Addendum for the Installation of the Lingenfelter 10 Bolt Supercharger Pulley Hub Kit

Similar documents
Lingenfelter High Flow Varimax Intercooler Pump Upgrade Kit Installation Instructions

INSTRUCTIONS 360 CHAINROLL

customraider.net GPS Accessory Handlebar Mount Installation Manual Install Instructions Revision E 07/31/2011 8/8/2011

1904, 1904Pg, 1904PgSB, and 1906SB High Capacity Ratchet Knockout Drivers

Installation Instructions Precision Sport Shifter

IN 578. Tools Required. Torque Specification: 10mm Socket 7/16 Socket 1/2 Socket 1/2 Wrench 7/16 Wrench 1/8 Allen Wrench.

w w w. h d o n l i n e s h o p. d e AUTOMATIC COMPRESSION RELEASE TOOL GENERAL INSTALLATION -J04654 REV Kit Number Models

WARNING. BX Ford Explorer With Adaptive Cruise Control & Eco Boost Installation Instructions

FM2113PC/FM2114PC SBC Top Mount Alt, w/ A/C & Power Steering

FM2113PC/FM2114PC SBC Top Mount Alt, w/ A/C & Power Steering

DYNATRAC BALL JOINT REBUILD INSTRUCTIONS V5.0

WARNING Kia Spectra 5 Installation Instructions BX2713. Serial Number

3.4 V6 MANUAL/AUTO or any 05- PRESENT 5-SPEED TRANSMISSION to cyl. 23 SPLINE GEAR DRIVEN T-CASE KIT INCLUDES: No. Part No. Qty. Ck.

BX2173 Installation Instructions Ford Focus (including the 2.3L engine) 2003 Ford Focus SVT

PROSTEER BALL JOINT REBUILD INSTRUCTIONS V1.0

MODEL SK61732 COMPRESSOR SERVICE KIT

Required Tools: Procedure:

INSTRUCTIONS INSTRUCCIONES CONSIGNES

GENUINE PARTS INSTALLATION INSTRUCTIONS

Assembly & Installation Instructions FOR VEHICLE MOUNT KIT USING VEHICLE CENTER MEMBER

2009 Acura TL Installation Instructions

Please read BOTH these Installation Instructions and the General Instructions before attempting to install or operate this equipment.

Disassembly Instructions - 1 hp. Planetary Reduction Gears

RTI TECHNOLOGIES, INC.

OPERATIONAL MANUAL V1.0. Removing/Replacing Blades

Please read BOTH these Installation Instructions and the General Instructions prior to installing or operating this equipment.

BX Honda Accord Ex-L 2012 Honda Accord SE Installation Instructions

Please read BOTH these Installation Instructions and the General Instructions prior to installing or operating this equipment.

w w w. h d o n l i n e s h o p. d e TIMKEN BEARING CONVERSION TOOL GENERAL INSTALLATION -J04672 REV Kit Number Models

Lab Style Table Frame Part No Assembly Guide Automation Technology

WARNING Acura TSX Installation Instructions. B as e plate s BX1012. Serial Number

FLOE quick attach & standard sectional dock and leg kits

Engineering Data Single Reduction Parts List Item # Description Basic Single Reduction Unit 1. Gear Housing 2. Pipe Plug 3. Vent Plug 4. Splash Guard

RC4WD R2 Disconnect Transmission parts replacement guide

UAL SHOP DRIVE PULLEY

DYNATRAC BALL JOINT REBUILD INSTRUCTIONS V4.0

RBP-1215B-RX DODGE RAM QUAD CAB RX3

Arc Trainer Main Frame Assembly

BHJ Products, Inc. Parts List & Instructions

PROVEN WORLDWIDE SNORKEL FOR CHEVY COLORADO NEW PRODUCT

Please read BOTH these Installation Instructions and the General Instructions prior to installing or operating this equipment.

Dodge Dakota WARNING. B as e plate s. Installation Instructions BX1971. Serial Number

WARNING. BX Ford Explorer With Adaptive Cruise Control & Eco Boost Installation Instructions. Bolt Torque Specifications

Please read BOTH these Installation Instructions and the General Instructions before attempting to install or operate this equipment.

Submersible Turbine Assembly Manual

WARNING. B as e plate s. BX Saturn L Series Installation Instructions. Serial Number

Sheet Metal Brake Plans for a 6' Sheet Metal Brake

CONTROLS KIT FOR ALL # & # HARLEY DAVIDSON SPORTSTER MODELS

INSTALLATION INSTRUCTIONS

Ford Pick Up Rear leaf Spring Kit Installation Instructions

Please read BOTH these Installation Instructions and the General Instructions prior to installing or operating this equipment.

BHJ Products, Inc. Parts List & Instructions

FRONT BUMPER INSTALLATION INSTRUCTIONS Toyota 4Runner

Please read BOTH these Installation Instructions and the General Instructions prior to installing or operating this equipment.

OTECO INC. MODEL ,000 PSI 4-1/16 PORT DM GATE VALVE MAINTENANCE MANUAL

IF YOU DO NOT KNOW WHAT YOU ARE DOING, DO NOT DO IT!

LS1/LS6 CHEVROLET Installation Manual For Systems without A/C #13405 / #13425

Retro Fit Gearbox Mount. Assembly Instructions. Assembly Instructions. Before You Start. General Information. Manual No M

MODEL H " BYRD SHELIX CUTTERHEAD INSTRUCTIONS

INSTRUCTIONS INSTRUCCIONES CONSIGNES

TURBO DRIVE INSTALLATION MODEL 1582T KNEE FEED Lagun Mill

DRIVE COMPONENTS REMOVAL. 9. FXCW/C: see Figure Remove bolt (9), sprocket retainer (8), and thrust washer (7). NOTE PRIMARY DRIVE LOCKING TOOL

Page 1. SureMotion Quick-Start Guide: LARSACC_QS 1st Edition - Revision A 03/15/16. Standard Steel Bolt/Screw Torque Specifications

Installing CNC Stepper Motor Mounts On A Sherline Mill

MODELS 49 RA 49 RAZ 49 RAC

Please read BOTH these Installation Instructions and the General Instructions before attempting to install or operate this equipment.

INSTALLATION MANUAL FRONT. See pages 2 and 3 of this manual for configuration options. Level of Difficulty. Product Photo (center section only)

Ready To Go SimpleSpec tm. Installation Manual. For more information, please visit 3-form.com or call

WARNING Pontiac G6 GT BX3235. Serial Number. Installation Instructions

WARNING. BX Saturn SC Saturn SC Saturn SL, SL Saturn SL2, SW Saturn SW1 Installation Instructions

Nancy s Knit Knacks LLC 4 Yard Option Upgrade Kit Assembly Instructions and User Manual

Please read BOTH these Installation Instructions and the General Instructions before attempting to install or operate this equipment.

Tuf-Lite III Fans 5000K Series Hub

Please read BOTH these Installation Instructions and the General Towing Instructions before attempting to install or operate this equipment.

Please read BOTH these Installation Instructions and the General Instructions prior to installing or operating this equipment.

INSTALLATION INSTRUCTIONS GRILLE GUARD RAM 1500 PART # 5058/5058-2

TorqueMaster Replacement Spring

To remove sanding pad, turn counterclockwise.

German Auto Solutions BMW Monoball Kit Installation DIY

Horological Milling Machine Bushing and Depthing Accessory

Tuf-Lite III Fans 5000K Series Hub

AndyMark DART 12.

Please read BOTH these Installation Instructions and the General Instructions prior to installing or operating this equipment.

Race Splitter Upgrade Kit Installation Instructions

Please read BOTH these Installation Instructions and the General Instructions prior to installing or operating this equipment.

FRONT BUMPER KIT P/N APPLICATION BEFORE YOU BEGIN KIT CONTENTS. Instr Rev Page 1 of 6

PRESENT, FORD TRANSIT, 148 WHEEL BASE ROCKER GUARDS

EP-60 END OF CAR JUNCTION BOX KIT and ASSEMBLY AND INSTALLATION INSTRUCTIONS

WARNING. BX Chevy Cruze LS/1LT/2LT/LTZ. (Includes Fog Lights) Installation Instructions

H8508 Impact Wrench SERVICE MANUAL. Model (Serial Code FWN) Model (Serial Code FWP)

BX Toyota Tacoma (Includes Prerunner) Installation Instructions

Lead Screw Cover Installation

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

Rhino Packing Gland Tool

MSR/MSB Mechanical Setting Tool

STYLE BAR & TONNEAU COVER INSTALLATION

LEG CURL IP-S1315 INSTALLATION INSTRUCTIONS

Please read BOTH these Installation Instructions and the General Towing Instructions before attempting to install or operate this equipment.

Please read BOTH these Installation Instructions and the General Instructions prior to installing or operating this equipment.

ASSEMBLY & INSTALLATION INSTRUCTIONS

Transcription:

Addendum for the Installation of the Lingenfelter 10 Bolt Supercharger Pulley Hub Kit PN: L250150309 Lingenfelter Performance Engineering 1557 Winchester Road Decatur, IN 46733 (260) 724-2552 (260) 724-8761 fax www.lingenfelter.com Revision - 1.2 Release date: 27 May 2014

Parts List Lingenfelter 10 Bolt Supercharger Pulley Hub Kit (PN: L250150309) # Description Part number 1 10 bolt hub L220126109 10 Stainless socket head cap screw, M4x0.7x12 47503 1 242 Loctite, 0.5 ml 24205 1 3/16 x 1 dowel pin 98381A510 1 LPE decal LPE-DECAL 1 Instructions N/A Available LPE 10 bolt supercharger pulley options 1 Lingenfelter C6 ZR1 LS9 2.35 11 Rib 10 Bolt Pulley L220136109 1 Lingenfelter C6 ZR1 LS9 2.60 11 Rib 10 Bolt Pulley L220146109 1 Lingenfelter CTS-V Camaro ZL1 LSA 2.55 8 Rib 10 Bolt Pulley L220300709 1 Lingenfelter CTS-V Camaro ZL1 LSA 2.35 8 Rib 10 Bolt Pulley L220310709 Optional (to pin the pulley or hub) # Part number Description 1 L950010000 3/16 straight flute solid carbide drill bit Tools and materials required Flat head screwdriver Pulley removal tool (LPE L950066509 or equivalent) Mill (or equivalent) End mill Black marker Arbor press, hydraulic press or equivalent Vise Press fit lube or equivalent Allen key set (metric) Tools and materials required to pin the hub (optional operation) 3/16 straight flute solid carbide drill bit 1/8 high speed steel drill bit Drill press Hammer Punch This addendum provides instructions for the installation of a ten bolt hub and pulley. This addendum applies to the installation of a ten bolt supercharger hub and pulley kit on GM LSA (CTS-V and ZL1 Camaro) and LS9 (ZR1 Corvette) equipped vehicles. Read the entire instruction manual before beginning installation. Many of the stock parts will be used in reassembly. Torque value warning - the torque values for the fasteners are provided in metric (Nm) and then imperial units. For the imperial units some are referenced in lb-ft and others in lb-in. Make sure you notice the difference and set your torque wrench correctly. Page 1.

1. Remove the cap on the pulley by using a small flat head screwdriver and prying up. 2. Using a pulley removal tool, such as the Lingenfelter L950066509 pulley removal tool shown to the left, remove the factory pulley from the supercharger front cover. NOTE - make sure you are pulling on the pulley against the shaft and NOT against the casting or you will move the shaft in relation to the shaft support bearings. 3. Steps 4-6 will detail the machining operation that must take place in order to provide enough clearence for the new pulley. 4. Start by marking both of the tabs with a black marker. Make sure that the you do not go below your mark in the machining process. LPE suggests using an adjustable boring head or a die grinder to remove material. Remove the tabs 1.55 down as illustrated in the next step. Page 2.

5. Using a runout gage, locate your end mill to be concentric with the inside of the jackshaft housing (you may also use the jackshaft itself to center the endmill). You can complete the machining with the jackshaft installed if your boring gage allows it, otherwise you will need to remove the jackshaft. If you remove the jackshaft, you must replace the bearings. See the next step for the dimensions of the machined part. 1.88 OD 6. These are the dimensions that you will need to use to machine your jackshaft support. 1.55 FROM TOP 7. Using a machine press, press the supplied 10 bolt hub onto the jackshaft. NOTE - make sure you support the center of the shaft and are not pressing on or supporting the part from the 3 pins at the end of the shaft or from the casting itself. If you support it from the casting you will move the shaft in the support bearings. The LPE pulley removal and install kit includes a machined spacer designed to properly locate the shaft when installing the pulley (see arrow). 8. The leading edge of the hub should be flush with the end of the jackshaft, as shown in the adjacent illustration. Steps 8-10 are optional. Since the supercharger pulley is spinning at higher RPM and driving more load than the stock pulley, pinning the pulley is recommended but not required. LPE pins all of their LSA & LS9 supercharger pulleys. Page 3.

9. Using a vise, secure the supercharger pulley so that it is clamped evenly and, using a drill press, drill a 3/16 hole, 1.05 deep in the center of the end of the pulley. Next, using a 1/8 drill bit, drill a hole completely through the pulley and shaft in the same position. This will allow you to remove the pin if you are ever replacing or removing the pulley. NOTE: LPE recommends using a hardened solid carbide drill bit to drill the 3/16 hole as the shaft material is very hard. 10. Place the 3/16 x 1 LPE dowel pin (part # 98381A510) into the hole that was just drilled out. 11. Secure the front cover and supercharger pulley. Using a hammer and punch, hit the two surfaces around the pin shown to the left. This will keep the dowel pin securely in place. 12. Reinstall the black cap onto the front of the hub. Page 4.

13. Install the supercharger pulley onto the 10 bolt hub. 14. Apply a small amount of Loctite Blue to the supplied M4x0.7x12 socket head cap screws and, using a 3 mm Allen wrench or socket, secure the pulley to the hub with these screws. Use the pattern to the left to tighten the screws. Torque to 2.3 Nm (20.7 lb-in). 15. LPE LSA & LS9 two piece pulley removal: The Lingenfelter two-piece LSA & LS9 pulleys have twelve (12) holes on the face. Ten (10) of the holes are not threaded and these are used to secure the pulley to the hub. The two (2) holes (indicated by the yellow arrows in the adjacent illustration) are threaded to accept M4 x 0.7 fasteners. These two holes allow you to use two M4 x 0.7 screws to remove the pulley from the hub. To do so, remove the ten (10) M4x0.7x12 mm fasteners from the pulley and then thread two M4x0.7x14 or longer screws into the two additional holes. Tighten one screw and then the other to evenly work the pulley off of the hub. For additional product installation information and technical support, contact LPE or your LPE products distributor. You can also find technical support and usage discussions regarding this product and many other LPE products in our Internet forums: Page 5. http://www.lingenfelter.com/lpeforumfiles Lingenfelter Performance Engineering 1557 Winchester Road Decatur, IN 46733 (260) 724-2552 (260) 724-8761 fax www.lingenfelter.com L250150309 Lingenfelter 10 bolt supercharger pulley hub kit v1.2