COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Community Development Department (248)

Similar documents
New construction or additions permit guide

DEVELOPMENT APPLICATION

Dorsey s Search. Name Address Home Telephone Work. Address. Property Owner s Signature

City of Sarasota Public Art Requirements Information Package

LAUREL SPRINGS APPLICATION FOR PROPERTY MODIFICATION

CAMPBELL COUNTY GILLETTE, WYOMING. Electrical Inspector Senior Electrical Inspector

SITE PLAN APPROVAL PROCESS Step 1 Step 2 Step 3 Step 4 Step 5 Week 1

Application for Registration of Designated Radiation Equipment Class 3b and 4 Lasers

Appendix M Trellis Type Shade Structure Design Guide

APPENDIX B TRAFFIC IMPACT STUDY CRITERIA

WASHINGTON COUNTY OREGON

MANUFACTURED HOME New Homes, Replacements, and Additions SUBMITTAL REQUIREMENTS

Laser Equipment Companion Manual

October Inaccessible Electrical Facilities. Phase 2 Primary Lines (Lower Keys)

MINIMUM ACCEPTABLE PLAN SUBMITTALS M.A.P.S. CITY OF ESCONDIDO BUILDING DIVISION 201 N. BROADWAY, ESCONDIDO, CA (760)

Township of Derry. Dauphin County, Pennsylvania. Residential Deck Addition Submittal Guide and Construction Fact Sheet

Permission for Use of Images Policy

FEE-HELP, VET FEE-HELP and VET Student Loans Re-Credit Application Form

ENGINEERING SURVEYING GEOGRAPHIC INFORMATION SYSTEMS COMMERCIAL BUILDING PERMIT APPLICATION

SUBMITTAL REQUIREMENTS FOR PLAT IMPROVEMENTS

Alberta Infrastructure. Digital Project Delivery COBie Requirements

Cleveland Public Theatre. Catapult. Request for Proposals. Deadline for submissions is Monday, June 12 th, 2017

SITE PLAN CONTROL APPLICATION SUBMISSION CHECKLIST

Supplementary Appendix to ARTC Track & Civil Code of Practice. Trackside Monuments ETD-11-01

CHAPTER 2 DESIGN PROCEDURES Table of Contents

TRANSPORTADORA DE GAS DEL PERU

BILLING POLICIES AND PROCEDURES FOR ALL PROVIDERS

1.12 Equipment Manager

Property Address/Location: Case No.: (to be completed by Staff)

JHU SCHOOL OF MEDICINE SUBAWARD & SUBCONTRACT INFORMATION SHEET

Creating Gift Card Batches

Town of Truckee Residential Plan Submittal Checklist

Develop preliminary specification and plans from a design brief

Participation is open on equal conditions to all national and international experienced individual consultants.

RiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014

Specification for Learning and Qualifications for Physical Intervention Skills

DXF2DAT 3.0 Professional Designed Computing Systems 848 W. Borton Road Essexville, Michigan 48732

2.1 PROJECT MANAGEMENT

Pool & Hot Tub Guide

NATF CIP Requirement R1 Guideline

C&E Mobility Policy (Standard)

Prospectus. Solo or Group Exhibition Opportunities at Gallery Underground

WIRELESS COMMUNICATION FACILITY APPLICATION SUPPLEMENT

Project QC Consultation on Proposed Reliability Standards and Supporting Documents. Information session for registered entities

Official Travel Transportation Division. The Official Travel Section coordinates the movement of individuals and groups who are conducting official

SBA S ALL SMALL MENTOR PROTÉGÉ PROGRAM

Victorian Student Number Data Quality and Process Guidelines for Victorian Government Schools

Table of Contents. ilab Solutions: Core Facilities Core Usage Reporting

Claim Amalgamation. Getting Started. Amalgamate means to join 2 or more cell claims into one cell claim. Before you start:

Puget Sound Company Overview. Purpose of the Project. Solution Overview

PS PLANT & EQUIPMENT ISOLATIONS & LOCKOUTS

The Corporation of Delta COUNCIL REPORT Regular Meeting. File No.:

Pre-Installation Preparation Job Aid

b. Army Reserve Design Process Submittal Requirements (DPSR) c. USARC G-2/6 IT Design Whitepaper, 2 April 2012 ( ENCLOSURE 1)

CUSTOMER PORTAL. Floorplan Management

ARTS OF THE ALBEMARLE

DIGITAL IMAGE & VIDEO SPECIFICATIONS. Digital Item Production Team: Brings kohls.com product pages to life through imagery & copy.

Connection tariffs

American Association of State Highway and Transportation Officials

ENGINEERING PROCEDURE DISPENSATION FOR INFRASTRUCTURE DRAWINGS

Application Package Checklist ITEMS MUST BE REVIEWED AND APPROVED BEFORE AUTHORIZATION IS GIVEN TO INTERCONNECT WITH UTILITY.

DynaRound Hatch Guard System Installation Instructions

Can Fire Suppressant Gels Protect Log Decks? A Case Study to Test the Concept

Desktop Teller Exception User Guide

The University of Pennsylvania Lighting Guidelines: Interior Lighting Controls Lighting Control Design Guidelines & Instructions for Use

PotashCorp Tier 1 Safety Standard FLAME RESISTANT CLOTHING (FRC)

ROSCOMMON COUNTY Public Summary of FOIA Procedures and Guidelines

Figure 1: A Battleship game by Pogo

How to Install a Slate Tile Floor By See Jane Drill TM Copyright 2014, All Rights Reserved

Beechcraft Bonanza HID Landing Light Assembly Kit

ANDERSON PUBLIC LIBRARY LIBRARY CARD ISSUING POLICY

Common Network Operation Tools

Figure 1: View, connection compartment closed

REQUEST FOR QUALIFICATIONS DENVER INTERNATIONAL AIRPORT T1 ROADWAY PROJECT PUBLIC ART BUDGET: APPROXIMATELY $200,000 USD

2018 Print and DPI Annual Competition Rules

Record Plat. Application Upload Checklist & Submission Requirements. Rev

Installing a Squeak-Free Nascor Floor System

BLM-Alaska Yukon Lowlands - Kuskokwim Uplands - Lime Hills Rapid Ecoregional Assessment

IA CERTIFICATE (Revision 3 Revised for Annual review)

JJ / CP RFP Response to Inquiries

U.S. Bank One Card Procedures. Office of Accounts Payable. General Information: (619) Website:

APPENDIX 6A MODULE 6 DESIGN DEVELOPMENT REVIEW COMMENTS

Roof Safe Netting CONTENTS

(DRAFT) ENCINITAS COMMUNITY EMERGENCY RESPONSE TEAM (ECERT) Communications Plan. ECERT Communications Plan Rev. 0.2 Page 1 of 12

IEC Functional Safety Assessment

American Association of State Highway and Transportation Officials

HOLIDAZZLE CREATIVE LIGHTING EXPERIENCE 2016

Grade 7. National Core Visual Arts Standards. Lesson Assignment (Criteria for Success) Artist/Big Idea

IONIA COUNTY Public Summary of FOIA Procedures and Guidelines

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN OFFICE

NSW Prototype User Manual AUTHORITIES. Delegation agreement from the European Commission MOVE D2/ME D(2012)

Call to Artists. PO Box 369 Lake Oswego, OR

Kennecott Utah Copper Corporation Safety and Health Standards

Canterbury Artisan Festival 2017 Juried Craft Fair Application

BASIC SAFETY AND FABRICATION GUIDE. Safety Guidelines

Avista Corporation s Standards of Conduct Implementation and Compliance Procedures 1

AF4000 MOD-1 OEM Production Line Troubleshooting Guide

Consult with this syllabus before asking questions regarding the course rules. There will no exceptions to these rules.

EE015: Electrical Drawings and Schematics

Altis Flight Manager. PC application for AerobTec devices. AerobTec Altis v3 User Manual 1

Transcription:

COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Cmmunity Develpment Department (248) 347-0415 MICHIGAN BUILDING CODE 2015 DATE: PLAN EXAMINER: PROJECT NAME: PROJECT ADDRESS: All dcuments required by the gvernmental agency fr apprval shall carry the embssed r printed seal f an architect r prfessinal engineer licensed in Michigan (Act 299 as amended). At the time f submittal, n fees will be included with the cmplete package. Within 15 business days, the Plans Examiner will cnduct a Plan Review and calculate nly the plan review fee. This fee must be paid prir t any further review f the prject. Prir t the building permit being issued the remaining fees must be paid. The fllwing fees will be assessed fr additinal plan review: Re-submittals with majr changes frm riginal submittal 50% cst f riginal submittal Re-submittal with minr changes frm riginal submittal $100.00 Plans submitted in Design Build phases, each submittal - $200.00 abve riginal submittal The initial plan review fee will remain the same and is based upn the value f cnstructin. Plans are missing necessary infrmatin and/r in need f clarificatin fr ur plan review prcess. Please submit the fllwing: Prject must have address t lg int the cmputer. Prvide a statement t identify the Design Prfessinal in respnsible charge. Include a seal and signature (riginals). Sectin 107.3.4, PA 299 as amended Identify all prpsed deferred submittals (attach) Sectin 107.3.4.2

(2) sets f site plans (riginal seals and signatures) (2) sets f architectural plans (riginal seals and signatures) Sectin 107.1 (2) sets f plumbing plans (riginal seals and signatures) Michigan Plumbing Cde 2015 (2) sets f mechanical plans (riginal seals and signatures) Michigan Mechanical Cde 2015 (2) sets f electrical plans (riginal seals and signatures) Michigan Electrical Cde based n 2014 N.E.C. with Part 8 State Amendments (2) Sets f Michigan Unifrm Energy Cde, Part 10a (ANSI/ASHRAE/IESNA Standard 90.1-2007) clarify whether cmpliance with applicable sectins have been met. Fr new buildings Sectins 5.1, 6.1, 7.1, 8.1, 9.1, 9.2, 10.1 r 11.1 Additins fr existing buildings Sectin 4.1.2.1 Alteratins Sectin 4.1.2.2 Alteratins heating, ventilating, and air cnditining Sectin 4.1.2.2.2 (2) sets f engineered truss diagrams (riginal seals and signatures) (2) sets f permanent lateral truss bracing details (2) sets f specificatins (riginal seals and signatures) if applicable (2) sets f Structural Calculatins (riginal seals and signatures) Sectin 1603.1 (2) sets f Sil Investigatin reprts (riginal seals and signatures) Sectin 1802.1 Statement f Special Inspectin (riginal seals and signatures) Sectins 1704.1, 1704.1.1, 1704.1.2 List all reference standards Identify each special inspectr assigned t each special inspectin Letter frm the wner clearly describing the nature f their business and it s peratins 1 dcument If applicable Mall management must sign plans when lcated in the mall

The permit applicatin has nt been filled ut cmpletely Owner Cntractr Architect Applicant Telephne number Address Email address A title blck which includes: Type f Cnstructin Sectin 602.1 Use Grup and Occupancy Classificatin Sectin 302.1 List f all installed fire prtectin Sectin 901.1 (List all reference standards per Chapter 35) List f mixed use ccupancies, separated, and nn-separated Sectin 508.2.4 List f accessry use Sectin 508.2 List f incidental use Sectin 508.2.5 Tenant Use Grup Sectin 302.1 Occupant lads fr all areas (actual and calculated) Sectin 1004.1 Statement indicating shp drawings will be submitted fr all fire prtectin systems Cmplete building plans shwing use f all areas Prvide all apprpriate wall and flr sectins Prvide additinal fundatin details Prvide dr hardware schedule Prvide dr, windw, and glazing schedule Prvide interir finish schedule including flame spread and smke develped indexes and testing criteria fr applicable wall, ceiling, and flr finishes. Sectin 803.1 Prvide manufacturer cut sheets Sectins 803.1, 803.2, 803.2.1, 803.6.1, 804.2, and 804.5 Decratins and trim Sectin 805.1 (Grups A, E, I, R-1, and drmitries in R-2) Plastics utilized in the design shall prvide dcumentatin in accrdance with Sectin 2601.1

Prvide details shwing all barrier-free requirements per PA Act 1 f 1966 as amended, 2015 Michigan Building Cde, and ICC/ANSI A117.1 2003 Editin* Maneuvering clearances fr drs Sectin 404.2.4* Service cunters Sectin 904.1* Wrk surfaces Sectin 902.1* Kitchens Sectin 804.1* Tilet and bathing rms Sectin 603.1* Reach limitatins Sectin 308.1* Changing rms Sectins 803.1, 903.1* Clear flr spaces Sectin 304.1* Knee t te clearances Sectin 305.3, 306, and 606.2* Accessible rutes (ramps) Sectin 405.1* Barrier free parking spaces Sectin 501.1 and 1106.1* Existing buildings additinal barrier free verificatins in accrdance with PA Act 1 f 1966 as amended. If the change in use grup r ccupancy lad r alteratin invlves less than 50% f the flr area apply Rule 125.1352, Sectin 2, Subsectin 2(A) If the change in use grup r ccupancy lad r alteratin invlves mre than 50% f the flr area apply Rule 125.1352, Sectin 2, Subsectin 2(B) Prvide additinal infrmatin n general means f egress requirements Sectin 1003.1 Emergency lighting Sectin 1006.1 Exit signs Sectin 1011.1 Lcatin f exit drs Sectin 1020.1 Other Verify zning cmpliance with Planning Department 248-347-0475 Zning Façade Planning Other

Prjects that utilize hazardus materials as defined by Sectin 307.1 shall prvide the fllwing infrmatin frmatted in accrdance with: Table 307.1(1) Table 307.1(2) Table 414.2.2 Table 414.2.5(1) Internatinal Fire Cde 2009 Chapter 28 Prvide C.A.S. (Chemical Abstract Service) numbers Prvide a list f all fire-resistance rated assemblies. Als, prvide a diagram f the actual testing agency design and include the apprved tested design number. Sectin 703.2 Firewall Sectin 706.1 Fire barriers Sectin 707.1 Fire partitins Sectin 709.1 Hrizntal assemblies Sectin 712.1 (include the tested design numbers fr cnstructin f the assembly Sectin 703.1) Jint system Sectin 714.1 (include installatin and fire test criteria and prvide manufacturer cut sheet) Verify structural lading per Sectins 1603.1 and 1604.1 Flr and rf live lads dead lads and cncentrated lads Grund snw lad snw drift surcharge snw expsure Basic wind speed (3 secnd gust), 90 miles per hur (km/hr) Seismic Design Categry and Site Class Wind expsure categry Fld resistant design Building categry imprtance factr Submit details t shw thrugh-penetratin firestp systems Sectin 713.1 List lcatins f all fire dampers and prvide manufacture cut sheets fr their installatin, shwing testing in accrdance with UL 555 and hurly ratings f Table 716.3.2.1

Preliminary plan review fr building nly. Yur plan review fee f $ needs t be submitted at this time t the Building Department. The review will nt cntinue until this fee is paid. The Plan Review will cntinue as sufficient infrmatin has been received t cntinue. The Plan Review will nt cntinue, as additinal infrmatin is required t cntinue. Please submit the requested infrmatin as sn as pssible. NOTE: Once all f the required infrmatin is received and yur prject is accepted fr plan review, the plan review prcess takes apprximately 15 wrking days. If the prject has nt received final site plan apprval, the Building Department reserves the right t put the review n hld until final site plan apprval is granted. Please nte The sectin numbers referenced in this dcument are frm the Michigan Building Cde 2015 unless therwise specified. *ICC/ANSI A117.1 2009 Editin Please nte Shuld it be deemed necessary, a meeting can be scheduled with the Plan Examiner in rder t mre effectively cmmunicate pssible reslutins t cde related items that cannt be clarified by phne cnsultatin. Cntact the Plan Examiner at (248) 347-0415 between the hurs f 8:00 9:00 am. and 3:30 5:00 pm. t schedule a meeting.