HipMaster Installation Instructions

Similar documents
RIDGEMASTER PLUS CAUTION INSTALLATION INSTRUCTIONS ALWAYS WEAR SAFETY GLASSES TOOLS NEEDED GENERAL GUIDELINES FOR RIDGEMASTER PLUS AND HIPMASTER

Installation Instructions

Installation Instructions

Installation Instructions

Installation Instructions

This document is provided for guidance only, it is not intended to cover all local code variations.

Installation Instructions

Inspire Aledora Slate Application Guidelines

SmartVent Eave Edge Installation Instructions

Inspire Slate Starter Piece Hip and Ridge. 13 1/2" Height: 13 ½" Width: 12" Squares/ Pallet. Bundles/ Square

Installation Manual. Future Roof Shingle / Slate Products

Installation Manual. Future Shingle Products

6 STEP INSTALLATION GUIDE BY DCI

Application Guidelines - Shake General Information

DIRECTIONS FOR APPLICATION

Armourvent Multi application guide

Installation Manual. For Gerard Shingle Products

DIRECTIONS FOR APPLICATION

Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes

Table of Contents. Installation Guide for Profile with Hidden Fasteners 3. Installation Steps 4, 5. Prestige Series Moldings 6, 7. Other Accessories 8

A P P L I C A T I O N I N S T R U C T I O N S

Bitumen Roofshingles ARMOURVENT MULTI APPLICATION GUIDE VENTILATION

DIRECTIONS FOR APPLICATION

Roofing Training - Basics. Sandy Wesch

Tuff-Rib Install Guide

BARRELL VAULT BATTENLESS

Hatteras Shingles. CertainTeed Shingle Applicator s Manual. YOUR OBJECTIVE: To learn the correct procedures for installing Hatteras shingles

C e r t a i n T e e d S h i n g l e A p p l i c a t o r s M a n u a l. and Carriage House STEEP. Slope Application. (over 21/12)

StormMaster Slate General Instructions 1.) GENERAL INSTRUCTIONS 2.) ROOF DECK VENTILATION 3.) ROOF DECK

EVALUATION REPORT GAF Materials Corporation 1361 Alps Road, Building 7-3 Wayne, NJ 07470

Installation Guidelines

Installation Guide. Step 3. Valley Flashing. Step 7. Transition Flashings and Accessories. Step 6. Hip and Ridge Installation

Table of Contents. Important Notices 3. Residential Roofing Application 4. Trims & Accessories 5. Trim Glossary 6, 7, 8. Estimating Material 9

RED DIAMOND SHINGLES Roof Installation Introduction:

SECTION 9: ROOF STRUCTURE, ROOFING MATERIALS AND FLASHING, GUTTER, DOWNSPOUTS, AND SKYLIGHTS. Background

Grand Manor Carriage House and Centennial Slate 16 YOUR OBJECTIVE: To learn the correct method of installing each of these roofing products.

6x6 Maximizer Storage Shed Assembly Manual Version #9 Feb 26th, 2015

BARDOLINE INSTALLATION INSTRUCTIONS

Barrel Vault Counter Batten and Batten

SG-30 A P P L I C A T I O N I N S T R U C T I O N S. Directions For Application

Laminated Shingles. Landmark Series and Landmark TL. CertainTeed Shingle Applicator s Manual

Application Guidelines - Slate General Information

10. Vents, Baffle Guard and Blocking

REGAL. Installation Manual

CertainTeed. Shake / Slate Installation Guide

LAMINATED SHINGLES CERTAINTEED SHINGLE APPLICATOR S MANUAL SUPPLEMENT

Installation Guide. Guardian Slate Roof System. England, Scotland & Wales

PREMIUM LAMINATED ASPHALT SHINGLES Frederick, MD

8x4 SpaceSaver Garden Shed Assembly Manual

INSTALLATION GUIDE LEARN MORE AT DECRA.COM

Polytegola N. Bitumen Roof shingles. Application guide

ONDUVILLA. The Attractive Alternative to Shingles I N S T A L L A T I O N I N S T R U C T I O N S

Straight Rib Series Metal Roofing Panel Installation Guide

Table of Contents. Important Notices 3. Residential Roofing Application 4. Trims & Accessories 5. Trim Glossary 6, 7, 8, 9

ROOFING VENTILATION. Euramax Canada, Inc. Pro-Master Ridge Vent. Pro-Master Highpoint Series 5 & 7 Ridge Vents. Standard Box Vents

Revision Date: April 01, Paramount Enclosure

StormMaster Shake GENERAL INSTRUCTIONS For Spanish Instructions Click Here (Para las Instrucciones Españolas Haga Clic Aquí)

Best Buy Metals Toll Free / Phone / Fax

Multi-Width Shake. Widths: 9", 8", 7", 6", 4" Length: 22" Thickness at butt: 5/8" Single-Width Shake. Widths: 9" Length: 22" Thickness at butt: 5/8"

GlassMaster General Instructions - Ardmore, OK & Hampton, GA <br /> Atlas Roofing

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS

MetroCOTTAGE Shingle

E-Z BUILD STEEL BARN 12' 12' 12' 16' 12' 20'

F-WAVE REVIA SYNTHETIC ROOFING SHINGLES

b) Symphony comes pre-packaged in color and width blends. There is no need to mix Symphony at the job site. Currently Symphony is available in the

Guardian Shingle Granite Ridge Shingle

Steel Roofing & Siding INSTALLATION GUIDE

REDLAND DRY VALLEY. Installation Instructions for Redland Dry Valley. Version: 6. Date: May Redland Technical Solutions

STORMMASTER SHAKE GENERAL INSTRUCTIONS

ForceField Air & Water Barrier System. installation instructions

Tuff Rib Panel Installation Specifications

Gambrel Barn with Overhang Manual

LP SmartSide Soffit ON SITE STORAGE PREPARATION. Application Instructions Vented and Non-Vented Smooth Finish or Cedar Texture. General Information

Shapes Siding. Perfection Shingles. Chalk Line

DETAIL MANUAL for Standing Seam / Image II

MasterFlow Green Machine Dual Powered Roof Vent

Solar Powered Roof Exhaust Fan

PROJECT INSTRUCTIONS Roofing

COMPOSITE SIDING INSTALLATION GUIDE

METAL ROOFING INSTALLATION GUIDE

Gerard Installation Manual Shingle Profiles

Granite Ridge Shingle Guardian Shingle

HERITAGE LAMINATED ASPHALT SHINGLES Frederick, MD

I n s t a l l i n g Enviroshingle APPLICATION INSTALLATION GUIDELINE

Cambridge English Application Instructions

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

INSTALLATION DETAILS

DETAIL MANUAL. Metal Roofing Wholesalers. Classic Rib Roofing Panels

14.0 SIDING AND SOFFITS SECTION

Dura-Lock Roof System

installation guide Villa

Installation Manual SOLID CORE SIDING

8x12 SpaceMaker Garden Shed Assembly Manual

Brava Old World Slate Installation Guide

Table of Contents. Fasteners... 4 Venting Preparation Installation with Battens - DECRA Tile & DECRA Shake 1

Installation Guide. Titan Old World Slate REV Titan Manufacturing Phone: (407) Fax: (866)

Table of Contents. Roof to Head Wall w/ Side Flashing DECRA Shake XD Roof Overview Roof Penetration - Pipes & Vents...

Pocket Door Installation Instructions

9 ft Naramata Spa Shelter Assembly Manual Outdoor Living Today

Transcription:

Mid-America, Plus and HipMaster Installation Instructions New applications for metal, slate and wood shingle roofs (see page 7) CAUTION: Before beginning installation read all general guidelines, special notes and installation steps thoroughly and be sure to check and follow all your local building codes. Failure to do so may result in improper installation and may void the homeowner s warranty. Tools needed: hammer, circular saw, chalk line, utility knife or snips, tape measure, caulking gun & roofing sealant. GENERAL GUIDELINES FOR RIDGEMASTER, RIDGEMASTER PLUS AND HIPMASTER 1. can accommodate any pitch from 3-12 to 16-12. Plus and HipMaster can accommodate roof pitches from 3-12 to 12-12. For Plus 9" and HipMaster 9" use the same specifications as Plus and HipMaster. 2. and Plus can be used only for ridge installations, NOT for hip areas. For hip installations you MUST use HipMaster. HipMaster can also be used for ridge installations, for example, with wood and dimensional shingles. 3., Plus and HipMaster must be used with an equal or greater amount of soffit ventilation (see How to Figure Proper Ventilation on bottom of Page 4). Mid-America SoffitMaster soffit vents perfectly balance ridge vents in net free ventilation per square inch (See SoffitMaster on page 8). 4. IMPORTANT: Always use nails long enough (2 1 /2 3") to completely penetrate roof sheathing by at least 1/4". This applies to installing both ridge vent and cap shingles. 3" nails are available from your Mid-America distributor (sold separately). ALWAYS WEAR SAFETY GLASSES DURING INSTALLATION. 5. All slot cut outs should end from the outside wall, chimneys, ridge corners or hip joints. HIP ROOF NOTE: Hip slots should start halfway up the roof hip and end 36" from the top of the hip, unless joining up to a ridge vent, in which case hip slot cut outs can end from ridge. In order to maintain maximum structural integrity, hip slot cut outs should be no more than 24" long and spaced about apart (see Illustration A below). 6. must always extend 10 beyond slot at beginning and end of ridge. For optimal roofline appearance run and HipMaster along entire ridge and hip line to the terminal ends of the roof (as shown in Illus. B below). If there is no ridge to join up to, HipMaster should extend 36" beyond its slots in both directions with Starter Pieces on each end. (See HipMaster steps 14 19, page 6.) 7., Plus and HipMaster each have an Overlap and an Underlap end that interlock when laid end to end in the proper orientation. This unites the 4 foot sections into a single, structurally integrated, weathertight system. Always start installing with Overlap End on outside terminal end of ridge. (See Illustrations E, F and G on page 2 for identification of Overlap End). IMPORTANT: You should also complete your ridge vent installation with a factory end on the opposite terminal end of the ridge (see Steps 13 and 14 on page 4 for this technique). 8. Baffles on underside of vents (see Illustration H on page 2.) MUST ALWAYS sit flush on flat part of shingle surface and not extend into slot area. To prevent weather penetration through gaps and ridges in architectural or dimensional shingles, baffles must sit flush on upper flat part of shingle not on raised dimensional part. This may require trimming the shingle and repositioning it in the baffle area to maintain continuous baffle contact with a flat surface (see Step 12 on page 4). Failure to sit baffles properly could result in leakage of snow or water. NOTE: These instructions are designed to meet most typical residential and commercial applications. However, no installation manual can cover all individual situations. For special situations and applications, please call Mid-America at 1-800-521-8486. Illustration A Example of slot cut outs. Examples of Terminal Ends Illustration B Maintaining a continuous roofline with and HipMaster Copyright 1999 Mid-America Building Products 36" (If not joining with ridge vent Intermittent slots for hips approx. 24" long and spaced apart Slot cut outs (shown in black above) should stop short of terminal ends and chimneys. Hip slots should be cut intermittently and begin half way up hip, stopping from ridge if joining up to a ridge vent and 36" if there is no ridge vent to join up to. 1 All vents should extend beyond slots, but, for optimal appearance, extend ridge and hip vents to terminal ends of roof and join them where they meet. This creates a continuous roof line and a better looking installation.

Illustration C Truss Roofs (No Ridge Boards) Illustration D Rafter Framed Roofs with Ridge Pole Sheathing 1" Air 1 1/4" 1 1/4" Sheathing 1/2" Air 1/2" Air Plywood sheathing on truss roofs can be laid 1" short on one side at ridge or you may leave 1/2" air opening on each side of center for a 1" total air opening. Any larger sized opening will not improve ventilation. REMEMBER: Baffles must always be in complete contact with flat surface and not overlap slot. NOTE: Plus 9" and HipMaster 9" use the same specifications as Plus and HipMaster with the exception of accepting 9" cap shingles instead of 11". Illustration E UNDERLAP ENDS Illustration F Plus & HipMaster* Ridge Pole (1 1/2" thick) Cuts should be made to expose a 1/2" air opening between sheathing and each side of ridge pole. Any larger sized opening will not improve ventilation., Plus & HipMaster = 12.228 sq. in. per lineal foot Net Free Ventilation. (See page 4 also.) Overlap End Illustration G Underlap End SUPPORTED NAIL BOSSES (For nailing vent to roof sheathing) SHINGLE ALIGNMENT GUIDE For fast and accurate spacing of cap shingles (Ridge- Master Plus and HipMaster only). Slotted Ends Illustration H Plus and HipMaster* Blowing Snow & Bug Barrier (Must be left in) Baffles Structural Ribs OVERLAP ENDS (Always start with Overlap end on outside terminal end of roof) NAILING GUIDE To use for nail alignment when installing cap shingles Patented Hip Baffle Slotted Interlocking Ends * HipMaster has an added baffle underneath not shown above. 2

and Plus Installation ALWAYS WEAR SAFETY GLASSES. 1 For retrofitting, remove existing cap shingles from roof. (For new construction, start with Step 3a). Always wear protective eye wear. 2 For ridge pole construction, determine a point that will expose a 1/2" air slot on each side of ridge pole. You may want to use a chalk line as a cutting guide. For truss roofs, see Illus. C on page 2. 3 Use a circular saw to cut roof substrate along chalk line. Begin slots from end of outside wall under roof. See Illus. A on page 1. Adjust saw depth so you don t cut rafters. Watch for nails when cutting. 3a For new construction cut slots or set back plywood, then shingle roof so top course of shingles ends with flat area of shingle at ridge. 12-12 to 16-12 Pitch 9-12 to 12-12 Pitch 4 Install a minimum of two ridge cap shingles at all the terminal ends of the roof. 5 For Snip factory ends to fit your pitch. Usually no trimming is necessary for 3-12 to 6-12 pitches. 6-12 to 8-12 Pitch Plus 6 Pitch guides are given above for. No trimming is required for Plus. Overlap End 7 8 Flexing and Ridge- Master Plus to preform the pitch makes installation easier. IMPORT- ANT: Always start with Overlap end on outside terminal end of roof. Start 2" from one end and begin nailing Overlap end of Ridge- Master to roof. Nail through supported Nailing Bosses. (See Illustrations E and F on page 2). Overlap end 13 11 9 7 5 3 1 Overlap End Underlap End Overlap End Underlap End 14 12 10 8 6 4 2 Underlap end Recommended nailing sequence is to start from one end together with Overlap vents join 9 10 11 and of vent and work to the other end alternating sides and nailing completely as you go. Keep vent shaped evenly or baffles will not sit flush on roof. Male Slotted End Underlap slotted ends to prevent weather and insect infiltration. No caulking is necessary at these joints. 3 Female Slotted End Interlocking Slots Plus joins together with Overlap and Underlap slotted interlocking ends to prevent weather and insect infiltration. No caulking is necessary at these joints.

Create 1/2" Overlap 12 IMPORTANT: With laminated or architectural type shingles, the baffles on the underside of the vent MUST sit flush on flat part of shingles as shown and not on dimensional ridges and gaps part of shingle. 13 To end your ridge vent installation follow this procedure.if last piece of needs to be cut because it is too long, measure length to be cut, add 1/2" to measurement and cut off squarely with knife. Factory End Goes on Outside 14 Knife back baffles on cut end about 1/2" to create an overlap end. Join handmade end to last piece of vent installed making factory end the outside terminal end and finish by nailing to roof. Centering notch Lettered lines 15 To nail cap shingles in place, use nail guide provided on vent labeled "Nail Here." (See illustration above). Make sure nails penetrate all the way through the vent and the roof sheathing by a minimum of 1/4". For Plus use 16 17 built in Shingle Alignment Guides to evenly space and square 11" cap shingles on vent. For Ridge- Master Plus 9" and HipMaster 9" follow same guides but use 9" caps. To ensure perfectly square placement of cap shingles align centering notch on back of shingle with center line along top of Plus. Align back of shingle with horizontal lettered lines. To evenly space cap shingles 18 19 on Plus, note whatever lettered line the back of your first shingle falls on then use the same lettered line for all the cap shingles. (See line D in example above). Industry Standard for Proper Ventilation = 1 sq. ft. of ventilation for every 300 sq. ft. of attic space with Ridge Nail all cap shingles in place using nails long enough to completely penetrate roof sheathing by 1/4". 4 20 EXAMPLE: 2,000 sq. ft. attic To complete installation, apply a good quality roof sealant to the outside terminal ends of or Plus where it meets the roof. 40' x 50' = 2,000 sq. ft. attic. 50% in ridge and 50% in soffit. 2000 sq. ft. 300 sq. ft. = 6.67 sq. ft., 6.67 x 144 = 960 sq. in. (conversion to inches) Plus { and HipMaster = 480 sq. in. (ridge) 12.228 sq. in. per 960 sq. in. = + lineal foot Net Free 50' 480 sq. in. (soffit) 40' Ventilation Soffit HOW TO FIGURE PROPER VENTILATION (total ventilation required) A 50' ridge with installed equals approximately 600 sq. in. of ventilation. (More than industry standards)

HipMaster Installation CAUTION: Before beginning installation, read all instructions and Special Notes sections thoroughly and be sure to check and follow all local codes. Failure to do so may result in improper installation and may void the homeowner s warranty. SPECIAL NOTES: 1. Make sure you use only HipMaster on hips of roofs. ridge vent is not designed for hip areas. 2. For best results use Starter Pieces (sold separately) to blend HipMaster into roof at bottom of hip. At top of hip, join HipMaster with where possible. A template is provided on the box as a guide to make this easy. When top of hip vent does not join with ridge vent, terminate with another Starter Piece (see Steps 14 19, page 6). 3. Slot Cut Outs: It is not recommended to cut one continuous slot for hips. Proper ventilation and strength can best be obtained with intermittent cuts. Initial cuts should start halfway up the roof hip and end from top of hip when joined with, 36" from top of HipMaster when not joining to ridge. (See Steps 5 6 below and illus. A, page 1). 4. CAUTION: HipMaster must always be installed with the arrows on all vents pointing up towards the top of the roof. Failure to do so will result in leakage (see Step 9 below). 5. A generous amount of roofing sealant must be applied where the flat underside of the baffle on HipMaster contacts the roof in order to fill the gaps between the vent and the shingles that step down the roof (see Step 8). If retrofitting, remove existing cap Install a minimum of two cap 1shingles from ridge and hip. (New 2 shingles at the bottom of each 3 construction skip Step 1). ALWAYS WEAR SAFETY GLASSES. hip and at the terminal ends of each ridge if you will be installing Ridge- Master along with HipMaster. If your roof has a ridge, install along entire ridge from hip joint to hip joint. (See Ridge Master installation, but do not install ridge cap shingles on top at this time). NOTE: Slots can stop within of ridge when HipMaster is joined with. Snap two parallel chalk lines Cut slots on chalk lines starting 4 2 1/2" apart along entire hip 5 halfway up roof hip and ending 6 (1 1/4" on each side of center). Cutting away shingles on these lines with a roofing knife will make following steps easier. BE SURE TO WEAR SAFETY GLASSES. from top when joining with ridge. See step 14 for terminating with Starter Piece. See next step for cutting pattern. See Illus. D page 2 for slot air opening guidelines. For hips, one continuous slot is not recommended. To maintain maximum roof strength, hip slots should be approximately 2 feet in length, be spaced 1 foot apart and extend halfway down the hip. Set saw depth to cut only sheathing not rafters. Arrows point up Underlap end is always at top Begin installing HipMaster by 7 nailing Starter Piece in position. 8 9 Round end goes at bottom of roof. There should NOT be a slot opening cut underneath Starter Pieces. Before installing each vent apply roofing sealant in a line parallel to slot and 3/4" away from it. Add generous amounts at low points particularly with dimensional shingles. 5 IMPORTANT: When installing HipMaster, make sure arrows on all hip vents point up towards top of roof and Underlap end is at top. Failure to do so will result in leakage.

Lay HipMaster in position making sure there is good contact end at bottom. Join Always start with an Overlap 10 11 12 vents with roofing sealant. Ensure that all low points in shingles are filled with sealant. Failure to properly seal could lead to water intrusion. 13 11 9 7 5 3 1 14 12 10 8 6 4 2 together by interlocking the ends. REMEMBER: ALL arrows on all vents must point UP towards TOP of roof. Recommended nailing sequence is from bottom to top 14 join with HipMaster at top of When there isn t a ridge vent to 13 15 of HipMaster and roof as indicated, alternating sides and nailing completely as you go up roof. NOTE: Butt Starter Piece up to end of HipMaster and caulk bottom and all joints liberally. roof, use a Starter Piece to terminate vent. Remember: slot cut outs must stop 36" from top end of HipMaster when terminated with a Starter Piece. Make sure first vent is interlocked with Starter Piece and begin nailing in place, making sure nails penetrate at least 1/4" through sheathing. (Refer to Step 13 for nailing sequence.) When hip and ridge vent are installed together, follow this method. Lay last piece of hip vent over top of ridge vent, measure where center of hip vent crosses center of ridge vent and cut hip vent square at this point. CUT HERE Carefully cut and remove mitre 16 17 template from box and use guides to trim to your pitch. Place point of mitre template at square cut end of HipMaster and scribe line for cutting. Cut HipMaster along scribed mitre lines with shears or knife to form proper hip to ridge mitre. 18 After applying roof sealant as in Step 10, lay down HipMaster and nail in place. Repeat for other side. A tight Use built-in Shingle Alignment 19 mitre should result. If mitre is 20 Guides to evenly space cap 21 slightly open it should be sealed with roofing sealant. shingles on HipMaster. See Steps 16, 17, 18 and 19 on page 4 for further tips. 6 Nail all cap shingles in place working from bottom of hips to top of ridge. Finish by capping ridge. Apply a bit of roof sealant to last shingle where needed.

Special Applications of and For Residential, Commercial, New Construction or Reroofing The following diagrams are intended as a general overview only. More extensive installation instructions are available for these applications and others from Mid-America. Call Mid-America at 1-800-521-8486 for more information. Metal Roof METAL ROOFING D Rib Plus Standing Seam Metal Cap Slate Roof Metal Cap Wood Shingle Roof SLATE ROOFING Ridge Roll Cap Sheet Metal Sheet Metal D-Rib Metal Closure 1" Air Nailer Sealant Tape Nailer Z Flashing D-Rib Panel TRUSS CONSTRUCTION Standing Seam Panel Slates RIDGE POLE CONSTRUCTION Metal Cap Use Plus or HipMaster. For use with D-rib or standing seam roofs. Adapts to ridge pole or truss construction. WOOD SHINGLE ROOFING Severe Weather Service Ridge Roll Cap Normal Weather Service Use HipMaster. For use with standard and textural slates. Adapts to ridge pole or truss construction. LAMINATE/WIDE BEAM 1x4 Nailer Ridge Cap Full Shingle Ice & Water Shield Ice & Water Shield Z Flashing 1" Air s Ice & Water Shield Shingles Roofing Nail Shingles Nailer Note: Cut off baffles on one side of only. TRUSS CONSTRUCTION Use HipMaster. Can be used with two types of shingles: Blue and Red label No.1 and No.2 Fivex-Perfections-Royals. Adapts to ridge pole or truss construction. Use. To be used for wide ridge beams as often found in cathedral ceilings, firewalls, etc. Remove baffles and end pieces from one side of (see inset at right). 7 Remove end piece to form flap