MICC Ltd Unit 21 Sedling Road Wear East Industrial Estate Washington Tyne & Wear NE38 9BZ Tel: +44 (0)

Similar documents
Part 7 Assembling the X axis

SENA INSTRUCTION MANUAL

30DC Speed Lathe Manual

Giraud Tool Company, Inc.

AUTO STABILIZING AND LEVELLING SYSTEM

GMR 1 PROFESSIONAL. ÁU~²Ýœ ÈULM¼« Àπ ß Õ ŸË Õ Èß π Petunjuk-Petunjuk untuk Penggunaan HıÎng dõn s dùng Instructions d emploi. Operating Instructions

SAVE THIS FOR FUTURE REFERENCE THIS PRODUCT IS FOR PROFESSIONAL LABORATORY USE ONLY USER'S MANUAL

MODELS 49 RA 49 RAZ 49 RAC

(Assembling Guide supplied by imakr ) with the support of MyMiniFactory.com

BBF Series Blower Base Frame Assembly Instructions Rev.: BFA-9105

Submersible Turbine Assembly Manual

SALES CUSTOMER SERVICE TECHNICAL ASSISTANCE CALL TOLL-FREE:

- 4 - Fig. 3b. Fig. 1b. Fig. 2. Fig. 2b MT 300

Removing outter components

Referencing 0,0 position

Service installation of hardtop Installing hardtop

M2 Assembly. M2 Sub-Assemblies mm Belt Sub-Assembly mm Belt Sub-Assembly Spider Sub-Assembly... 4

Page 1. SureMotion Quick-Start Guide: LARSACC_QS 1st Edition - Revision A 03/15/16. Standard Steel Bolt/Screw Torque Specifications

V4 Premium Kit. Prusa i3 Build Guide

TABLE OF CONTENTS MODEL 8750/8800 OCL

imove-f Assembly Manual (Motorized Version-M1/M2)

HIT-30 ALUMINUM DOOR SERIES OWNERS MANUAL

Horizontal and Vertical. Metal Cutting Band Saw MODEL: BS-115

SatNOGS. SatNOGS Rotator v3 Mechanical Assembly. This is the assembly guide for the third version of the SatNOGS Rotator.

Installing CNC Stepper Motor Mounts On A Sherline Lathe

8 x 5 PLANER THICKNESSER OPERATING INSTRUCTIONS MODEL: W588

FM2113PC/FM2114PC SBC Top Mount Alt, w/ A/C & Power Steering

ABM International, Inc.

INSTRUCTIONS AND PARTS LIST POWER HAMMER

AM8 Printer A metal frame for your Anet A8 By Pheneeny v1.0 April 20, 2017

FM2113PC/FM2114PC SBC Top Mount Alt, w/ A/C & Power Steering

Model: SCD430 SCD640. Installation & Operation Guide P/N SCD640-95

Top spin Nr /

It is highly recommended that you use a thread lock compound such as Loctite brand on all threads to keep them from vibrating loose.

30AUTO Speed Lathe Manual

Pow-R-Feed Systems Service Manual

Hatchback Wing Riser Kit

FABA. Installation Instructions. Conductor Bar System. Publication #FABA-03 3/1/04 Part Number: Copyright 2004 Electromotive Systems

RACER TECH COMMANDER HD TIE ROD INSTALLATION

Allow 60 from door face

Tube Facing Tool.

7. Operating instructions: EFL 300

ACTUATOR KIT. Assembly Instructions. for 300mm, 500mm and 1000mm kits. S.A. Brown & Maker Store. v1.

M4 Foot Operated Underpinner Instruction Manual

REP Design LLC. 193 Winding Ridge Rd, Southington, CT INSTALLATION INSTRUCTIONS:

Installing CNC Stepper Motor Mounts On A Sherline Mill

AndyMark DART 12.

Serial Number Location

TITAN-BIT KEY-CUTTING MACHINE INSTRUCTION MANUAL

ABM International, Inc. Navigator Assembly Manual

INSTALLATION OF WELLS SUPER QUICK CHUCK LEFT HAND ON RED WING LATHE

UNDERPINNERS CS 88 & CS 89 FOOT-OPERATED PNEUMATIC. Technical and User Manual. Version 1 au 12 / 01. Cassese / Communication

Nancy s Knit Knacks LLC 4 Yard Option Upgrade Kit Assembly Instructions and User Manual

VACUSEAL MODEL 200. HOT TUB PRODUCTS 233 Carrington Road Bethany CT

TITAN2-EDGE Public Access Computer Station Dual Track

Durst Laborator 138 S

Assembly Instructions

INSTALLATION RECOMMENDATIONS For The Con-Tech ODYSSEY Line Voltage Flexible Track System

hawos Pegasus 400 Volt

Model: SS660-OB Stainless Steel Floor Scale Series. Installation, Set-Up and Operation Manual

Table of Content. Machine Features and Functions. Specifications. Configuration and Working Principle 5. Machine Operation. Machine Adjustments

FACTORY CAT TOMCAT CORPORATION

600mm COMPOUND MITRE SAW ASSEMBLY INSTRUCTIONS. MODEL NO: MBS600D Part No: GC05/12

ASOLA - THETA ISTRUZIONI DI MONTAGGIO FITTING INSTRUCTIONS INSTRUCTIONS DE MONTAGE INSTRUCCIONES DE MONTAJE MONTAGEANLEITUNG. IMPBAT Rev.

JEWEL, SAPPHIRE, STAR and NOVA Turntables

Vertere RG-1 and SG-1 Record Player User Manual. Unpacking. 1 Top Packing Foam Pad

LU6X-130 Instructions and Parts List (including LU6X Basic) Operating Instructions

LEG CURL IP-S1315 INSTALLATION INSTRUCTIONS

KneeWalkersForRent.com How to Set Up and Adjust Your Knee Walker

Hydrajaws Safety Lifeline Tester

TS4001. Model # 10 inch Table Saw addendum SETUP & OPERATION MANUAL

Geology, Prospectors, Mining, Metallurgy, Assaying, Environmental, Geotechnical

Cut-Off Machine Model CC 14SE

Removing and Replacing the Y-truck

INSTALLATION OF WELLS SUPER QUICK CHUCK LEFT HAND ON BALDOR LATHE

Motorized M3 AX7200 Rotary-Style Gasket Cutter Operating Instructions

MODEL 36 Di-Acro Hand Shear

Face Mount to Through-the-Post Mount

CRP700 Benchtop Basic CNC Machine Assembly Instructions. Updated 9/11/2014 SHEET 1 of 25

OPERATIONAL MANUAL V1.0. Removing/Replacing Blades

By C.W. Woodson From the pages of Model Craftsman magazine June, 1937

Helix. Operating Instructions and Parts List. Spring Assembler Model HX20

INSTALLATION INSTRUCTIONS Small Flat Panel Height-Adjustable, Extended Pitch Swing Arm Wall Mount Model KWE-110

SPOT WELD CUTTER SHARPENER

MINI-LATHE QUICK CHANGE TOOL POST

E.C. HOPKINS LTD PGO4 PEANUT GRINDER OPERATORS MANUAL AND PARTS LIST

Electric Guitar Kit DC Style electric guitar kit

BEST PRACTICE GUIDE. Socket Bases. Working with Concrete Slabs

Wooden Frame Type Instruction Manual

Special Z-Axis Ballscrew Replacement

MantelMount. TM1A Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

COFFEE LABORATORY WHITE STONE VA TEL

Fast End Mill. Drill Re-Sharpening Machine

Replacing the Reciprocator on the SWF Compact Series Machine (601C and 1201C)

Thomas Scientific Swedesboro, NJ U.S.A.

CRP700 Benchtop Basic CNC Machine Assembly Instructions. Updated 10/24/2014 SHEET 1 of 24

RECOMMENDED SPARE PARTS FOR NORMAL ONE (1) YEAR OPERATION OF VD CRUSHER

OPERATION AND MAINTENANCE HANDBOOK D407270XA

EDGE2 DUAL MONITOR ARM

RC-TEK Ltd. SKYSHARK 450 REFERENCE MANUAL. Copyright 2007 RC-TEK, All Rights Reserved

Transcription:

MICC Ltd Unit 21 Sedling Road Wear East Industrial Estate Washington Tyne & Wear NE38 9BZ Tel: +44 (0)191 416 8884 MINERAL INSULATED CABLE PRECISION DRILLING MACHINE INSTRUCTION MANUAL (Amended for new Speed controller December 2015) 1

MINERAL INSULATED CABLE PRECISION DRILLING MACHINE 1 Scope The Precision Drilling machine complements the M.I. Thermocouple Welding Machine. The Drilling Machine is designed to remove the insulation from the end of a prepared sample of M.I. cable in order to facilitate a complete welded measurement junction. The insulation is removed along with a section of conductor by drilling the end of the cable precisely to the required depth. The machine must cleanly cut away the conductors without twisting them together at the same time as removing the insulation. 1.1 Physical Construction The Drilling Machine consists principally of a thyristor controlled DC 250W motor that can run up to 3000 rpm. This motor drives a precisely mounted ER16 Collet extension/holder, which accommodates the various drills. The collet extension is carried by two ball bearing pedestal blocks precisely centrally aligned with a second collet extension. This second collet extension is mounted in a linear bearing set allowing forward movement without radial displacement. Both sets of bearings are mounted on a 2 x 4 Aluminium box section, which is further mounted on a ½ thick Aluminium base plate. These last two components ensure maximum rigidity of the aligned collet holders. Please Note: The precise alignment of the linear bearing and the two pedestal bearings is factory set using a 300mm precision ground linear shaft. It is not necessary to readjust this setting and it is recommended that no attempt be made to slacken any of the mounting bolts. 1.2 Dimensions The approximate dimensions of the machine are Height 140 mm 5 ½ Width 250 mm 10 Depth 370 mm 14 ½ Weight 10Kg 22lbs 1.3 Supplies The machine is designed to operate from a single-phase mains supply in the ranges 110/120v AC or 220/240V AC 50/60 Hz. 1.4 The mains fuse is located inside the IEC power connector socket on the rear of the machine (pull-out section). This fuse is rated at 5Amps. 1.5 Shipping The machine is dispatched as follows The main package containing the machine A box containing collets, drills, drill guides and tools A package containing the mains lead, footswitch and Manual 1.6 Bench Mounting The machine has two mounting points to facilitate fixing to a benchtop. (This is recommended) Underneath the base plate are two hexagonal spacers with M6 threaded holes. These allow tight fixing of the machine to the benchtop but will prevent distortion of the rubber feet. There are two M6 threaded studs with wing nuts in the accessories box; these can be used to fix the machine to a bench up to 40mm thick. The two mounting holes should be drilled 270mm apart and at least 50 mm from the front of the bench. 2

Bench-Mounting Hole details 270 mm 2 Holes 6mm diameter >50 mm Front of bench 1.6 Setting up Once the machine has been fixed to the bench and checked then the collets may be assembled for operation. There are to 4 collets to hold the drills used to drill out the insulation. These are 0.5 to 1 mm, 1 to 2 mm, 2 to 3 mm and 3 to 4mm (All may not be supplied depending on cable sizes required/ordered). A further collet has a 10 mm capacity and this is used to hold the drill guides. The drill collets are fitted to the fixed collet holder on the machine and the 10mm drill guide collet is fitted to the movable collet holder. Depth Stop Moving Collet Holder Fixed Collet Holder Linear Bearing Component Identification 3

Fitting collets into collet holders. The collet holder is designed to release the collet from the shaft when the locating collar is unscrewed. The collet fits into a lip inside the locating collar. To fit a collet, hold the locating collar in one hand and offer up the collet at an angle twisting it into the locating collar. (Do not force it in) When the collet is properly in place the front face will align with the front of the locating collar. The locating collar and collet will then screw into the shaft. Once this technique is mastered it is very easy to fit and remove collets. Shaft Locating Collar Collet Collet Holder/Collet Extension Collet Locating Collar For the moving Collet holder the appropriate drill guide can be inserted into the collet prior to screwing the locating collar into place Drill Guide For the fixed Collet Holder the required drill can be inserted into the collet prior to screwing the locating collar into place. Please note: - DO NOT insert a drill larger than the collet upper size limit into the collet - this will damage the collet and cause misalignment. Always use the appropriate collet for the drill size used. 4

When fitting the drill guide, the collet-locating collar can generally be tightened by hand since the shaft of the collet holder will not turn in the linear bearing. For the drill collet two 25 mm open-ended spanners are provided in the accessories box. (DO NOT use pliers or a mole wrench to tighten the collets.) 2.0 Operation This section gives details of the machine operation for normal drilling of 1.0 to 6.0 mm MI thermocouple cables prior to hot junction welding. 2.1 Table The following table gives the Drill sizes used to prepare a standard range of cable. These drill sizes are based on a sheath to I.D. ratio of approximately 0.72 and a radial clearance of approximately 0.10 to 0.15mm. (Variations occur due to the availability of matching standard drill sizes). For the 1.0 mm cable the radial clearance is 0.08 mm. Cable size Drill Drill Collet 1.0 0.55 1.0 0.5 1.5 0.85 1.0 0.5 2.0 1.2 2.0 1.0 3.0 1.9 2.0 1.0 4.0 2.6 3.0 2.0 4.5 3.0 3.0 2.0 5.0 3.3 4.0 3.0 6.0 4.0 4.0 3.0 For drill sizes appropriate to other sheath/ I.D. ratios please contact the machine supplier. 2.2 Controls There are two rocker switches visible on the top of the machine. The left-hand-side switch is for machine speed fast and slow. The speeds relate to each other. Fast is the motor top speed (set internally) and slow is 1/2 of top speed. The right-hand-side rocker switch is used to select the method of starting and stopping the machine. Set this switch forward to allow the use of the optional foot-switch, the centre switch position is Off and the back position is Run. On the rear of the machine there is an on/off switch built into the mains inlet socket. This also includes the mains fuse holder. (There is also a spare 5A fuse) 5

2.3 Cable preparation The cable must be properly prepared to ensure efficient and continuous use of the machine. Cables that are too large may jam in the drill guides; cables that are too small will not drill centrally. The main consideration is the condition of the cut-end of the cable; this must be free of burrs, straight and not distorted in any way. It is recommended that several trial runs be carried out on a medium sized cable (e.g. 3.0mm) before attempting to use the drill on production cables. 2.4 Drilling Sequence 2.4.1 Release and remove the depth stop using the Tee handled Allen key supplied 2.4.2 Select Drill guide, drill and drill collet appropriate to cable size using the table above. 2.4.3 Fit the Drill-guide to the10mm collet as detailed above 2.4.4 Fit the Drill and drill-collet as detailed (The drill must be tight in the drill collet) 2.4.5 Replace the depth stop but do not tighten it yet 2.4.6 Offer the cable up to the drill guide from the open end of the Collet Holder Shaft 2.4.7 Ensure that the cable is fully seated in the drill guide 2.4.8 With the machine still switched Off - Push the cable gently forward until the drill comes in contact with the cable inside the drill guide. N.B. If the drill does not come into contact with the cable then it may be set too far back into the drill collet. Release the collet, pull the drill forward and retighten the collet. 2.4.9 Keeping the cable touching the drill, set the backstop to the required drill depth appropriate to your own manufacturing preferences. N.B. Many manufacturers drill the cable to one diameter deep. This can be achieved by placing a piece of cable of the same diameter as the cable being drilled in between the backstop and the bearing face. 2.4.10 Tighten the backstop using the Tee handled Allen key supplied and pull the shaft back away from the drill collet. 2.4.11 Close the Acrylic Safety Cover over the drill section. 2.4.12 Select the motor speed depending on the cable size. This is a matter of preference but in general the higher speed is more appropriate to the small cable sizes and the lower speed to the large cable sizes. 2.4.13 Select either the foot switch or the run setting of the mode switch. 2.4.14 With the machine running, gently push the moving Collet holder into the drill. The machine will not turn the moving collet so there is no need to grip it tightly. Keep pushing gently until the backstop prevents further movement. 2.4.15 Remove the cable and switch off the machine 2.4.16 It is recommended to immediately sweep the waste material away using the brush supplied. This will ensure a long and trouble free life of the machine. For batch production the machine can be left in the run position and several cables drilled in sequence. (The motor is rated for continuous operation) It is still recommended to sweep the waste material away on a regular basis. 6

Appendix Replacing drive belt Case shown totally removed for clarity In the unlikely event that the drive belt needs replacing this can be carried out providing that the two pedestal bearings remain in alignment. Remove the top cover and observe the position of the motor drive belt. Grub screws (two at each location) Slacken the two grub screws in the bearing sleeve of the front bearing. Slacken the two grub screws in the bearing sleeve of the rear bearing. Slacken the two grub screws in the small pulley. Gently slide the collet holder forward until the small pulley is released from the shaft. Replace the drive belt with a new 450 mm Synchronous HTD Belt. Shaft aligned with rear of Aluminium box section Push the shaft back into the pulley and then into the rear-bearing sleeve. Retighten the grub screws on the bearing sleeves and the small pulley ensuring alignment with the motor pulley. 7