPOINTS CHAIRMAN TO THE BOARD

Seabridge Gold Inc. News Release Trading Symbols: TSX: SEA FOR IMMEDIATE RELEASE NYSE: SA November 12, 2013

A CANADIAN COMPANY SUCCESSFULLY OPERATING IN WEST AFRICA: THE ROXGOLD EXAMPLE

MEDIA RELEASE OCEANAGOLD REPORTS SIGNIFICANT INCREASE IN MINERAL RESOURCES AT WAIHI IN NEW ZEALAND

April Developing Zinc, Gold & Silver Projects in Nevada and Ontario

MEDIA RELEASE OCEANAGOLD INTERSECTS SIGNIFICANT HIGH-GRADE MINERALISATION ON MARTHA AND EMPIRE VEINS AT WAIHI

T3 Mine Feasibility Study Update

Forward-Looking Information

MASON GRAPHITE PROVIDES LAC GUERET PROJECT AND CORPORATE UPDATE

TSX.V: SKE/OTCQX: SKREF. July 2018

THE COUNTDOWN TO KARLAWINDA Building a new mid-tier gold producer

Q ARAGUAIA OPERATIONAL UPDATE

For personal use only

For personal use only

FSIC FRANCHISE. Frequently asked questions

ORCA GOLD S ROBUST INITIAL RESOURCE AND SUCCESSFUL EXPLORATION SUPPORT PRELIMINARY ECONOMIC ASSESSMENT AT BLOCK 14 NEW CFO APPOINTMENT

Discovery in the Prolific Copper and Gold Belts of Eastern Europe. Fall TSX.V: BLS OTCQB: BLSSF

ANNUAL & SPECIAL MEETING OF SHAREHOLDERS

Exploration Update Drilling Recommences in Côte d Ivoire Significant Drill Results in Ghana

July Developing Zinc, Gold & Silver Projects in Nevada and Ontario

PRODUCING AND EXPLORING Q WEBCAST

For personal use only

AN OUTSTANDING TEAM WITH A PROVEN TRACK RECORD DEVELOPING AN EXCEPTIONAL GOLD DEPOSIT

MAVERIX METALS TO ACQUIRE SIGNIFICANT ROYALTY PORTFOLIO THROUGH STRATEGIC PARTNERSHIP WITH NEWMONT

Pasinex Announces Maiden High-Grade Zinc Resource in Turkey

For personal use only

Investor Update. April 14, 2015

Copper To The World 2018

PyroGenesis Additive Announces the Development of New Plasma-Based Process to Produce Metal Powders; Production of MIM Cut in Quantity; Ramp-Up Update

ABOUT US NORTHMET PROJECT INVESTORS CAREERS CONTACT NEWSROOM. 1 of 6 6/27/2016 3:20 PM

Overview of Mineral Exploration and Development Regulations in Ontario Municipality of Trent Lakes March 8, 2018

Resources and Energy Group (REZ) is pleased to enclose a brief presentation on the Radio Gold Mine Project.

Kirkland Lake Gold Announces Management Appointments

PACIFIC DRILLING S.A.

Mining Indaba 2010 Russell Ball Executive Vice President & CFO February 2, 2010 Cape Town, South Africa

CIBC 17 th Annual Whistler Institutional Investor Conference Laurie Brlas, EVP and CFO. January 24, 2014

Beleave Signs Agreement to Acquire 250,000 Square Feet of Greenhouse Space and 85 Acres of Land to Expand its Production Capabilities

For personal use only

The Ring of Fire Partnership. M.J.(Moe) Lavigne, VP Exploration

MODERN EXPLORATION OF HISTORIC YUKON GOLD FIELDS

For personal use only

There s good reason why it s called Goldstrike.

AGM June 20, 2017

Textron Reports First Quarter 2016 Income from Continuing Operations of $0.55 per Share, up 19.6%; Reaffirms 2016 Financial Outlook

Scoping Study Commences on Nyanzaga Gold Project in Tanzania

Quarterly Activities Report for Quarter Ended 31 March 2010

Daseke Adds Three Companies; Annual Revenue Run Rate Grows to $1.2 Billion

A Seasoned Project Generator with a World Class Partner Newmont Plateau $53M Arrangement with Newmont

FORM 8-K. MCORPCX, INC. (Exact name of registrant as specified in its charter)

Managing Ageing Infrastructure

African Mining INDABA Dave Schummer, Senior Vice President Africa Operations February 6, 2013

Textron Reports Third Quarter 2014 Income from Continuing Operations of $0.57 per Share, up 62.9%; Revenues up 18.1%

WNA s Worldwide Overview and Outlook of Global Uranium Mining Supply and Demand

1. Provision of supporting information to attribute the category of Inferred Mineral Resource to the Kodu Deposit estimate.

VULCAN RESOURCES PRESENTS TO THE FENNOSCANDIAN EXPLORATION AND MINING CONFERENCE

By SveMin, FinnMin and Norsk Bergindustri

Red Eagle Mining Colombia s Premier Emerging Gold Producer

For personal use only

SOUTHERN HEMISPHERE SECURES US$25M FARM-IN OPTION AGREEMENT WITH ANGLO AMERICAN IN CHILE

LEVERAGING EXPERIENCE Discovering Value

CORPORATE PRESENTATION

FOCUS INTENSIFIES ON DIAMBA SUD FOLLOWING KEY APPOINTMENT

EMP Approval to Drill Next Dome Complex

2010 Reserves and Non-Reserve Mineralization

Confirms 2013 Financial Guidance

Pershing Gold Corporation. A Unique Growth Story

Textron Reports Second Quarter 2014 Income from Continuing Operations of $0.51 per Share, up 27.5%; Revenues up 23.5%

Energy Metals that Power the Future

Emerging Giant. Turnagain Project. Over 2 million tonnes of 18% Ni Concentrate 27 year mine life. Hard Creek Nickel Corporation

Southern Cross Goldfields Ltd

CLIFFS NATURAL RESOURCES INC.

Transcription:

NEWS RELEASE Colossus Minerals Development Remains On Schedule for Initial Production In Second Half of 2013 Toronto, Ontario, February 7, 2013 Colossus Minerals Inc. (the Company or Colossus ) (TSX: CSI)(OTCQX:COLUF) is pleased to provide a development update for its 75% owned Serra Pelada gold platinum palladium Mine. The Serra Pelada Mine is a joint venture between Colossus and Cooperativa de Mineração dos Garimpeiros de Serra Pelada ( COOMIGASP ) located in the State of Pará, Brazil. Highlights The Company remains on track to start initial production early in the second half of 2013 at an initial rate of 250 tonnes per day ( tpd ) and continue the ramp up phase throughout the remainder of 2013 to 500 tpd. The current plan envisages two active mining faces for 250 tpd of production, three to five mining faces for 500 tpd of production and six to nine mining faces for 1,000 tpd of production. The Company expects to achieve 1,000 tpd of production by the end of the first quarter of 2014. Underground development is progressing well with a number of infrastructure projects necessary to support full scale mining now complete or well underway. Development at the face continues through the mineralized zone. The rock quality during collection of the bulk sample remains within expected parameters from geotechnical work completed prior to first access to the mineralized zone. The Company continues with systematic and cautious development as this is the first time accessing the mineralized zone and it is providing valuable geotechnical information ahead of initial production. Dewatering is progressing well from both surface and underground while dewatering of the historic pit to within five metres of the solids level is 95% complete. Underground water inflow rates remain within expectations. Process plant construction remains on schedule for commissioning to begin early in the second half of 2013; the total project is currently 60% complete. More than 95% of engineering & procurement is complete, 55% of concrete has been poured and structural steel erection will commence by the middle of February. Other critical infrastructure construction also remains on schedule. The power line and power house are on track to be commissioned early in the second quarter of 2013 while the tailings dam is expected to be ready in conjunction with mill commissioning.

Claudio Mancuso, Chief Executive Officer commented, We are now within six months of commencing our commissioning phase. Both underground development and infrastructure construction are progressing well towards our initial production target of early in the second half of 2013. Going forward, the Company will provide development updates monthly so that construction and development progress can be tracked as we strive towards our most important milestone; production at Serra Pelada. David Anthony, President & Chief Operating Officer further commented, Mobilization of the site construction team is now advanced. All principle materials and resources are in place to enable completion of the process plant and infrastructure projects as scheduled. Our mining team is pleased to have started collection of the bulk sample. Planning and preparations have been made to start mining operations during the third quarter of this year. Construction and Development at the Serra Pelada Project Underground Development As announced on December 31, 2012, the Company reached mineralization in its secondary development and the bulk sample collection process is ongoing with all material being assayed and sorted on surface on the stockpile pad. Geologic controls and assaying of material continue to guide the bulk sampling process. Ground conditions and ground water flow into the mine remain manageable. Development of this secondary access will continue and management expects extraction and sampling of the bulk sample to be complete in the first quarter. The Company is progressing cautiously and prudently, as the bulk sample process is also being used to collect comprehensive geotechnical information and to test different extraction methods. Geotechnical assessment and monitoring indicates that full scale mining operations will be sustainable at planned rates of production. Underground development is now ramping up and focusing on the development of infrastructure necessary to support initial production early in the second half of 2013. In addition to developing the main decline while developing the bulk access drive, a number of infrastructure projects are well underway or completed. Two new drill bays have been established in the bulk sample access drive, allowing the Company to drill much shorter holes (maximum total length of 150 metres) resulting in better targeting of the areas the Company plans to include in its first resource/reserve estimate at the beginning of the second quarter of 2013. These drill bays are also being used to gather geotechnical information which will be used in the development of the Company s mine plan. Former drill bays have now been converted into permanent underground infrastructure to support mining operations. The first underground drill bay has been converted into an electrical substation and a former sump has been converted into a second electrical substation. The second underground drill bay has been converted into a refuge station which was commissioned in January 2013. Work continues on the refurbishment of an artisanal shaft which will be used to provide underground ventilation. This shaft will be enlarged in the second quarter of 2013 and the ventilation system will be upgraded to support expansion of mining operations. The Company also continues to develop its mine plan. While the geological and geotechnical information gathered during the collection of the bulk sample is yet to be incorporated, the Company believes its ramp up plans are conservative and achievable. The Company is currently planning an Colossus Minerals Inc. Page 2

additional 600 metres of development between now and the end of June in order to start initial production at 250 tpd in the second half of the year. This estimate assumes a development rate of three metres per day per development crew. During 2012, the Company achieved improvements in rates of advance as additional equipment and more experienced underground mine personnel were mobilized to site. Development rates for the period from January to July 2012 were two metres per day however an average of three metres per day was consistently achieved during the period from August 2012 to January 2013. In February and March, the Company will have one development crew and will ramp to two in April once ventilation upgrades have been made and additional mining equipment, scheduled for March delivery, arrives on site. Initial production will begin from two active mining faces and the Company anticipates having a 10,000 tonne stockpile once production begins in the second half of 2013. Ramp up activities will continue throughout the remainder of 2013 as the Company anticipates having four development crews by August and expects to be at 500 tpd by the fourth quarter of 2013 and 1,000 tpd by the end of the first quarter of 2014. The current plan envisages two active mining faces for 250 tpd of production, three to five mining faces for 500 tpd of production and six to nine mining faces for 1,000 tpd of production. Geotechnical information gathered during the bulk sample process suggests that these production rates may be achievable with less active mining faces than currently planned and the Company is in the process of testing different extraction methods in the bulk sample access drive prior to incorporating these results into its preliminary mine plan. All equipment required to achieve the development and mining rates discussed above have been ordered and are on their way to site. Three new Atlas Copco scoop trams and two haulage trucks will be delivered to site by mid March. Two other haulage trucks will be delivered in May and August, respectively. A third rockbolter will arrive at site in June and a fourth jumbo in July. Process Plant Construction Process Plant construction remains on schedule for commissioning to begin early in the second half of 2013; the total project is currently 60% complete. The various phases of the processing plant construction, along with respective percentage completion, are presented in the table below. Engineering 95% Procurement 95% Ball mill refurbishment 95% Earthworks 95% Civil Construction 55% Structural Steel Fabrication 25% Structural, Mechanical, Piping & Electrical Installation Contract awarded Civil construction is progressing well and has not been significantly impacted by the seasonal rainfall. Concrete placement is ahead of schedule at 55% complete and this team is fully mobilized, with completion scheduled for mid April. Sub grade concrete placement is complete for all process plant buildings and structures and above grade concrete is progressing slightly ahead of schedule. Structural steel for the process plant will begin to arrive by the middle of February and steel erection will begin shortly thereafter. Ball mill refurbishment will be complete in early February with delivery to site expected in early March. Critical contracts for structural steel, plate work, piping fabrication and Colossus Minerals Inc. Page 3

structural, mechanical, electrical and instrumentation installation have been awarded and site establishment is advanced. Critical process plant equipment continues to be delivered to site. The tailings thickener was delivered to site in December 2012. The in line leach reactors, gravity concentrators vibrating screens, vibrating feeder, hydrocyclones and reagent dosing pumps are landed at the port and will be delivered during February. A pictorial update has also been provided with this press release (and can be accessed by clicking here) to provide additional information regarding the progress of the processing plant and other infrastructure construction. Infrastructure Construction The 34.5 kv transmission line to bring power to site is currently under construction by Equatorial Energia S/A ( EE ), Brazil s second largest utility company, and is on track to be commissioned by early April. The power house to connect the site distribution lines to the EE transmission line is currently under civil works construction. Concrete placement and structural steel erection for the power house is substantially complete. Mechanical installation is scheduled to start in the middle of February. This facility will be available for use by the end of March. The power house will also be equipped with generators for backup power, which have already been purchased and are on site. Basic engineering for the tailings dam is complete. Golder Associates are in the process of completing detailed engineering. The earthworks contract has been awarded and this contractor is mobilized to site. Bulk materials for construction are currently being procured and will begin to arrive in the middle of February. The tailings impoundment facility is on track to be ready to receive material by the end of July. Dewatering Dewatering activities from surface have proceeded for more than 18 months and the rate of water removal remains consistent. As development has continued into the mineralized zone, our underground dewatering has increased and is now in balance with the rate of production from surface. Dewatering activities remain manageable and these are integrated with the ground control program. Lastly, the water level in the historic pit has been drawn down by approximately twenty metres. The Company s plan is to dewater to within five metres of the solids level and this is now 95% complete. About Colossus: Colossus is a development stage mining company focused on bringing its 75% owned Serra Pelada goldplatinum palladium Mine into production. The Serra Pelada Mine is a joint venture between Colossus and Cooperativa de Mineração dos Garimpeiros de Serra Pelada (COOMIGASP) located in the State of Pará, Brazil. Serra Pelada, located in the mineral prolific Carajas region in the State of Pará, is host to one of the highest grade gold and platinum group metals deposits in the world. Between 1980 and 1986 Serra Pelada was host to the largest precious metals rush in Latin American history. Colossus Minerals shares, warrants and notes trade on the Toronto Stock Exchange (TSX) under the symbols CSI, CSI.WT.A and CSI.NT respectively and in the United States its Common Shares trade on the OTCQX under the symbol COLUF. The Company is headquartered in Toronto, Canada. Colossus Minerals Inc. Page 4

CAUTIONARY STATEMENT REGARDING FORWARD LOOKING INFORMATION Forward looking statements in this press release include statements regarding the timing and nature of future exploration and development programs that are dependent on projections that may change as drilling continues, or if unexpected ground conditions are encountered. The Company does not currently have any mineral properties that are in production or that contain a reserve as defined by National Instrument 43 101. In addition, areas of exploration potential are identified which will require additional drilling to determine whether or not they contain similar mineralization to areas that have been explored in more detail. Significant additional drilling is required at Serra Pelada to fully understand system size. Except for statements of historical fact relating to Colossus, certain statements in this press release relating but not limited to the Company's exploration and development plans, activities and intentions, constitute "forward looking information" within the meaning of the Securities Act (Ontario) or "forwardlooking statements" within the meaning of the United States Private Litigation Reform Act of 1995. These forward looking statements represent management's best judgment based on current facts and assumptions that management considers reasonable. Forward looking statements are frequently characterized by words such as "target", "plan", "expect", "project", "intend", believe", "anticipate" and other similar words, or statements that certain events or conditions "appear to", "may" or "will" occur. Forward looking statements are based on the opinions and estimates of management at the date the statements are made, and are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward looking statements. The factors include but are not limited to risks related to the joint venture operation, actual results of exploration activities, the inherent risks involved in the exploration and development of mineral properties, changes in project parameters as plans continue to be refined, delays in obtaining government approvals, the uncertainties of project cost overruns or unanticipated costs and expenses, uncertainties relating to the availability and costs of financing needed in the future, the uncertainties inherent to conducting business in Brazil and the rest of Latin America, the availability of equipment and supplies, unexpected adverse climate conditions, the reliance on only a few key members of management, as well as those factors discussed in the section entitled "Risk Factors" in the Company's most recent Annual Information Form filed with Canadian provincial securities regulatory authorities and other regulatory filings which are posted on SEDAR at www.sedar.com. Unless required by law, Colossus undertakes no obligation to update forward looking statements if circumstances or management's estimates or opinions should change. The reader is cautioned not to place undue reliance on forward looking statements. For further information, please contact: Ann Wilkinson, VP, Investor Relations Colossus Minerals Inc. Tel: (416) 643 7655 Web site: www.colossusminerals.com Email: awilkinson@colossusminerals.com Colossus Minerals Inc. Page 5

Serra Pelada Building Brazil s Next Gold Mine Production on the Horizon February 2013

Site Overview View from Above Primary Crushing Area Portal Administration Maintenance Warehouse 2

Process Plant Construction Ball Mill Foundation Concrete Being Poured 3

Process Plant Construction Ball Mill Foundation Concrete Being Poured 4

Process Plant Construction Sub-Grade Concrete Placement Complete Power House Gold Room Tailings Thickener Spiral Concentrators Scrubbing, Screening and Reagents Building 5

Surface Construction Equipment With Power House in the Background Power House Concrete Placement and Structural Steel Complete 2011 IR Events (October/2011 December/2011) 6

Underground Development Continuing with Primary Development 7

Underground Development 8

Underground Development Refuge Station Commissioned in January 9

Underground Development Electrical Substation Commissioned in December 10

Bulk Sample Mineralized Material on the Run of Mine Pad 11

OUR TEAM We Thank Them for THEIR Efforts We are Proud of THEIR Progress 12