mm. 48h 25-85% RH. Leginstructies Parquet_FLOATING_multifit_A4_2017_ENG.indd 1 22/02/ :21:18 75% 50% x = 8 mm x = 10 mm x = 12 mm

Similar documents
mm. 48h 25-85% RH. Leginstructies Parquet_GLUED_uniclic_A4_2017.indd 1 22/02/ :21:36 75% 50% x = 8 mm x = 10 mm x = 12 mm

INSTALLATION INSTRUCTIONS FOR QUICK-STEP LAMINATE.

INSTALLATION INSTRUCTIONS FOR ELKALAMINATE. IN ORDER TO OBTAIN A GOOD RESULT, WE ADVISE TO FOLLOW ALL GIVEN INSTRUCTIONS CAREFULLY.

INSTALLATION INSTRUCTIONS FOR QUICK-STEP LAMINATE WITH HYDROSEAL TECHNOLOGY.

For best results, it is essential that you follow the installation instructions exactly.

INSTALLATION INSTRUCTIONS FOR QUICK-STEP LAMINATE WITH HYDROSEAL TECHNOLOGY.

Install your floor between 18 and 30 C.

Columbia Laminate Installation Instructions

TORLYS LEATHER PLANK INSTALLATION INSTRUCTIONS

INSTALLING YOUR UNICLIC FLOOR - Small planks / 3 sizes

For ANGLE-DROP Styles

General Installation Instructions. Laminate Drop & Lock installation - 2G

Installation Instructions

IMPORTANT NOTES ABOUT YOUR FLOORING PLEASE READ BEFORE INSTALLING INSTALLATION & MAINTENANCE FOR ENGINNERED HERRINGBONE

INSTALLATION INSTRUCTIONS

INSTALLATION. GlUElEss CliCK BamBoo installation GUidE. Introduction. Tips for a successful installation

Lifestyle Laminates Uniclic Floating Floor

AquaGuard - Water Resistant Flooring Installation guidelines

Installation instructions

FITTING INSTRUCTIONS FOR OFD SOLID OAK FLOORING

DuChâteau Vinyl DeLuxe Grand Collection LuxCor Click Installation Instructions

MOHAWK LAMINATE INSTALLATION INSTRUCTIONS

General Installation Instructions

Installation Instructions FOR INTERLOCKING ENGINEERED HARDWOOD (P.1)

Loose Lay Luxury Vinyl Plank

INSTALLATION INSTRUCTION

Engineered Strand Uniclic Floating Installation

Laying instructions Installation of multilayer Herringbone / Basket-weave with tongue and groove joint.

INSTALLATION INSTRUCTIONS of Chevron and Herringbone Engineered Hardwood Flooring

HeatBoard Joisted Floor System

PLEASE READ THIS FIRST

INSTALLATION LAMTON INSTALLATION INSTRUCTIONS. Lamton Laminate Flooring with Underlay Attached Glueless Installation. Tools and Accessories

Installation Guide. Pionite Decorative Surfaces One Pionite Road, Auburn, Maine PIONITE ( )

TONGUE & GROOVE NAIL-DOWN INSTALLATION INSTRUCTIONS

ENGINEERED WOOD INSTALLATION GUIDE: The Cardinal Collection

[320] LAYING PRINCIPLE: CREATION 30 CLIC

WOOD. Floating. Installation Instructions

Installation instructions for Egger Laminate and Comfort flooring with UNI fit! installation system

INSTALLATION GUIDE FOR MAZAMA MULBERRYWOOD HARDWOOD FLOORING

Unit5EustonStreet FreemensCommon Leicester LE27ST T: F:

15mm Solid European Droploc Oak Fitting Guide & Warranty Information

Galaxy SPC RIGID-CORE UNICLIC HYBRID PLANK. Installation Guidelines

WET AREA PANELLING. Designer Walls. Fast

Laminate Floor Installation Guide

INSTALLATION INSTRUCTIONS

English Professional Installation Guidelines

Wet Area Panelling. Linear Series

INSTALLATION INSTRUCTIONS

Laying and maintenance of cement tiles

Step-by-Step Installation Instructions for

Laminate Installation Guide

INSTALLATION GUIDE.

Installation Instruction

INSTALLATION. Installation Guide. Installing Bamboo Flooring on Top of a Wood Subfloor

Laminate Flooring Alternative to Hardwood Flooring

INSTALLATION INSTRUCTIONS

Manufacturer 12mm Laminate Flooring Installation Guidelines

Installation Instructions for Viking Hearth Engineered Wood Flooring

INSTALLATION GUIDE. Preparation. Subfloor Preparation. Installation of Vapour Barrier Paper (asphalt-free) Model repair and maintenance kit

LAMINATE FLOORING INSTALLATION INSTRUCTIONS READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION.

Step-by-Step Installation Instructions for

Installation Instructions for Engineered Wood Flooring

Glueless Laminate Installation Instructions

INSTALLATION GUIDE. Preparation The environment

Engineered Hardwood Flooring Installation Instructions

Step-by-Step Installation Instructions for

1INSTALLATION GUIDE: ENGINEERED WOOD FLOORING

installation guide TASMANIAN HARDWOOD OVERLAY FLOORING

PLEASE READ THESE INSTRUCTIONS COMPLETELY BEFORE BEGINNING THE INSTALLATION.

Pneumatic Clamp Carrier. Installation & Operation Manual

CINTRALUX ALU BARREL VAULT EP 10/10

Pneumatic Clamp Carrier. Installation & Operation Manual

TRIVERSA TRIVERSA ID. Triversa Triversa ID Installation Instructions. Remove the wall base and doorway trim. Always undercut wood door casings

INSTALLATION GUIDE SOLID HARDWOOD FLOORING

Installation and Warranty

EZYSTONE WORKSURFACES

INSTALLATION GUIDE. Preparation

INSTALLATION INSTRUCTIONS

Masterfully crafted hickory engineered flooring. Homestead. Cover: WALNUT

Royal Collection. Installation Guidelines

Plexidor Pet Door Wall Kit Instruction for All Sizes Plexidor : S, M, L, XL; BiteGuard KennelPlex TM 1113,1418, 1419 & 1825 and Plexidor Electronic LG

Linda Barker Collection Heritage Collection Classic Collection INSTALLATION GUIDE

¾ Solid Installation Instructions

Wilkhahn. Care & Maintenance

For more information, call PERGO

Wood Molding Installation Guide

Fitted Furniture Installation and Aftercare Guide

Vinyl is an extremely durable material that is not affected by water, and that requires little maintenance. Our wide planks

Exterra Installation Guide

LUXURY VINYL FLOORING INSTALL INSTRUCTIONS

Stunning. Sustainable. Superior. Introducing

Jeep. Cut-Out Fender Flares Set of 4. Included in Hardware Kit:

1. AREAS OF APPLICATION. CREATION CLIC SYSTEM 55 [INSIGHT CLIC] PLANKS AND TILES 5 mm including 0.55 mm of wear layer In planks or in tiles

Please read and review installation instructions completely before proceeding with the actual installation.

PREPARATION PREPARATION BEFORE DELIVERY INSPECTION MOISTURE TESTING PREPARING THE SUBFLOOR LAYING THE FLOOR HEATING AND AIR CONDITIONING

SOLID STRAND BAMBOO INSTALLATION GUIDE. Tips for a successful installation

Installation Instructions for easy to install Texture Plus faux wall panels

Robert Bosch GmbH. Minimalist washstand

PolyCarb has good resistance to many chemicals. Some chemicals may harm the PolyCarb sheets. Contact us when in doubt about any chemical.

HAVWOODS FITTING AND MAINTENANCE INSTRUCTIONS FOR EUROPLANK

Transcription:

Quick-Step wood fl ooring materials are delivered with instructions in the form of illustrations. The text below is covering a fl oating illustration in regards of a fl oating installation, and is divided in areas: Preparation, Installation, Finishing and Cleaning. We recommend that you read trough this information carefully while studying each illustration. In case of doubts or questions please contact your Quick-Step dealer/ Technical services. The use of the original Quick-Step accessories is strongly recommended to benefi t from the full product warranty. BEFORE STARTING UP A parquet fl oor is to be considered as an interior product, and should be taken care of like such prior to, during and after installation. The installation should be done after eventual painting and other wet works are done and dried out. If other works are ongoing after installation, a breathtaking covering should be placed on top of the Quick Step parquet. Don NOT tape covering material direct to the surface since the glue might harm the lacquered or oiled surface. 5-0 8h 5-85% RH Yearly RH % 0% 75% 50% x = 8 mm x = 0 mm x = mm Quick-Step fl oors can be bought in diff erent formats, decors and qualities. Make sure you have received the fl ooring that you have ordered before starting the installation. It is always a good idea to store one end-label together with your receipt. Do not install wood planks with damaged surfaces, edges or lock joints. Check every panel carefully before and during the installation, preferably in daylight. Bear in mind that wood is not a homogeneous material. There can be diff erences between the individual planks just as there are diff erences between individual trees. The occurrence of sap wood, knots and cracks is dependent on the selected grading and chosen range. These are natural features of wood and cannot be considered as a product fault. Therefore you should always check if you have the right impression off the fl oor before installation and that you have all the information. If a parquet panel has been installed it is considered as accepted and any defects or colour variation aff ecting this panel cannot form any ground off complaint. We recommend that the panels are mixed from several packs during installation. After receiving the fl oor packs these should be acclimatized. This has to be done unopened and stored in a fl at position free from the wall and fl ooring prior to installation. Recommended is to store them at a normal room temperature (5-0 C / 59-5 F) and a relative humidity level between 5-85% for a minimum of 8 hours prior to installation. A Quick-Step fl oor is composed of natural wood and will naturally expand and contract upon changes in the relative humidity. The dimensional variation of an installed fl oor will be slightly more in width compared to the length. For example: at 0 C and a RH between 0-0%, the movement is limited. Quick-Step wood fl ooring is produced and delivered with a moisture content to cope with an RH between 5-85%. In a dry climate, for example in the Nordics during winter time, the RH might drop below 5% and in summertime rise above 70%. This will create a movement in your fl oor surface. To secure enough clearance for this natural movement and to avoid open joints, squeaking, etc. always keep a dilatation joint of 0 mm average to the walls, thresholds, staircases, pipes, etc. During the installation of normal residential room size. Use the spacers of the installation kit to keep the correct clearance. Installing in winter time in very low RH, the clearance should lowered to 8 mm (low RH = fl oor shrinks). If installing in summer time with a high RH level the clearance should be raised to 5 mm (high RH = fl oor expands). The clearance should be left open and must not be fi lled by any sealant, silicone or other adhesive. A fl oating installation is a fl oating installation so never fasten the fl ooring with nails, glue, screws or in any other way. Quick-Step wood fl ooring must be installed on a solid, self-supporting subfl oor, wood fl ooring or seamless undamaged vinyl. In case of other types of fl oor coverings these must be removed. No signs of mould and/or insect infestation should be present. Make sure the subfl oor is level and nail/screw down any loose parts. When laying a fl oating fl oor, in case of textile or other vapour-permeable fl oor coverings it is necessary to remove both the fl oor covering and its base. Existing fl oors made from a vapour-tight covering do not need to be removed (PVC, linoleum, etc.) if they meet all other requirements. In a fl oating installation it is always necessary to use an underlay. Install the new fl oor at ninety degrees to the existing subfl oor. The crawl space under the wooden base must be ventilated. Remove any obstacles and make sure there is suffi cient ventilation ( min. cm² of ventilation opening/ m² of fl oor). The moisture content of the wood cannot exceed 0%. Be aware of that any wood and/or organic material might/will dry out locally and damage the parquet if any heating source like hot fans, wood stoves etc. is creating high temperatures. Leginstructies Parquet_FLOATING_multifit_A_07_ENG.indd /0/07 5::8

Cement <,5% CM CaSo < 0,5% CM > mm m >, mm 5 cm 5 7 8 The entire subfl oor must be carefully checked for any type of unevenness. Use a straight edge of m approximately, make sure there are no unevenness of more than mm. Peaks higher than, mm within a 50 mm radius are also prohibited. If needed use a levelling compound to achieve correct fl atness of the base fl oor. 5 To achieve optimal sound reduction, best walking comfort, avoid squeaking and to level minor unevenness we strongly recommend using a Quick-Step underlay. A fl oating installation done on screed, a cement based subfl oor or when fl oor heating is involved, a vapour barrier must be installed. If the chosen Quick-Step underlay does not have a vapour barrier a 0, mm PE-fi lm has to be used as a minimum damp screen. Make sure the PE-fi lm overlaps with a minimum of 00 mm. In case of a fl oating installation with any other type of underlay that is not a Quick-Step underlay the same technical specifi cations must be met. In case of problems and the underlay is the cause no warranty will be valid. Quick-Step wood fl ooring must not be installed in a typical wet room or in rooms with a fl oor drain. An installation directly on fl oor joists is prohibited. 7 Mineral subfl oors such as concrete must be suffi ciently dry prior to installation (<,5% CM / 75 % RH). If the moisture content is higher or may become higher other types of damp proofi ng must be used. 8 Plan the installation direction of the planks carefully before start up. Normally we recommend installation parallel to the incoming light. If the room is long and narrow like in a hallway we would install parallel to the long walls. Be aware of the fact natural colour will be aff ected by sun light (discolouration by UV light is inevitable). This might lead to natural fading and colour changes which are not a product fault. Leginstructies Parquet_FLOATING_multifit_A_07_ENG.indd /0/07 5::9

5 Quick-Step wood fl oors are easy to install and require no expensive tools. In addition to a few common DIY tools (folding rule, pencil, hammer, handsaw or jigsaw, carpenters square and possible power drill and hand gloves) you only need the Quick-Step installation kit containing a tapping block, pull bar and spacers. Be sure you have all tools available before starting the installation. When cutting the Quick-Step wood plank be sure you are not creating splinters or chipping when cutting. If using a handsaw keep the decorative surface faced up. If using a jigsaw keep decorative surface down. Every Quick-Step wood plank is methodically checked for any imperfections before being packed. Still, packs can be damaged during transportation or when the packs are opened. Do not install a plank with a damaged surface, edge or click joint. Carefully inspect each plank before installing. At Quick-Step a box can contain one plank that consists out of multiple, shorter begin/end pieces to ease your installation. The amount of shorter begin/end pieces per box can vary between two and three. Cumulative length of all shorter pieces will always be equal to the length of one standard plank. Be aware of the fact wood is not a homogeneous material. There will be diff erences from plank to plank as there are diff erences from tree to tree. These aspect provides you with the warm and natural feeling a parquet fl oor has to off er. Knots and cracks will also appear depending on the grading and the chosen range. This is natural and will not be considered as a product fault. Therefore always be sure you have got the right impression of the fl oor and information from the dealer before installation. An installed plank is considered as accepted and cannot be claimed. We recommend to mix the boards, taking planks out of diff erent boxes at the same time when installing. Parquet panels can be installed fl oating or glued down. 5 If you choose to install a fl oating fl oor you must lay the fi rst section of underlay parallel to the length of the planks to be installed. Gradually add the next sections of underlay as you lay the parquet panels. It is vital that you use a levelling underlay to smooth away any unevenness in the fl oor base. A vapour-tight foil should be used to protect the Quick-Step parquet against raising damp or condensation when installing on screed, concrete/cement based subfl oor and when under fl oor heating is involved. Leginstructies Parquet_FLOATING_multifit_A_07_ENG.indd /0/07 5::9

>8m >8m >m 7 8 With room lengths of more than m and widths of more than 8 m an intermediate expansion joint should be fi tted. Expansion and contraction are linear so the greater the surface the larger the expansion joint needs to be. An expansion joint must be used in typical doorways and room angles. Parquet fl oors are not suitable for use in damp areas like bathrooms and saunas. Before starting carefully measure the length and the width of the room to pan a precise lay-out to achieve a balanced appearance of the fl oor. This will ensure also you won t end up with the last row being too narrow. If the last row would be less than 0 mm the installation will be easier if you cut down the planks of the fi rst row in the width. 7 Often the installation is done parallel to the long walls of the room. The most common direction of installation of all types of wood fl oors is from left to right with the tongue side (A) facing the starting wall.. The planks should be installed facing the tongue side (A) to the wall. Always remember the spacers to ensure your expansion gap! Thanks to the Multifi t patent the installation is very easy. This patent makes it very simple to dismantle a plank if needed without destroying the connection mechanism. The end joint can be assembled in diff erent ways by folding down angling, sliding or tapping in horizontally. The quickest, easiest and most secure way is by folding down. A rubber hammer can be a handy tool to double check the joints and gently tap them if needed. 8 Narrow down the width on the fi rst row or as a minimum cut off the tongue to achieve the fi rst distance to the wall. If the wall is curved/ uneven the fi rst row has to be cut and coped to the contour of the wall. Use spacers! Cut off the tongue on the fi rst plank also on the short side. This plank will then have the plastic tongue in the end to the right. Leginstructies Parquet_FLOATING_multifit_A_07_ENG.indd /0/07 5::0

5 5 7 8 9 0 5 9 0 9 Install the fi rst rows in accordance to the illustration. We recommend the overlap/staggering between end joints to be about / of the plank length but never less than 00 mm. Installing the fi rst rows like shown will help keep a straight line to start the rest of the installation. The cut-off from the fi rst and second row should normally be perfect as starting planks in the and row. Always remember using the spacers to keep the correct distance to the walls. 0 Lift the connecting plank up in an angle of about 0-0 degrees, push it into the long side groove and slide it gently towards the left until the plank ends meet. Push the plank fi rmly downwards to the fl oor and the Mulitfi t system will lock the joint perfectly in the end. Always check every joint before continuing (gently tap with rubber hammer and tapping block if needed). 5 Leginstructies Parquet_FLOATING_multifit_A_07_ENG.indd 5 /0/07 5::0

+0 mm 8 - mm For a nice fi nish where the next fl ooring meets a threshold we recommend undercutting the mouldings of the door. To secure the correct cut off turn a plank upside down and place it on the fl oor up to the frame. Then place the hand saw fl at against the plank and simply cut trough the frame/moulding as shown. Remove the cut out and vacuum away dust. Then you can simply slide the fl oor underneath the frame/moulding and make a perfect fi nish. To install Quick-Step wood fl ooring around pipes, carefully measure and mark the planks with the exact centre point for each pipe. Drill a hole at each of the marked points that is equivalent to the diameter of the pipe + mm in dry climate and mm in wet climate. If located on the long side of the plank make a 5 degree cut from each hole to the edge of the plank and then cut between the holes as shown. If located on the end of a plank make a straight cut across the plank. Install the plank. Then using some regular wood glue along the cut edges of the piece you ve cut out and glue the piece in place where it belongs. Be sure no glue comes between the cut out piece and the subfl oor. Use spacers to secure a tight glue point and remove any glue on the fl oor surface directly with a damp cloth. The gap you have created between the pipes are to ensure the fl oor can move as expected from season to season. These cannot be fi lled with any sealant, silicone or other adhesive. Use the Quick-Step radiator caps to conceal gaps around radiator pipes. Inspect the fi nal surface of the installed fl oor, remove all spacers and install the Quick-Step wood wall bases according to the instructions following the wall bases. Leginstructies Parquet_FLOATING_multifit_A_07_ENG.indd /0/07 5::

i www.quick-step.com <5 min H O When installing a fl oating fl oor you can walk on it during installation and immediately afterwards. After installation it is recommended to have circumstances of 5 - C and a RH level between 5-85%. During winter time the air in the rooms is usually extremely dry, for this reason it is strongly recommended to use humidifi ers in order to obtain a constant humidity level. In the summer and autumn, when there is a high relative humidity the room should be well ventilated. To remove dirt and dust from the fl oor use a dry mop, a brush or a vacuum cleaner. Make sure the vacuum cleaner is equipped with soft wheels and a special parquet brush to avoid scratching your fl oor. Never use a steam cleaner to clean your wooden fl oor. For the fi rst cleaning of the fl oor make sure to fi rst remove ALL dust and dirt before using a cloth. Wet maintenance of a wooden fl oor is absolutely forbidden. Only use the recommended cleaning products for fl oor maintenance. Remember that using other cleaning products may damage your fl oor. Always wipe the fl oor dry immediately so that no more moisture or liquid is visible on the fl oor. Bevelled parquets must only be cleaned with a dry cloth. 7 Leginstructies Parquet_FLOATING_multifit_A_07_ENG.indd 7 /0/07 5::

type w Castor chairs must have castors of the so called type soft wheels and a plastic protector mat should be placed under the area where the chair is placed/used. All furniture legs should be protected by felt pads to avoid scratching the lacquered/oiled surface. Avoid sliding/dragging furniture over the wooden surface to avoid possible scratching. Lifting the furniture is recommended. Always place a quality door mat at any entrance door to avoid introduction of sand, dirt or water which might create scratches. 5 Special cleaning instructions are at hand with your Quick-Step dealer or on the website of these products. Please read them with care before maintaining your lacquered/oiled surface. The manufacturer bears no responsibility for problems or damage which arises through inexpert preparation of the subfl oor, the fl oor installation itself or the exposition of the fl oor to unsuitable climatic conditions/maintenance. The right for compensation for damaged or diff erently coloured panels does not extend to parquets which already have been installed. In non-standard cases we recommend you to inform yourself suffi ciently with regards to the specifi c requirements of our construction project. In the event of further questions please contact your retailer. 8 Leginstructies Parquet_FLOATING_multifit_A_07_ENG.indd 8 /0/07 5::