API STANDARD 53 PROVES IDEAL TRAINING AIDE Michael Gibson, PhD; IDEAS Singapore Pte Ltd

Similar documents
C o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w!

C o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w!

Moduels in PetroTrainer. PetroTrainer. How PetroTrainer is used

C o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w!

International Well Control Forum IWCF. Well Control Training Syllabus. Drilling Level 2. 1 st January 2014 Version 3.0

Enhancing Industry Capability for drilling Deepwater Wells A Chevron Perspective

Marathon Drilling Indonesia

IWCF Well Control Level 5. Celle Drilling Conference 2017

@balance Deepwater. MPD services

June 16, Via Electronic Transmission. Lamar McKay Chairman and President BP America, Inc 501 Westlake Park Boulevard Houston, TX 77079

Drilling Systems. Cameron Drilling Control Systems Applications. 1 Semi-submersible Platform Applicaton

MPD ACTIVE PRESSURE MANAGEMENT Next-generation MPD technology, built by manufacturing specialists

Industry Response - Post Macondo

ACCREDITATIONS AND ASSOCIATION MEMBERSHIPS

On the Development of the Blowout Preventer PRA Model

C o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w!

EXPERIENCES FROM A VIRTUAL SIMULATOR ENVIRONMENT. Stavanger, October 20 th 2011

Overview and Update of API Standards

Industry & Govt Changes Post Macondo. Charlie Williams Chief Scientist Shell Executive Director - Center for Offshore Safety

API RP 53 Recommend Practices for Blowout Prevention Equipment Systems for Drilling Wells vs. Standard 53 4 th Edition 2011

GTSC Rig for Hands-on Training

C o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w!

The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure.

Recent advancement in well-control technology improves safety and allows cost savings for well designs

Macondo Blowout Lessons Learned for Prevention and Mitigation

Offshore Drilling Rigs

Drilling Courses Overview Pressure control and drilling equipment course offering

An Introduction to Oil & Gas Drilling and Well Operations

Well Control Events. Well Flow Modeling. hydraulics and

Industry & Govt Changes Post Macondo

International Well Control Forum Well Intervention Pressure Control Subsea Syllabus

NAS Real-Time Monitoring of Offshore Oil and Gas Operations Committee Todd Durkee Director of Deepwater Drilling & Completions

GENERAL TOPICS ADDRESSING THE CURRENT INDUSTRY Michael Gibson, PhD; IDEAS Singapore Pte Ltd

Texas Oil Tools Bop Manual READ ONLINE

NORWAY. Norwegian Industrial Property Office (12) APPLICATION (19) NO (21) (13) A1. (51) Int Cl.

DE120 Successful Well Completion and Workover Practices:

Drilling Courses

Module No. # 01 Lecture No. # 3 Safety in design and operations. (Refer Slide Time: 00:10)

Marine Well Containment Company. Charlie Miller, Chief Technology Officer

New Developments in Regulation of U.S. Offshore Oil and Gas Operations

COILED TUBING DESIGN & OPERATIONS

Managed Pressure Drilling New Convention in Deepwater Wells. Brian Grayson, Bhavin Patel, Alice Gomez Weatherford International

4/28/2006. ModuSpec Engineering

Upstream / Upstream Safety Sessions

SubSea MudLift Drilling: from JIP to the Classroom

Training Fees 4,250 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch

In any of the 5 star hotel. The exact venue will be intimated prior to course commencement.

Marine Well Containment Company Response Overview New Orleans Area Committee

C o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w!

Deepwater well design, construction & drilling operations

AADE Houston Chapter. Group. 26 January 2011

Subsea Structural Engineering Services. Capability & Experience

Cameron MBO Multi-Bowl Wellhead System

2009 Half Year Results Summary

7 Briefing. Responsible investor

IDEAS E-Learning Course

4 Briefing. Responsible investor

ECDM System. November, Security Classification: Restricted - Status: Draft

Enhancing international subsea well incident intervention

PressurePro CONTROL SYSTEM

SUBSEA WELL CONTAINMENT. Global Basis. Deepwater & Emerging Technologies Group (DETG) AADE Houston Chapter 25 January 2012

Deepwater Horizon Failure of Blowout Preventer (BOP)

Noble Corporation. Don Jacobsen Senior Vice President Industry & Government Relations Marine/Offshore Industry Conference 29 March 2012

Deep Water Definitions

MARS. Multiple application reinjection system

SAFESTACK TECHNOLOGY, LLC William M. Caldwell, Principal 1211 Government Street Ocean Springs, MS 39564

NTL No N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010

Sinking of the Deepwater Horizon. 11 perish and 115 survive

TOP HOLE DRILLING WITH DUAL GRADIENT TECHNOLOGY TO CONTROL SHALLOW HAZARDS

DE123 Advanced Drilling Practice Technology

Investor Relations Presentation April 30, 2013

15,000 psi 20,000 psi. BigBore IIe HPHT SUBSEA WELLHEAD SYSTEMS

Personalized Service, Industry Expertise. Franklin Howard

Review of Joint Industry Projects: Delivering Subsea Well Intervention Capability James Burroughs SWIS Operations Manager

3 Day Stuck Pipe Prevention

OTC seems to be able to afford to fix the problems associated with downtime due to an incomplete design.

The Role of Business and Engineering Decisions in the Deepwater Horizon Oil Spill

Petrosync Distinguished Instructor

JOINT INDUSTRY OFFSHORE OPERATING PROCEDURES TASK FORCE, JOINT INDUSTRY OFFSHORE EQUIPMENT TASK FORCE, JOINT INDUSTRY SUBSEA WELL CONTROL AND

Lloyd s BOP Register energy Risk servicesmodel Project Development. Scotty Roper Project Manager Moduspec USA, Inc.

SAFER, SMARTER, GREENER

Tore Aarsland. Chairman of the Editorial Revision Committee / Senior Design C6 Technologies. 10-Jan-13

INVESTIGATION REPORT VOLUME 2

An informal discussion of drilling contractors was held prior to the Well Control Committee meeting. Key topics discussed included the following:

Oil and Gas UK Well Integrity Guidelines

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015

GE Oil & Gas Drilling & Production. VetcoGray subsea wellhead systems. Advanced solutions for extreme conditions

Experience, Role, and Limitations of Relief Wells

Defining the New Normal for Offshore Drilling Copenhagen 16 June Alan Spackman Vice President, Offshore Regulatory & Technical Affairs

When a drilling project is commenced, two goals must be achieved:

Siem WIS. Siem WIS AS. Closed Loop Drilling CLD. August Siem WIS AS.

3D OFFSHORE PROJECT SIMULATION. Singapore Shipyard. Replace all chain. Adding a riser

SERVICE IN ACTION. : Jackup Drilling Rig. : Johor Bahru Malaysia (on-site) DURATION : 4 days on-site STATUS : Periodic maintenance ACTIVITIES

Design and Concept Integration- MPD Technology in Deepwater Rigs. Julmar Shaun S. Toralde, Global Deepwater Managed Pressure Drilling Champion

BigBore IIe. 15,000 psi 20,000 psi SUBSEA WELLHEAD SYSTEMS

BRIEF INTRODUCTION OF OILMAN

ISO/TR TECHNICAL REPORT

GE Oil & Gas Drilling & Production. Drilling Systems. reliable to the extremes

FPSO Operation and Maintenance

Click to edit Master title style APPEA AWIC UPDATE. Self Audit Checklist Source Control First Response

Transcription:

API STANDARD 53 PROVES IDEAL TRAINING AIDE Michael Gibson, PhD; IDEAS Singapore Pte Ltd This paper has been written for presentation at the API Axis Conference to held in Kuala Lumpur, Malaysia, 13-15 January 2016 ABSTRACT This paper portrays the advantages of utilising API Standard 53 as a key training aide in the area of Blowout Prevention Equipment Systems for a fast-track or accelerated Assistant Driller Training Program for young people new to the Industry employed by a major drilling company here in South East Asia. The challenge was to educate young people of different backgrounds, nationalities, skill capabilities and language abilities in Blowout Prevention Equipment who have never come across such equipment before so that they clearly understood the design and functionality of their equipment on-board their specific rig. Given that well control is not an easy subject for people to understand (especially those who are new to the Industry) the task of writing material especially suited for such people is not as easy as it may seem, since the bulk of material available on the subject is at too high and too complex a level. API Standard 53 was the ideal solution for this training program since it is both clearly and unambiguously written. It also dove-tails perfectly with the new IADC Wellsharp well control training program and the OGP Report No.476 which recommends certain enhancements to well control training. That every trainee scored high marks in the Blowout Equipment Systems section is testimony to the fact that API Standard 53 is indeed the perfect training aide for young people coming into the Industry for the first time and is, furthermore, seen as an ideal standard for future training courses e.g. for Driller s and Drilling Engineers for example. OBJECTIVES To show how API Standard 53 can help with the training of new, young people coming into the Industry and how it dove-tails with the new IADC Wellsharp well control training program, the varying levels of IWCF and the contents of OGP Report No. 476 which recommends enhancements to well control training.

P a g e 2 BACKGROUND One of South East Asia s leading, prestigious and forward-think Drilling Contractors based in Singapore and Kuala Lumpur had a requirement, a year ago, for a fast-track Assistant Drillers program which would take suitable young people through to the position of Assistant Driller within a period of approximately 18 months. As training providers, IDEAS Singapore Ltd were approached to discuss the task. This was a challenging requirement due to the mixture of people. There were male and female personnel, people from a mix of countries i.e. Brunei, Malaysia, Thailand and Indonesia; differing English abilities; differing cultures; differing educational abilities (e.g. some had excellent engineering degrees, some had not, having practical experience instead), there was a range of background skills and an age range. Despite the differences, all were so keen to learn and hard-working; and all wanted to pass the course with flying colours. There is an excellent amount of well-written literature on virtually any variety of drilling subjects one might care to source and cross-reference. However, this is not true of well control material, particularly for young people at entry level. (IDEAS has been training drilling personnel for many years now on a variety of courses, including well control). Furthermore, post Macondo, the Industry has really tried hard to promote the understanding of the subject as opposed to just passing and exam, and there have been many suggested improvements, not least those contained within the publication of OGP Report No. 476 for example. Well control is also one of those subjects feared by many drill crew and even drilling engineers. Generally, it s not explained at all well. A complex subject, which should be taught with sympathy and delicacy, it is often taught with all the finesse of a butcher in a butcher s shop. So, in order to a) reduce the student s fear of well control, b) help them understand well control, c) achieve a high exam pass-rate, d) become more in-line with the post Macondo recommendations (e.g. OGP Report No. 476) and e) become more in-line with the differing levels of IWCF and the new IADC Wellsharp programs, IDEAS searched far and wide for the right material as regards BOPE (Blowout Prevention Equipment). Generally, we found that much of the material readily available on the market and the material used by many well control schools wasn t explanatory enough or wasn t simple enough in effect, it was neither well written nor was it at the right level. The only documents / manuals which we could use was the Drilling Contractor s Well Control Manual and API Standard 53. There was also the advantage that, apart from the delegates understanding their own company s well control policies and procedures, they would also, at an early age, learn API Standard 53. API STANDARD 53 At 112 pages long, of great vintage, containing 43 sections, 18 Figures and 11 Tables, API Standard 53 must be one of the clearest, most succinct and most unambiguous documents in the Industry.

P a g e 3 Although the delegates only require to learn about Surface BOP Stacks (the Drilling Contractor specialises in Tender Assist Drilling, example photo below), there s plenty of Subsea BOP Stack information available should the company ever move into semi-submersibles for example. The West Pelaut Tender Assist Drilling Unit Drilling for Shell Brunei Apart from the text information, the following proved particularly useful:- Annex A Surface Function Test Worksheet; Annex A Pump System Annex A Accumulator Closing Test Annex A Accumulator Pressure (especially the notes) Annex B Failure Reporting Annex C Accumulator Pre-charge Calculations Figure 1 Example Choke Manifold Assembly for 2K and 3 K Rated Working Pressure Service Surface BOP Installations Figure 2 Example Choke Manifold Assembly for 5K Rated Working Pressure Surface BOP Installations Figure 3 Example Choke Manifold Assembly for 10K or Greater Rated Working Pressure Service Surface BOP Installations Figure 4 Example Kill Line Assembly for 2K and 3K Rated Working Pressure Service Surface BOP Installations Figure 5 Example Kill Line Assembly for 5K and Greater Rated Working Pressure Service Surface BOP Installations Figure 6 Example Kill Line Assembly for 5K and Greater Rated Working Pressure Service Surface BOP Installations Figure 7 Example Standpipe Choke Installation Figure 8 Example Illustration of Surface BOP Ram Space Out

P a g e 4 Table 1 Surface BOP Pressure Designations (in particular for introducing MPa Units) Table 2 Pressure Test, Surface BOP Systems, Initial Test Table 3 Pressure Test, Surface BOP Systems, Subsequent Tests Table 4 Example Surface MEWSP Calculations Given Well & Equipment-specific Data The cross-referencing with other publications in the Bibliography also proved particularly useful, namely:- API RP 59, Recommended Practice for Well Control Operations API RP 64, Diverter Systems Equipment & Operations INCORPORATING API STANDARD 53 INTO THE TRAINING PROGRAM During the program s inception phase, well control was identified as a major concern for a variety of reasons:- Young people are genuinely apprehensive regarding well control examinations; Young people often doubt their ability in this typically complex area; Some young people doubt their English ability / capability. It was thus essential to incorporate API Standard 53 in a sympathetic way; a way in which the equipment side of well control could be readily understood in the first instance. Then, when the equipment side of well control was understood (i.e. what the equipment did, what it was for etc.) the other areas of well control could be studied (leading up to filling out the kill sheet and killing the well through either the Driller s Method or Wait & Weight). Three ways were selected to incorporate API Standard 53 into the training program:- E-Learning Modules Offshore Practical Tasks Log Classroom Training Constant Linked-In Discussion E-LEARNING MODULES E-Learning modules are an excellent way to learn anytime, anywhere and are regarded as being both highly flexible as well as informative. There are a total of 3 E-Learning Modules to the Training Program, and it s within the first module (Drilling Equipment & Systems) that reference is made directly to API Standard 53, asking the delegate to check that he / she has API Standard 53 to hand for ready reference. OFFSHORE PRACTICAL TASKS Following each E-Learning module the students had a number of tasks to carry-out offshore which both tied-into and expanded the learning value of the module. Essentially hands-

P a g e 5 on and practical, the tasks were contained in a conveniently sized Offshore Practical Tasks Log Book. Examples of the tasks are given at the end of each module. MODULE 1 E-Learning The first module began with direct reference being made to the Drilling Contractor s schematic of their typical well control system, below:- Drilling Contractor s Typical Well Control System contained within Well Control Manual Pressure Control The E-Learning module then continued with a video as to why pressure control is so important, covering, in particular, the following areas:- Hydrostatic Pressure Formation Pressure Kicks / Influxes BOP Stack Blowouts & Consequences Reasons for Kicks / Influxes Referenced Equipment Following the video, direct reference was then made to the following items of well control equipment:-

P a g e 6 Diverter Systems BOP s General Annular BOP s Ram BOP s (Pipe, Variable Bore, Shear & Blind) A second video (BOP s & Equipment) concluded this first module with the following topics:- Overview Pressure Ratings Annular Preventers Ram Preventers Choke Line & Manifold Mud Gas Separator BOP Stack Operation Examples of Offshore Practical Tasks Sketch the Diverter System on-board your rig (if you have one) including where the overboard gas lines go. Become familiar with the diverter element closing system and the overboard line valve opening system. Note the Working Pressure and where the hydraulic fluid comes from to close the element. Sketch the BOP Stack on-board your rig, noting, in particular, what rams are below the Annular Preventer. Note the Working Pressures of the Annular and the Rams and where the hydraulic fluid comes from to close them. List the distances from below the rotary to the Annular Preventer (AP), the Rams and the Wellhead. Note if there is a surge bottle for the AP and what type of AP you have (e.g. DL or GK). Witness the Testing of the BOP Stack and make notes as to the test pressures achieved, the time period they were achieved for and the frequency with which these tests are carried out. Copy the test charts. Sketch the pipework, valves and gauges which constitute the choke manifold on-board your rig. Annotate your sketch with information as to what goes where in terms of flow-path and note the pressure ratings. MODULE 2 E-Learning This module began by showing a video on Surface BOP equipment, of the following topics, making specific reference topic by topic to API Standard 53:- Overview The Driller s BOP Control Panel Accumulators Hydraulic Lines Operating Lever on Accumulator Choke Manifold and Chokes

P a g e 7 Mud Gas Separator Mud Gas Separator Operation Flare Line Trip Tank Trip Tank Operation Another key advantage of API Standard 53 is the standard of the drawings / schematics. It s far easier for the student to understand the schematic below prior to going onto the rig floor. API Standard 53 Schematic: Straightforward to Understand On the Drill Floor: Rather More Difficult to Understand

P a g e 8 Module 2 also covered the following areas:- Drilling / Spacer Spools Choke & Kill Manifolds & Flow Path Requirements Choke & Kill Piping & Flexible Lines Choke & Kill System Hydrate Suppression: Glycol Injection Standpipe Manifold Cement Manifold Examples of Offshore Practical Tasks Sketch where the glycol injection point is and where the glycol injection pump is. Explain to your Supervisor / Mentor just why the injection of glycol is so important during well killing operations. State what must injection pressure be and the flow rate of glycol. Sketch the hook-up of all of the lines and what the functions are of each line. State the Working Pressure. Draw the hook-up of the line from the cement unit. State when this line might be used and what its pressure rating is. Study the BOP / Diverter Control System and list your observations. State the function of the Control System. State how actuation of the valves at the choke manifold is carried out. Find out what is inside an accumulator bottle and what the principles of operation are. Explain the operation to your Supervisor / Mentor, particularly the pressure / volume relationship. MODULE 3 E-Learning This module covered the following areas in particular, again cross-referencing in detail with API Standard 53:- BOP Control Systems / Accumulator Units BOP Handling Systems Mud Gas Separators (especially design, vent line, the liquid seal, hot mud line) Trip Tanks / Stripping Tanks Degassers PVT Systems Mud Return Flow Volume Meters Safety Valves / FOSV s Upper / Lower Kelly Cocks Float Valves Gray Valve / Hydril Drop-in Dart Valve.

P a g e 9 Examples of Offshore Practical Tasks What should the Koomey pressures be for the following :- Accumulator Manifold Annular Describe the internal workings of the BOP stack and its different functions from top to bottom. Describe and perform the line-up for drilling and tripping operations. Identify the locations of all the BOP Control Panels and gauges. Identify HCR valve operating handle. CLASSROOM TRAINING At the end of each 6-month training session a week s classroom training was organized. The purposes of this session were four-fold:- To ask the delegates if they had any questions relating to the E-Learning Modules and API Standard 53 / Well Control Equipment To ask the delegates if they had any difficulties with their Practical Tasks Offshore To explain the material in more detail To relate the learning to actual well control situations The classroom also gives the delegates the opportunity to discuss related issues as well. CONSTANT LINKED-IN DISCUSSION The social media platform chosen for individual / group chat was Linked-In. This proved quite satisfactory, with delegates having their questions answered usually within 24 hours. RESULTS As expressed by Management, the results of the program 12 months in are excellent, with Senior Management at Director level expressing their continued satisfaction with the course. Students are passing the equipment sections of their Level 3 IWCF well control exams with rates in the region of 95%, which is quite remarkable. CONCLUSIONS It may be concluded with accuracy that this novel training program is proving to be highly satisfactory, as borne out by both the student s results and Management s comments. It may be further concluded that API Standard 53 is just the right quality for such training purposes, its excellent quality contributing most notably to the success of the course. REFERENCES 1. API Standard 53, Fourth Edition, November 2012 2. SKD Well Control Manual 3. IADC Drilling Manual 4. Institute Francais du Petrole Drilling Data Handbook

P a g e 10 5. SKD Rig Specific Data Sheets AUTHOR S BIOGRAPHY Michael Gibson PhD has 35 years international oilfield experience working in a wide variety of disciplines ranging from drilling engineering through to drilling operations and, latterly, drilling consultancy and training. A champion of lateral thinking, new technology, risk analysis and inter-disciplinary teamwork, he studied at The Robert Gordon University in Scotland. He holds Master s Degrees in Offshore Engineering and Engineering Technology and a PhD in High Pressure High Temperature Drilling. He currently advises and teaches a wide-range of clients worldwide and is based in Singapore. FOOTNOTE IDEAS Singapore Pte Ltd was established in Singapore in order to transfer its North Sea, Atlantic and Gulf of Mexico experience to South East Asian operators, drilling contractors and service companies. Focusing upon well performance, risk reduction, efficiency and costeffectiveness, IDEAS Singapore Pte Ltd advises a number of clients, including deepwater operators and drilling contractors, ranging throughout South East Asia. IDEAS also teaches a great deal throughout South East Asia, and this Abstract refers to a very large drilling company based here in South East Asia.