SPLIT FRAME INSTALLATION INSTRUCTIONS

Similar documents
C-Series & S-Series Classic Frame with Transom (Single or Pair)

Table of Contents F Series Frames

Versatrim Side-Snap Frame

MH Series Mitered Frames shall be as manufactured or furnished by Republic Doors and Frames, McKenzie, Tennessee

ARCHITECTURAL STICK SYSTEMS

TECHNICAL DATA SHEET STANDARD STEEL FRAMES SPECIFICATIONS MESKER STANDARD STEEL FRAMES

4. Partially open the operating panel and tilt the top toward the interior of the door (Figure 4). Lift the panel off the sill and set it aside.

Steel Door Frame Installation in Steel Stud Construction

Block Frame Inovo Patio Door/Transom/Sidelite Field Mulling Instructions. simonton.com/installation. If mulling sidelites, skip to Step 5.

Contemporary 3 Panel Classic 5 Panel French Panel

Heavy Wall Applied Stop Tube Frame and Door Installation

Installation Instructions. 45 and 60-Minute Fire-Rated Neutral Pressure Veneered Door Frame UBC & UL-10C

FIRE RATED DOOR AND FRAME GENERAL REQUIREMENTS

VYTEX PREMIUM SLIDING GLASS DOOR. Table of Contents. Precautions and Safety 2. Tools Required...3. Inspect and Prepare Door...4

FIRE RATED DOOR AND FRAME GENERAL REQUIREMENTS

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

SECTION HOLLOW METAL DOORS AND FRAMES

Series 7650 Installation Instructions Sliding Glass Door

Parveneer Positive Pressure Fire Rated Frames Double rabbet with T stop for 20 minutes

6400, 8400 and 9400 Series Sliding Patio Door

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

Installation Instructions for Vista Air Vertically Folding Walls

IDP Entry-Fit Steel Door Frames. Installation Instructions K2A and NK2A Series Frames

LEGENDS RETRACTABLE DOOR SCREENS

Versatrac Bypass Door Units, Conventional and Top Track, 300 and 400 Series

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

Series 7600 Installation Instructions Aluminum Multi-Slide Door (Pocketing)

INSTALLATION INSTRUCTIONS SERIES 487 CENTER GLAZED WITH 1-1/2" TRIM OFFICE PARTITIONS

SECTION HOLLOW METAL DOORS AND FRAMES

Installation Instructions. 45 and 60-Minute Positive Pressure Fire-Rated Veneered Door Frame UBC & UL-10C

Phone # La Jolla Doors. Block Frame Installation Manual Aluminum Frame with either Vinyl or Aluminum Panels

Step by Step Installation Instructions. Poly Shutters. Customer Service or visit us online at smithandnoble.com

FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL

Chapter 18. Interior Doors

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

Design Considera ons & Installa on Guidance

Insolroll Clutch Operated Shades Installation Instructions Installation Instructions

Versatrac R-System Stock Extrusions, Clips and Accessories

western window systems westernwindowsystems.com installation instructions non-pocket 2-1/4 panels

YSD 400 Sliding Door System Installation Manual

STACKING MULTI-SLIDE DOOR SYSTEM

INSTALLATION INSTRUCTIONS FOR REPLACEMENT FORGENT WOOD GLASTRA WINDOWS RECOMMENDATIONS FOR COMMON INSTALLATION OF ALL REPLACEMENT WINDOWS.

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Thermally Broken Framing and Door Installation

8/7/ HP SWING DOOR INSTALLATION INSTRUCTIONS

ClearSpan End Frame Kit 26' Wide x 12' High

ESA-200 Fixed Sidelite

Storage and Installation of welded LL Hollow Metal Door Frames in Steel Studs

Step by Step Installation Instructions. Poly Shutters. Customer Service or visit us online at smithandnoble.com

Read guide from beginning to end before starting installation. Read all warnings and cautions during unit installation.

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

TOLERANCES AND CLEARANCES FOR COMMERCIAL HOLLOW METAL DOORS AND FRAMES

Versatrac R-System Stock Extrusions, Clips and Accessories

Chapter 9. Windows and Exterior Doors

HMMA 841 TOLERANCES AND CLEARANCES FOR COMMERCIAL DOORS AND FRAMES HOLLOW METAL -07 MANUAL AMERICAN NATIONAL STANDARD ANSI/ NAAMM METAL DOORS & FRAMES

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE

Pocket Door Installation Instructions

INSTALLATION AND CARE INSTRUCTIONS

AMBICO Limited Section and WOOD BULLET RESISTANT DOORS AND FRAMES Page 1

ESA-100 Fixed Sidelite/Non Breakout

Knock Down Patio Door Assembly Instructions Regular & Impact

Seamed Edge Doors 1000 Series

ICU TRACKLESS SLIDING DOOR

LABEL & RATING OPTIONS

Installation Guide. for E-Series/Eagle Clad Hinged Inswing French Door

1200 SERIES 2 PANEL DOOR rev.1 DETAILED INSTALLATION INTRUCTIONS

Installation And Care Instructions. Vertical Honeycomb Shades

Straight Stringer Installation Instructions

Ballistic Fiberglass Doors & Frames

SYSTEM 42 SCREEN CASSETTE WITH 30mm SIDE RAIL

Sliding Glass Door Assembly and Installation Guide

Installation, Operation and Care Instructions. Retractable Cord Operating System

Magnaline Systems Block Frame Installation Manual

Please read and understand all instructions before beginning. These instructions cover impact and non-impact aluminum French Door 650/750.

LEGENDS RETRACTABLE DOOR SCREENS

Sash Replacement Guide for Andersen 400 Series Tilt-Wash Transom Windows

Retractable Screen Installation Instructions For Vinyl and Aluminum Clad and Wood In-Swing Hinged Doors (See separate instructions for sliding doors)

IMPORTANT NOTICE WARRANTY WILL BE HONORED ONLY IF THE JAMBS HAVE BEEN INSTALLED IN ACCORDANCE WITH THESE INSTALLATION INSTRUCTIONS

INSTALLATION AND CARE INSTRUCTIONS

Installation Manual for Metal Toilet Partitions Standard Series

SECTION BULLET- RESISTANT DOORS

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS

PROJECT LOCATION SECTION PREFINISHED STEEL DOOR FRAMES

Vinyl Windows Manufactured by VPI Quality Windows

Mira Premium Series Bi-Parting French Sliding Patio Door Installation Instructions

Vinyl Windows and Doors Manufactured by VPI Quality Windows

Product Guide. An Introduction to Hollow Metal Terminology and CURRIES Product. ASSA ABLOY, the global leader in door opening solutions

Parts List (Continued) 18 each: #8 x 0.625" Truss Head Phillips Screw 20 each: #8 x 1.75" Flat Head Phillips Screw 4 each: #8 x 1.25" Flat Head Philli

101B, 210X, ELM, VSTB Installation Manual

Installation, Operation and Care Instructions. Continuous Cord Loop Operating System

INSTALLATION AND CARE INSTRUCTIONS

Vertical Honeycomb Shades

ICU TRACK SLIDING DOOR

Chapter 9. Windows and Exterior Doors

Panoramic Door. Block Frame Installation Manual Aluminum top and bottom track with either aluminum or vinyl panels

SMARTfit High Intensity Cognitive Training. SMARTfit Trainer Installation Manual for Stud and Concrete Walls Revision 1.3

End of Row Doors. Revision Number 1

1. VERIFY ALL COMPONENTS

SMARTfit Functional and Brain Fitness Training Multi-Station Trainer Installation for Stud and Concrete Walls (US)

Transcription:

SPLIT FRAME INSTALLATION INSTRUCTIONS Revised 2014/09/29 Guillaume Gauthier, Eng. Product Manager

RECEIPT OF MERCHANDISE... 2 INSTALLATION... 2 SPLIT FRAME COMPONENTS... 3 TOOLS, HARDWARE AND PARTS... 4 ROUGH OPENING... 5 SPLIT FRAME INSTALLATION... 6 ADDITIONNAL INSTRUCTIONS ON BORROWED LITE INSTALLATION... 12 APPENDIX A SPLIT FRAME WITH VERTICAL MULLION AND SILL... 13 APPENDIX B SPLIT FRAME WITH MECHANICAL SPLICE... 15 Figure 1 : Split Frame Components... 3 Figure 2: Profile and nomenclature... 3 Figure 3 : Rough opening and frame measure... 5 Figure 4 : Unwrapping the split frame... 6 Figure 5 : Removing the shipping screws... 6 Figure 6 : Placing the frame into the opening... 7 Figure 7 : Tightening the first jamb anchor... 8 Figure 8 : Screwing the strap anchor... 8 Figure 9 : Bending and attaching the tab... 9 Figure 10 : Add one screw in the center of each wall anchor... 10 Figure 11 : Placing sandpaper on trim section... 10 Figure 12 : Removing the trim with a crowbar and rubber mallet... 11 Figure 13 : Borrowed lite installation... 12 Figure 14 : Mullion floor anchor... 13 Figure 15 : Mullion Floor anchor alignment... 13 Figure 16: Positioning the mullion on floor anchor... 14 Figure 17 : Overview of a mechanical splice... 15 Figure 18 : Top view of the frame and trim parts taken apart... 15 1

RECEIPT OF MERCHANDISE 1. Material must be handled and stored in compliance with NAAMM HMMA 840 (Guide Specifications for Installation and Storage of Hollow Metal Doors and Frames) or SDI 122 (Installation & Troubleshooting Guide for Standard Steel Doors and Frames). 2. The installer must complete a thorough verification of products upon receipt or before installation. INSTALLATION The qualified installers must have a minimum of 3 years experience in installing commercial steel doors, steel frames and hardware. Before installing 1. Understand and apply the installation instructions of NAAMM HMMA 840 (Guide Specifications for Installation and Storage of Hollow Metal Doors and Frames), SDI ANSI A250.11 (Recommended Erection Instructions of Steel Frames) or SDI 122 (Installation & Troubleshooting Guide for Standard Steel Doors and Frames). The installation of firerated frames and doors must comply with NFPA 80 (Standard for Fire Doors and Other Opening Protectives). 2. Inspect the product and make sure you have all the parts you need before you begin the installation. 3. Confirm product compliance with the approved door/frame/hardware schedule. Verify the door opening number, opening type, handing, width, height, and hardware prep (is it the right product, in the right place?). If this is not done, de La Fontaine will not assume any responsibility or back charges. 4. If you encounter any problems, contact your supplier. 5. Make sure the frame is in good condition. If you have any questions concerning the frame installation, please contact your representative for assistance. 2

SPLIT FRAME COMPONENTS Figure 1 : Split Frame Components Figure 2: Profile and nomenclature 3

TOOLS, HARDWARE AND PARTS 1. Tools for split frame installation Drill Measuring tape Soft rubber mallet Pliers Level Utility knife Bar clamp Bit driver extension (for thick walls) Phillips bit driver 2. Hardware and parts for split frame installation (supplied by de La Fontaine) PART # DESCRIPTION IMAGE 01 3/4 inch (19 mm) self-drilling screws (for drywall installation) 03 Sandpaper roll to be cut in 1-1/4 inch (31.8 mm) pieces Note: Screws for masonry installation by others 4

ROUGH OPENING 1. Three-sided frames, transom frames, Borrowed lites siiting on floor or sidelite frames It is the installer s responsibility to make sure the opening is suitable for the frame installation. The installer must check the following points: a. Wall thickness compares to frame jamb throat. b. Make sure the opening is free of debris and other material that could compromise the installation. 2. Borrowed lites Figure 3 : Rough opening and frame measure Width and height of the rough opening should be 1 inch larger per side on height and width. 5

SPLIT FRAME INSTALLATION 1. Unpacking the frame a. Lay the frame on the floor, on the door side. b. Unwrap the frame, using a utility knife on the throat side of the frame. Leave the wrapping material under the frame. Figure 4 : Unwrapping the split frame c. Remove the cardboard protection corners and dispose of them properly. The material can be recycled. d. Once the frame is unwrapped, remove the shipping screws and dispose of them properly. Figure 5 : Removing the shipping screws e. Take the trim off the frame and place it in a secure area, ideally leaning on its unfinished side. f. Raise the frame and place it in a secure area, ideally leaning on its unfinished side. g. Dispose of the packaging material properly according to your local regulations. 6

2. Setting the frame in the opening *for side lights or mechanical splices, see appendix A and B Figure 6 : Placing the frame into the opening a. Place the frame in the opening. To make sure the frame slides correctly, make sure the jamb anchors are retracted fully against the jambs. b. While holding the frame, use a bar clamp on the hinge jamb to temporarily secure the frame in the opening. c. Using a level, make sure the hinge jamb and head are plumbed, squared and leveled. Shim if necessary (fire-rated openings must have steel shims). 7

3. Securing the hinge jamb in the opening a. Secure the hinge jamb using ONE jamb anchor (intermediate anchor is strongly suggested). b. Make sure to loosen the two (2) A screws (Picture 7, step 1). Screw the anchor to the wall using two (2) B screws (part # 01) (Picture 7, step 2). c. While lightly prying the anchor against the wall, tighten the two (2) A screws (Picture 7, step 3). Be careful not to screw with excessive force. Check the level again, to make sure nothing has moved. Figure 7 : Tightening the first jamb anchor d. Screw the strap anchor of the hinge jamb into the wall, using the proper fasteners for your application (drywall, masonry, other). This fastener is not supplied with the frame. Make sure it does not interfere with the base board installation. Figure 8 : Screwing the strap anchor e. Screw the remaining hinge jamb anchors, following instructions 3 a, b, and c. 8

f. Once the hinge jamb anchors are all secured, use the pliers to bend the tabs (one tab per anchor) to have them leaning against the anchor (have the pliers placed correctly on the tab and just twist the tab). (Picture 9) Then, screw the tab to the anchor with two (2) 3/4 inch (19 mm) self-drilling screw (part #01); Figure 9 : Bending and attaching the tab The door can either be installed now or later. If the door is available, install it now and use it as a template for the clearances. 4. Door installation a. Hang the door and use it as a template for the net opening size. b. Remove the custom spreader bar. Unscrew the fasteners and tilt the bars up and down to break the micro-joints at both ends. c. Make sure to have the proper opening width and the proper clearances. Use shims if necessary. Metal shims must be used on fire rated opening. NOTE: The spreader bar should keep the opening at the optimal width if the door is not available. 5. Securing the strike jamb in the opening a. Secure the strike jamb anchors the same way as for the hinge jamb anchors. Refer back to step 3 and follow each instruction. By now, the anchors are all in position and secured. The door and frame assembly is operational. Check for installation quality and solidity. Make sure the final measurements and clearances are accurate. Also, make sure the frame is plumbed, squared and leveled. Once it is done, screw the one screw (see picture 10) in the center of each wall anchor, to make sure the anchors will remain in place during the frame lifetime. 9

Screw one screw in one of these holes 6. Trim installation Figure 10 : Add one screw in the center of each wall anchor a. Cut small pieces of sandpaper (part #03). Roll provided is 3" (76.2 mm) wide, so cut 1" (25.4 mm) x 3" (76.2 mm) pieces (use one piece per jamb anchor). b. Place the sandpaper on the edge of the trim section, just beside the paint line (1/4" (6.5mm) from the side) with the surplus on the back side. Align them height-wise with the jamb anchors. Figure 11 : Placing sandpaper on trim section c. Insert the trim in the frame by pushing on it. When it is inserted all around, use the rubber mallet to position the backbend return against the wall. 10

Note: Once the trim is installed, it can be removed, but rarely without scratching the wall. If ever you should remove it, use a crowbar and the rubber mallet. Insert the crowbar between the wall and the trim section. Hit the rabbet of the trim with the rubber mallet. By gentle vibration, remove the trim section. Figure 12 : Removing the trim with a crowbar and rubber mallet 11

ADDITIONNAL INSTRUCTIONS ON BORROWED LITE INSTALLATION The same steps shall be followed for the installation of a borrowed lite. However, the installers should be advised that: a. Borrowed lite split frames do not have strap anchors at base of frame (Ref.Figure 8) b. They will receive extra anchors at base and head. c. Rough openings should be 2 wider and higher than nominal (order or rabbet to rabbet) size Ex: 18 Wide x 22 High rough opening will suit a 16 x 20 frame. d. The following sequence should be followed when securing anchors: i. Attach anchors of one vert jamb ii. iii. iv. Attach anchors of the other vert jamb. Attach base anchor Attach head anchor v. Remove shims at bottom if used (wood shims not allowed in fire rated wall). Figure 13 : Borrowed lite installation 12

APPENDIX A SPLIT FRAME WITH VERTICAL MULLION AND SILL The mullion and sill of a split frame side light are face welded to the door side (frame). It is not shipped separately and does not need any field welding. The only additional operation to be done is to install a floor anchor before setting the frame in the opening. The following steps are done just before the frame is set in the opening. 1. Additional tools/hardware required Necessary tools for proper anchoring to the floor (either ramset or screwed), mullion floor anchor (supplied) and fasteners 2. Setting the anchor in the opening. Figure 14 : Mullion floor anchor a. Using the wall as guide, draw a line from one side of the opening to the other (on active door side) b. Measure the position where the anchor should be located. c. Place the mullion anchor at this position, but move it forward 7/16 and attach it to the floor. Figure 15 : Mullion Floor anchor alignment d. Insert the frame, bottom first, and then tilt into the opening. 13

It is also possible to use the frame as template. Then follow these next steps instead of a to d. a. Place the side light in the opening; hold it in place and make sure the mullion is aligned with both jambs, using a level or a straight edge. Use the bottom of the mullion as a template to mark the floor with a pen b. Move back the elevation and place it in a secure area. c. Center the mullion floor anchor inside the marks and attach to the floor. Figure 16: Positioning the mullion on floor anchor Continue the installation following the standard frame procedure (step 3). 14

APPENDIX B SPLIT FRAME WITH MECHANICAL SPLICE The use of a mechanical splice on a split frame is almost the same as for a regular frame. Once the frame is unpacked, follow these steps for correct installation of the frame/sidelight/borrowed light. Mechanical splice of a mullion (also used on base) Mechanical splice of a header (also used on jamb) Figure 17 : Overview of a mechanical splice Figure 18 : Top view of the frame and trim parts taken apart 15

B-1. Lay the trim parts on the floor. Attach both trims parts together using the mechanical screws provided. Make sure alignment is good before tightening the screws. Place the assembled trim in a secure area. B-2. Lay the frame parts on the floor. (Welded frame may contain welded mullions). Join together the two parts of the frame assembly, including mullions, bases and headers. Make sure the alignment of all the frame components is good before screwing the self drilling screws. B-3. Steel plugs are provided with mullion/bases mechanical splice preparation. Insert them into the round hole when the fastening operation is over for a neat and aesthetic appearance. B-4. Resume the installation the same way as a regular frame (from step #2, page 6) 16