Installation recommendations nora stair solutions

Similar documents
Installation Recommendations Joint sealing of nora floorings

3Insert the second rod no. 4

Roll Out Vinyl Installation Guide

Repairs. Chapter 10 Repairs 10. 1

ARMA-CHEK SILVER APPLICATION MANUAL. T. +49 (0)

Install your floor between 18 and 30 C.

Wallgard 1,3 product

Robert Bosch GmbH. Minimalist washstand

Instructions for Installing Vinyl Stair Treads with Musson 3 Wide Double-Face Tape

Please read through the entire document before starting your installation process to better understand what is required.

Recommendation for fitting the floor coverings: Alfa / Beta

1Take the keel (3) and

San Felipe: Step by Step Pack 3

SAN FELIPE: Step by Step Pack 2

HeatBoard Joisted Floor System

INSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION

Handrail H Series. Product Installation. Instructions. Installation Instructions For. Wall Mounted and Freestanding Round Handrails

1Smooth pieces 4, 5 and 6, using

5If the protruding part is. 6Place 1 as is shown in the. 7Place what was assembled

General Installation Instructions

For best results, it is essential that you follow the installation instructions exactly.

Nanton Grain Mill Assembly

Laying and maintenance of cement tiles

Exterra Installation Guide

1Use the metal file to smooth

Scissor Stool. Written By: Feitan

Zenterra TM Installation Guide

INSTALLATION INSTRUCTIONS FOR ELKALAMINATE. IN ORDER TO OBTAIN A GOOD RESULT, WE ADVISE TO FOLLOW ALL GIVEN INSTRUCTIONS CAREFULLY.

STONEYBRIDGE STRUCTURES

Coffee table with recessed tray

MAGNUM BOARD INTERIOR INSTALLATION GUIDELINES

Central New York Rocket Team Challenge 2018 Rocket Assembly Instructions

TONGUE & GROOVE NAIL-DOWN INSTALLATION INSTRUCTIONS

DO NOT HESITATE TO CONTACT US TO BE GUIDE DURING THE INSTALLATION OF SQUAREDECKO PRODUCTS

How to repair a wall or ceiling FREE

MATERIALS FORMAT CODE NOTES

Adhesive Selection. ph Limit Trowel Size Unit Size Coverage per unit. 1/16 x 1/16 x 1/16 V-notch 2.85 Gallon SF 30.

WELDING. Section nine 9.1 CORRECT TOOLS

Install Windsor Corners

BRACKET FIX SYSTEM FITTING INSTRUCTIONS

TRIVERSA TRIVERSA ID. Triversa Triversa ID Installation Instructions. Remove the wall base and doorway trim. Always undercut wood door casings

How to Install Elite Bayside Beadboard

Jeep Cherokee 4-Door XJ Set Part # Rev

Vivian Mansion Assembly Instruction By Laser Dollhouse Designs

APPLICATION OF JAC FILMS

INSTALLATION. GlUElEss CliCK BamBoo installation GUidE. Introduction. Tips for a successful installation

TREX REVEAL RAILING Installation Instructions

Install Instructions for Solano Jurastone #4012 Mantel

Three layer Felt Roofing using cold applied adhesive

Stair Tread & Riser Installation Guide

Little Briana Cottage Dollhouse assembly instructions

Install Instructions for Torrance Jurastone #4004 Mantel

Building Instructions ARTEMIS Sailing Canoe Day Six Version 1.0 Brian Pearson & Dr. Axel Schmid Day Six. Align and Glue Planks

Installation Instruction

Robert Bosch GmbH. Wall organiser

Flash Coving. Chapter 8 Flash Coving 8. 1

Installation Guide. Aspect Stone Peel & Stick Tile. proper surface preparation is essential for a successful project. Installations Methods

Water Line and Water Line Assembly Gasket

INSTALLATION INSTRUCTIONS FOR QUICK-STEP LAMINATE.

Molding Installation & Profile Guide

Tape Measure Metal Clippers Screw Bit Set With Extensions

INSTALLING YOUR UNICLIC FLOOR - Small planks / 3 sizes

USER GUIDE Crystal - Pressure Mount

How To Create An Entertainment Unit

Installation Instructions for Viking Hearth Engineered Wood Flooring

Wilsonart Decorative Edge Fabrication Manual

FITTING INSTRUCTIONS FOR OFD SOLID OAK FLOORING

3Position the hull of the ship as

INSTALLATION GUIDE Twinback

Installation Instructions

Installation Instructions

Laminate Floor Installation Guide

EZYSTONE WORKSURFACES

VersaDrive 4/8 Construction Jig Addendum. 4 and 8 Tetrode VersaDrive

Columbia Laminate Installation Instructions

WET AREA PANELLING. Designer Walls. Fast

GREENHOUSE 6'x8' ASSEMBLY INSTRUCTIONS. (Internal Dimensions) Overall Dimensions (Approx.) L 193 W 200 H cms 97.5" L 76" W 78.

1INSTALLATION GUIDE: ENGINEERED WOOD FLOORING

BUILDING A GOAL WALL DO IT YOURSELF! INSTRUCTIONS FOR A GOAL WALL

POWER VLIES STRETCH 160

Chapter 5. Installation procedures. Installation procedures 24. Topics. Notes. 5.5 Flash coving General recommendations 25

installation manual m y w a l l a r t. c o m

INSTALLATION INSTRUCTIONS FOR QUICK-STEP LAMINATE WITH HYDROSEAL TECHNOLOGY.

Ask your DIY store or carpenter to cut the required boards to size. Instructions. 1. Cut out the opening for the bottles

Jeep Cherokee Door XJ Set Part # Revision J

Drawings of all parts have been included for ease of part identification.

Loose Lay Luxury Vinyl Plank

HOW TO INSTALL HORIZONTAL ROD RAILING TREX SIGNATURE STANDARD

Ford F150 Rear Flares Set Part # Revision

rondo exangle drywall finishing sections

SANERI 3 º. Self-adhesive SBS-elastomer bitumen cap sheet

MISCELLANEOUS CABINET REPAIRS

Installation Instructions for Engineered Wood Flooring

Panel Riser Kit Option 1. Installation Instructions 226BEE 0117CH

Read guide from beginning to end before starting installation. Read all warnings and cautions during unit installation.

Manual 2: Graficast print films for high level wrapping. MANUAL 2. Graficast Print Films FOR HIGH LE VEL WR APPING

Installation Instructions. This leaflet must be read thoroughly before commencing installation. 1 P a g e. Version 2.

How to assemble the Reims Gueux Pit End Modules #005

English Professional Installation Guidelines

Processing Guidelines ORAFOL Films for Aircraft Applications

Transcription:

Installation recommendations nora stair solutions Suitable subfloors are stairs made of wood, stone, screed (primed), metal as well as other hard and solid subfloors. The subfloor must fulfil the requirements of the country-specific standards regarding the readiness for installation. The front edge of the step has to be straight and match the shape of the profile. Rounded or wavy edges prevent full adhesion of the stairtread at the edge - the area which is subject to maximum stress. The springiness of the edges at this point may cause damage to the adhesion and the stairtread itself. Damaged or out of square (not right-angled) front edges have to be straightened with repair angles and levelled with nora level compound SF*. Dusty and/or porous subfloors are primed with nora primer*. Uneven or excessively rough subfloors either at the wall or on the ground have to be levelled and smoothed. At the time of installation and of adhesive bonding, the subfloor temperature must be at least 15 C. Ensure that the norament stairtreads have the required subfloor temperature. Especially in winter time, the rubber stairtreads and profiles have to be stored on site for several days. When installing stairs the stair angles and profiles for the landings (skirting and stringer) are always installed first (picture 1). Afterwards the norament stairtreads are installed or the stairs covered with noraplan /norament (picture 2). picture 1 picture 2 Required tools for the installation of nora stair solutions Please also see our General remarks for the installation of nora floor coverings, stairtreads and accessories. * or comparable product by a different manufacturer. The suitability and processing as well as the consumption of the chosen product can be gathered from the build-up recommendation and the technical data sheet. 1

A. Stair nosing, stair angles, skirtings, stringer As a string casing for right-angled steps, stair angles for the wall and banister side as well as profiles for the landings (skirtings and stringer) are available. Stair angles Stair angles For the wall side TW 7006 U Outer angle 170 mm 170 mm For the banister side TG 7004 U Outer angle TW 7005 U Inner angle 170 mm 170 mm 170 mm 170 mm TG 7003 U Inner angle 170 mm 170 mm 4.8 mm 18 mm 8.2 mm 50 mm 33 mm Same cross-section as skirting S 1008 U Same cross-section as stringer A 5013 U nora profiles are made of rubber. In order to achieve a good adhesion and bonding, the back of the profile has to be cleaned thoroughly with a damp cloth. 2

1. First the stair angles are cut to size using the profile cutter. To do so, overlap the inner and outer angle for each section, then cut the two pieces to size from the back. 2. In addition, the rubber lip of the stair angles for the banister side is chamfered. 3. After that, use superglue to fix the angles together inseparably. 4. All stair profiles (other than the stair nosing T 5044*) are fixed with contact adhesive. The adhesive is applied abundantly to the subfloor and to the back of the stair angles using a brush. (It is not necessary to sand the back of the profile.) For bonding, the contact adhesive on both glued sides has to be touch-dry. *The stair nosing T 5044 can also be fixed with nora Stepfix 240 because the length of the tread section has been extended to 7 cm. 3

5. Now the connected stair angles are glued to the wall in one piece. Immediately after being positioned, the profile is carefully pressed down and hammered into place with a light coloured rubber mallet. 6. On the banister side, place anti-adhesive paper over the contact adhesive and affix the stair angles from bottom to top. 7. In doing so, gradually remove the anti-adhesive paper and always tap the angles using a light coloured rubber mallet. 8. Continue the border strip by fixing the profiles with the same cross-section (skirtings and stringer) to the wall and banister side of the landings. 4

9. Always install noraplan or norament from the bottom step upwards. Cut a fitting riser (see part B norament stairtreads ) and affix it with nora stepfix 240. 10. Cut the stair nosing with the profile cutter or the installer s knife to size. 11. Affix the stair nosing with contact adhesive. 12. Cut the tread to size and affix it with nora stepfix 240. Complete the installation of the stairs from bottom to top accordingly. 5

B. Installation of norament stairtreads for stairs with straight steps and rectangular edges norament stairtreads are stair nosing, tread and riser in one piece. They are suitable for indoor applications only and fixed with nora stepfix 240*, a double-sided adhesive tape with a pre-dried contact adhesive film (for further information see technical data sheet). The vertical stair nosing section (nosing) is manufactured with an angle of approx. 80. Therefore norament stairtreads cannot be installed on stairs wrecked back more than 80. For the fitting of the norament stairtread with 2 m length we recommend to work in pairs. Please note: The vertical stair nosing section is not fixed. 1. The installation of the norament stairtread begins at the bottom step. Measure the height of the riser and cut the riser part of the first stairtread off accordingly along the grooves. (The nosing of this stairtread is used later for the top step.) The cut of the width of the riser part is carried out as described below for the stairtread. 2. Place the stairtread with some distance from the banister or wall side. Use a pair of compasses to mark one side of the stairtread parallel to the chosen edge (wall or banister side). 3. Cut the stairtread from the rear along this line and make an additional undercut at the edge. This will make it easier to subsequently adjust the stairtread. * or comparable product by a different manufacturer. The suitability and processing as well as the consumption of the chosen adhesive can be gathered from the build-up recommendation and the technical data sheet. 6

4. Place the cut side of the stairtread against the chosen edge (wall or banister side) and check for precise fit. Apply a marking on the lower part of the nosing and the riser. 5. Now move the stairtread to the other side. Measure the distance between the two markings with the compasses and subtract approx. 2-3 mm. Use the compasses to transfer this distance to the second side (wall or banister side) and mark the stairtread accordingly. 6. Cut the stairtread from the rear along this line and make an additional undercut at the edge. 7. Now position the stairtread onto the step to check for precise fit. Then cut the remaining stairtreads accordingly. 7

8. After the cutting of stairtreads equipped with safety strips, the ends of these strips have to be fixed additionally with superglue. 9. Apply nora stepfix 240 to all steps of one flight of stairs from bottom to top beginning at the bottom riser. 10. Apply the adhesive tape to the entire areas of riser and tread and rub it down thoroughly with the stair tool. You do not need to cut off any overlapping adhesive tape because small folds and overlaps will not be visible later through the stairtread. However, do not leave any uncovered spaces. Hint: To facilitate the cutting of the nora stepfix 240 strips slightly wet the knife and your hands with water. 11. At the top step cut off nora stepfix 240 flush with the edge of the step. 8

12. Remove the protective paper from the riser of the bottom step and insert the pre-cut riser part of the first stairtread. Rub into place, knock on with a light coloured mallet and cut off along the step edge. 13. For the installation of the stairtread remove approx. 10 cm of the protective paper of the adhesive tape from the stair nosing. 14. Hint: Bend over the nosing by standing on it for a short time - as shown in the picture to make sure it makes full contact with the riser afterwards. 15. Insert the stairtread accurately, rub the nosing into place and knock it on with a light coloured mallet. 9

16. Then pull out the remaining protective paper from under the tread part of the stairtread. Rub the tread part firmly into place, remove the protective paper from the riser, fit in the riser part of the stairtread and rub it on. 17. Additionally, hammer the stairtread into place with a light-coloured rubber mallet and cut off the protruding part of the riser along the step edge. 18. For the last step at the landing use the nosing of the first stairtread whose riser was fixed to the bottom step. This will prevent differences in height and colour. At first, apply a marking in the middle of the groove between the nosing and the tread part on the back of the stairtread. 19. Transfer the distance of this line from the nosing to the top step on the landing. 10

20. Apply contact adhesive to this area and to the back of the nosing, then leave to dry. 21. Place the nosing together with the tread part onto the top step and tap down. This will insure that the stair nosing is installed straight and that the cut to remove the tread part is carried out straight as well. 22. Install the norament tiles on the landing flush with the stair nosing. 23. The joints between stairtread and stair angles may be sealed with nora 1-component cold weld. In case of a joint between the top stair nosing and the flooring of the landing this joint can also be sealed with nora 1-component cold weld (see processing recommendation Joint sealing ). 11

Please note If stairtreads are installed side by side on one step, the two stairtreads are glued together with superglue. nora stepfix 240 has been tested and approved only for norament rubber stairtreads. We cannot accept any warranty for the fixing of other materials. Its use is restricted to stairs, do not use nora stepfix 240 for large areas. When a norament stairtread installed with nora stepfix 240 is removed at a later point of time, residues of the adhesive tape may remain on the subfloor. For this reason, nora stepfix 240 is not suitable for use on existing floors which are to be re-used in their original condition. Please follow the recommendations and processing instructions of the adhesive manufacturer. If in doubt, the adhesive manufacturer has to confirm the use of the chosen adhesive on a specific subfloor. Contact: Tel.: UK +44 (0) 1788-513 160 DE +49 (0) 6201-80 66 33 UAE +971 (4) 450 817 5 Link to the video: www.nora.com/installation E-Mail: info@nora.com www.nora.com 03/2017