Zintra Acoustic Textures Cutting and Installation Instructions for ½ panels

Similar documents
SLATE LITE. handling fabrication and installation guide

Installing a Squeak-Free Nascor Floor System

PhotoVu Digital Picture Frame Service & Repair Guide

Big Kahuna Assembly Instructions

DynaRound Hatch Guard System Installation Instructions

INSTALLATION INSTRUCTIONS

ASSEMBLE ALUMINUM TOOLBOX

INSTALLATION INSTRUCTIONS

Note: If using fusible web adhesive to secure stars, prewash all fabric but do NOT use fabric softener.

INSTALLATION INSTRUCTIONS

How to Install a Slate Tile Floor By See Jane Drill TM Copyright 2014, All Rights Reserved

I I I I. Assembly Instructions:

Standard Operating Procedure for SEM3 (ThermoFisher / FEI Apreo)

BASIC SAFETY AND FABRICATION GUIDE. Safety Guidelines

Ten-Tec Model RX-366 Subreceiver 565/566 Subreceiver Installation and Operation Manual-74467

Pencil Drawing. Hard 2H H F HB B 2B 4B 6B Soft

BigMouth

Double Axis Square Turned Bowl

A2: Aperture, DOF, & Focus

A Geno Technology, Inc. (USA) brand name. Orbital Shaker. Cat. No. BT909, BT926, BT

Claim Amalgamation. Getting Started. Amalgamate means to join 2 or more cell claims into one cell claim. Before you start:

Cascading Skirt Pattern

Take Along Sewing Tote

21 st Century Shooting

Using the Register of Swiss Surnames

Cyrus Redblock. Kit Inventory

Appendix M Trellis Type Shade Structure Design Guide

m LUCASEY SLELCD COMPANY Important! Please read all warnings and cautions before installing the mount. SLELCD DETAILED INSTRUCTIONS Page 1 of 6

Wilsonart Decorative Edge Fabrication Manual. Wilsonart Decorative Edges

SolarEdge Built-in Revenue Grade Meter Troubleshooting

Samples from

SISTEMA ELEVATÓRIO ETV 460A

Meet the Science Expert

2015 Chevrolet Corvette Corvette Service Manual Body Systems Vehicle Access Repair Instructions Document ID:

COMP 110 INTRODUCTION TO PROGRAMMING WWW

OMAL MITER RT Round End Tenon Machine for Stiles and Rails

To receive a service letter, please scan the Volunteer Log and it to:

Machine Shop Lab Manual GENERAL INSTRUCTION

Consciousness Shifting

This app uses callas pdftoolbox server as the imposition engine and consequently you have to have that program installed on your Switch server.

.,Plc..d,~t l~ucjio PA300 DIGITAL BASS PROCESSOR USER'S MANUAL. 2 Why use the DIGITAL BASS PROCESSOR? 2 About the PWM Subsonic Filter

INFINITY ALUMINUM INSTALLATION GUIDE

WiFi Lab C. Equipment Needs:

Great Guitars! SKILLS/OBJECTIVES o To understand how sound is created o To understand frequency and its relationship to wave shape o To make guitars

ComfortView. Application and Technical Overview. Neighborhood Street Lights.

FG-03: Hand Burn Profile

6 th and 7 th Grade Advisory Plans (Week 16)

Pool & Hot Tub Guide

CUSTOMER PORTAL. Floorplan Management

Remote Control Learn Button Receiver Input Connections

VM1AT-R1 INDUSTRIAL MICROCONTROLLER

Design and fabricate a lamp using the given electrical component.

Improv Piecing and Matchstick Quilting By Kelly Nagel, Sulky of America

Insert Picture, reduce the size of a Picture and Wrap text around a picture

Banner pocket v3 Page 1/7. Banner pocket v3

The UNIVERSITY of NORTH CAROLINA at CHAPEL HILL

APPLICATION NOTE Sales & Application DEWESoft Slovenia

Puget Sound Company Overview. Purpose of the Project. Solution Overview

Dorsey s Search. Name Address Home Telephone Work. Address. Property Owner s Signature

RIG SOLAR FILM. High quality clear 48 gauge Polymer material \V;th excellent transmission qualities.

N2CX Accuprobe Plus Assembly Instructions

Using the Laser Cutter

Table of Contents. ilab Solutions: Core Facilities Core Usage Reporting

Specification for Learning and Qualifications for Physical Intervention Skills

RiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014

Selecting Yo r Guitar Notes on the First String: Introducing E Acoustic Guitars and Electric Guitars The Note E with Chords Tuning Your Guitar

Colourful Stitches. Quick Summer Medallion. 45 x 45 Gyleen X. Fitzgerald Quick Summer Medallion.

Operating Instructions

DXF2DAT 3.0 Professional Designed Computing Systems 848 W. Borton Road Essexville, Michigan 48732

5. Experimental Results

Installation hole (4.2mm) Push. Ambient daylight threshold. 8 hours manual on

STRONGHOLD IRON INSTALLATION GUIDE

For as long as there have been people trying to find their way, there have been stars to guide them. Stars dance in the heavens weather we see them

Set up and use your Beats X earphones

Super ABC Plug-in kit for Pacman or Ms Pacman

Dry Contact Sensor DCS15 User Manual

Fitting instructions for all. SitaRoof- and renovation outlets, extension elements and accessories

Fitting instructions for all. Sita balcony outlets, extension units and accessoires

Door Restore System 2K

Potting Bench BUILD TIME

Pulse Width Modulation (PWM) Cornerstone Electronics Technology and Robotics II

Tube Change for PANalytical X-Pert Pro

Excel Step by Step Instructions Creating Lists and Charts. Microsoft

Lite-On offers a broad range of discrete infrared components for application such as remote control, IR wireless data

You Be The Chemist Challenge Official Competition Format

Installation Instructions Palladium Wall Panels - Demountable Factory Finished Edges and Field Cut Edges

SINGER FUTURA TM Holiday Banner

FXP611 Flexible PCB Antenna with Cable Application Note

2018 Print and DPI Annual Competition Rules

MWL-MT10DX Turbo Ace Semi-Automated Tungsten Electrode Grinder

Flash Image Rotator Web Part

Laminators Incorporated manufactures a full line of sign panel products that are the industry standard for professional sign makers.

Building and Installing Bumblebee Houses

Introduction to Life Cycle Risk Management Help Page

ANTIOCH UNIVERSITY VIRTIUAL WRITING CENTER

1.12 Equipment Manager

IR Emitter and Detector Product Data Sheet LTE-R38386AS-ZF Spec No.: DS Effective Date: 09/14/2016 LITE-ON DCC RELEASE

Flux Bender Equalizer

Enabling the Bluetooth Low Energy Direct Test Mode (DTM) with BlueNRG-MS

INSTRUCTION BOOKLET (PUZZLES BY NIKOLA ZIVANOVIC)

Transcription:

Zintra Acustic Textures Cutting and Installatin Instructins fr ½ panels CUTTING AND FABRICATING PANELS ON SITE Any f the panels can be cut r adjusted n site. This allws fr site adjustments r adaptatins t bstacles (such as fire alarm bxes r electrical bxes.) When cutting r drilling, make sure t use sharpened tls t avid any verheating f the material. A utility knife with a new blade can als be used. The texture f the panels are similar t MDF. A panel may be cut with: Hand saw Use a fine tthed blade. Hld the blade at a lw angle. Cut slwly with regular and even strkes. Table saw r Circular saw Allw the panel t pass thrugh the saw with even pressure. D nt frce the panel at any time. Use a fine tthed blade with 80 teeth r mre. Carbide tipped blades are recmmended fr extensive cutting r if many panels are t be cut cnsecutively. Jig saw If adjustable, use a slwer speed and steady mvement. Select a fine tthed blade suited fr finish wds and plastics and use a template fr cututs. Be aware t nt verheat an area with any blade. D nt attempt t use ruters r spiral cutters. Laser tls are als nt recmmended. Best results will be achieved by using nly very sharp tls and blades, ensuring clean cutting while nt verheating the material during the cut. Carefully clamp all panels t avid vibratin during cutting. Vibratin during cutting r fabricatin may result in panel damage. Prperly supprt the panel at all times. Carefully measure all walls t be cnfident that yu can transfer thse measurements nt the panels prir t cutting. Scribe t fit as necessary. Use a pencil t mark the panel. If yu must mark the face side, use blue tape befre marking it. Pencil marks will nt erase frm Zintra. Zintra panels can be drilled. Carbide tipped steel drills are recmmended t btain a high grade finish n the sides f every hle. Better results will be btained with slw t medium drill speeds. MDC 400 High Grve Blvd., Glendale Heights, IL 60139 tel 800 621 4006 fax 847 437 4017 mdcwall.cm

INSTALLATION Zintra panels are simple t install. The panels are mst cmmnly installed using ne f fur methds: Direct adhesin t the substrate. Using Z clips. Using stand ffs. Mechanical fasteners (screws and nails). If yu are unsure abut which methd has been specified fr yur prject, please cnfirm thse details with yur specificatin surce and direct yur questins t them. MDC may be able t assist yu with sme cmmn questins, but please realize that yur specific prject may be unique t yu. Suitable substrates are scuffed MDF, plywd, gyp bard, CMU r any unifrmly clean, suitably sund, stable, smth and/r previusly painted surface with a verified bnd f the catings and layers with a surface which has sme tth t allw adequate bnding. If yu have any dubts abut yur surface, then a site mck up is suggested. Applicatin t lse r unsecured plywd r MDF panels is nt recmmended. D nt rush the installatin. A prfessinal installer is recmmended s that prper care and attentin are paid t this. Installatin details fr thse fur methds: Direct Adhesin t the Substrate. Be certain that yur substrate will hld an adequate bnd t the recmmended adhesive. If in dubt abut a cating r a finish already in place, an adhesin mck up test is recmmended befre yu begin. Cut, scribe and pre fit all Zintra ½ panels as necessary. Once all f the panels have been prperly sized and trimmed, begin the applicatin f the adhesive t the BACK SIDE ONLY f each panel. Use ONLY Liquid Nails LN710 Panel and Mlding adhesive tubes. Place the cartridge tube int the caulking gun, cut the nzzle and puncture the inner seal. Trim nzzle t prduce a ¼ thick bead. First, apply a squiggly bead 1 in frm the edge f the panel alng all fur perimeter edges f the BACK face f the panel. See belw images fr reference. Then apply a zig zag pattern diagnally acrss the central sectin f the panel, within the already placed bead f adhesive. Apply the panel t the substrate within 20 minutes and mnitr yur adhesive t prevent it frm skinning ver. Set the panel gently int place. MDC 400 High Grve Blvd., Glendale Heights, IL 60139 tel 800 621 4006 fax 847 437 4017 mdcwall.cm

Smth the panel int place and then lift it ff the surface, hlding the panel separate fr ne minute. Then reset the panel t the substrate, this time applying adequate pressure t firmly set it. Mechanically supprt the panel(s) if yu deem it necessary until the adhesive is cmpletely set. NEVER use slvent based cntact adhesives r unauthrized adhesives. Using Z Clips (als called 2 part French cleats r Z bars ) Z clips are tw parts fr each clip, ne munted t the wall substrate and the ther munted t the back f the material. If using a Z clip system, be sure t allw a gap at the ceiling line which is sufficient in dimensin t allw the clip, which will be installed n the panel, t be lifted up ver the wall munted prtin f that clip and then drpped in t be seated prperly. This is cmmnly a 1 r s allwance. Depending upn the size f yur panel, yu will have 2, 3 r 4 f the Z clips t munt the panel securely. MDC 400 High Grve Blvd., Glendale Heights, IL 60139 tel 800 621 4006 fax 847 437 4017 mdcwall.cm

The gal is t munt each panel level and plumb. Begin by munting yur first half f each Z clip t the back f the first panel. Orient the clip t be facing dwnward (pen gap is dwn). Install the uppermst clip n clser than 1 t the hrizntal tp edge f the panel. Clips shuld be psitined t be: Parallel t the hrizntal edge f the panel. Centered n the panel and n clser than 6 away frm each vertical side edge. Separate each clip t be psitined n clser than 2 belw the clip abve it. Attach the panel clip halves t the panel using pan head #8 sheet metal screws, ½ lng. Yu will need t drill hles fr these screws in the Z clip halves, but nt int the panel itself. D nt vertighten any screws. Psitin a screw anchr t be n less than every 12 alng the clip. With each half clip nw attached t the panels, yu can crdinate the placement f the ppsing half f each clip attached t the substrate. BE SURE YOUR PLACEMENTS ARE DESIGNED TO ALLOW FOR THE DROP IN HEIGHT ALLOWANCE NEEDED TO LIFT THE PANEL OVER THE BOTTOM CLIPS BEFORE SEATING EACH. Measure dwn frm the ceiling n the substrate and psitin the uppermst clip n a hrizntal line which is placed t allw the tw halves t be seated prperly nce the panel is installed. Verify that these clip psitins are level and prperly spaced t crdinate with the ppsing halves befre cmmitting. Install these clips using a suitable anchr fr yur substrate. Mst cmmnly, that will be 5/8 gyp bard. Select yur anchr knwing that the best chice fr the screw is a pan r truss head #8 f apprpriate length t securely embed int the wall studs. We d nt recmmend the use f fluted head drywall screws fr this. Yu will need t drill hles fr these screws in each f the Z clip halves. With the wall halves nw secured, yu can lift the panel t slip ver the wall Z clips and then drp int prperly seated psitin. Using Stand Offs The number f stand ffs will be determined by yur panel dimensins. Please refer t the fllwing diagram fr an verview f hw many that might be. Blcking is als recmmended with Stand-Offs as a hidden supprt t prevent caving f panels. Stand ff placement guide Stand ffs shuld be 3 frm the edge f panel 2 x 2 2 x 4 2 x 9 4 x 4 4 x 9 MDC 400 High Grve Blvd., Glendale Heights, IL 60139 tel 800 621 4006 fax 847 437 4017 mdcwall.cm

Begin by marking the panel back fr the placement f each hle fr each stand ff required. N hle shuld be clser than 3 away frm the perimeter edges f the panel. Using a tungsten carbide bit f the diameter apprpriate t match yur stand ff (nt supplied, s yu will need t determine these), use a pwer drill t create each hle as yu have marked. With all f the hles nw drilled, determine the precise placement f where the panel is t be installed. With ne persn hlding the panel level and plumb, a secnd persn will mark the substrate fr the precise placement f the hles. Secure each stand ff base t the substrate using an apprpriate anchr. (We recmmend that yu have arranged a backing supprt already in the wall r align a vertical clumn f anchrs t fall n a wall stud instead f hanging the full weight ff just the gyp bard wall panel. The installer r specifier will be making these chices.) Set the panel in place ver the stand ff bases and attach the stand ff head cap trims t secure the panel. Tighten nly by hand, d nt ver tighten. Mechanical Fasteners Yu may als secure the Zintra panel t the substrate using the same fastener placement guide as used fr the stand ffs, but use direct fastening (screw r nails) t secure the panel. If using screws, we suggest that yu use a pan r truss head and that yu pre drill yur hles (selecting a tungsten carbide drill bit f the apprpriate diameter t the screw yu have selected.) Remember t select an anchr which is apprpriate t yur substrate. Each standard Zintra panel is apprximately 18 lbs. Make sure t tighten all screws t be tight, but t nt be verly tight (d nt cmpress the Zintra unevenly.) Pwer nailing can be utilized if yu have adjusted the tip f the gun fr the density f the Zintra. If yu are unsure abut the system selected fr yur prject, please stp and verify the details. MDC may be able t assist yu with sme methds f cmmn attachment, but thers may be unique t yur prject. MDC 400 High Grve Blvd., Glendale Heights, IL 60139 tel 800 621 4006 fax 847 437 4017 mdcwall.cm