Adhesive Selection. ph Limit Trowel Size Unit Size Coverage per unit. 1/16 x 1/16 x 1/16 V-notch 2.85 Gallon SF 30.

Similar documents
Adhesive Selection. 1/32 x 1/16 x 1/32 U-notch 4 Gallon 880-1,040 SF 40.0 P u u u. 1/32 x 1/16 x 1/32 U-notch 4 Gallon 1,200-1,400 SF 40.

Layout and Fitting. Chapter 6 Layout and Fitting

Layout and Fitting. Chapter 6 Layout and Fitting 6. 1

Repairs. Chapter 10 Repairs 10. 1

TRIVERSA TRIVERSA ID. Triversa Triversa ID Installation Instructions. Remove the wall base and doorway trim. Always undercut wood door casings

Loose Lay Luxury Vinyl Plank

Chapter 5. Installation procedures. Installation procedures 24. Topics. Notes. 5.5 Flash coving General recommendations 25

3 Simple Steps to a Beautiful Tile Surface. Tec Skill Set How-To Project Guide Floor Tile 1. PREPARE THE SURFACE 2. SET THE TILE. Reverso en español

Roll Out Vinyl Installation Guide

Installation Systems. Chapter V Installation Systems

Installation Instructions

Flash Coving. Chapter 8 Flash Coving 8. 1

Installation Instructions

Wallgard 1,3 product

INSTALLATION INSTRUCTIONS

ARTIFICIAL GRASS GENERAL PROJECT INSTALLATION TIPS. Buy or Rent HAND TOOLS & POWER EQUIPMENT. SHOP ONLINE or AT YOUR LOCAL HOME DEPOT STORE

English Professional Installation Guidelines

DuChâteau Vinyl DeLuxe Grand Collection LuxCor Click Installation Instructions

Instructables Butcher Block Top

pinnacle plus SCULPTED RUBBER WALL BASE

Engineered Hardwood Flooring Installation Instructions

MATERIALS FORMAT CODE NOTES

General Installation Instructions

FITTING INSTRUCTIONS FOR OFD SOLID OAK FLOORING

INSTALLATION LAMTON INSTALLATION INSTRUCTIONS. Lamton Laminate Flooring with Underlay Attached Glueless Installation. Tools and Accessories

INSTRUCTIONS *= RECOMMENDED += ACCEPTABLE N/A= NOT AN APPROVER INSTALLATION METHOD

Exterra Installation Guide

Wall Installations. Chapter 16 Wall Installations 16. 1

Installation Guide. When purchasing Aboeda flooring, add 5%-15% to actual square footage needed for cutting allowance.

Wallpaper. the Right Way. Wallpaper is trendy again, both with designers, who are speccing it more often, and

Tools You Will Need: Pencil Chalk Line Level Rubber J-Roller Miter Saw (either hand saw or electric) Utility Knife Black Dot Stickers (provided)

TILING GUIDE. What you need: Tiles - Pliers and standard screwdriver

BAMBOO FLOORING PRE-FINISHED SOLID BAMBOO INSTALLATION GUIDE

LUXURY VINYL FLOORING INSTALL INSTRUCTIONS

Installation Instructions for Viking Hearth Engineered Wood Flooring

Laminate Floor Installation Guide

Instructions for Installing Vinyl Stair Treads with Musson 3 Wide Double-Face Tape

Installation recommendations nora stair solutions

Field Specs & Assembly Instructions

Installation Instructions Palladium 3D Hi Impact Wall System, Partial Height with Color Matched Caulk Joints

INSTALLATION. GlUElEss CliCK BamBoo installation GUidE. Introduction. Tips for a successful installation

TONGUE & GROOVE NAIL-DOWN INSTALLATION INSTRUCTIONS

Kraus Engineered Luxury Vinyl Plank 5G Insta-Loc Click Installation Instructions

The use of retaining pins is not required when using Armaflex 520 Adhesive.

SINCE 1995 HYBRID / LOFT / MANOR LINE INSTALLATION GUIDE

TORLYS LEATHER PLANK INSTALLATION INSTRUCTIONS

WoodWORKS Channeled Plank

INSTALLATION OF TILES

Au. di VoglFuge data sheet

Alterna Grouting Tiles & Planks

WETFLOR INSTALLATION GUIDE

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

Power Tape Rubber and Vinyl Stair Treads

INSTALLATION. Installation Guide. Installing Bamboo Flooring on Top of a Wood Subfloor

Installation Manual 0318

WOODWORKS Walls. Installation Instructions WALL

Installation Instructions for Mincey Marble Manufacturing s Standard 3-Piece Panels [Not Extending to the Ceiling]

The Gothic Chess Set

INSTALLATION GUIDE Twinback

Zenterra TM Installation Guide

Eagle clad double-hung window installation instructions

AquaGuard - Water Resistant Flooring Installation guidelines

Artificial Grass. Fitting Guide

Installation Instructions

Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes

Installation Instructions for Engineered Wood Flooring

Required Tools. Installation of Hook Plates & Discs. Professional Installation Guidelines for Engineered Wood & Hardwood with LocPlate Products

PATIO INSTALLATION MANUAL

UltraTile Rubber Weight Floor

The Fyfe Building Instructions for Assembly of the N scale kit.

Installation Instructions FOR INTERLOCKING ENGINEERED HARDWOOD (P.1)

Laminate Flooring Alternative to Hardwood Flooring

Contents. pages 20-24: Installing Edge sinks into. custom laminate countertops page 8: Installing Edge sinks into postform laminate countertops

Demilune 4. Apron Joinery. Curved Apron Tenon. Bridle Joint Legs. Bridle Joint Front Apron

FLEXITEEK INSTALLATION INSTRUCTIONS

WELDING. Section nine 9.1 CORRECT TOOLS

Installation Guide. Pionite Decorative Surfaces One Pionite Road, Auburn, Maine PIONITE ( )

Manufacturer 12mm Laminate Flooring Installation Guidelines

AIA Specification. Section Slate Shingles PART 1 GENERAL

Installation Instructions for Mincey Marble Manufacturing s 6 x 24 - Stacked - IL Panel System. Product number TS-VS/6 x 24 - Stacked - IL

Installation Instructions Stainless Steel Wall Panels

Brick, blockwork and concrete walls are also suitable providing the surfaces are flush without excessively wide mortar joints.

LuxCore Installation Instructions

Approx. Weight in g/m²

General Information 2 Tools/Materials Required 3 Site Work 3 Base Options 4

STANDARD 3-PIECE CULTURED MARBLE PANEL INSTALLATION GUIDE

Product number TS-CS/12 x 12. Please read the following before attempting to install your new 12 x 12 Contemporary cast marble panel system

Ben Franklin 5&10 Store

Outdoor Deck Turf Tile. Installation Instructions

Series Sloped glazed Curtain wall. Installation Instructions

How to Install Elite Bayside Beadboard

5If the protruding part is. 6Place 1 as is shown in the. 7Place what was assembled

Prior to installation, the installer assumes all responsibility for final inspection and quality of the product

BONDO PROCESS. Installation Guide.

Love Always Quilt. Additional Supp lies Needed. Fabrics Needed. Finished Size: 44" x 58 ½" (113.03cm x cm)

Installation Instructions Palladium Square Edge Panels

Installation Instructions and Details

INSTALLATION GUIDE FOR MAZAMA MULBERRYWOOD HARDWOOD FLOORING

Shingle Installation Guidelines

Transcription:

PVC-Free Tile & Plank Installation Guide CERES Sequioa & Halo Free CBC Flooring Please refer to the CBC Flooring website www.cbcflooring.com for the most current guidance about product application charts, material handling, subfloor preparation and testing, product installation and maintenance recommendations. Failure to follow these instructions may result in installation related problems. Do not install unless you have the correct product, color and quantity of materials. Check for visible damage before installation. Immediately notify CBC Flooring of any discrepancies BEFORE installation. Installation of materials implies acceptance. No credit for labor will be provided for installing the incorrect materials or materials with visible issues. DO NOT INSTALL OVER ANY EXISTING FLOORING. Handle materials with care to prevent damage. DO NOT DOUBLE STACK PALLETS. Store all flooring products and accessories in a dry interior area maintained between 50ºF-85ºF (10ºC-29ºC). Avoid temperature extremes. Store cartons of tile or plank flooring flat and squarely on top of one another. Do not lie on edge. Acclimate flooring, adhesive and substrate in the area to be installed to a stable condition between 65 F- 85 F (18 C-29 C) and 20%-65% RH for a minimum of 48 hours before, during and after installation. Afterwards, maintain a minimum temperature of 50 F (10 C) for the life of the floor. Refer to Material Handling & Subfloor Preparation Guide for additional product handling and subfloor preparation guidance. Adhesive Selection Make sure that you have the recommended adhesive and trowel size for installation conditions. Use only recommended adhesives as others may not provide satisfactory performance. For most installations, CBC Flooring recommends using CBC 9000 hard setting adhesive. See the Selection Chart below or call CBC Technical Support for assistance at 1-919-230-8700. Recommended RH Limit ph Limit Trowel Size Unit Size Coverage per unit Weight (lbs) per Unit CERES Sequoia Halo Free Wet or Flood Washed Extreme Heat or Cold Heavy Static Load Custom Designs CBC 9000 Hard Setting Adhesive 80% 10.0 ph 1/16 x 1/16 x 1/16 V-notch 2.85 Gallon 480-540 SF 30.0 P P u u 1/16 x 1/16 x 1/16 V-notch 2.85 Gallon 513-570 SF 30.0 N N u u Surface: P=Porous N=Non-Porous u= Porous & Non-Porous

Instructions for the use of CBC 9000 CBC 9000 hard setting adhesive is to be used on all applications. Check flooring materials before installation to make sure they are the correct product, size and color specified and free of visible damage or defect. Immediately notify CBC Flooring or any discrepancies BEFORE installation. Installation of materials implies acceptance. No credit for labor will be provided for installing the incorrect materials or materials with visible issues. Spread adhesive evenly. Do not allow any puddles or lumps of adhesive. When using CBC 9000 be sure that trowel notches are as recommended and kept clean. CBC does not recommend re-notching a trowel by hand. Replace the blade or entire trowel as necessary to insure proper coverage. For porous or rough substrates the tiles or planks are to be placed into the adhesive immediately. For smooth and non-porous substrates install tiles or planks into adhesive within 20 minutes. NOTE: In both cases it is recommended to work in the classic backward style laying tile and plank into freshly applied adhesive. It is important that adhesive not be allowed to set or skin over. Set adhesive requires removal and reapplication. Laying in wet will allow for movement of the flooring until adhesive has set. Install and roll tile into wet adhesive film, do not let adhesive skin over. Work off the flooring when possible to prevent adhesive from oozing, shifting of material, or indentation from adhesive displacement. If you must work on top of the material, use kneeling boards or ½ blue foam insulation. Roll the flooring with a 100 lb. 3-section roller immediately after setting flooring into adhesive and again after 1 hour. Wait a minimum of 3 hours for foot traffic and 48 hours for rolling traffic or point loads Dye Lots The installation needs to be planned to control dye lots. The installation of multiple dye lots together implies acceptance of material. Dye lots, or Lots are printed on each product label. For Halo & CERES Floors, the production code starts with V and represent the dye lot. Check the dye lots on each unit as there may be more than one dye lot on a pallet. If more than one dye lot is used in the same room, compare flooring materials to see if a color, texture or gloss variation is present. Dry lay different dye lots together for owner approval BEFORE installing. If dye lot differences stand out, keep materials from the different dye lots separate. CBC Flooring wood and stone visual products imitate natural wood and stone materials. Slight color variations may be present within a dye lot and are not considered manufacturing defects. Installing Tile Products Laying out the job is done the same way as standard 12 x 12 tiles. Where border areas are plainly visible, care should be taken to center the pattern so border tiles are the same size on each side. In all cases, avoid cutting border tiles less than 6 inches. Proper planning is important, so dry lay (without adhesive) some tiles to be sure of the layout. Tile Direction Tiles can either be laid all in one direction, or quarter turned. To assist the installer, most tiles have arrows on the back. The arrows show machine direction during manufacturing. Rectangular tiles are normally laid out in a brick pattern. The End User or Specifier should determine tile direction and layout. To be sure, dry lay a section of tile to see if the desired look has been achieved.

Cutting Tile Tile products can be cut using a tile cutter, a linoleum knife or a utility knife. Keep knife blades sharp for easy, accurate, safe cuts. Fit tiles using the same methods as other floor tiles (overlap, pattern scribe, wall scribe, freehand). Avoid heating tiles when cutting. If it is necessary to heat tiles, heat very slightly from the back. Custom Designs CBC tile flooring can be specified with custom patterns or logos. The tile can be cut into custom designs two ways: by fabricators using water jet and ultrasonic cutting or by the installer at the job site. If you are interested in having your custom design precut, please contact your local CBC Flooring representative regarding custom cutting. Custom cutting done by the installer on the job site should be cut from the top of the tile using a very sharp knife. Installing Tile with Divider Strips/Grout Note: Divider Strips and Grout strips applies to Halo flooring only. TOLI Divider Strips are 36 inches long and either 3 mm wide Type D (approximately 1/8 ) or 5 mm wide Type F (approximately 3/16 ). Halo Divider Strips and Grout are 36 inches long and 3/16 wide. PVC Divider Strips may be used with no change of adhesive necessary. The most popular design using divider strips, stripping or grout is to install one strip around each tile, similar to the look of a grout joint or a metal divider strip. Other designs may be created using Tile or Plank products with divider strips, stripping or grout. These instructions assume that divider strips, stripping or grout will be installed around each tile. For this pattern, order one strip for each tile plus 10% waste. The installation of stripping or grout is a simple process using the following steps: Dry Lay a small section of flooring to determine the starting point. Find the center and establish working lines, as you would for any normal tile installation. Calculate the center based on the size of the pattern you are creating (tile size + divider strip = pattern size). Dry lay a small section of flooring to establish the starting points, which may require moving the working lines. This will also help the installer and the customer to visualize the pattern before starting the installation. Precut a supply of divider strips to the same length as one tile. (Figure 1) Spread the adhesive and allow the proper set up time. Begin laying the tile along the working line. Insert one of the precut divider strips between each tile. Install the field tiles first, and the border tiles later. Use a hand roller as you lay each strip, to be sure the strip makes full contact with the adhesive. (Figure 2) Before laying the next row of tiles, lay a row of full-size divider strips along the first row. Use a hand roller to be sure the strips make full contact with the adhesive. (Figure 3) Lay the next row of tiles against the row of divider strips. Insert one of the precut divider strips between each tile. (Figure 4) Before laying the next row of tiles, lay a row of full-sized divider strips against the second row. Repeat the steps above until the field tiles have all been laid. Be sure to use a hand roller to be certain the divider strips make full contact with the adhesive. When finished, roll the entire floor with a 100-lb. roller. Cut and adhere the border areas. Roll the divider strips using a hand roller to ensure they make full contact with the adhesive. When finished, roll the entire perimeter with a 100 lb 3-section roller. Keep foot traffic and rolling or point load traffic off the floor for the time specified by the adhesive used. Begin maintenance program after the time specified by the adhesive used.

Figure 1 Figure 2 Figure 3 Figure 4 Installing Plank Products Note: Installing Halo Free plank with TOLI Lightwood plank will create gapping problems due to size differences. Lightwood plank are metric sized while Halo Free plank are imperial sized. CBC plank flooring is manufactured to simulate real wood planks, and can be installed just like a wood plank floor in a random staggered pattern, diagonally, herringbone, or others (see diagram below). Plank flooring can be installed in the Checkerboard design with or without using TOLI divider strip or Halo stripping around each block of the design. Straight lay planks can be installed starting at the longest straightest wall or like a tile installation, from the center of the room. Measure across room and make sure last plank will be at least 1/2 plank wide or trim first plank. If installing planks in a pattern, planks should be installed from the center of the room. Find the center and establish working lines, as you would for any tile installation. When starting installation along the longest wall, move working line 2-3 feet away from the wall. Lay a section of plank without adhesive to establish the pattern (see pattern reference below). Care should be taken to avoid cutting planks less than 9 inches long, or less than half the width of the plank. Move your working lines to achieve this. Dry laying a section of flooring assists this process. Spread the adhesive and allow the proper set up time. Lay the first plank from the starting point, following the working line. Lay the first 2 rows across the room. Place the planks aligned to the reference line butted together tightly. Careful placement of the first row of planks is very important, since the rest of the planks follow the first row. Set all of the full planks first, and then fit the border planks later. To fit border planks, use the overlap method as you would for square tiles: Place a full plank on top of the last full plank installed. This is the plank to be cut. Then place another plank flush with the wall, overlapping the plank to be cut. Mark a line on the plank to be cut, cut the plank following this line, and install the plank net to the wall. Be careful not to cut planks too tight to the wall. This will cause the plank to buckle. Crosscuts on LVT Planks can be done using a tile cutter, or a utility knife with a small carpenter s square or straightedge. Lengthwise cuts work best with a straightedge. Keep a sharp blade in your knife for easy, accurate, safe cuts. For beveled planks, always butt factory edge to factory edge. Be sure not to place cut edges against beveled edges. Cut edges can be beveled using a sanding block and medium grit sandpaper. Hold the sanding block at the same angle as the bevel and sand to match factory bevel.

Transition Strip For installations where products of different thicknesses will meet. The transition strip is an easy way to bridge the height difference between the two products. To install the Transition strip, install either the tile or the resilient sheet flooring first. Leave a clean, straight edge where the transition will be installed. Lay the transition strip into the adhesive, fitting tightly to the flooring s edge. Roll with a hand roller. Allow the adhesive to set. The other flooring material can then be cut and adhered to fit tightly to the adhered transition strip. Transition Strip: 36 Length available only in color # 3 - Medium Grey.080 (2.0 mm) 1/8 (3.0 mm) 5mm (approximately 3/16 or.2 ) wide Product, Nominal Size Metric Inches Sq.Ft/ Piece Pieces/ Box Sq.Ft/ Box Halo Free Tile 18 x 18 457 mm x 457 mm 18 x 18 2.25 20 45 Halo Free Tile 24 x 24 610 mm x 610 mm 24 x 24 4.00 10 40 Halo Free Plank 4 x 36 102 mm x 914 mm 4 x 36 1.00 36 36 Halo Free Plank 6 x 48 152 mm x 1220 mm 6 x 48 2.00 18 36 CERES Sequoia 4 x 36 (2mm thickness) 102 mm x 914 mm 4 x 36 1.00 30 30 When the installation is complete, follow the flooring products appropriate Maintenance Guide. Contact Information For additional information, please call 919-230-8700 Email: technical@cbcflooring.com www.cbcflooring.com Rev 02-17