TECHNICAL INSTRUCTIONS

Similar documents
Bolt Together Pump/Screw Together Frame Conversion Kit

SUBJECT INSTALLATION INSTRUCTIONS FOR FIELD JOINT FRYER DO NOT UNDER ANY CIRCUMSTANCES CONNECT THE TWO (2) GAS MANIFOLDS TOGETHER

INSTRUCTIONS INSTRUCCIONES CONSIGNES

INSTALLATION INSTRUCTIONS CONTOURED LIGHT BAR APPLICATION: CHEVY EQUINOX/ GMC TERRAIN PART NUMBERS: ,

MUELLER. Improved, Centurion Series, Modern Improved, and 107. Fire Hydrants. Inserting Extension Sections. Reliable Connections

Pickup Box Utility Rack Package Installation (Instruction ID: )

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

MUELLER. Improved, Centurion Series, Modern Improved, and 107. Fire Hydrants. Inserting Extention Sections. Reliable Connections

Installation Instructions Precision Sport Shifter

INSTALLATION INSTRUCTIONS

FLOE DOCK FURNITURE WARNING ASSEMBLY INSTRUCTIONS

Signature Choral Riser Side Rail

INSTALLATION INSTRUCTIONS ATV PLOW Mount Kit: PN Application: Sportsman 400, Magnum 425

Power Train Lift Max. Capacity: 1,250 lbs.

RBP-1215B-RX DODGE RAM QUAD CAB RX3

INSTALLATION INSTRUCTIONS ATV Winch Mounting Kit Part Number: Applications: Honda Rancher. Before You Begin.

INSTALLATION MANUAL CHEVROLET BIG BLOCK V4120 / V4220

INSTALLATION INSTRUCTIONS

Fan, Eden/Northfield, GS Installation Instructions (SKU ) Packing List

Big Block Installation Manual For Systems without A/C

OPERATORS MANUAL WEEKENDER STEEL LADDER RACK

Preference Collection and Treatment Console INSTALLATION GUIDE

Big Block Chevrolet Installation Manual For Systems with A/C #14220 / #14120

Riser Extension INSTALLATION GUIDE 40100AX35 / 40100AX18. Manual 40100X35-8

STOP. V00029AC Rev. 04 READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING CABINET FROM SKID TOOL LIST. NET-ACCESS S-Type Network Cabinets

INSTALLATION MANUAL WEEKENDER STEEL LADDER RACK

Preference Collection 5580 Treatment Console INSTALLATION GUIDE

CTTR Tire Rack Required tools

INSTALLATION INSTRUCTIONS UTV LIGHT BAR KIT Part Number: and Application: All UTV s*

BOX-115 Club Car Precedent Utility Box Mounting Kit Installation Instructions

Engineering Data Single Reduction Parts List Item # Description Basic Single Reduction Unit 1. Gear Housing 2. Pipe Plug 3. Vent Plug 4. Splash Guard

MPA-9000 Universal Ceiling Projector Mount Kit

INSTALLATION INSTRUCTIONS ATV WINCH MULTI-MOUNT Multi-Mount Mounting-Kit: PN Application: YAMAHA BIGBEAR 00+

GENUINE PARTS INSTALLATION INSTRUCTIONS

Fisher 667 Diaphragm Actuators Size 80 and 100

BOX-118 E-Z-Go TXT Utility Box Mounting Kit Installation Instructions

BOX-117 E-Z-Go RXV Utility Box Mounting Kit Installation Instructions

INSTALLATION INSTRUCTIONS ATV PLOW Mount Kit: PN Application: HONDA RANCHER

VAN STORAGE SOLUTIONS FOR THE WAY YOU WORK

pneumatic c-ring tool

Assembly Instructions Signature Choral Riser 4-Step Model

PARTITION INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

STEP 1 STEP 2 LEVELER KIT OPTION MOBILE CASTER KIT OPTION

SERVICE INSTRUCTIONS Model 9670 Lubricant Pump

Preference Collection 5543 Central Console INSTALLATION GUIDE

INSTALLATION INSTRUCTIONS SKID PLATE BODY ARMOR Part Number: Application: 2009 POLARIS SPORTSMAN XP 550/850

PLOW MOUNT KIT FOR POLARIS RANGER P/N ASSEMBLY / OWNERS MANUAL

INSTALLATION INSTRUCTIONS ATV SNOW PLOW WARN KIT PN: KAWASAKI KIT PN: KAF Application: Kawasaki Prairie

Commercial & Industrial Meter Maintenance Guide

INSTALLATION INSTRUCTIONS

Reliance SG800 Series Steel Water Gage Valves

SEAT-361 E-Z-Go RXV RHOX Seat Kit Installation Instructions

A-dec 541 and 545 Delivery System Mount on Preference Collection 5580 I NSTALLATION GUIDE

WARNING. Failure to observe these instructions could lead to severe injury or death.

SAVVY OFF ROAD GAS TANK SKID INSTALLATION INSTRUCTIONS

Instruction Sheet P/N B Trim the new RTD wires. 5. Coat the new RTD with. 4. Strip the ends of the existing

INSTALLATION MANUAL PBC-UMS

INSTALLATION & OPERATING INSTRUCTIONS. REDCO LETTUCE KING I and LETTUCE KING IV

Guitar Mobile Storage Rack

FSCTD Dual Back to Back Flat Screen Ceiling Mount

TACTIK Front Bumper. Installation Manual for Current Wrangler (JK) X

DRAWER Mitsubishi pajero lwb

P/N B ProBlue and DuraBlue Thermostat Service Kit - P/N

DOOR KIT P/N APPLICATION BEFORE YOU BEGIN KIT CONTENTS. Instr Rev Page 1 of 6. Verify accessory fitment at Polaris.com.

INSTALLATION MANUAL PBL-UMP

INSTALLATION MANUAL CHEVROLET SMALL BLOCK V3120 / V3220

TOYOTA TUNDRA CARGO DIVIDER Preparation. Part Number: PT

Mounting Instructions For 3-Piece Namur Style Mounting Bracket To 2-Way 60 Series Valves

Installation, Maintenance and Operating Instructions

SAFETY THIS PRODUCT IS FOR OFFROAD USE ONLY. ALL LIABILITY FOR INSTALLATION AND USE RESTS WITH THE OWNER.

INSTALLATION MANUAL FRONT. See pages 2 and 3 of this manual for configuration options. Level of Difficulty. Product Photo (center section only)

ATTENTION: PLEASE READ AND UNDERSTAND ALL INSTRUCTIONS AND WARNINGS BEFORE ASSEMBLING, INSTALLING OR USING THIS PRODUCT.

Rear Katerack Installation Instructions

Service Manual. Chipper/Shredder - CS4210 and CS4265 IMPORTANT: READ SAFETY RULES AND INSTRUCTIONS CAREFULLY

Assembly Instructions and Owner s Manual Flex TechBridge

M ACS Instructions

Baffle and Shredder Kits

Installation Guide Philips MP80/90 Installation Kit for Penlon Anesthesia Machine

LC6X4WTM Security Wall Mount with Tilt for up to 60" Flat Screens with VESA 600mm x 400mm or less

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Y-Connector Accessory (For Multi-Dual Arm Mounting Systems) Model: KSA-1011

SAM. Model: STV-C65 LCD Mobile Visualized Stand Instruction Manual. Weight Capacity: 1251bs / 56.7kg Suits LCD Flat Panel Display: 42"-55" Page 20

Office Partitions WARNING. Assembly Instructions. Customer Service A S S E M B LY HARDWARE H1 H2 H3 H4 H5 H8 H9 H10 H11 H12

Retro Fit Gearbox Mount. Assembly Instructions. Assembly Instructions. Before You Start. General Information. Manual No M

BETTIS SERVICE INSTRUCTIONS FOR MODELS G01 THROUGH G10 SERIES HYDRAULIC SPRING RETURN ACTUATORS WITH M11 HYDRAULIC OVERRIDE

Reliance SG777 Series Steel Water Gage Valves

FRONT BUMPER KIT P/N APPLICATION BEFORE YOU BEGIN KIT CONTENTS. Instr Rev Page 1 of 6

baseplate GMC Adadia & Buick Enclave

4.2 - PUMP MAINTENANCE MODELS: AC, AS, WC, WS

Installation Manual. SKU# TracVan Double SKU# TracVan Double SKU# TracVan Triple

Diva Acoustical Ceiling

Installation Manual Roof Zone Ladder Rack

INSTALLATION INSTRUCTIONS / DODGE RAM CREW CAB 2500/3500

FM2113PC/FM2114PC SBC Top Mount Alt, w/ A/C & Power Steering

Jenny Legs Assembly Instructions

INSTALLATION INSTRUCTIONS WINCH MOUNTING KIT Part Number: Application: Kymco MXU 250

Magnum low voltage drawout circuit breaker IEC horizontal stab cassette shutter kit (double wide A cassettes)

Kawasaki Teryx 750 Cab Kit* Caution: Before using this product, read this manual and follow all Safety Instructions.

Transcription:

0 TECHNICAL INSTRUCTIONS Innovation Anode Retrofit Instructions This kit applies to all Innovation model water heaters ITEM 1: P/N 44173 ANODE MOUNTING BRACKET ITEM 2: P/N 44174 ANODE BLOCK (2 each) ITEM 3: P/N 54107 3/8 16 HEX HEAD CAP SCREW (3 each) ITEM 4: P/N 54106 5/16 24 HEX HEAD CAP SCREW ITEM 5: P/N 56077 HEX NUT 5/16 24 ITEM 6: P/N 53058 LOCKWASHER (3 each) ITEM 7: P/N 88019 O RING, NEOPRENE (4 each) ITEM 8: P/N 54108 1/4-20 HEX HEAD SEAL BOLT (4 each) ITEM 9: P/N GP-18532 HEAD GASKET ITEM 10: P/N GP-18556 HEAD RELEASE GASKET Innovation Heat Exchanger Anode Retrofit Part List ITEM# QTY. P/N DESCRIPTION 1 1 44173 ANODE MOUNTING BRACKET 2 2 44174 ANODE BLOCK 3 3 54107 HEX HEAD CAP SCREW 3/8 16 X 1, NiCu ALLOY 4 1 54106 HEX HEAD CAP SCREW 5/16 24 X 1 1/2 STAINLESS 5 1 56077 HEX NUT 5/16 24 STAINLESS 6 3 53058 LOCKWASHER, EXT TOOTH, STAINLESS 7 4 88019 O RING, NEOPRENE 8 4 54108 HEX HEAD SEAL BOLT 1/4 20 with NEOPRENE RING 9 1 GP-18532 HEAD GASKET 10 1 GP-18556 HEAD RELEASE GASKET Disclaimer The information contained in these instructions are subject to change without notice from AERCO International, Inc. AERCO makes no warranty of any kind with respect to this material, including, but not limited to, implied warranties of merchantability and fitness for a particular application. AERCO International is not liable for errors appearing in this manual. Nor for incidental or consequential damages occurring in connection with the furnishing, performance, or use of this material. 05/21/2015 AERCO International, Inc. 100 Oritani Dr. Blauvelt, New York 10913 Phone: 800-526-0288 Page 1 of 6

1. Introduction This Technical Instruction Document (TID) provides instructions for installing the anode assembly in Innovation water heaters in the field. This kit is delivered unassembled. These instructions apply to all Innovation model water heaters. 1/4-20 HEX HEAD SEAL BOLT (4 Each) 5/16-24 HEX CAP SCREW (POSITIONING SCREW) (1 Each) 3/8-16 HEX CAP SCREW O RINGS ANODE MOUNTING BRACKET (2 PARTS) 2. Tools Required Figure 1: Anode Assembly Exploded View Assorted socket or open-end wrenches 3. Preparing the Unit To prepare the unit for the retrofit, perform the following: Preparing the Unit for Retrofit 1. Set the ON/OFF switch on the control panel to the OFF position. Disconnect AC power from the unit by turning off power at the breaker. WARNING! - A high voltage of 120 VAC is used in Innovation water heaters. It is REQUIRED that all power applied to the unit is removed before performing the procedures described below. Use extreme care when accessing circuits and electrical connections within the equipment. Serious personal injury or death may occur if this warning is not observed. Various components may be hot. Care must be exercised to avoid burns. AERCO suggests allowing the unit to cool to room temperature before starting these instructions. 05/21/2015 AERCO International, Inc. 100 Oritani Dr. Blauvelt, New York 10913 Phone: 800-526-0288 Page 2 of 6

Preparing the Unit for Retrofit Continued 2. Turn off the supply gas upstream from the unit. 3. Allow enough time for the unit to return to room temperature. 4. Close the water inlet, outlet, and recirculation shut-off valves to the unit. 5. Carefully open the drain valve while opening the relief valve on the rear of the unit to relieve pressure and allow air into the shell. Do not drain the unit without venting the shell! A vacuum in the unit may displace the head liner causing serious damage not covered by warranty. 6. Remove all panels from the front, top and sides of the unit, to provide access to the heat exchanger top plate. IMPORTANT! Observe local requirements and lockout procedures when working on the unit. 4. Disassembling the Unit Disassembling the Unit 1. Referring to Figure 2, remove the 5/8-11 hex nuts and washers from the upper head and then remove the upper head. 2. Remove the upper head-liner (copper or other material) and retain it for reassembly. 3. Remove the head release gasket and discard it. 4. Remove the head gasket and discard it. CAUTION 5/8-11 HEX NUT UPPER HEAD 5/8-11 X 3-3/4 STUD SHELL FLANGE HEAT EXCHANGER UPPER HEAD LINER (P/N 123077) HEAD RELEASE GASKET (P/N GP-18556) HEAD GASKET (P/N GP-18532) Figure 2: Heat Exchanger Head Configuration 5. Installing the Anode Assembly Once the upper head has been removed, refer to Figure 3, below, and complete the instructions below to install the anode assembly. 05/21/2015 AERCO International, Inc. 100 Oritani Dr. Blauvelt, New York 10913 Phone: 800-526-0288 Page 3 of 6

Anode Assembly Installation 1. Cut a doughnut shaped piece of cardboard that will fit snugly inside the heat exchanger shell and around the combustion chamber head and fit it in place above the heat exchanger tubes. This will act as a shield to prevent any hardware or debris from dropping into the chamber during installation. 2. Thread the 5/16-24 hex nut (P/N 56077) most of the way onto the 5/16 24 hex head cap screw (the positioning screw) (P/N 54106), and then thread the positioning screw a short way into the center hole of the mounting bracket s larger piece. 3. Place the mounting bracket on the combustion chamber head s lifting hook with the positioning screw directly over the lifting hook. 4. Position the smaller, separate piece of the mounting bracket on the opposite side of the lifting hook, and loosely fasten it to the larger piece of the mounting bracket with two 3/8 16 hex head cap screws (P/N 54107) and lock washers (see Figure 3). CAUTION The 3/8 16 hex head cap screw material is softer than steel screws and the threads can strip easily. Take precautions to prevent stripping during installation. This kit includes an extra screw in case one is damaged. 1/4-20 SEAL BOLTS (4 Each) 5/16-24 POSITIONING HEX SCREW (1 Each) 5/16-24 NUT (1 Each) MOUNTING BRACKET 3/8-16 CAP SCREWS & LOCK WASHERS MOUNTING BRACKET, SEPARATE PIECE COMBUSTION CHAMBER HEAD LIFTING HOOK COMBUSTION CHAMBER HEAD Figure 3: Anode Assembly and Combustion Chamber Head 5. Lift the mounting bracket up until the upper 3/8 16 cap screw comes in firm contact with the underside of the lifting hook and level and parallel to the heat exchanger s shell flange, and then fully tighten both screws. 6. Fully tighten the 5/16 24 positioning screw. The lifting hook is now held firmly between the 3/8 16 cap screws and the positioning screw. 05/21/2015 AERCO International, Inc. 100 Oritani Dr. Blauvelt, New York 10913 Phone: 800-526-0288 Page 4 of 6

Anode Assembly Installation Continued 7. Fully tighten the 5/16-24 hex nut on the positioning screw to lock it in place. The mounting bracket is now firmly attached to the lifting hook, ensuring that the anode blocks are electrically connected to the unit. 8. Position the four (4) O rings (P/N 88019) in the circular recesses around the threaded holes in the anode blocks (P/N 44174). The O rings keep water from entering the threaded holes, preventing them from corroding, which would shorten the anode s life. 9. Fasten one anode block to the mounting bracket with two (2) 1/4 20 hex head seal bolts (P/N 54108) and fully tighten them. Note that these are specialized bolts with built-in O rings DO NOT substitute off-the-shelf bolts of the same size. DO NOT over-tighten these bolts. 10. Repeat the previous step to attach the second anode block to the mounting bracket. 11. Remove any hardware or debris that may have fallen on the cardboard shield installed in step 1 and then remove the shield from the chamber. 6. Reassembling the Heat Exchanger Reassembling the Heat Exchanger 1. Place the new head gasket (P/N 18532) on top of the heat exchanger shell flange. 2. Place the new head release gasket (P/N 18556), upper head liner and upper head on, aligning them with the 5/8-11 X 3-3/4 studs in the shell flange. 3. Replace the nuts and washers on the 5/8-11 X 3-3/4 studs. 4. Cross tighten the nuts to approximately 75 ft.-lb. torque to obtain a uniform seating, then progressively tighten the nuts to 200 ft/lbs. minimum. 7. Returning the Unit to Service Returning the Unit to Service 5. Close the drain valve. 6. Reopen the unit s water inlet, outlet, and recirculation shut-off valves. 7. Reinstall the unit s front, top and side panels. 8. Turn on the supply gas upstream to the unit. 9. Reconnect AC power to the unit. 10. Set the ON/OFF switch on the control panel to the ON position. --- END --- 05/21/2015 AERCO International, Inc. 100 Oritani Dr. Blauvelt, New York 10913 Phone: 800-526-0288 Page 5 of 6

Change Log Date Description Changed By 09/08/2014 Rev A: Initial release (reference PIR 1086) Chris Blair 05/21/2015 Rev B: 934-190: Added two gaskets to the instructions: GP- 18532, GP-18556. Chris Blair International Inc. AERCO International, Inc., 2015 05/21/2015 AERCO International, Inc. 100 Oritani Dr. Blauvelt, New York 10913 Phone: 800-526-0288 Page 6 of 6