RPSEA PROJECT STATUS REPORT FEB 2011

Similar documents
ULTRA-DEEPWATER RISERLESS INTERVENTION SYSTEM (RIS)

International Well Control Forum Well Intervention Pressure Control Subsea Syllabus

Riserless Subsea P&A. Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N

June 24, 2010 RPSEA Project 1502 Thomas E. Williams int.com

BP SWOPS Single Well Oil Production System. Sandy Meldrum CEng, MIMechE

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS. API 17G4 Riserless Subsea Well Intervention Systems REVISION TASK GROUP STATUS

SUBSEA 101. Find more Subsea 101 case studies online

NORWAY. Norwegian Industrial Property Office (12) APPLICATION (19) NO (21) (13) A1. (51) Int Cl.

Hans J Lindland FMC Kongsberg Subsea Innovative Technologies, Creative Solutions

Deep Water Definitions

Subsea Pump System - Optimized for Rapid Deployment & Operation within the Primary Barrier. Brian Piccolo, Technology Development Mgr.

GE Oil & Gas Drilling & Production. VetcoGray subsea wellhead systems. Advanced solutions for extreme conditions

MSV Seawell. The vessel that pioneered subsea light well intervention

Tore Aarsland. Chairman of the Editorial Revision Committee / Senior Design C6 Technologies. 10-Jan-13

Deepwater riserless (RLWI) enablers for increased oil recovery. Bringing shallow water experience to deepwater.

The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure.

SAFER, SMARTER, GREENER

MARS. Multiple application reinjection system

Marginal Project Development

TEPZZ _49_B_T EP B1 (19) (11) EP B1 (12) EUROPEAN PATENT SPECIFICATION. (51) Int Cl.: E21B 33/035 ( ) E21B 33/076 (2006.

Heidrun Inverted Gas Lift System

HorizontalBore SUBSEA TREE

Doing More With Lightweight. Well Intervention Subsea Europe Drummond Lawson. London, 30 th October Managing Director

Geoprober Drilling Moving from Ideas To Reality (Status August, 2005)

Drilling Systems. Cameron Drilling Control Systems Applications. 1 Semi-submersible Platform Applicaton

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015

Marine Well Containment Company. Charlie Miller, Chief Technology Officer

SUBSEA WELL CONTAINMENT. Global Basis. Deepwater & Emerging Technologies Group (DETG) AADE Houston Chapter 25 January 2012

Siem WIS. Siem WIS AS. Closed Loop Drilling CLD. August Siem WIS AS.

Offshore Systems. Cameron s Subsea Production Philosophy

Marathon Drilling Indonesia

An Introduction to Oil & Gas Drilling and Well Operations

Enhancing Industry Capability for drilling Deepwater Wells A Chevron Perspective

Intervention/Decommissioning

Mutineer-Exeter Development Drilling & Completions Challenges Darren Greer & Peter Dodd

MSR/MSB Mechanical Setting Tool

Send your directly to

Riser Lifecycle Monitoring System for Integrity Management

Marine Well Containment Company. Charlie Miller, Chief Technology Officer

Enhancing international subsea well incident intervention

Friction Grip in Wellheads: An Innovative Approach to Load Support & Sealing

VIRTUS CONNECTION SYSTEMS Advanced Diverless Connection Solutions for any Subsea Field Application

EDP/LRP. Drill Well 20 th September 2018 Rev2 Presenter: Simon Carpenter [INPEX]

MSR/MSB Mechanical Setting Tool

Wall Thickness.190" -.730" 4130/4140 to Meet API Grades - J55, K55, N80, L80, C90, C95, T95, P110. Also available in Grades

BigBore IIe. 15,000 psi 20,000 psi SUBSEA WELLHEAD SYSTEMS

Learn more at

AADE Houston Chapter. Group. 26 January 2011

COILED TUBING DESIGN & OPERATIONS

Offshore Drilling Rigs

Pilot Installation of Retrofit Gas Lift System Brae Bravo UK North Sea

15,000 psi 20,000 psi. BigBore IIe HPHT SUBSEA WELLHEAD SYSTEMS

Case Study (GoM 2016): Enhanced Production Strategies Throughout Field Life Using Standardised Flow Access Modules (FAM) Ian Donald

ECDM System. November, Security Classification: Restricted - Status: Draft

Challenges of Deep Water To Jackup Conductors And Risers

Macondo Blowout Lessons Learned for Prevention and Mitigation

Tailor Made. Create your unique subsea valve

PIPING NOMENCLATURE. Header Branch connection Valve Flange Expansion joint Expansion loop Pipe support Reducer Elbow

To Jackup Conductors And Risers

Pumps and Subsea Processing Systems. Increasing efficiencies of subsea developments

"All Electric", Challenges with a new set of interfaces

4 Briefing. Responsible investor

OneSubsea Pumps and Subsea Processing Systems

Cost Reduction in Frontier Deepwater Riser Systems

Wellhead Control Products, Inc. Hangers

Subsea Intervention: Is It Worth It? Drummond Lawson

Table Of Contents Casing Head 02 Christmas Tree & Tubing Head Tubing Spool 04 Contact Us

Deepwater Precommissioning Services

(12) United States Patent

IADC Conference, RIO 2005 Fatigue Monitoring of Deepwater Drilling Risers. Mateusz Podskarbi, Ricky Thethi, Hugh Howells; 2HOffshore Inc

HELIX ENERGY SOLUTIONS

Increased Safety & Efficiency from a Dedicated Light Well Intervention Vessel on Deepwater Subsea Wells

ACID STIMULATION CASE STUDY

CONNECTION. Certified System Components. Subsea Connections

Riser & Flowline Intervention Using New Composite Coil Tubing Technology

@balance Deepwater. MPD services

Land wellhead systems & offshore surface wellhead systems

Defining the New Normal for Offshore Drilling Copenhagen 16 June Alan Spackman Vice President, Offshore Regulatory & Technical Affairs

In-line Subsea Sampling: Non-disruptive Subsea Intervention Technology for Production Assurance

Vertical Tie-in Systems

Kuala Lumpur 3 October 2012 State of the Industry of Riserless Light Well Interventions (RLWI)

API RP 53 Recommend Practices for Blowout Prevention Equipment Systems for Drilling Wells vs. Standard 53 4 th Edition 2011

Subsea Lift. Inwell and caisson lifting systems

Vertical Tie-in Systems

Subsea Developments Status and Trends. Tore Halvorsen Senior Vice President

Focused on the future

Suspended Subsea Well Monitoring CaTS TM Wireless Technology. Donald Horsfall RPLM (ECIS)

Riser Lifecycle Monitoring System (RLMS) for Integrity Management

Subsea Structural Engineering Services. Capability & Experience

IMPROVES EFFICIENCY OF SUBSEA TREE CHANGE-OUTS

Ultra deep water and ultra deep drilling technologies for 21 st Century Mohole. Engineering Development Advisory Committee J-DESC, JAPAN

DataSphere Permanent Monitoring Suite ADVANCED REAL-TIME WELLBORE MONITORING

7 Briefing. Responsible investor

Cameron MOSAIC. Systems for the Malampaya Project

Tech Unit No: Approved By: Quality Engineer Date: Lock-Set Packer

Umbilical Manufacturer s Perspective on the Challenges of Deep Water Operations. Presented by: James Young, JDR Engineering Director

NOIA ANNUAL MEETING CONCERNS/INITIATIVES. BSEE Update. Joe Levine BSEE Washington DC April 11, 2014

(12) United States Patent (10) Patent No.: US 6,715,554 B1. Cunningham et al. (45) Date of Patent: Apr. 6, 2004

Hunting Manufactures and distributes products that enable the extraction of oil and gas

Transcription:

RPSEA PROJECT STATUS REPORT FEB 2011 RPSEA Project 08121-2301-03 Ultra-Deepwater Riserless Intervention System (RIS) & RPSEA Project 09121-3500-07 Ultra-Deepwater Subsea Test Tree (SSTT) and Intervention Riser System (IRS)

PROJECT 2301 STATUS Contract Award: July 2009 Kick-Off Meeting: 6 Jan 2010 Task 1 - Project Management Plan: Completed Feb 2010 Task 2 - Technology Status Assessment: Completed Feb 2010 Task 3 - Technology Transfer Plan: Completed Feb 2010 Task 4 Routine Reporting & Project Team Meetings: Ongoing Task 5 System Architecture & Design Basis: Draft Aug 2010 Task 6 System Design & Analysis: in Process Task 7 Operational Planning: in Process Task 8 TRAP, HAZOP, HAZID &FMECA Analyses: In Planning Task 9 RIS Component Design: In Process Task 10 Vessel Motion & Deck Handling Study: In Process Task 11 Design Verification: Not Started Task 12 Business Case Development Plan: Not Started All Tasks Scheduled to be Completed by Q1 2012

PROJECT 3350-07 STATUS Contract Award: May 2010 Kick-Off Meeting: 1 Feb 2010 Task 1 - Project Management Plan: In Process Task 2 - Technology Status Assessment: In Process Task 3 - Technology Transfer Plan: In Process Task 4 Routine Reporting and Project Team Meetings: Ongoing Task 5 Functional Design Specifications: Not Started Task 6 System Design & Analysis: Not Started Task 7 TRAP, HAZOP, HAZID &FMECA Analyses: Not Started Task 8 Design Verification: Not Started Task 9 Cost and Schedule Estimates Not Started Task 10 Business Case Development Plan: Not Started All Tasks Scheduled to be Completed by Q1 2012

SUBSEA WELL INTERVENTION SYSTEM (SWIS) FIGURE 1 BLOCK DIAGRAM SUBSEA WELL INTERVENTION SYSTEM (SWIS) FOR ULTRA-DEEPWATER APPLICATIONS Surface Tree 5" - 20 ksi Intervention Control System Intervention Vessel W2301 tion System upply Intervention Riser 5" - 20, ksi Subsea Lubricator/ Winch Package 5" - 15 ksi (20 ksi) Subsea Coiled Tubing System 5" - 15 ksi (20 ksi) 00, Part 1 ee (SSTT) upply 00, Part 2 er System upply of Supply Subsea Test Tree (SSTT) 5" - 15 ksi / 4" - 20 ksi Emergency Disconnect Package 5" - 20 ksi Well Control Package 5" 15 ksi (20 ksi) ROV System & Tooling Horizontal / Vertical Tree 5" - 10 ksi Horizontal / Vertical Tree 5" - 15 ksi Horizontal / Vertical Tree 4" - 20 ksi i 15 ksi 20 ksi 15ksi upgradabel to 20 ksi

SWIS P & ID

WELL CONTROL PACKAGE (WCP) & EMERGENCY DISCONNECT PACKAGE (EDP) Well Control Package (WCP) WCP Connector Safety Shear Head Wireline / CT BOP (3 Rams) Production Isolation Valve WCP RE-Entry Hub Crossover Valve Annulus Access Valve Lower & Middle Circulation Valves Remote Circulation/Kill Valve 6-off Chemical Injection Valves Emergency Disconnect Package (EDP) EDP Connector Retainer Valve Annular BOP Upper Circulation Valve 4-off Chemical Injection Valves

WELL CONTROL PACKAGE (WCP) 13 5/8 20 ksi Re-Entry Hub (H-4 Mandrel) [GE Oil & Gas / Vetco Gray] 5 1/8 20 ksi Production Isolation Valve (Gate Valve) [GE Oil & Gas / Vetco Gray] 13 5/8-15 ksi x 13 5/8 20 ksi Adapter 5 1/8 15 ksi Triple Ram Wireline/Coiled Tubing BOP [NOV/TOT] 5 1/8 15 ksi Safety Shear Head [NOV/TOT] 13 5/8 20 ksi x 13 5/8 x 15 ksi Adapter 2 1/16 20 ksi X-Over/Circulation/Kill Valves (Gate Valves) [GE Oil &Gas / Vetco Gray] ½ 20 ksi Chemical Injection Valves (Gate Valves) [Pacston] 13 5/8 20 ksi WCP Connector (DW H-4 Connector) [GE Oil & Gas / Vetco Gray]

EMERGENCY DISCONNECT PACKAGE (EDP) 13 5/8 20 ksi Re-Entry Hub (H-4 Mandrel) [GE Oil & Gas / Vetco Gray] 5 1/8 20 ksi Production Isolation Valve (Gate Valve) [GE Oil & Gas / Vetco Gray] 13 5/8-15 ksi x 13 5/8 20 ksi Adapter 5 1/8 15 ksi Triple Ram Wireline/Coiled Tubing BOP [NOV/TOT] 5 1/8 15 ksi Safety Shear Head [NOV/TOT] 13 5/8 20 ksi x 13 5/8 x 15 ksi Adapter 2 1/16 20 ksi Circulation/Kill Valves (Gate Valves) [GE Oil &Gas / Vetco Gray] ½ 20 ksi Chemical Injection Valves (Gate Valves) [Pacston] 13 5/8 20 ksi WCP Connector (DW H-4 Connector) [GE Oil & Gas / Vetco Gray]

SUBSEA LUBRICATOR / WINCH PACKAGE (SLWP) Subsea Lubricator Package Variable Length Lubricator Wireline Tool Selector/Storage Rack Tool Trap & Tool Catcher [NOV/TOT] Dual Wireline Pack-Offs [NOV/TOT] Multi-Port Grease Injector Head [NOV/TOT] Variable Pressure Wiper Seal [NOV/TOT] Subsea Grease Injection System 3-off Chemical Injection Valves Optional Tractor Subsea Winch Package Battery Operated Winch (48v DC) Variable Speed Motor ROV Retrievable Battery Packs Remote Data Monitoring Slick Line and/or E-Line

WIRELINE TOOL SELECTOR/STORAGE RACK Three Concepts Evaluated 1. Fixed Storage w/ ROV Assisted Transfer to/from Lubricator (ExxonMobil SIMS) 2. Rotating Storage Assembly in Common Pressurized Housing (Expro AX-S) 3. Rotating Storage Assembly w/ Individual Pressurized Tubes Concept No. 3 Selected Key Features of Tool Selector/Storage Rack 16 Individual Storage Tubes in two rotating racks (8 Tubes/Rack) Tool Strings up to 90 Long Subsea Tool Change-Out w/o ROV Assistance Integrated Tool Trap & Tool Catcher 20 ksi Pressure Rating

SUBSEA WIRELINE WINCH Subsea Lubricator Package Variable Length Lubricator Wireline Tool Selector/Storage Rack Tool Trap & Tool Catcher [NOV/TOT] Dual Wireline Pack-Offs [NOV/TOT] Multi-Port Grease Injector Head [NOV/TOT] Variable Pressure Wiper Seal [NOV/TOT] Subsea Grease Injection System 3-off Chemical Injection Valves Optional Tractor Subsea Winch Package Battery Operated Winch (48v DC) [Radoil] Variable Speed Motor ROV Retrievable Battery Packs Remote Data Monitoring Slick Line and/or E-Line

Subsea Test Tree SUBSEA TEST TREE (SSTT) Slim-Bore Design (13 3/8 OD) Rated for 1 MM lbs @ 0 ksi (0.5 MM lbs @ 20 ksi) Dual Ball Valves (1 Cutting, 1 Sealing) 4-Off Chemical Injection Valves Emergency Disconnect Module Shear Joint Retainer Valve Riser Circulation Valve Upper (Annular) Pack-Off Joint Accumulator Module EH/MUX Control Module 32 Functions Wireless Backup (thru Riser)

INTERVENTION RISER SYSTEM (IRS) Mono-Bore Riser w/ DTC s Breech-Loc Riser Connector Full Bore (5 1/4 ID) with Smooth ID Small Diameter (11 ¾ OD) High Strength (Rated for 1.5 MM lbs) Fast Make-Up (1/12 turn), Pre-Loaded Connection Titanium Riser Joints 45 ft Joints plus Pup Joints 45 lbs/ft in seawater > 12,000 ft Water Depth Rating

Wall Thickness (In) INTERVENTION RISER SYSTEM (IRS) 2.00 1.80 1.60 1.40 1.20 1.00 0.80 0.60 0.40 0.20 0.00 T-95 C-110 Aluminum 1953 T1 Titanium Gr-29 1 2 3 4 5 6 7 8 9 10 Water Depth (1,000 Ft)

INTERVENTION CONTROL SYSTEM (ICS) E/H MUX Control System based upon DTC s MODSYS Modular Control System Components Packaged into Small, ROV Retrievable Modules 12,000 ft Water Depth Rating Wire, Fiber, Acoustic and Wireless Communication Wire and Battery Power

THANK YOU Questions?