INSTALLATION GUIDE INSTALLATION GUIDE EKODECK SHOULD NOT: IMPORTANT INFORMATION

Similar documents
INSTALLATION GUIDE HEALTH & SAFETY NATURAL VARIANCES & WEATHERING. Ekodeck Should Not: Warnings

LOOKS AND FEELS LIKE TIMBER

NewTech - CleverDeck Composite Decking Installation Guidelines

GREEN WORLD LUMBER GENUINE MAHOGANY DECKING INSTALLATION GUIDE

DuraLife Porch Collection Installation Instructions

Decking Installation Instructions IMPORTANT EVERGRAIN AND EVERGRAIN ENVISION PRODUCT INFORMATION CUTTING & DRILLING LUMBER SIZES & DIMENSIONS

Installation Guide (888)

Installation Guide (888)

CELLBOARD DECK CLIP FIXING INSTALLATION MANUAL CBWD14525

CELLBOARD DECK CLIP FIXING INSTALLATION MANUAL CBWD14525

NewTechWood Screening Installation Guide. v au

INSTALLATION INSTRUCTIONS MILLENNIUM DECKING Before Installing Millennium Decking, please read these instructions in their entirety.

CELLBOARD DECK CLIP FIXING & FACE FIXING INSTALLATION MANUAL CBWD14525 CBWD09023 CELLBOARD DECK INSTALLATION MANUAL - JULY V1 1

SHIPLOCK CLADDING PRODUCT GUIDE INSTALLATION TECHNICAL SPECIFICATIONS CARE & MAINTENANCE

DECKING INSTALLATION GUIDE

EASY INSTALLATION GUIDE WPC DECKING.

I N S T A L L A T I O N & M A I N T E N A N C E G U I D E

Massaranduba Decking Installation Instructions - edeck.com!

installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty

Durabrac Gable Bracket Installation Guide

How to operate (folding)

I N S TA L L AT I O N & M A I N T E N A N C E G U I D E

CONTRACTOR CERTIFICATION COURSE

HALLMARK DECKING INSTALLATION MANUAL

INSTALLATION INSTRUCTIONS

General Installation Instructions

PolyCarb has good resistance to many chemicals. Some chemicals may harm the PolyCarb sheets. Contact us when in doubt about any chemical.

Contents. Installation Guide. Dynex Soffit Installation Guide V03 March The Smart Choice in Soffit

Stratco Sanctuary INSTALLATION BEFORE YOU START TOOLS REQUIRED GUIDE

Wave Profile Installation Guide

Make every component count.

INSTALLATION GUIDE DUOFUSE SLAT WALL SYSTEM

Indura Plank Installation Instructions

COMPOSITE RAILING INSTALLATION

Eaves Lining Installation Guide

How to Build Good Decks..

Five Star Panel Installation Instructions

Installation and User Guide

Potting Store Assembly Instructions

MANUFACTURE GUIDELINES

AZEK Porch Install Guide

Effective February, 2015

Pristine Precise Perfection

Fireball Fab Welded Baluster Insert Panel System Installation Instructions

AZEK Trim & Moulding Install Guide

Installation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts

Installation Guide. Shingles. Classical. Shingles. Warning. Storage. Cutting Shingles. Touch-Up. Eastern White Cedar

Effective April 1, 2013

installation care & maintenance instructions moistureshield.com limited lifetime warranty

Installation Instructions for Bifold Doors (JII103)

Vinyl Windows Manufactured by VPI Quality Windows

NyloDeck Installation Guidelines

Panel Installation Instructions

LuxCore Installation Instructions

Dura Deck. Installation Manual and Care Guide. Timber Composite Decking

Balustrade Systems / Installation Instructions

INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS

ClearView Panels Mil 3 Finished Sides with Grommets 1 Hem Side Mil 3 Finished Sides with Grommets 1 Hem Side DESCRIPTION

NOVA HD UMBRELLA OWNER MANUAL

STEEL FRAMING WEATHERBOARD SYSTEM

Vinyl Windows and Doors Manufactured by Pella Corporation

TruGrain 6 and 4 Flat Board Siding System Assembly Installation Guidelines

Resysta 6 and 4 Flat Board Siding System Assembly Installation Guidelines

Installation Instructions for. Before You Begin TOOLS REQUIRED

Install Instructions. SCR-48N Crash Rail. Please read these instructions thoroughly prior to beginning the SCR-48N Crash Rail installation!

SlipGrip Data Sheet & Installation Guide

POTTING BENCH. SAFETY EQUIPMENT Gloves Goggles Dust mask

INNOCLAD SHIPLAP FIXING INSTALLATION MANUAL WC13625 WC20025 WC24025

KEITH PANEL SYSTEMS FUNDERMAX- MAX EXTERIOR EXPOSED FASTENER PRESSURE EQUALIZED WALL SYSTEM

Handrail H Series. Product Installation. Instructions. Installation Instructions For. Wall Mounted and Freestanding Round Handrails

Installation Instructions

UltraDeck. Decking & Railing Installation Guide.

Corner Potting Store Assembly Instructions

Before You Begin IMPORTANT. Always wear safety glasses when cutting and drilling railing or decking products.

Hills Folding Frame Double and Single

Yellow Balau Hardwood Decking How to Guide January 2015

Installation Instructions Palladium Wall Panels - Demountable Factory Finished Edges and Field Cut Edges

REMEMBER TO USE APPROPRIATE PERSONAL PROTECTIVE EQUIPMENT.

OUR VISION... All you require is:

Vinyl Windows and Doors

TREX TRANSCEND RAILING

Playaway Swiss Cottage Assembly Instructions

INSTALLATION INSTRUCTIONS Scout II - Fast Trac PART #

Corrugated Sheet. Installation Instructions

Customer Service: Installation, Care and Maintenance

Bird Feeder BUILD TIME

Residential Treated Wood Use Category Guide

Technical Documentation

Rev. 05/16 01 ACRYLIC INSTALLATION GUIDE

ENGINEERED WOOD INSTALLATION GUIDE: The Cardinal Collection

IMPORTANT NOTES ABOUT YOUR FLOORING PLEASE READ BEFORE INSTALLING INSTALLATION & MAINTENANCE FOR ENGINNERED HERRINGBONE

SHADOWBOX INSTALLATION FOR: Standard 6 H x 8 W Shadowbox Fence 5 x 5 Routed Posts Dog Ear or Straight-Edge Pickets 1.75 x 3.5 Rail

NEVADA ASSEMBLY INSTRUCTIONS

Installation & user guide

Arla WOODEN CARE GUIDE BY DIRECT OUTDOOR LIVING

Installation Guide. Pionite Decorative Surfaces One Pionite Road, Auburn, Maine PIONITE ( )

Cabonyx Installation Manual

42" Hybrid Composite Railing Installation Guide. v

Panel Installation Instructions

Installation Manual. Last Updated 4 February, Postal PO Box 932 Bayswater VIC

Transcription:

INSTALLATION GUIDE INSTALLATION GUIDE EKODECK SHOULD NOT: To achieve a safe and long lasting Ekodeck installation, it is important to read the following guide in full. Be used as a structural or load bearing member. IMPORTANT INFORMATION Have a cantilever (overhang edge of an Ekodeck board) greater than 20mm.EKODECK SHOULD NOT: Be applied directly to a solid surface such as concrete. Always use proper protective clothing and safety equipment. Protection of the eyes, nose and mouth from dust particles is especially important when cutting and drilling in confined spaces. Using safety glasses, gloves, a dust mask and long sleeves is highly recommended. WARNING! It is the sole responsibility of the homeowner, contractor or installer to determine the specific requirements, effectiveness, suitability and safety in regards to any application or use of Ekodeck products. Ekodeck is not designed to be a freestanding product. It must be installed safely and be correctly fixed down to a substructure. The substructure must comply with all the relevant regulations and aspects of the Building Code of Australia. The substructure must be anchored to the ground on all sides including the house. Ekodeck boards are heavier and more flexible than traditional timber and should always be carried on their side edges for better support. Always exercise precaution and care when lifting Ekodeck boards. Do not attempt to lift or carry more Ekodeck boards than can be safely handled at any given time. Proper ventilation and air circulation underneath and between boards is necessary to facilitate the evaporation of water and moisture. It will also allow Ekodeck to expand and contract naturally. The recommended ground clearance is 300mm. The maximum joist spacing is 450mm. The weathering process for Ekodeck products will vary according to exposure to different climates, sunlight and moisture. Ekodeck boards will usually achieve their fully weathered colour within 3-6 months. Slight colour variation of Ekodeck boards will occur and are considered normal and not a defect or fault. Our aim is to replicate the variations found in natural timber to give your deck the most natural look possible.

INSTALLATION & FASTENING Pre-drilling and countersinking all holes is recommended when installing Ekodeck boards. This is to avoid mushrooming (i.e. when the material rises up above the screw and the surface of the deck). When drilling holes, frequently remove shavings by raising the drill bit out of the hole to avoid clogging. Pre-drilled holes must be at least 15mm away from the end edge and 20mm from side edges of the boards. Ekodeck should be fixed with 2 fasteners at every joist and any single piece of Ekodeck must be installed over at least 3 spans (i.e. 4 joists) to keep within the structural load bearing limits of its design. Pre-drill and screw CUTTING For best results, use carbide tipped blades. When using a drop saw we recommend a 10" (254mm) blade with 60 teeth or 7¼" (184mm) blade with 60 teeth for cutting. As Ekodeck contains recycled plastic, cutting may cause electrostatic build up causing the shavings to cling to your saw blade. Your saw may need to be wiped down at the completion of the job. Where possible cut Ekodeck using a dust extractor (if your saw has this attachment); this will reduce this effect and make for an easier clean up. FIXING TO TIMBER JOISTS Screwing using stainless steel 10g x 50mm/60mm screws is the recommended method of fixing Ekodeck. Pre-drill and countersink pilot holes that are at least the size of the screw shank. In warmer climates you may need to pre-drill holes slightly larger than the diameter of the screw to allow for increased movement caused by expansion and contraction. When pre-drilling, minimise the amount of joist penetration. This will make the screw bite more into the timber and better secure the fastener. Pre-drill and screw FIXING TO STEEL JOISTS When fixing Ekodeck to steel joists we recommend that you pre-drill and countersink before screwing the deck down. This is similar to the way that you would fix a hardwood deck to steel joists. The size of the pilot hole should be slightly larger than the diameter of the screw. We recommend the use of a high quality galvanised steel screw when going into steel. HIDDEN SCREW FIXING SYSTEM If you would prefer to use a hidden screw system, where the screws are neatly hidden from view, then we recommend the Ekodeck Plus and Quickfix System available through Bunnings. VENTILATION When designing your deck, consideration must be given to ventilation. We recommend a ground clearance of 300mm and a 6mm gap between boards to facilitate optimum airflow. Avoid the tendency to box or seal the deck in completely. The deck must have adequate airflow to allow it to breathe. GAPS & SPANS Specification (mm) Ekodeck profile 88 x 23 x 5400 137 x 23 x 5400 A. Residential centre-to-centre joist spacing (max) 450 450 B. Minimum ground clearance 300 300 C. Minimum side-to-side gap 6 6 D. Minimum end-to-end gap (butt join) 4* 4* E. Minimum gap from side and end edge of board to solid structures 6 6 F. Minimum distance from side edge for fastening boards 20 20 G. Minimum distance from end edge for fastening boards 15 15 Stainless Steel Screws (pre-drill and countersink) Recommended Recommended *Please refer to section on Expansion and Contraction for more information. 2 Installation Guide

EXPANSION & CONTRACTION Ekodeck expands and contracts with changes in temperature. This is normal behaviour of any wood plastic composite and is not a product fault. It is most important to take this into proper consideration during installation of your Ekodeck. Failure to do so can void any warranty claim. The amount of expansion and contraction you experience is dependent on several different factors including: Seasonal climate installing in the peak of summer or winter Deck position if the deck is in direct sunlight or part shade etc Local climate if the local area is subject to large changes in temperature during the day compared to night Store and fix Board length the longer the board, the more it will expand and contract Fully fastened boards you will notice less movement in the boards once they are fully installed/fastened down to the substructure. BUTT JOINS AND EXPANSION GAPS As a result of these aforementioned factors leaving a 4mm expansion gap at the butt join is a good guide. However, if you are installing in the peak of summer or on one of the hottest days for your location close this 4mm gap and butt the boards together. Evenly spread your butt joins across the area of the deck and avoid concentrating them on 1 or 2 joists. Additional joist support (i.e. blocking) is recommended to provide a greater fastening area and to avoid splitting the joist or the board. An alternative to using butt joins is breaker boards. Breaker boards can be used instead of butt joins in your installation and should be used if your deck is larger than 5.4m. For more information please refer to the section titled Breaker Boards. Tips: Allow the boards a few days to acclimatise to your site conditions. This allows your Ekodeck to adapt to the ambient heat typical of your location. Delay any edge/length trimming to a few days after installation is complete and preferably trim on a cool/moderate day. 3 Installation Guide

BREAKER BOARDS The longer the board length, the more the board will expand and contract. While Ekodeck comes in long 5.4m lengths suitable for most areas, we recommend the use of breaker boards where the deck length is greater than 5.4m. The use of breaker boards is an alternative design to butt joins and can be used to limit the visual effect of butt join gaps and mitre join gaps opening and closing. A minimum end gap of 2mm applies when using breaker boards. The diagrams below are for illustration purposes only. Example of a breaker board design (recommended for decks longer than 5.4m): Multiple mitre join design (not recommended): Multiple mitre joins with a breaker board (recommended): Another recommended option is to change the direction of the boards at the corner of the house: You may choose to position your breaker boards to tie in with certain features of your home for example: doorways or windows, or just create the feeling of a separate area. The use of breaker boards can greatly enhance the design of your deck as you take advantage of Ekodeck s long, clean, straight lines. 4 Installation Guide

STORAGE & HANDLING Ekodeck boards must be: Supported at least every 600mm on a level plane. Laid flat especially during transportation and never at an angle. Never be dropped or dumped when unloading. Stored on a flat, dry surface and at least 100mm off the ground. Covered until it is time to use them for installation. Handling Storage CLEANING AFTER INSTALLATION Immediately after installation you must thoroughly wash your Ekodeck. This step is necessary to remove excess sanding dust leftover from our finishing process. Scrub the deck in the direction of the grain with hot water mixed with a mild solution of sugar soap using a stiff bristle brush/broom. Wash down thoroughly with a high-pressure washer or a garden hose with a fan spray nozzle. Squeegee off the water and mop any wet areas. WARNING! The use of a pressure washer greater than 1,500 PSI and/or applied closer than 30cm from the decking surface could damage the deck. Do not use dirt blaster type nozzles. www.ekologix.com.au Ekologix Australia Pty Ltd. Unit 1, 20-26 Sabre Drive Port Melbourne, VIC 3207 Phone: +61 3 9639 7774 Email: info@ekologix.com.au All information contained in this document was correct and current at the time of publishing and is subject to change without notice. EKO0237 5 Installation Guide