ENGINEERING & CONSTRUCTION. Procurement Construction Commissioning. General Contractor in the Oil, Gas and Petrochemical Industries

Similar documents
به نام خدا. Construction, Commissioning, Operation, Maintenance Oil & Gas / Petrochemical Industry

8 10 From Deep in Seas to the Surface in Refineries. 14 Phases 20 & 21 (Ongoing) 32 Bandar Abbas Oil Refinery (Completed)

Content. OIEC History OIEC. OIEC History. Core Values. Renewable Energy. Services and Projects. Subsidiaries GROUP

FUELING DEVELOPMENT 2 EUROASIA INDUSTRY EUROASIA INDUSTRY 3

ONG CONSULTANTS PROFILE

DE-PRIME GLOBAL SERVICES LTD DE-PRIME GLOBAL SERVICES LTD. ADDRESS: 1 Echendu Chinwo Close, Chukwuodara Rumoudara, Port Harcourt, Rivers State.

ENGINEERING SOLUTIONS FOR THE OIL & GAS INDUSTRY

Reliance Industries Limited

Petro Tadbir Pars. Engineering & Design Services. Business Catalogue

Next Generation FPSO: The Engineering & Construction Contractor Solution

KISH PETROLEUM ENGINEERING

Worldwide Technip in Turkmenistan

Table of Contents. About Petropars. Completed Projects Phase 12 Phase 19. Petropars Projects PPI POSCO POMC PRE PPI-FZE KCT. Petropars Subsidiaries

PASARGAD OIL COMPANY. gas and power THE BIGGEST PRODUCER OF BITUMEN IN IRAN MISSION AND VALUES

S. ANDREW MCINTOSH EDUCATION TECHNICAL EXPERIENCE

DE059: Hydrocarbon Production Operations

Applying Earned Value to Overcome Challenges. In Oil and Gas Industry Surface Projects

TEESSIDE GAS CRACKING PROJECT AND GIVING AGED ASSETS A NEW LIFE

Self-Introduction and PhD Plan

COMPREHENSIVE SOLUTIONS

a leader on the rise 2

IRAN STATISTICAL YEARBOOK Introduction

SmartBrains. Process Plant Layout & Piping Design engineering. Institute of Oil and Energy. What You Will Learn...

Introduction to Fitness For Service November 10, 2016, University of Alberta, Edmonton.

Oil & Gas. GST Engineering

McDermott International, Inc. Conflict Minerals Policy

DETAILED ENGINEERING OF PROCESS PIPING SYSTEMS

Engineering. Drafting & Design. Regulatory Interface. Project & Construction Management. Marine Operations Services

Process Solutions for the Oil and Gas Industry

Simcon, Inc. 80 Days to Operator Competency

COMPANY PROFILE FOR ELECTRICAL / ENGINEERING PROJECTS & SERVICES

Company Presentation May.2016

Those with a command of technology can also improve it.

Specially Sponsored by

BUILDING STRATEGIC SOLUTIONS

RRC POWER & ENERGY STATEMENT OF QUALIFICATIONS. experience matters

Oil & Gas Professional Recruitment Solutions

Project Experience, April 2009

Floating LNG facilities

RELIANCE INDUSTRIES LIMITED

Our projects Shell Prelude FLNG

ENGINEERING SERVICES CONSULTANCY

Engineering Design and Training Services

Chemionix Solutions. Outsourcing. Engineering. Drafting

EXPERT WITNESS AND DISPUTE SUPPORT Engineering, Procurement, and Construction (EPC)

Graphite quality x 1000 mm 1000 x 1000 mm. Roll length: m

Reliance Industries Limited. Notice Inviting Expression of Interest

OILMEX OILMEX BUSINESS GROUP. WELCOME. their processes of design, construction and quality in their diverse management of projects.

Hydrocarbon Production Operations

T HREE D AY T RAINING P ROGRAM ON GOOD LABORATORY PRACTICES

Tel : +31 (0) Fax: +31 (0)

General Presentation. EARTO WORKING GROUP Quality and Excellence in RTO Management. Presentation

Managing Offshore Field Development & Marine Asset October 2017 Dubai, United Arab Emirates

NO. ONGC/EOA/KG-DWN-98/2 Cluster 2/ONSHORE/EOI/2016/ Date: EXPRESSION OF INTEREST (EOI)

The Government of the Republic of Moldova. The Standardization and Metrology Service

SEMCO MARITIME Projects, solutions and competences for the energy sector

GE018: Interpretation of Engineering Drawings

McDermott International, Inc. (Exact name of registrant as specified in its charter)

Process Equipment Troubleshooting

Employability Enhancement Program for Engineers. Transformation of an engineering degree holder to a real Engineer, who can do more at work.

21 Convegno Annuale Sezione Componentistica d Impianto ANIMP

Completions & Commissioning Specialist

Turning the wheels of your success

AM SGB Sdn Bhd. Company Profile. Transformer First Class

BOLTIGHT HYDRAULIC BOLT TENSIONING TIGHTEN BOLTS SIMULTANEOUSLY TO ENSURE EVEN PRELOAD

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

Delineation and Regulatory Oversight of Processing Oil and Gas Midstream Facilities

NSP/ 007 / 006 Guidance on Substation Design: Transformer Transport, Delivery and Installation

SEMCO MARITIME. Projects, solutions and competences for the energy sector

TRANSFORMER OPERATIONAL. Principles, Selection & Troubleshooting

EE059: Transformer Operation, Maintenance, Diagnosis & Testing

4 Briefing. Responsible investor

It all starts here. Format fermé : 9" x 12" Format ouvert : 18 x 12 Marges : 0,125" Couleurs : CMYK

INDUSTRY INFRASTRUCTURE MARINE

Technology, Passion and Trust

AL NASR ENGINEERING (AL QUSAIS FACILITY)

WE CREATE IMPOSSIBLE ABOUT US. KASRAVAND is a DESIGN and MANUFACTURING Company

OIL AND GAS PRODUCTION RELATED SERVICES PRIMARY CONTACTS. Kevin H. Bunten. E. Shawn McDonald

Offshore Engineering. Design, Fabrication, Installation, Hook-up and Commissioning September 2017 Dubai, United Arab Emirates

Cooke Precast Concrete

Engineering Design & Power Training Institute

Sustainable Solutions for the Oil & Gas Industry

JULY Standards are finally approved by the Standards High Council of Iranian Ministry of Petroleum.

FPSO Operation and Maintenance

Principal Corrosion, Materials& Metallurgical Engineer

illizwe Engineering Business Profile

ENGINEERING SHORT COURSES

CONTENTS TABLE OF. Introduction. Company Details. Organization Chart. Certificates & Insurances. Our Products. List of machineries and Equipment

SUPPORT OF THE GOVERNMENT OF THE RUSSIAN FEDERATION

Bolt Tightening Solutions Torque and Tension, we ve got got it covered.

Orbost Gas Plant Upgrade Project Community Information Sessions. 18 & 19 September 2018

Fluid Technology Automation Technology smart buildings Technology

Sustainable Solutions for the Oil & Gas Industry YEARS

PGNiG. Code. of Responsible Gas and Oil Production

Special Sponsorship. Supporting Organizers

Offshore Engineering. Design, Fabrication, Installation, Hook-up and Commissioning Sep 2017, Dubai

DNB s oil and offshore conference. Idar Eikrem, CFO

Roger Hill to present: Independent Consultant

Royal Edge Engineering. Company Profile

Investor Relations Presentation April 30, 2013

Transcription:

Engineering Procurement Construction Commissioning General Contractor in the Oil, Gas and Petrochemical Industries

ABOUT RADIRA RADIRA CO., founded in 1981, is a general contractor company based in Tehran, Iran and has been implementing projects in the field of oil, gas and petrochemical industry ever since. The company has set to expand its domains under the management of a board of directors consisting of members who benefit from long experience and extensive knowledge in the relevant fields. Today our vision is not just to fully commit to what we take over and keep the project owners satisfied as we did before, but also to broaden our boundaries and go beyond the ordinary definitions of quality, safety and commitment. RADIRA'S FIELDS OF ACTIVITY Radira implements oil, gas, petrochemical, industrial and water treatment projects incorporating extensive experiences and professional human resources. Our activities include the design, procurement, management and execution of civil, mechanical, electrical and instrumentation works of petroleum refineries; chemical, petrochemical, industrial, power generation, water and wastewater treatment plants; storage tank farms; oil, gas and water pipelines; power transmission lines; oil pump and gas compressor stations and electrical substations.

STOCK HOLDERS MAHMOUD JONEIDI MANAGING DIRECTOR Birthday: 1942 Degree: M.S. In Mechanical Engineering Shiraz University 1973 Professional Experiences : Radira Co. (1981 up to now) Field of Activity : Engineering & Construction Position : Managing Director Dey- Sara Consortium (1978 to 1981) Field of activity : Engineering & Construction Position : Deputy Managing Director Sara Co. (1974 to 1978) Field of Activity : Engineering & Construction Position : Deputy of Site Manager Pars Oil Refinery (1973 to 1974) Field of Activity : Engineering, Production & Development Position : Technical Office Engineer MAHMOUD HOSSEINI KALAHROODI HEAD OF BOARD OF DIRECTORS Birthday: 1949 Degree: M.S. In Mechanical Engineering Shiraz University 1973 Professional Experiences : Radira Co. (1981 up to now) Field of Activity : Engineering & Construction Position : Head of Board of Directors Butane Engineering Services Co. (1975 to 1981) Field of Activity : Engineering & Construction (LPG) Position : Engineering Manager ALI TORABZADEH MEMBER OF BOARD OF DIRECTORS Birthday: 1951 Degree: Associate Diploma in Mechanics Professional Experiences : Radira Co. (1981 up to now) Field of Activity : Engineering & Construction Position : Member of Board of Directors Dey- Sara Consortium (1978 to 1981) Field of Activity : Construction Position : Site Manager Sara Co. (1974 to 1978) Field of Activity : Engineering & Construction Position : Head of Mechanical Executive Division ABBAS SABOKROU MEMBER OF BOARD OF DIRECTORS Birthday: 1948 Degree: Diploma & Experimental Civil Engineer Professional Experiences : Radira Co. (1981 up to now) Field of Activity : Engineering & Construction Position : Member of Board of Directors Dey- Sara Consortium (1978 to 1981) Field of Activity : Construction Position : Executive Staff Sara Co. (1971 to 1978) Field of Activity : Engineering & Construction Position : Executive Staff

CURRENT PROPERTIES & STAFF Office Area Office Staff Site Staff Central Office of the Company 450 m2 20 ONGOING PROJECTS Underground Piping, Phase 13, South Pars Gas Field Development Light Naphtha Hydrotreating & Isomerization Units of Tehran Refinery Bandar Abbas Gas Condensate Refinery EPC1, Phase 12, South Pars Gas Field Development Lordegan Ammonia / Urea 145 m2 360 m2 410 m2 970 m2 180 m2 10 14 9 32 12 TOTAL 2,515 m2 97 0 478 89 99 654 239 1,559 ANNUAL TURNOVER Year Turnover (USD) 2009-2010 297,269,448 2008-2009 194,169,249 2007-2008 74,298,130 2006-2007 78,682,935 2005-2006 106,333,904 300,000,000 250,000,000 200,000,000 150,000,000 100,000,000 50,000,000 0 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010

THE COMPANY S MISSION Our mission is to offer the most reliable services nationwide as well as internationally and our creed is to design, plan, execute and handover projects safely and within specified time and budget. ORGANIZATION CHART Head Office Site

QUALITY POLICY RADIRA is committed to the quality of the construction it performs and the related services it offers. The objectives of the management team are to maintain high standards in procurement and product quality while conforming to clients budget and completion time and to ensure that all works comply with contractual and regulatory requirements including safety and environmental. To achieve the quality objectives, the company has established the necessary quality system which is fully documented in the quality manual and the quality procedures it makes reference to. Quality assurance is the concern of the staff at all levels. Every section and individual in the company has quality related responsibilities which are honestly and consistently fulfilled. Should difficulties arise, priority is given to using whatever resources available for their speedy recovery. All the personnel in the company shall abide by this policy and fully cooperate with the quality manager in the implementation and maintenance of the quality system. HSE Our safety policy is to provide a safe work environment and conduct all works in a way that eliminates risks to people; and prevents properties from damage. This is the fundamental responsibility of every individual on site. All supervisors must routinely take complete responsibility for the prevention of accidents and for the safety of all works under their direction. With proper attention, awareness, and cooperation by everyone, we can achieve accident-free projects.

Ongoing Projects

UNDERGROUND PIPING, PHASE 13, SOUTH PARS GAS FIELD DEVELOPMENT Tombak, Iran CLIENT: Petro Paydar Iranian Company YEAR STARTED: 2011 YEAR ACCOMPLISHED: Ongoing INITIAL PRICE: 94,802,445,437 IRR FIELD OF ACTIVITY: Oil & Gas Underground piping; performing pre-commissioning and relevant civil works and cooperation with the client for the commissioning formalities

LIGHT NAPHTHA HYDROTREATING & ISOMERIZATION UNITS OF TEHRAN REFINERY Tehran, Iran CLIENT: Chagalesh Consulting Engineers Co. YEAR STARTED: 2008 YEAR ACCOMPLISHED: Ongoing INITIAL PRICE: 206,358,800,000 IRR FIELD OF ACTIVITY: Oil & Gas Installation of mechanical equipment and electrical instruments; interconnection piping; construction of industrial buildings and storage tanks; performing pre-commissioning and civil works and cooperation with the client for the commissioning formalities

BANDAR ABBAS GAS CONDENSATE REFINERY As Radira-Steam joint venture Bandar Abbas, Iran CLIENT: PGSOC (Persian Gulf Star Oil Co.) YEAR STARTED: 2008 YEAR ACCOMPLISHED: Ongoing INITIAL PRICE: 46,093,604 EUR FIELD OF ACTIVITY: Oil & Gas Engineering, procurement and construction of 26 storage tanks

EPC1, PHASE 12, SOUTH PARS GAS FIELD DEVELOPMENT As a Member of NASR Consortium* Assalouyeh, Iran CLIENT: Petropars Co. YEAR STARTED: 2008 YEAR ACCOMPLISHED: Ongoing INITIAL PRICE: 284,159,226 USD FIELD OF ACTIVITY: Oil & Gas Engineering, procurement, construction, pre-commissioning, commissioning, start-up and performance test of tanks and non-industrial buildings *NASR Consortium: Navrood-Arya Pishrow Gharn-Steam-Radira

LORDEGAN AMMONIA / UREA As a Member of Hampa Group Lordegan, Iran CLIENT: Lordegan Petrochemical Industry Co. YEAR STARTED: 2008 YEAR ACCOMPLISHED: Ongoing INITIAL PRICE: 70,772,000 EUR FIELD OF ACTIVITY: Petrochemistry Erection of steel structures; installation of mechanical equipment and electrical instruments; piping; insulation; construction of industrial buildings and storage tanks; performing pre-commissioning and civil works

Accomplished Projects

LPG RECOVERY, TREATMENT AND STORAGE UNITS & A DUAL PURPOSE JETTY Lavan Island, Iran CLIENT: Chagalesh Consulting Engineers Co. YEAR STARTED: 2007 YEAR ACCOMPLISHED: 2009 OVERALL PRICE: 71,983,157,753 IRR TOTAL MAN-HOUR: 285,000 FIELD OF ACTIVITY: Oil & Gas Erection of steel structures; installation of mechanical equipment and electrical instruments; piping; insulation; construction of industrial buildings; performing pre-commissioning and civil works

GAS COMPRESSION STATION & PIPELINES As Radira-Chagalesh joint venture Kish & Siri Islands, Iran CLIENT: Iranian Offshore Oil Co. (IOOC) YEAR STARTED: 2004 YEAR ACCOMPLISHED: 2008 OVERALL PRICE: 128,883,000,000 IRR TOTAL MAN-HOUR: 700,000 FIELD OF ACTIVITY: Oil & Gas Engineering and procurement of equipment; performing fabrication, construction, commissioning and start-up works and procedures

OFFSITE FACILITIES OF ETHANE RECOVERY & FRACTIONATION PLANT Assalouyeh, Iran CLIENT: Pars Petrochemical Co. YEAR STARTED: 2004 YEAR ACCOMPLISHED: 2006 OVERALL PRICE: 237,670,828,716 IRR TOTAL MAN-HOUR: 1,580,660 FIELD OF ACTIVITY: Petrochemistry Construction and erection of two double wall cryogenic tanks (110,000 m 3 & 58,000 m 3); performing mechanical, piping, electrical, instrumentation, insulation, painting and civil works

OFFSITE FACILITIES OF THE 9TH OLEFIN PLANT Assalouyeh, Iran CLIENT: Arya Sasol Polymer Co. YEAR STARTED: 2003 YEAR ACCOMPLISHED: 2004 OVERALL PRICE: 41,629,999,392 IRR TOTAL MAN-HOUR: 600,000 FIELD OF ACTIVITY: Petrochemistry Erection of steel structures; installation of mechanical equipment and electrical instruments; piping; insulation; construction of industrial buildings and storage tanks; performing pre-commissioning and civil works

FLARE SYSTEM & 48" FLARE LINE OF C2 RECOVERY PLANT Assalouyeh, Iran CLIENT: Pars Petrochemical Co. YEAR STARTED: 2003 YEAR ACCOMPLISHED: 2004 OVERALL PRICE: 68,800,000,000 IRR TOTAL MAN-HOUR: 500,000 FIELD OF ACTIVITY: Petrochemistry Performing civil works; erection of a flare stack; installation of flare pipelines; execution of procurement, utility piping, electrical and instrumentation works

BISTOON LINEAR ALKYLEBENZENE (LAB) PROJECT As a Member of Hampa Group Kermanshah, Iran CLIENT: Bisotoon Petrochemical Co. YEAR STARTED: 2002 YEAR ACCOMPLISHED: 2004 OVERALL PRICE: 320,000,000,000 IRR TOTAL MAN-HOUR: 200,000 FIELD OF ACTIVITY: Petrochemistry Installation of mechanical equipment and electrical instruments; interconnection piping; construction of industrial buildings; performing precommissioning and civil works

FABRICATION OF 7 DOUBLE BOOM SHIPYARD CRANES Bandar Abbas, Iran CLIENT: Mangan Co. YEAR STARTED: 2000 YEAR ACCOMPLISHED: 2005 OVERALL PRICE: 32,447,000,000 IRR TOTAL MAN-HOUR: 700,000 FIELD OF ACTIVITY: Ship Building Industry Fabrication and erection of one 30-ton, two 40-ton and four 150-ton shipyard cranes

ABOVE GROUND PIPING INSTALLATION; TRAIN 1 & 3, PHASES 2 & 3, SOUTH PARS GAS FIELD DEVELOPMENT Assalouyeh, Iran CLIENT: Hyundai Eng. & Const. Co. YEAR STARTED: 2000 YEAR ACCOMPLISHED: 2001 OVERALL PRICE: 21,750,000,000 IRR TOTAL MAN-HOUR: 648,080 FIELD OF ACTIVITY: Oil & Gas Field fabrication and installation of above ground piping and valves

OFFSITE UNITS & UTILITIES OF TABRIZ PETROCHEMICAL COMPLEX Tabriz, Iran CLIENT: Tabriz Petrochemical Co. YEAR STARTED: 1993 YEAR ACCOMPLISHED: 1997 OVERALL PRICE: 24,477,000,000 IRR TOTAL MAN-HOUR: 2,000,000 FIELD OF ACTIVITY: Petrochemistry Construction of concrete structures including firefighting & raw water systems, waste water treatment and a cooling tower; construction of industrial buildings; fabrication and erection of storage tanks

WATER TREATMENT PLANT & STORAGE TANKS Jam Urban Area, Kangan, Iran CLIENT: National Iranian Oil Co. (NIOC) YEAR STARTED: 1991 YEAR ACCOMPLISHED: 1994 OVERALL PRICE: 3,010,000,000 IRR TOTAL MAN-HOUR: 270,000 FIELD OF ACTIVITY: Water Treatment Installation of mechanical and electrical equipment and instruments and water treatment units; piping; construction of industrial buildings and 6 cone roof storage tanks; performing pre-commissioning and civil works

GAS-CONDENSATE LIQUID STORAGE TANKS & ONSHORE FACILITIES Bandar Taheri, Iran CLIENT: National Iranian Oil Co. (NIOC) YEAR STARTED: 1987 YEAR ACCOMPLISHED: 1991 OVERALL PRICE: 6,827,000,000 IRR TOTAL MAN-HOUR: 120,000 FIELD OF ACTIVITY: Oil & Gas Erection of steel structures; Installation of mechanical equipment and electrical instruments; piping; insulation; construction of industrial buildings and storage tanks; performing pre-commissioning and civil works

CRUDE OIL STORAGE TANKS Lavan Island, Iran CLIENT: Toyo Kanetsu K.K. YEAR STARTED: 1985 YEAR ACCOMPLISHED: 1986 OVERALL PRICE: 245,000,000 IRR TOTAL MAN-HOUR: 372,600 FIELD OF ACTIVITY: Oil & Gas Installation of mechanical and electrical equipment and instruments; erection & commissioning of two floating roof tanks of 1,000,000 BBL & 500,000 BBL

OIL DEPOT, GAS STATION & RESIDENTIAL AREA Dayyer, Iran CLIENT: National Iranian Oil Co. (NIOC) YEAR STARTED: 1985 YEAR ACCOMPLISHED: 1986 OVERALL PRICE: 286,000,000 IRR TOTAL MAN-HOUR: 150,000 FIELD OF ACTIVITY: Oil & Gas Erection of steel structures; installation of mechanical equipment and electrical instruments; piping; construction of industrial and residential buildings and underground storage tanks; performing pre-commissioning and civil works OIL DEPOT & BUND WALLS Lavan Island, Iran CLIENT: Iranian Offshore Oil Co. (IOOC) YEAR STARTED: 1982 YEAR ACCOMPLISHED: 1983 OVERALL PRICE: 75,000,000 IRR TOTAL MAN-HOUR: 60,000 FIELD OF ACTIVITY: Oil & Gas Installation of mechanical and electrical equipment and instruments and firefighting units; piping; insulation; construction of a storage tank and surrounding bund walls; performing civil works LPG CYLINDER MANUFACTURING PLANT Mashhad, Iran CLIENT: Butane Co. YEAR STARTED: 1981 YEAR ACCOMPLISHED: 1982 OVERALL PRICE: 73,000,000 IRR TOTAL MAN-HOUR: 80,000 FIELD OF ACTIVITY: Oil & Gas Installation of mechanical and electrical equipment and instruments and firefighting units; piping; insulation; construction of buildings and a storage tank; performing precommissioning and civil works

CERTIFICATIONS & CITATIONS Certificate of Contractor's Competency ISO 9001:2008 Establishment License for Engineering Services Unit NIPC Satisfaction Expression Certificate of Membership in the Iranian Society of Mechanical Engineers Certificate of Membership in International Consultants and Contractors Association of Iran Guild Association of Contractor Companies of Iranian Industrial Installation and Equipment Citation Letter from TOYO KANETSU K.K Safety Letter of Commendation from Arya Sasol Polymer Company

Address: No. 13, 5th Sarvestan St., Pasdaran Ave., Tehran - Iran Tel : (+9821) 22840111, (+9821) 22840162, (+9821) 22854075 Fax : (+9821) 22841756 Url: www.radira.co.ir www.radira.com www.radira.ir Email : info@radira.com Managing Director: Joneidi / Mahmoud joneidi@radira.com Head of Board of Directors : Hosseini Kalahroodi / Mahmoud hosseini@radira.com Member of Board of Directors : Torabzadeh / Ali torabzadeh@radira.com Member of Board of Directors : Sabokrou / Abbas sabokrou@radira.com Summer 2012