TARGA 7300 CASEMENT INSTALLATION INSTRUCTIONS NOTE: Read instructions completely before attempting any installation.

Similar documents
TARGA 7100 SINGLE HUNG INSTALLATION INSTRUCTIONS NOTE: Read instructions completely before attempting any installation.

TARGA 7200 HORIZONTAL ROLLER INSTALLATION INSTRUCTIONS NOTE: Read instructions completely before attempting any installation.

SENTINEL SERIES 110 SINGLE HUNG WINDOWS

SERIES 360. Single Hung Windows. NOTE: Read instructions completely before attempting any installation.

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

Series 7650 Installation Instructions Sliding Glass Door

Tools required by installer: Materials required by installer:

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

Vinyl Windows and Doors Manufactured by VPI Quality Windows

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit.

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032)

I n s t a l l a t i o n I n s t r u c t i o n s S E N T I N E L S E R I E S 1 50 SLIDING GLASS DOORS

How To Install Windows: Nail-Fin Application

All Window Installation Instruction

INSTALLATION GUIDE WOOD PIVOTING CIRCLE/ OVAL

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) ImpOrTaNT INFOrmaTION & GlOssary.

Installation Recommendations for Finless Frame Doors

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE

Read guide from beginning to end before starting installation. Read all warnings and cautions during unit installation.

Flashing Materials. Rough Opening Preparation

Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions

Installation Guide. for E-Series/Eagle Clad Hinged Inswing French Door

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS

Installation Guidelines for all Quaker products with nail fins New Construction nail fin installation with a Zip sheathing system.

THERMO-FIT REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS (BRICKMOULD / NO NAILING FLANGE)

GENERAL INSTALLATION GUIDELINES

GENERAL INSTALLATION GUIDELINES

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

INSTALLATION INSTRUCTIONS for Vinyl Projecting Windows with Integral Nailing Fin (JII023)

Assembled Patio Door Installation Guide 2-Panel Patio Door with Non-Welded Frame

Heavy Wall Applied Stop Tube Frame and Door Installation

Kinro Metal, Vinyl, Flush Mount and Recessed Fin Windows OEM INSTALLATION MANUAL

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GLOSSARY ROUGH OPENINGS

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

(773) INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GL OSSARY ROUGH OPENINGS

Vinyl Windows Manufactured by VPI Quality Windows

WOOD OUT SWING AWNING, CASEMENT, & HOPPER WINDOW

FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL

Sun Windows General Information New Construction Hinged Door Installation Instructions

PIVOT DOOR 3400P INSTALLATION INSTRUCTIONS

STACKING MULTI-SLIDE DOOR SYSTEM

RECREATIONAL VEHICLE DOOR INSTALLATION INSTRUCTIONS

NEW CONSTRUCTION PATIO DOOR INSTALLATION INSTRUCTIONS (WITH NAILING FLANGE)

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows with Exterior Trim or Nail Fin (JII024)

DOOR INSTALLATION GUIDE WOOD FRAMING New Construction

VYTEX PREMIUM SLIDING GLASS DOOR. Table of Contents. Precautions and Safety 2. Tools Required...3. Inspect and Prepare Door...4

Eagle clad double-hung window installation instructions

Installation Guide for E-Series/Eagle Clad Mechanically Fastened Windows

NEW CONSTRUCTION, REPLACEMENT AND FLUSH FIN REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS

window installation Guide wood FRaMinG New Construction

Sun Windows General Information New Construction Sliding Door Installation Instructions H F

I n s t a l l a t i o n I n s t r u c t i o n s

WINDOW REPLACEMENT INSTRUCTIONS FOR CASEMENT, DOUBLE-HUNG AND CLAD FRAME WINDOWS USING FRAME SCREWS

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACIÓN FOR CLAD CASEMENT & AWNING WINDOW VENTANA DE DOS HOJAS CON REVESTIMIENTO

8/7/ HP SWING DOOR INSTALLATION INSTRUCTIONS

Picture Window Rough Opening Installation with Sheathing Intact with Brickmould Tools: (Not supplied by manufacturer) Fig. 0-1

Series 7600 Installation Instructions Aluminum Multi-Slide Door (Pocketing)

Installation Guidelines. Next Dimension. Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window

4-lite Patio Door. Installation Instructions

Casement/ Casement Picture Pocket Installation (Interior) Tools: (Not Provided by Manufacturer) Fig Supplies: (Not Provided by Manufacturer)

Vinyl Windows and Doors Manufactured by Pella Corporation

Installation of Fiberglass Windows

Providing 3 Layers of Protection

Chapter 9. Windows and Exterior Doors

Kinro Metal, Vinyl, Flush mounted and Recessed Fin Windows (HUD) OEM INSTALLATION MANUAL

INSTALLATION INSTRUCTIONS for Vinyl Projecting Windows with Integral Nailing Fin (JII023) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS

POCKETING MULTI-SLIDE DOOR SYSTEM

INSTALLATION INSTRUCTION FOR CLAD BOW WINDOWS WITHOUT HEAD AND SEAT BOARD

Curtain Wall Installation Guide

Steel Reinforced Joining Thank you for choosing Andersen. Please leave this guide with building owner.

INSTALLATION INSTRUCTION FOR WOOD DOUBLE-HUNG AND CASEMENT WINDOWS USING WOOD BRICKMOULD OR FLAT CASING

INOVO 2-LITE SLIDING PATIO DOOR

INSTALLATION INSTRUCTIONS FOR REPLACEMENT FORGENT WOOD GLASTRA WINDOWS RECOMMENDATIONS FOR COMMON INSTALLATION OF ALL REPLACEMENT WINDOWS.

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS

Frequently Asked Questions

3-LITE PATIO DOOR INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS - INSTRUCCIONES PARA LA INSTALACIÓN CLAD WINDOWS WITH FLUSH FLANGE

Vinyl Windows and Doors

INSTALLATION INSTRUCTIONS

Thermally Broken Framing and Door Installation

INSTALLATION INSTRUCTIONS - INSTRUCCIONES DE INSTALACION FOR HURRICANESHIELD IMPACT-RESISTANT DOUBLE-HUNG, SINGLE-HUNG AND SIMULATED-HUNG

INSTALLATION INSTRUCTIONS FOR TEUTONIC ENTRANCE DOOR RECOMMENDATIONS FOR COMMON INSTALLATION OF ENTRANCE DOORS.

CGI Series 560 SGD Installation Instructions

Installation Guide for Andersen Architectural Clad Hinged Windows

INTERIOR. Checkrail. Flashing tape

SERIES 4070-T GENERAL ASSEMBLY AND INSTALLATION INSTRUCTIONS

Chapter 9. Windows and Exterior Doors

Block Frame Inovo Patio Door/Transom/Sidelite Field Mulling Instructions. simonton.com/installation. If mulling sidelites, skip to Step 5.

Installation Instructions

4. Partially open the operating panel and tilt the top toward the interior of the door (Figure 4). Lift the panel off the sill and set it aside.

InStallatIon InStruCtIonS for vinyl 2-lIte PatIo door assembled

VINYL WINDOWS (new construction or replacement) page 2. VINYL PATIO DOORS pages WOOD CLAD WINDOWS (new construction).page 5 WOOD CLAD WINDOWS

RECOMMENDED INSTALLATION PROCEDURE LEVEL 3

Vinyl Windows and Doors

Installation Guide for Architectural Wood Hinged Windows

INSTALLATION INSTRUCTION INSTRUCCIONES DE INSTALACIÓN FOR CLAD HINGED PATIO DOOR PUERTA DE BISAGRA PARA PATIO

Storefront Installation Guide

Installation Guide for Andersen 400 Series Tilt-Wash Transom and 200 Series Narroline Transom Windows

series 9500 top load bi4fold installation instructions

Transcription:

TARGA 7300 CASEMENT INSTALLATION INSTRUCTIONS NOTE: Read instructions completely before attempting any installation. These instructions are provided as a general guide in the installation of CGI windows. Applicable approval documents should be used in conjunction with these instructions. Only experienced installers familiar with these or similar products should attempt to install these units. Incorrect installations could void warranty. Contact CGI technical support at 305.593.6590(Miami) or tf 800.442.9042. HARDWARE AND TOOLS REQUIRED: PPE (safety glasses, ear protection, gloves, etc.) Tape Measure/Level Shims (up to a 1/4 ) Drill with bits (Impact drill if necessary) Anchors/screws as described in approval documents Caulking gun Sealant NOTICES: If installing CGI products into renovated buildings, be aware that older paints may contain lead. For more information on the specific building or structure and the proper and safe handling requirements, please contact your local authorities or visit www.epa.gov/lead. CGI reminds you to recycle whenever possible and recycle responsibly. To properly dispose or recycle products being removed, please contact your local authorities. WOOD BUCK INSTALLATION INTO MASONRY OPENINGS FOR FLANGE WINDOWS 1. Make sure that masonry opening (or rough opening on stud construction) is made to within tolerance, level and plumb. Verify by measuring at each end and every 24 (vertically and horizontally). Make any corrections required to openings. Bucks must be set on a smooth and flat surface. Remove or chip away any concrete, which protrudes from the face of the opening prior to setting bucks. Make sure ends of masonry opening are square and not rounded at corners. Chip concrete if necessary. 2. Select the size of Pressure Treated wood buck to be used (see figure 1 or refer to approval documents for approved bucks) and decide how far from the face of the wall the bucks are going to be set. Most contractors like to set the wood bucks in about 1 to 2 from the exterior face of the 8 concrete walls when installing windows. 3. Set wood bucks in a continuous heavy bed of professional grade sealant. Make sure sealant is applied at ends were bucks touch one another. Run a continuous bead of sealant on exterior side of bucks between concrete and wood, after installing bucks. 4. Make sure wood bucks are installed continuous and on all four sides of the opening. Wood bucks must touch one another at ends. 5. Install wood bucks level and plumb in all directions. Verify that opening is square. Do not follow the walls, as many times they tend to be leaning in or out. 6. Wood bucks must be secured to the structure, independently of the window. Figure 1: Wood Buck types 7300 1

INSTALLATION INSTRUCTIONS FOR FLANGE OR EQUAL LEG (FLUSH) FRAME WINDOWS 1. Check window opening for correct size. If the opening is incorrect, have it fixed. Never attempt to force a window into a small opening or install a window into an oversized opening. 2. If wood bucks are being used, make sure they are of the correct size and type for the installation method being used (see figures 4 and 5 Installations Types A and B). Verify that wood bucks are plumb, level and square. Note that Installation Type C (Equal/Flush Leg) does not require a wood buck. 3. If installing flange windows, clean window flange and apply a generous amount of professional grade sealant / caulking material to flange at full perimeter (figure 2). Make sure the sealant is compatible and will adhere to vinyl and wood. If installing equal leg frames (figure 6), the perimeter sealant is applied after window is installed. 4. Stand window upright and open casement vent. Once the window is properly opened, install window from the outside on to the opening. If flange frame is being used, the backbed sealant should seep out as it gets compressed. 5. It may be necessary to disengage the operator to access all the screws on the frame. The operator arms connect to the vent with snap stud pins. To disengage, pry the operator arm away from the stud pin. To re connect, snap the arm back into the stud pin. 6. Temporarily secure window frame using installation screws as selected from the approval documents for your specific application. Note that head and sill frame members have installation holes located differently than frame jambs (see figures 4 6). To simplify the pre installation process, you may want to use a smaller temporary screw such as a #12 Sheet Metal Screw and only penetrate the wood. Shim every installation screw snugly (shim space should not exceed 1/4 ). Temporarily secure the window with one screw at each end of jamb member (top & bottom). Make sure window is plumb, level and square. Caution: Any window, which is forced into an opening and racked or twisted, can eventually cause glass breakage. 7. Once the window is correctly set, finish installing with the proper installation screws. A longer drive extension may be necessary to avoid contact with vinyl and impact wrench/screw gun. Add sealant to the heads of the screws at the sill (figure 3). This will help prevent water leakage. If temporary #12 screws were used, replace those with the correct screws. Every hole must have a screw and every screw must have a shim. If operator was disengaged, re connect and makes sure window operates correctly. 8. On flange windows, make sure there is no daylight between wood buck and window flange. If any exists or as a precautionary step, apply additional sealant from the outside at this joint. If installing equal leg (flush) frames, initial perimeter sealant can be applied at this point. 9. Perform a last check of the window operation. If the window is not opening or locking properly, make sure the heads of the jamb installation screws are tight against the vinyl and not sticking out. Also, make sure there is no debris along the frame that would interfere with movement of the vent. Lastly, make sure the frame members are not bowed/twisted and preventing the vent from closing and locking. INSTALLATION HINT: If the window does not close properly and evenly, then re check plumbness, level and squareness. Figure 2: Sealing the window flange Figure 3: Sill screw sealant 7300 2

Figure 4: Installation type A using 1 x bucks 7300 3

Figure 5: Installation type B using 2 x bucks 7300 4

Figure 6: Installation type C using 2 x bucks using Equal Leg (Flush) Frame directly into structure 7300 5

INSTALLATION INSTRUCTIONS FOR FIN FRAME WINDOWS 1. Check window opening for correct size. If the opening is incorrect, have it fixed. Never attempt to force a window into a small opening or install a window into an oversized opening. 2. Verify that opening is correctly prepared. Using a self adhering flexible flashing as part of the opening preparation is recommended. For more specific details on fin frame opening preparation, reference FMA/AAMA 100. 3. Stand window upright and open casement vent. Once the window is properly opened, add a generous amount of backbed sealant (minimum 3/8 bead) to the backside of the fin (figure 7). This seal is CRITICAL, especially at the sill area. Add this sealant to the head, sill and jambs. Install window from the outside into wood opening. 4. The fin has pre punched slotted holes for installation screws (slotted holes allow for expansion and contraction of house structure). Note that there are more screw holes than necessary on the fins, so refer to approval documents to see where installation screws will be required. 5. Secure window using installation screws as selected from the approval documents for your specific application (see figure 8). Shim window to main structure at every installation screw location (shim space should not exceed 1/4 ). You can secure the window with a few screws at first to make sure window operates correctly and is plumb, level and square. Caution: Any window, which is forced into an opening and racked or twisted, can eventually cause glass breakage. 6. Once the window is correctly set, finish installing with the rest of the installation screws. If in doubt, use more screws rather than less. 7. After completely setting window, a self adhering flashing (SAF) which is a flexible water proofing film/membrane must be applied to the window fins. Begin by placing the film across the sill fin always extending the film on to the house wall. Next, place film on the jamb fins, overlapping the sill film at the bottom. Finally, place film across the head fin, overlapping the jamb film on each side. This technique/sequence of working from the sill up is critical in weather sealing the window. 8. Perform a last check of the window operation. Make sure there is no debris along the frame that would interfere with movement of the vent. Lastly, make sure the frame members are not bowed/twisted and preventing vent from closing and locking. INSTALLATION HINT: If the window does not close properly and evenly, then re check plumbness, level and squareness. Figure 7: Sealing the fin 7300 6

Figure 8: Installation type D using Fin Frame 7300 7