Customer Service: Installation, Care and Maintenance

Similar documents
installation care & maintenance instructions moistureshield.com limited lifetime warranty

installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty

COMPOSITE RAILING INSTALLATION

CONTRACTOR CERTIFICATION COURSE

Build Outdoor Stairs. Stair Building Terms There are five basic design elements you'll need to consider when planning outdoor stairs:

Installation Guide (888)

Installation Guide (888)

Installation Instructions for. Handrail Component System

Installation Instructions for. Before You Begin TOOLS REQUIRED

PAINT & MISC. Notes. Table of Contents. Front Handrail Posts Front Handrails Closet Shelving Exterior Deck...

DECKING INSTALLATION GUIDE

DuraLife Porch Collection Installation Instructions

2x Bottom Bracket. 1x Rail Support STEP 1 STEP 2

woodworkersjournal.com MATERIAL LIST

INSTALLATION INSTRUCTIONS. Level Rail With Cap: Page 2 Level Rail Without Cap: Page 8 Stair Rail: Page 12

Step 2 - Measure and install joist hangers every 16". See Figure "B" above. Fill every hole in each

CXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately

Vinyl Gazebo Instructions

U. M. ARMY Texas Conference. Wheel Chair Ramp Manual

Chapter 17 - Porch Trim

12ft Octagon Bayside Gazebo Assembly Manual

A Step-by-Step How To Guide

Level Railing. Installation Guide. v2.5 W W W. S O L U T I O N S A L U M I N U M. C O M

Chapter 1. Beam and Sill Plates

INSTALLATION INSTRUCTIONS MILLENNIUM DECKING Before Installing Millennium Decking, please read these instructions in their entirety.

10ft Octagon Bayside Gazebo Assembly Manual

Balustrade Systems / Installation Instructions

The following instructions will guide you through the installation of your new vinyl railing.

ATLANTIS RAIL Contact Information

Installation Instructions Palladium Wall Panels - Demountable Factory Finished Edges and Field Cut Edges

RAILING R A IL ING 51

TREX TRANSCEND RAILING

Deck Evaluation Checklist

Installation Guide. deckorum Composite Decking

12ft Octagon (Precut) Creekside Gazebo Assembly Manual

T r e x Art i s a n Se r i e s Railing

A ledger/header board is the next step if you are attaching your deck to an existing structure.

UltraDeck. Decking & Railing Installation Guide.

MAGNUM BOARD INTERIOR INSTALLATION GUIDELINES

PORCH RAIL INSTALLATION INSTRUCTIONS. Level Rail... 2 Stair Rail... 8 Care & Maintenance, Finishing... 15

NX7 SERIES 5-1/2 HANDRAIL

AFCO-Rail Post INSTALLATION INSTRUCTIONS AFCO-RAIL POST

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

HOW TO INSTALL ELITE PANELED WAINSCOTING Using X-Rails with Either Raised, Flat or Beaded Panels

NewTech - CleverDeck Composite Decking Installation Guidelines

The Festival Assembly Instructions

3. Use base plate as template (see FIG. 4-1) to mark location for fasteners.

RAILING SYSTEM INSTALLATION INSTRUCTIONS

COMPOSITE SIDING INSTALLATION GUIDE

Stair Parts Installation. Tricks

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

4. Components and Stairs

Post & Rail. Includes: Crossbuck, 2-Rail, 3-Rail and 4-Rail POST SUPPORT OPTIONS

TREX ENHANCE RAILING (Also Applies to Trex Select Railing) Installation Instructions

The following instructions will guide you through the installation of your new vinyl railing stair kit.

Balustrade System Installation - Cambridge & Huntington

1. TOOLS + MATERIALS REQUIRED

2x2 Baluster Railings FPO REDWOOD. Naturally beautiful Easy to use Practical and economical Durable and stable Resistant to decay and insects

(28) 2 x 4 x 8 Ft. Boards Tape Measure (9) 2 x 6 x 8 Ft. Boards Pencil (6) 2 x 2 x 8 Ft. Boards Carpenter s Square (9) 1 x 3 x 8 Ft.

Installation Guide. Deckorum. Composite Decking

Curved Baluster Railing Systems

TREX SIGNATURE (FORMERLY REVEAL) RAILING Installation Instructions

TREX SELECT RAILING Installation Instructions

Gambrel Barn with Overhang Manual

Deck Railings. Acustom, site-built railing sets your work. Site-Built

Call (770) STEP 6: Caulk bolt hole within the bracket for protection from the elements.

Installation of Balustrade Systems

TREX SELECT RAILING. Installation Instructions PARTS

10 x 10 Flat Top Two Tone Pergola

Grand Garden Chalet 6X3 Assembly Manual - Costco

10 x 10 Arch Top Pergola

Chapter 16. Underlayment and Finish Stairs

INS TA L L AT I O N IN S T R U C T I O N S F O R BEF O R E YO U BE G I N TOOLS REQUIRED

Build Like a Pro: Building a Deck

Fortress Railing Overview ACTUAL FREIGHT CHARGES APPLY TO ALL FORTRESS RAIL ORDERS

INSTALLATION INSTRUCTIONS GUIDE

NX8 SERIES 6-1/4 HANDRAIL W/ VINYL HANDGRIP

Installa on Guide: Fence Distributors. YourNextFence.com

1 ¼-inch Pocket Screws Brad Nailer or Hammer 1 ¼-inch Brad Nails Clamps

EASY INSTALLATION GUIDE WPC DECKING.

AZEK Porch Install Guide

Now available at participating Feeney (2/14) AF# A. Stores. 1/8'' Stainless Steel Cable Assemblies to Enhance Any Railing and Any View!

10X12 Arched Breeze Pergola Assembly Manual Outdoor Living Today

CAUTION: Before opening the crate place it flat on its side (not up right as show in the photo) Hardware included for assembling your gazebo:

Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes

Spiral Slide

INSTALLATION INSTRUCTIONS

CertainTeed INSTALLATION GUIDE SIMTEK FENCE PRODUCTS. Fence Installation Guide 3', 4' & 6' High

Installation Manual 0318

Aluminum Railing Installation. Glass Railing Spindle Railings Intimacy Railings and Panels

Installation Guide. 203 Chesterra Drive, Dahlonega, GA Toll-Free ~ Fax ~

Installation Guidelines

NyloDeck Installation Guidelines

Installation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts

DECKS. Stairway illumination Positive attachment of ledger Lateral load connection required board (R507.2) required (R ) (R311.7.

2. Sanding the Modules Sand the entire surface of each cyc module with 60-grit sandpaper. This will provide for better paint adhesion.

Installing Cable Railings

Salter Industries Spiral Stair

Post & Rail Crossbuck

Make every component count.

Transcription:

Customer Service: 800-951-5117 Installation, Care and Maintenance

Installation Instructions Easy step-by-step instructions for decking, railing and stairs. As with any building project, use proper eye and ear protection and follow local building codes. ChoiceDek composite decking is for decking and accessories only. It is not to be used as structural material. General Cleaning & Maintenance Instructions In an outdoor environment, periodic cleaning will help keep your deck looking new. As with any flooring surface, periodic cleaning is recommended. Warranty ChoiceDek Foundations composite decking is manufactured by Advanced Environmental Recycling Technologies, Inc. (A.E.R.T.) and is backed by a limited lifetime warranty against rot, decay and insect damage. The ChoiceDek Foundations warranty can be transferred one time. For complete warranty details, please visit our website or call Customer Service at 800-951-5117. The following are suggested cleaners for occasional maintenance: Spray & Forget TM Olympic Premium Deck Cleaner For specific cleaning issues, please visit our website or call Customer Service at 800-951-5117. 2

COMPONENTS Decking Systems FOUNDATIONS 1 in. 5.5 in. LENGTH: 8 ft., 12 ft., 16 ft. & 20 ft. ACTUAL DIMENSIONS: 1 in. 5.4 in. FOUNDATIONS Trim Board LENGTH: 8 ft. & 12 ft. ACTUAL DIMENSIONS:.67 in. 11.25 in. *Trim board NOT to be used as walking surface Railing Systems Our railing systems and accessories are designed to naturally complement your ChoiceDek deck or porch. LENGTH: 51 in. ACTUAL DIMENSIONS: 4.265 in. x 4.265 in. Collar ACTUAL DIMENSIONS: 6.1 in. 1.5 in. 6.1 in. Cap ACTUAL DIMENSIONS: 5.7 in. 1.8 in. 5.7 in. Baluster LENGTH: 31 in. & 38 in.* ACTUAL DIMENSIONS: 1.5 in. 1.265 in. *Available through Lowe's Special Order Program only. Speed Rail LENGTH: 6 ft. ACTUAL DIMENSIONS: 1.5 in. x 3.5 in. 3

INSTALLATION Tools Fasteners All you ll need is a hammer, screw gun, circular saw (carbide-tipped blade with fewer than 20 teeth is recommended), level, tape measure, rasp and blue chalk line. We recommend #7, 2¼-inch stainless steel trim head screws for the decking and railing. If you do not want the screw heads to show on the deck boards use the following technique: Manufacturer recommends blue chalk. DO NOT USE RED or other colored chalk because it may temporarily stain the deck. Step 1: Using a #7, 2¼-inch stainless steel trim head screw, countersink the screw into the decking material approximately ¼ of an inch. Step 2: Using your thumb, lightly push the displaced decking material over the hole left by the trim head screw. Step 3: Tap with a hammer, this will cover the trim head screw with decking material. Carbide-tipped Carbide-tipped blade with fewer blade than 20 with teeth.fewer Carbide-tipped thanwith 20 teeth. blade fewer Carbide-tipped than teeth. blade20 with fewer than 20 teeth. Using a 2-inch driver bit allows you to better gauge screw depth. Tap hole with edge of hammer for best results. Hidden Fasteners Building Code Requirements For your convenience, some common building code requirements are reprinted here. Since local building codes may vary, you must consult your specific building codes before proceeding. Residential minimum handrail height is generally 36-inches. Multi-family minimum handrail height is sometimes 42-inches. Baluster maximum spacing is generally 4-inches (clear distance between balusters).** Maximum gap between bottom rail and deck surface is generally 4-inches.** Some codes require a 2-inch maximum gap for multifamily applications. Our products are compatible with most hidden fastener systems. For best compatibility with ChoiceDek boards we recommend the Mantis 396 Hidden Deck Fastener. However, as with all fasteners, please consult the installation instructions provided by the hidden fastener manufacturer or contact our Customer Service department at 800-951-5117.. Easy to install with pneumatic fasteners or screws.. Automatically spaces boards for optimal gapping.. Concealed fasteners allow for an unblemished deck surface.. Allow joists to completely dry out - reducing structural rot or mold.. Powder coated high strength steel or stainless steel. * For additional cleaning tips contact Customer Service at 800-951-5117 or visit. ** Spacing note: The precise language is generally do not allow passage of a sphere 4-inch in diameter. Be sure to check on the tolerance requirements of your local building code. Every board should be fastened to each joist by a clip on both sides. For butt joints, add a second joist to allow for a second clip. 4

POST & DECKING INSTALLATION 1. Layout and install joists at either 16-inch on-center (OC) when decking will be installed perpendicular to the joists, or 12-inch (OC) when deck boards will be installed diagonally or at an angle to the joists. Joists must be level. Double or sister joists at butt joints to ensure plenty of room for fasteners. Pre-drill using a 7/64-inch bit when too close to the edge to prevent splitting. Drive screw at a slight angle into joist. & &Decking DeckingInstallation Installation 1/8" Gap 16" 1/4" Gap OC ENERS STENERS 1. st requires two, 1/2-inch, carriage bolts bolts 8-inches h post requires two, 1/2-inch, carriage 8-inches mimum lengthlength with 1-1/4-inch flat washer on back with nut. with 1-1/4-inch flat washer on back with nut. boardboard fasteners, we recommend #7, 2-1/4-inch deck fasteners, we recommend #7, 2-1/4-inch steel steel trim head screws for the and railing. If nless trim head screws fordecking the decking and railing. If ot the screw headsheads to show on the boards dowant not want the screw to show ondeck the deck boards ollowing technique: the following technique: 1. Layout and install joistsjoists at either 16-inch on-center (OC) (OC) whenwhen decking will be installed perpendicular to thetojoists, or 12-inch (OC) (OC) Layout and install at either 16-inch on-center decking will be installed perpendicular the joists, or 12-inch whenwhen deck deck boards will be installed diagonally or at or an at angle to thetojoists*. JoistsJoists must must be level. boards will be installed diagonally an angle the joists*. be level. #7, ng a2-1/4-inch #7, 2-1/4-inch steel steel trim head nless trim head ountersink the the ew, countersink to the ew intodecking the decking approximately erial approximately inch. of an inch. 2. ur thumb, lightlylightly push push the the ng your thumb, d decking material over the placed decking material overhole the hole ebytrim screw. thehead trim head screw. 12" Attach posts to decking frame. DO NOT NOTCH POSTS. The maximum distance from center of post to center of post is 72-inches. Square and level posts. OC awith hammer, this will the the a hammer, thiscover will cover d head screwscrew with decking material. with decking material. 2. TALLATION :: *INSTALLATION ng a 2-inch driverdriver bit allows you to better gauge Using a 2-inch bit allows you to better gauge w depth. screw depth. of hammer for best hole Tap with hole edge with edge of hammer for results. best results. s.** diameter. nch in diameter. 2. A. Block posts and attach to rim joists with two bolts (1/2-inch carriage bolts 8-inch minimum length with 1-1/4-inch flat washer and nut on back). Attach postsposts to decking frame. DO NOT Attach to decking frame. DO NOT NOTCH POSTS. The maximum distance NOTCH POSTS. The maximum distance from from center of post to center of post is center of post to center of post is 72-inches. Square and level 72-inches. Square and posts. level posts. A. Block postsposts and attach to rimtojoists A. Block and attach rim joists with two (1/2-inch carriage bolts bolts withbolts two bolts (1/2-inch carriage 8-inch - minimum lengthlength with 1-1/4-inch 8-inch - minimum with 1-1/4-inch flat washer and nut back). flat washer andon nut on back). Bolt positions: The top Bolt positions: Thebolt top bolt to beto nobe more than 3-inches no more than 3-inches belowbelow the finished deck deck surface the finished surface and the to beto nobe no andbolt thespacing bolt spacing less than on-center. less 4-inches than 4-inches on-center. Recommended spacing provides for proper drainage and prevents buckling from normal expansion and contraction. LineLine Line Line Line LineLine Line Bolt positions: The top bolt to be no more than 3-inches below the finished deck surface and the bolt spacing to be no lesswww.lifecycledecking.com than 4-inches on center. *For more regarding technical specifications, pleaseplease visit wvisit w w.lifecycledecking.com. *For information more information regarding technical specifications, w w w.lifecycledecking.com. www.lifecycledecking.com 5

3. Install ChoiceDek Decking using 2¼-inch, #7 stainless steel trim head screws, two screws per board per joist recommended. Screws should be a minimum of ½-inch from the board end to prevent potential splitting of the board. 1/8" Gap 1/4" Gap A. Allow ¼-inch side-to-side spacing between deck boards. Allow ⅛-inch (or greater) end-to-end spacing between end of boards (butt joints). If installing in freezing weather, leave ¼-inch (butt joints). B. Cut deck boards to fit around posts. Leave ⅛-inch gap between board and post. C. Staggering the butt joints on long decks usually improves the overall appearance of the finished deck. Some people also prefer a distinctive pattern for the deck boards. To achieve an interesting design. Install a pattern board, which eliminate butt joints. D. Once the boards are in place, adjust the blade depth of your saw to match the thickness of your deck boards. Use a blue chalk line to mark your cut and go (review tips below for overhang options). To avoid temporarily staining the decking boards, only use blue carpenter s chalk. Rasp the edges to finish. Router or rasp end of deck board using ¼-inch round for a finished look Allow ³/₁₆-inch overhang for any rim joist imperfections (straight) If you choose not to use the trim board, maximum recommended overhang is 1-inch 4. Slip post collar over post onto deck if installing. 6

RAILING INSTALLATION Railing Orientation: To use the railing, measure and cut the first 2x4 flush to the inside length between the posts. The speed rails allow the baluster to face either toward or away from the deck depending on which way the consumer prefers the rail system to be installed. 5. Cut two support blocks to the height you want the toe sweep (no less than 2-inches nor greater than 4-inches. Refer to your building code). Drill a lead hole with a ⅟8-inch drill bit in the center of the support block until you reach 1½-inch from the bottom of the block. Use one 2¼-inch #7 stainless steel trim head screw to fasten the support block to the 2-inch side of the bottom rail spaced no more than 24-inches from each post. A. Set one 2x4 rail edge wise on blocks. Position 2x4 to account for balusters facing toward the deck or away from the deck. B. Measure 1-inch into the inside of post and place baluster against post sitting with its end flush with the bottom of the 2x4 (1¼-inch side against the post). C. Using two 2¼-inch #7 stainless steel trim head screws, secure baluster to post, two screws at each end, and two additional screws evenly spaced between the end of the connections. D. Use two 2¼-inch #7 stainless steel trim head screws to secure the bottom rail to the baluster. E. Place second baluster against opposite post and repeat steps C and D. 6 Use clamps to secure for easier installation. Using scrap material between the clamps and railing may help avoid clamp marks. In addition, a few angle (toe nail) 2-1/4-inch, #7 stainless steel trim head screws can be added for additional support. However, rail CANNOT be attached to post with toe nailing alone. To avoid potential splitting, drill a lead hole with a 7/64 drill bit at a 45-degree angle. 6. Place second 2x4 flush with the top of the balusters and using two 2¼- inch #7 stainless steel trim head screws secure the baluster to the top rail. Repeat this step on the opposite end. 7

Top Rail 7. Place finishing 2x4 over the top rail in a flat position (with 4-inch side against 2-inch side of top rail). Outside edges of both 2x4 s should be flush. Secure finishing 2x4 to top rail using one 2¼-inch #7 stainless steel trim head screw on each end and three additional screws evenly spaced across the top of the finishing 2x4. Screws should be centered into top rail with a minimum ¾-inch from the edge of the flat 2x4. 8. Use the formula below to determine the amount of balusters you need and the spacing between them. Measure the distance in inches between the inside of one post baluster to the inside of the other post baluster. This is your total space. A. Divide the total space by 5, and round it off to a whole number. This is the number of additional balusters you will need. B. Multiply the value in (A) by 1.5 and subtract it from your total space. Finishing Rail C. Divide the value in (B) by the value of (A+1). This is the spacing between the balusters. You may want to cut two spacer blocks from scrap material or a baluster, the same width as answer C and use these two spacers at top and bottom to place each baluster. 4" 4" max 4" max 4" max 3" Baluster 9. If installing balusters that are not ChoiceDek brand, please refer to the manufacturer's installation instructions. Evenly space balusters on the inside of the top and bottom rails with 1½-inch side facing outward. Secure each baluster to the top and bottom rails with one 2¼-inch #7 stainless steel trim head screws at each rail. Balusters should be placed according to the required building code but no more than 4-inches apart. 8

10. Attach post caps to top of post. 11. Additionally for a finished look, install trim boards over the rim joists. Position flush with the top of the decking. Quality outdoor adhesive can be used for caps. A. Attach using four 2¼-inch #7 stainless steel trim head screws. One screw through the end or side of the decking and three screws into the rim joist vertically. Repeat this step every 10-12 inches horizontally throughout the length of the trim board. B. We recommend putting the screw through the thickest part of the deck board (center between the top of the board and the bottom of a rib) when attaching the trim board, then the other three into the rim joist. Railing Connectors/Brackets Our railing system is compatible with most 2x4 railing connectors/brackets. Please consult the installation instructions provided by the railing connector/bracket manufacturer or contact our Customer Service department at 800-951-5117. Trim/fascia boards are NOT to be used as walking surfaces 9 QUESTIONS? CALL 800.951.5117

45-Degree Railing 12. Determine the angle of the top 2x4 rail. A. Lay the top 2x4 rail centered on top of the two posts and mark angle (see railing orientation) and cut. B. Mark and cut the bottom 2x4 rail the same way except that the orientation of the board is edge wise. The thin edge down. 13. 14. A. Place bottom rail on blocks that are cut to the toe sweep height desired (no less than 2-inches nor greater than 4-inches). B. Place baluster with 45-degree cut side against the post positioned at the 45-degree corner and sitting against the bottom rail. Attach it to the post using procedure #5C. Finish with steps #5D through #11 - with the exception of the post baluster that has been installed already in this 45-degree section (step #13). C. Place a regular baluster against the diagonal baluster, sitting on bottom rail and attach with three 2¼-inch #7 stainless steel trim head screws, evenly spaced top to bottom. 10

Stair Railing 15. Be sure posts measure no more than 72-inches from outside at the angle of the stairway when using as a stair rail. Guard rail sections are sold in 72-inch lengths and must be trimmed to fit between the posts. Allow for decrease in length from angle cuts. 72" Maximum 16. Install deck boards. Boards may be flush with riser or extend past the rise by 1-inch. Use two 2¼-inch #7 stainless steel trim head screws per board per stringer. A. Optional: Cut and install kick boards (Deck boards) along each stair rise. B. Install post collars if desired. C. Cut and install trim board on stringers if desired. Use procedures in step #11. Kick Board Riser Stringer Trim Board Stair Stringers need to be 9-inches on center 11 QUESTIONS? CALL 800.951.5117

17. Lay a top and bottom 2x4 rail along the edges of the steps and up next to the post. A. Position both 2x4 rails for marking by lying on the steps. B. Mark the rails on the inside faces of the two upright posts. C. Cut each rail along this mark (line). 72" 18. Position bottom rail ½-inch above edges of steps (check local code) support on blocks cut from scrap material. 19. Cut ends of two balusters at the same angle as the top and bottom 2x4 rails and use them as the post balusters. 20. To complete stair railing follow steps #5B through #11 12