ELEPHANT DOOR SYSTEMS SERIES E1200

Similar documents
INSTALLATION INSTRUCTIONS SIDELITE ASSEMBLY SERIES 900 TERRACE DOOR AND SERIES 925 PATIO DOOR

INSTALLATION INSTRUCTIONS SERIES 487 CENTER GLAZED WITH 1-1/2" TRIM OFFICE PARTITIONS

14000 I/O Series Flush Glaze. Fabrication and Installation Instructions

Storefront Installation Guide

4500 Series. Fabrication and Installation Instructions

14000 Series. Fabrication and Installation Instructions

14000 Series. Fabrication and Installation Instructions

SERIES 900 TERRACE DOOR WITH TRANSOM AND SIDELITES

INSTALLATION INSTRUCTIONS ENTICE SERIES PREMIUM ENTRANCE SYSTEM EXTERIOR GLAZE

Installation Instructions

DHS-500 IMPACT SYSTEM INSTALLATION MANUAL

Storefront Installation Guide INSTALLATION INSTRUCTIONS

GENERAL INSTALLATION GUIDELINES

GENERAL INSTALLATION GUIDELINES

INSTALLATION INSTRUCTIONS 2 x 4 1/2 for 1 Glass

SERIES 5001 SLIDING GLASS DOOR PATIO DOORS INSTALLATION GUIDE

SERIES BW3250 BLAST WALL TABLE OF CONTENTS INSTALLATION INSTRUCTIONS GENERAL NOTES

YES 45 TU Thermal Storefront System Installation Manual

INSTALLATION INSTRUCTIONS SERIES 3600 SUNSHADE SYSTEM

NARROW, MEDIUM AND WIDE STILE, THERMASTILE AND DURASTILE. Installation Instructions

YES 40 FS/FI Storefront System Installation Manual

YES 600 Thermal Clip Storefront System Installation Manual

YSD 400 Sliding Door System Installation Manual

SERIES 300 SINGLE HUNG WINDOW INSTALLATION

SERIES 300 SINGLE HUNG WITH FIN WINDOW INSTALLATION

Sun Control-Solar Eclipse-Solar Shelf

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS. Thermal Entrances AA 250/AA 425 THERMAL DOOR WITH TRIFAB 601/601T FRAMING

YES 45 XT High Performance Thermal Storefront System

Series Sloped glazed Curtain wall. Installation Instructions

INSTALLATION INSTRUCTIONS TRIFAB VG SCREW SPLINE ASSEMBLY TRIFAB VG 450 TRIFAB VG 451 TRIFAB VG 451T

FG-5100T STORMMAX INSTALLATION AND GLAZING MANUAL NOTE:

YCW 750 IG Inside Glazed Curtain Wall System Installation Manual

YWE 40 T Window Wall System Installation Manual

Swing Door Installation Manual

4-lite Patio Door. Installation Instructions

YCW 752 Outside Glazed Curtain Wall System Installation Manual

Note: Installation and Glazing Manuals are product specific. FOR REVIEW ONLY! May 2015

Table of Contents. Typical elevation & cut lengths. General construction notes. General installation notes. Typical jamb assembly

YES 45 FS/FI Storefront System Installation Manual

YCW 750 OG Outside Glazed Curtain Wall System Installation Manual

Phone # La Jolla Doors. Block Frame Installation Manual Aluminum Frame with either Vinyl or Aluminum Panels

Sliding Glass Door Assembly and Installation Guide

Installation Instructions

Heavy Wall Applied Stop Tube Frame and Door Installation

YSG 40/50/50T Window Wall System Installation Manual

SERIES CF450 INSTALLATION INSTRUCTIONS. SERIES CF450 1¾ x 4½ - B1. Fabrication for Panel Assembly. High Performance Non-Thermal Storefront System

SECTION C1 INSTALLATION INSTRUCTIONS

Series 7600 Installation Instructions Aluminum Multi-Slide Door (Pocketing)

INSTALLATION INSTRUCTIONS TRIFAB 451UT SCREW SPLINE ASSEMBLY TRIFAB 451UT. AUGUST, 2010 (Part No. 452T-CG-970) EC

Flushglaze For Framed Openings and Horizontal Panels. Window System Installation Guide

3-LITE PATIO DOOR INSTALLATION INSTRUCTIONS

I n s t a l l a t i o n I n s t r u c t i o n s S E N T I N E L S E R I E S 1 50 SLIDING GLASS DOORS

Thermally Broken Framing and Door Installation

INSTALLATION INSTRUCTIONS

YCW 750 OG Outside Glazed Curtain Wall System Installation Manual

1200 SERIES 2 PANEL DOOR rev.1 DETAILED INSTALLATION INTRUCTIONS

SERIES CF451T INSTALLATION INSTRUCTIONS. SERIES CF451T 2 x 4½ - B2. Fabrication for Panel Assembly. High Performance Thermal Storefront System

SERIES 4070-T GENERAL ASSEMBLY AND INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

Series Exterior glazed curtain wall. Installation Instructions

Series Advanced and alternate. Installation Instructions

SERIES 2100/2200 CURTAIN WALL

SERIES 2100/2200 CURTAIN WALL

Installation Recommendations for Finless Frame Doors

Curtain Wall Installation Guide

PIVOT DOOR 3400P INSTALLATION INSTRUCTIONS

INOVO 2-LITE SLIDING PATIO DOOR

FIXED PANEL SLIDER QCI5241

YHS 50 FS Storefront System & Model 35H/50H Door Installation Manual

e-lite fabrication/assembly and Installation instructions

CRL JACKSON 900 SERIES

INSTALLATION INSTRUCTIONS

Series 7650 Installation Instructions Sliding Glass Door

INSTALLATION INSTRUCTIONS Frames and Entrance Doors

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

Series 6000 THERMAL MULTI-PLANE INSTALLATION AND GLAZING MANUAL

Frameless Inline Door With Return QCI5263

Vinyl Sliding Glass Door Assembly Instructions

MULTISLIDE DOORS INSTALLATION GUIDE & SITE PREPARATION

INSTALLATION INSTRUCTIONS

YHS 50 TU Storefront System & Model 35H Door Installation Manual

Installation Instructions for Vista Air Vertically Folding Walls

YSD 600 T/TH Sliding Door System Installation Manual

Panoramic Door. Block Frame Installation Manual Aluminum top and bottom track with either aluminum or vinyl panels

Heavy Wall Applied Stop Tube Frame and Door Installation

SERIES 8100 FIXED WINDOW BLOCK OR FIN FRAME

6400, 8400 and 9400 Series Sliding Patio Door

Frameless Inline Door QCI5254

Oxford Stalls Installation Instructions

INSTALLATION MANUAL STOREFRONT DOORS

INSTALLATION INSTRUCTIONS 2 1/2 x 7 for 1 Glass

INOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS CRL JACKSON

Installation Manual. YSD 600 T/TH Sliding Door. YSD 600 T/TH Sliding Door System

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

BuildingEnvelope Oldcastle ( ) -

CRL OVERHEAD TRACK BI-FOLD DOORS (OTC)

YOW 225 TU Window System

YHC 300 IG Inside Glazed Curtain Wall System Installation Manual

Transcription:

INSTALLATION INSTRUCTIONS ELEPHANT DOOR SYSTEMS SERIES E1200 Phone: (800) 262-5151 Fax: (866) 262-3299 crlaurence.com usalum.com crl-arch.com AVDB3096 03.13

TABLE OF CONTENTS SUBJECT PAGE GENERAL INSTALLATION NOTES... 03 INSTALLING THE TOP HEAD TRACK... 04 INSTALLING THE RECESSED SILL... 05-06 MOUNTING THE WINDLOAD ANCHORS - FIXED PANELS... 07 INSTALLING THE FIXED PANELS WITH THRESHOLD... 08 INSTALLING FIXED PANELS WITHOUT SUBSILLS... 09 INSTALLING FIXED PANELS WITH THE FF450 SUBSILL... 10 INSTALLING THE SLIDING PANELS... 11 EXTERIOR GLAZING... 12 OPTIONAL POWER OPERATED DOORS... 13-14 SITE PREPARATION DIAGRAM... 15 The rapidly changing technology within the architectural aluminum products industry demands that U.S. Aluminum reserve the right to revise, discontinue or change any product line, specification or electronic media without prior written notice. 02

GENERAL INSTALLATION NOTES Recommended Guidelines for All Installations: 1. REVIEW CONTRACT DOCUMENTS. Check shop drawings, installation instructions, architectural drawings, and shipping lists to become thoroughly familiar with the project. The shop drawings take precedence and include specific details for the project. Note any field verified notes on the shop drawings prior to installing. The installation instructions are of a general nature and cover most conditions. 2. INSTALLATION. AII materials are to be installed plumb, level, and true. Install operable windows preglazed only. 3. BENCH MARKS. AII work should start from bench marks and/or column lines as established by the architectural drawings and the general contractor with guaranteed accuracy. Working from these datum points and lines determine: a) The plane of the wall in reference to offset lines provided on each floor. b) The finish floor lines in reference to bench marks on the outer building columns. c) Mullion spacing from both ends of masonry opening to prevent dimensional build-up of daylight opening. 4. FIELD WELDING. AII field welding must be adequately shielded to avoid any splatter on glass or aluminum. Results will be unsightly and/or structurally unsound. Advise general contractor and other trades accordingly. AII field welds of steel anchors must receive touch-up paint (zinc chromate) to avoid rust. 5. SURROUNDING CONDITIONS. Make certain that construction which will receive your materials is in accordance with the contract documents. lf not, notify the general contractor in writing and resolve differences before proceeding with work. 6. ISOLATION OF. Aluminum to be placed in direct contact with uncured masonry or incompatible materials should be isolated with a heavy coat of zinc chromate or bituminous paint. 7. SEALANTS. Sealants must be compatible with all materials with which they have contact, including other sealant surfaces. Consult with sealant manufacturer for recommendations relative to joint size, shelf life, compatibility, cleaning/priming, tooling, adhesion, etc. It is the responsibility of the glazing contractor to submit a statement from the sealant manufacturer indicating that glass and glazing materials have been tested for compatibility and adhesion with glazing sealants, and interpreting test results relative to material performance, including recommendations for primers and substrate preparation required to obtain adhesion. The chemical compatibility of all glazing materials and framing sealants with each other and with like materials used in glass fabrication must be established. This is required on every project. 8. FASTENING. Within the body of these instructions, "fastening" means any method of securing one part to another or to adjacent materials. Only those fasteners used within the system are specified in these instructions. Due to the varying perimeter conditions and performance requirements, perimeter and anchor fasteners are not specified in these instructions. For perimeter and anchor fasteners refer to the shop drawings or consult the fastener supplier. 9. BUILDING CODES. Due to the diversity in local state/provincial, and federal laws and codes that govern the design and application of architectural products it is the responsibility of the individual architect, owner, and installer to assure that products selected for use on projects comply with all the applicable building codes and laws. U.S. Aluminum exercises no control over the use or application of its products, glazing materials, and operating hardware, and assumes no responsibility thereof. 10. EXPANSION JOlNTS. Expansion joints and perimeter seals shown in these instructions and in the shop drawings are shown at normal size. Actual dimensions may vary due to perimeter conditions and/or difference in metal temperature between the time of fabrication and the time of installation. Gaps between expansion members should be based on temperature at time of installation. 11. WATER HOSE TEST. As soon as a representative amount of the wall has been glazed (500 square feet or 46.5 m2) a water hose test should be conducted in accordance with AAMA 501.2 specifications to check the installation. On all jobs the hose test should be repeated every 500 square feet (46.5 m2) during the glazing operation. 12. COORDINATION WITH OTHER TRADES. Coordinate with the general contractor any sequence with other trades which offset curtain wall installation (i.e. fire proofing, back-up walls, partitions, ceilings, mechanical ducts, converters etc.). 13. CARE AND MAINTENANCE. Final cleaning of exposed aluminum surfaces should be done in accordance with AAMA 609.1 for anodized aluminum and AAMA 610.1 for painted aluminum. 03

STEP 1: INSTALLING THE TOP HEAD TRACK 1. Inspect the underside of the rough opening header surface for irregularities. It should be level, smooth and ready to accept the system hardware. Refer to the Shop Drawings for the location dimensions of the Top Sliding Panel Track. STRUCTURAL HEADER 2. Mark a line across the bottom of the header surface from side-to-side on which to locate the centerline of the Head Track as shown above (FIG. 1). Next, place a centerline mark on the header between the two vertical walls of the opening. Locate the two halves of the Head Track and lay them out on the floor directly below the header with the legs down. The prepped ends go together to form a splice. You will need to determine the correct orientation of the sliding panels from your shop drawings (i.e.: Key Lock will be on the Active Door side and the Flush Bolts will be on the inactive side) (FIG. 2). ROUGH OPENING HEADER SURFACE CS194 HEAD TRACK FOR SLIDING PANELS TOP ELEVATION END VIEW CENTERLINE OF TRACK W188 WEATHER PILE MINIMUM 1-1/8" X 3/8 SHIM SUPPLIED BY OTHERS APPROVED FASTENER SUPPLIED BY OTHERS FIG.1 ACTIVE DOOR SPLICE LINE CENTER OF OPENING INACTIVE DOOR 2" 6" 6" 2" FIG. 2 HEAD TRACK TOP VIEW EXTERIOR SIDE 3. Proceed to attach the two track halves to the header surface using the approved fasteners and shims maintaining a level installation. Be sure that the two halves are tight at the splice and straight across. 4. Remove the Damper Block and attach the Splice Plate using (8) #10 X 1/2" flat head sheet metal screws. Fasten the screws through the Splice Plate and into the structural header. The Flush Bolt Receiver should be centered across the Head Track splice as it is inserted up inside (FIG. 3). Head Track Splice PLATE (8) #10 x 1/2" Splice PLATE Mounting Screws Flush Bolt Receiver Remove the Damper Block Assembly EL110 Header Assembly Comes Complete With Header Splice PLATE, FLUSHBOLT Receiver, Splice PLATE Mounting Screws, Damper Unit With Locknut, and Damper Block. FIG. 3 04

STEP 2 : INSTALLING THE RECESSED SILL 1. From the center of the Flush Bolt Receiver, drop a plumb bob directly down to the floor. This will indicate the location of the bottom flushbolt hole in the Recessed Track. Place a mark on the floor (FIG. 4). 2. Next, mark the floor directly below each end of the Head Track along the same center line as above. 3. Snap a chalk line on the floor between the two end marks. It should pass through the center flush bolt hole location in Step 1. Lay the Bottom Recessed Sill on the floor directly below and parallel to the Head Track. Align the Bottom Flush Bolt hole and check with the plumb bob (FIG. 4). 4. Mark around the perimeter of the sill. 5. Cut a trench in the floor surface a minimum of 7" in width by 1" deep, adding at least 1/4" to each end (FIG. 6). BOTTOM FLUSHBOLT LOCATION FIG. 4 FIG. 5 05

STEP 2 : INSTALLING THE RECESSED SILL (cont d) 6. Using shims, align the Recessed Sill again with the plumb bob and project the pre-drilled holes onto the bottom of the recessed slot using a sharp center punch or small pilot concrete drill (FIG. 6). 7. Remove Recessed Sill and complete the drilling for concrete anchors. 8. Install anchors, fasteners, shims, and Recessed Sill. It is critical that the Recessed Sill be flush to the surrounding floor surface. Adjustments to shims may be necessary as you secure the sill (FIG. 7). Flush Flush 7" 1" Shim Plumb BOB Line FIG. 6 EL103 Steel Track Approved Fasteners EL650 Recessed Sill 1/4" Shim by Others Concrete Anchors Finished Floor SURFACE FIG. 7 06

STEP 3 : MOUNTING THE WINDLOAD ANCHORS - FIXED PANELS 1. Determine the sliding panel centerline from your Shop Drawings and mark the floor as illustrated below (FIG. 8). 2. For systems using two standard 3'-0" doors, the center-to-center measurement between mounting holes is 157-3/4" or 78-7/8" on each side of the sliding panel's centerline. On any door size, the correct centerline spacing for the EL115 Inboard Fixed Panel Floor Anchors are D.L.O. (Daylight Opening) + 13-3/4" (FIG. 8). EL115 Fixed Panel Floor Anchor 5-1/16" BOTTOM FLUSHBOLT HOLE 5-1/16" EL115 FIXED PANEL FLOOR ANCHOR RECESSED TRACK D.L.O. + 13-3/4" EL115 FIXED PANEL FLOOR ANCHOR CENTERLINE OF FIXED PANELS 5-1/16" FIG. 8 BOTTOM FLUSHBOLT HOLE CENTERLINE OF ASSEMBLY EL115 OUTBOARD FIXED PANEL FLOOR ANCHOR 5-1/16" 5-1/16" ANCHOR DIMENSIONS PER SHOP DRAWINGS D.L.O. + 4-1/2" (Typ.) EL115 INBOARD FIXED PANEL FLOOR ANCHOR 78-7/8" FOR 3-0" DOORS FIG. 9 3. Install the Outboard EL115 Fixed Panel Floor Anchors as illustrated above. Refer to Job Site Drawings. Typically the spacing is D.L.O. (Daylight Opening) + 4-1/2" (FIG 9). 07

elephant door SYSTEMS Systems STEP 4 : INSTALLING THE FIXED PANELS WITH THRESHOLD P125 Snap-In Filler FIG. 10 Sealant 1. Insert the Snap-In Fillers on the outboard sides of the Fixed Panels per Shop Drawings (FIG 10). 2. Apply several beads of sealant to the floor surface between the Inboard and Outboard EL115 Floor Anchors prior to installing the Fixed Panels (FIG. 11A). 3. Position each Fixed Panel onto the EL115 Floor Anchors as illustrated (FIG. 11B). Be sure that the brush weatherstrip is towards the building's interior. Brush 4. Stand the panel up vertically and align the center of the top rail 9-5/16" from the center of the sliding track. Check for plumb (FIG. 11). FIG. 11A 5. Shim with a 3/4" spacer block. Drill access holes every 8" and insert fasteners into the Structural Header (FIG. 12). Refer to Shop Drawings. FIG.11 FIG. 11B APPROVED FASTENERS BY OTHERS 9-5/16 STRUCTURAL HEADER NOTE: This method of attachment is only a recommendation. Local codes may specify something different. Refer to your Shop Drawings for the required hardware and attachment methods. VERTICAL JAMB FIXED PANEL 3/4 P427 HEADER PLATE FIXED PANEL HEAD DRILL ACCESS HOLE EL440 TRANSOM HEADER SEALANT BACKER ROD BY OTHERS 3/4 SPACER BLOCK BY OTHERS BRUSH STRIP 3/8 CS194 SLIDING PANEL HEAD TRACK FIG.12 FIG.13 #12 FLAT HEAD SHEET METAL SCREW (BY OTHERS) EL115 FIXED PANEL FLOOR ANCHOR #12 FLAT HEAD SHEET METAL SCREWS (BY OTHERS) 6. Drill and countersink #12 Flat Head Sheet Metal Screws through the Vertical Jamb of the Fixed Panels into the face of the EL115 Fixed Panel Floor Anchors (FIG. 13). 7. Secure the Fixed Panel Threshold to the floor surface with the specified fasteners. 8. Repeat the procedure for the other non-sliding panel(s). 08

elephant door systems STEP 5 : INSTALLING THE FIXED PANELS WITHOUT SUBSILLS 1. Refer to the Shop Drawings to determine if the installation requires the optional FF450 Subsills. If so, proceed to the next page. 2. If no Subsills are specified, mount each fixed panel directly to the flooring surface by fastening the base to the EL115 Fixed Panel Floor Anchors following the procedures in the previous Step 4 instructions (FIG. 14). FIG. 14 1" C L 4" 3. Cut weep holes on the exterior side of the Base Sill, 4" from the frame to the center of the notch and 1" x 5/32" in size (FIG.15). 5/32" 4. Apply sealant to two sides of the glazing pocket and insert the WD200 Water Deflectors, sliding them down into position (FIG. 16). FIG.15 EL652 VERTICAL JAMB FIG. 16 Apply silicone to two sides of glazing pocket at vertical/horizontal joint. Fill gasket reglet with silicone after Water Deflector is installed. Seal and tool water deflector/horizontal joint. Seal horizontal/vertical joint after Water Deflector is installed. Snap in and slide down Water Deflectors. EL652 UPPER HORIZONTAL(S) Once the Deflector is in place, apply sealant to the three edges as show below. Do not apply sealant to the front side. 1 2 3 WD200 Water Deflector EL440 5. Seal the Upper Water Deflector on three sides. The front, unsealed gap will allow water to pass down to the Base Sill where it can exit through the Weep Holes (FIG. 16). WD200 Water Deflector Apply Sealant to all four edges of the bottom Water Deflector. This will force water to drain to weep holes. 6. Seal the bottom Deflector on all sides (FIG. 17). 7. Finish by sealing all horizontal and vertical joints. Weep Hole (Not required with Subsill) BASE SILL EXTERIOR EL440 FIG. 17 09

elephant door systems STEP 6 : INSTALLING FIXED PANELS WITH THE FF450 SUBSILL CRL-U.S. Aluminum recommends using the FF450 Subsills on all installations that require ground-level glazed panels. They are not required for fixed panels with doors and thresholds. 1. Cut the FF450 Subsill to the proper length and add Weep Slots. The slots are 1/2" wide on centers and 3/16" tall. The recommended placement is 4" from each Vertical Jamb and an 8" maximum separation (FIG. 18). 8" WEEP SLOT 4" 3/16" 1/2" EL440 BASE SILL AR602 SHEAR BLOCK SEALANT (CRITICAL) SEALANT (CRITICAL) FIG. 18 1/2" FF450 SUB SILL WEEP SLOT 5/8" 1/4" FF450 SUB SILL SEALANT (CRITICAL) FF450 SUB SILL SEALANT (CRITICAL) ANCHOR BY OTHERS FIG. 19 1/4" SHIM BY OTHERS BACKER ROD BY OTHERS EL115 FLOOR ANCHORS CRITICAL SEALANT FIG. 20 2. Attach the Subsill on top of a 1/4" shim to the floor with the specified anchors (FIG. 18). Liberally apply sealant to each end of the FF450 Subsill and around all bolt heads (FIG. 19). BASE SILL 3. Place the Fixed Panel on top of the FF450 secured Subsill and the EL115 Fixed Panel Floor Anchors (FIG. 20). Follow the upper head mounting procedures in Step 4 Section 4-6 (FIG. 12). 4. Carefully apply sealant to the Base Components. Do not block the Weep Slots (FIG. 21). FF450 SUB SILL FIG. 21 CRITICAL SEALANT 10

elephant door systems STEP 7 : INSTALLING THE SLIDING PANELS 1. Determine the correct orientation for the Sliding Panels from the Shop Drawings. 2. Standing to the interior, insert the top of the panel into the CS194 Head Track then swing the bottom rollers onto the rails of the Recessed Sill (FIG. 22). 3. Be sure that the doors engage the jamb interlocks after standing the panels (FIG. 23). ACTIVE PANEL JAMB FIG.22 EL250 SLIDER INTERLOCK 4. Roll each sliding panel back-and-forth a few times to make sure that it is seated properly on the track. EL650 FIXED INTERLOCK FIG. 23 FIXED PANEL JAMB TOP VIEW 5. Close the inactive sliding panel and engage the upper and lower flush bolts. Next, close the active panel and assure that the cylinder lock engages. 6. Minor alignment changes may be made to the active panel by removing the access plate at the bottom of the inboard vertical jamb and turning the Height Adjustment Bolt (FIG. 24). TO RAISE - TURN CLOCKWISE HEIGHT ADJUSTMENT BOLT TO LOWER - TURN COUNTER-CLOCKWISE FIG.24 DAMPER UNIT TOP VIEW DAMPER UNIT LOCK NUT DAMPER BLOCK FIG. 25 TOP FLUSH BOLT STRIKE TRACK GUIDE FIG. 26 7. Slide the Active panel open and re-attach the Damper Block (FIG. 25). Turn the Damper Unit until it touches the end of the track guide on the top of the inactive panel and tighten the lock nut (FIG. 26). 11

elephant door systems STEP 8 : EXTERIOR GLAZING VERTICAL MULLIONS 1. Cut glazing gaskets to size. Gaskets should be 1/8" longer per foot of aluminum member to allow for shrinkage. The same gaskets are used at the interior and exterior. 3 2. Install interior gasket. Vertical gasket runs through. Start at corners and work towards center. Tight butt-joined corners are critical to avoid leakage. Seal ends of horizontal gaskets prior to abutting to vertical gaskets. 1 HORIZONTALS 2 3. Set glass in place following the four step procedure. Be careful not to disturb interior gasket while installing glass. Center glass in the opening (FIG. 27). FIG. 27 4 4. Locate setting blocks in horizontal/sill member. Unless otherwise noted on the Shop Drawings, all setting blocks will be at quarter points. Rest glass on setting blocks pressed against installed gaskets. SB200 SETTING BLOCK 5 5. To prevent glass from shifting in the opening, one "W" Side Block should be installed into each deep glass pocket of the vertical at center point or as recommended by glass manufacturer. Side blocking is recommended to prevent glass from shifting in the pocket. 6. Snap in the 1M453 Glass Stops and the remaining NP225 Exterior Glazing Gaskets. WB452 Stretch "W" block and slide it between glass and mullion into deep glazing pocket. Push it in all the way until it clears glass and locks itself in place. 1M453 GLASS STOP WEEP HOLE NP225 GLAZING GASKET 1" GLASS PANEL SB200 SETTING BLOCK NP225 INTERIOR GASKET FIG. 28 12

elephant door systems STEP 9 : OPTIONAL POWER OPERATED DOORS If your project requires power operated doors, the following items will be included with the order per door: (1) Stanley Magic Force Swing Door Operator (1) Stanley Magic Force Dual Controller (1) Stanley Magic Force Concealed Door Arm (1) Set of internal electrical connection hardware. The installer is responsible for all external power supply hardware to the door system (See site prep section). 1. Install the "Snap-in" Covers on both sides of the opening before proceding (FIG. 29). SNAP IN 2. Attach the Front Motor Mount to the Vertical Jamb (FIG. 29). HORIZONTAL TRANSOM FIG. 29 FRONT MOTOR MOUNT MOTOR CONTROL WIRES (B) (A) REAR MOTOR MOUNT MOTOR PLATE FRONT MOTOR MOUNT (C) P427 SNAP IN SILL COVER FIG. 30 FIG. 31 3. Feed the motor control wires through the grommet on the Rear Motor Mount and attach it to the to the Stanley Motor Plate using (2) 5/8-16 X 5/8" flat head screws (A) (FIG. 30). Lift the front of the Motor Plate up into the Transom Sill and set it onto the Front Motor Mount. Lift the rear of the assembly up and attach it to the Transom Sill with (2) 1/4-20 x 1" hex head bolts (B) while inserting the Front Motor Mount using (2) 5/8-16 X 5/8" flat head screws (C) (FIG. 30). 4. Attach the bottom, Snap In Sill Cover and repeat the procedure for the opposite side (FIG. 31). 13

STEP 9 : OPTIONAL POWER OPERATED DOORS (Cont'd) 5. Remove the end cap at the top of the door. 6. Detach the Motor Arm from the door top by removing the (4) 1/4"-20 X 1" Hex Bolts. Do not remove the shim plate below the arm. 7. Slide the motor arm onto the protruding splined motor drive shaft but Do Not tighten the set screw on the end at this point (FIG. 32). 8. Set the bottom pivot receiver onto the threshold pivot pin (FIG. 33). 9. Manually rotate the Motor Arm as you swing the top of the door upward. Align the four screw holes in the Motor Arm, Motor Arm Shim and door top. Insert the (4) 1/4"-20 X 1" Hex Bolts and tighten (FIG. 34). 10. Tighten the set screw and attach the End Cap. FIG. 32 MOTOR ARM MOTOR DRIVE SHAFT bottom pivot receiver THRESHOLD PIVOT PIN FIG. 33 END CAP (4)1/4"-20 X 1 SET SCREW MOTOR ARM FIG. 34 14

TO 125V 15A GFCI DEDICATED CIRCUIT ELEPHANT DOOR FIXED PANEL W / ADA HDWRE ELEPHANT DOOR TOP VIEW TO 125V 15A GFCI DEDICATED CIRCUIT 15