Supporting Planning and Engineering Processes at XFEL Examples, Benefits and Experience

Similar documents
The European X-Ray Free-Electron-Laser Facility

Status of the European XFEL Accelerator Construction Project. Reinhard Brinkmann, DESY

FLASH at DESY. FLASH. Free-Electron Laser in Hamburg. The first soft X-ray FEL operating two undulator beamlines simultaneously

XFEL Cryo System. Project X Collaboration Meeting, FNAL September 8-9, 2010 Bernd Petersen DESY MKS (XFEL WP10 & WP13) 1 st stage. Possible extension

LLRF Plans for SMTF. Ruben Carcagno (Fermilab) Nigel Lockyer (University of Pennsylvania) Thanks to DESY, PISA, KEK, Fermilab, SLAC Colleagues

INSTALLATION AND FIRST COMMISSIONING OF THE LLRF SYSTEM

The ILC Accelerator Complex

Performance of Superconducting Cavities for the European XFEL. Detlef Reschke DESY for the EU-XFEL Accelerator Consortium

LARGE SCALE TESTING OF SRF CAVITIES AND MODULES

Summary of Industrialization

THE CRYOGENIC SYSTEM OF TESLA

Physics Requirements Document Document Title: SCRF 1.3 GHz Cryomodule Document Number: LCLSII-4.1-PR-0146-R0 Page 1 of 7

3.9 GHz System (AH1) XFEL WP46

Introduction to the PAC07 International Industrial Forum for the ILC. Ken Olsen President Linear Collider Forum of America

Message from the Americas

Low-Level RF. S. Simrock, DESY. MAC mtg, May 05 Stefan Simrock DESY

Grounding for EMC at the European XFEL

Demonstration of exponential growth and saturation at VUV wavelengths at the TESLA Test Facility Free-Electron Laser. P. Castro for the TTF-FEL team

FLASH Operation at DESY From a Test Accelerator to a User Facility

Strategy for the engineering integration of the ESS accelerator

3 General layout of the XFEL Facility

System Integration of the TPS. J.R. Chen NSRRC, Hsinchu

FLASH performance after the upgrade. Josef Feldhaus

Commissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008

LLRF Operation and Performance of the European XFEL. An overview

CEBAF Overview June 4, 2010

Status of the ESS Accelerator Workpackage

FLASH: Status and upgrade

H. Weise, Deutsches Elektronen-Synchrotron, Hamburg, Germany for the XFEL Group

Superstructures; First Cold Test and Future Applications

ALICE SRF SYSTEM COMMISSIONING EXPERIENCE A. Wheelhouse ASTeC, STFC Daresbury Laboratory

Using Higher Order Modes in the Superconducting TESLA Cavities for Diagnostics at DESY

Beam Diagnostics, Low Level RF and Feedback for Room Temperature FELs. Josef Frisch Pohang, March 14, 2011

European XFEL Project overall status & accelerator complex

Motivation: ERL based e linac for LHeC

X-Band Linear Collider Report*

RF System LSD Work. William Merz

FLASH II: an Overview

LCLS-II SRF Linac Multi-lab partnership to build CW FEL based on SRF at SLAC. Marc Ross 13 January 2014

Niowave s Growth and the Role of STTR in its Development

BCS UPDATE. j. welch 2/9/17

TECHNICAL CHALLENGES OF THE LCLS-II CW X-RAY FEL *

ESS RF Development at Uppsala University. Roger Ruber for the FREIA team Uppsala University

Laser systems for science instruments

OVERVIEW OF INPUT POWER COUPLER DEVELOPMENTS, PULSED AND CW*

Status, perspectives, and lessons from FLASH and European XFEL

Superconducting 1.3 GHz Cavities for European XFEL

Overview of ERL Projects: SRF Issues and Challenges. Matthias Liepe Cornell University

TESLA TeV Collider Project Overview

High Power Couplers for TTF - FEL

CHALLENGES IN ILC SCRF TECHNOLOGY *

ILC Industrialisation Linear Collider Forum of Europe

HIGHER ORDER MODES FOR BEAM DIAGNOSTICS IN THIRD HARMONIC 3.9 GHZ ACCELERATING MODULES *

BEAM DIAGNOSTICS AT THE VUV-FEL FACILITY

SPOKE CRYOMODULES CONCEPTUAL DESIGNS FOR ESS & MYRRHA

Engineering Challenges and Solutions for MeRHIC. Andrew Burrill for the MeRHIC Team

Vibration studies of a superconducting accelerating

INSTRUMENTATION AND CONTROL SYSTEM FOR THE INTERNATIONAL ERL CRYOMODULE

To produce more powerful and high-efficiency particle accelerator, efforts have

THz Pump Beam for LCLS. Henrik Loos. LCLS Hard X-Ray Upgrade Workshop July 29-31, 2009

C100 Cryomodule. Seven cell Cavity, 0.7 m long (high Q L ) 8 Cavities per Cryomodule Fits the existing Cryomodule footprint

Cryogenics for Large Accelerators

E-JADE Europe-Japan Accelerator Development Exchange Programme Horizon 2020 / Marie Skłodowska-Curie Research and Innovation Staff Exchange (RISE)

ILC Reference Design Report Accelerator Executive Summary

Cryogenic Operations at SLAC

Packaging of Cryogenic Components

Short-Pulse X-ray at the Advanced Photon Source Overview

Short report on the First ILC Workshop

R.Bachimanchi, IPAC, May 2015, Richmond, VA

OVERVIEW OF REGIONAL INFRASTRUCTURES FOR SCRF DEVELOPMENT

ERLP Status. Mike Dykes

LC Technology Hans Weise / DESY

Design of the control system for the cryogenic distribution system of the European XFEL project

Status Report on the Survey and Alignment Activities at Fermilab

High Precision THIRD HARMONIC SC Cavity Alignment/Diagnostics/BPM with HOM Measurements Roger M. Jones Univ. of Manchester/ Cockcroft Inst.

Research infrastructure project. HIBEF-Polska

Advance on High Power Couplers for SC Accelerators

Energy Recovering Linac Issues

Frank Schmidt-Föhre, DESY

AMICI Accelerator and Magnet Infrastructure for Cooperation and Innovation. Olivier Napoly CEA/Irfu

Synchronization Overview

7 Infrastructure and auxiliary systems

Industrialization of E-XFEL string and module assembly at CEA- Saclay. Preparation work Lessons learnt Cost reduction

TESLA Progress on R1 & R2 issues

Interfaces with MPS/PSS

KEK ERL CRYOMODULE DEVELOPMENT

The TESLA Linear Collider. Winfried Decking (DESY) for the TESLA Collaboration

FREIA Facility for Research Instrumentation and Accelerator Development Infrastructure and Control Architecture

FLASH II. FLASH II: a second undulator line and future test bed for FEL development.

ELECTRON BEAM DIAGNOSTICS AND FEEDBACK FOR THE LCLS-II*

Progress in High Gradient Accelerator Research at MIT

SNS LLRF Design Experience and its Possible Adoption for the ILC

Femtosecond-stability delivery of synchronized RFsignals to the klystron gallery over 1-km optical fibers

ASSEMBLY PREPARATIONS FOR THE INTERNATIONAL ERL CRYOMODULE AT DARESBURY LABORATORY

Does the short pulse mode need energy recovery?

HIGH POWER COUPLER FOR THE TESLA TEST FACILITY

RF STATUS OF SUPERCONDUCTING MODULE DEVELOPMENT SUITABLE FOR CW OPERATION: ELBE CRYOSTATS

Design considerations for the RF phase reference distribution system for X-ray FEL and TESLA

DESY Project. Introduction. E Elsen

Status Report on the Survey and Alignment Activities at Fermilab

Transcription:

Supporting Planning and Engineering Processes at XFEL Examples, Benefits and Experience Lars Hagge, Benno List SLAC, 31.03.2014

Agenda > Introduction: Collaborative Engineering > Collaborative Design & Design Integration: A 3D Model of the XFEL > Civil construction (CFS): Collaborating with Construction Companies > Project management: Collaborative Planning of > 50 Work Packages > Cryomodules: Quality Management in Series Production > Summary & Conclusions Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 2

Introduction COLLABORATIVE ENGINEERING Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 3

Org Chart European XFEL Construction Project Project Board (PB) Accelerator Consortium Coordinator ACC Administrative Director of the XFEL GmbH ADG Civil Construction Coordinator CCC Cold Linac Coordinator CLC Machine Layout Coordinators MLC Photon Systems Coordinator PSC Project Office Leader POL Technical Coordinator TC WP Representatives WPRs XFEL Project Leader XPL Staff Functions Technical Coordination Project Office Safety & Health Coordination Change Management WP-Group 1 WP-Group 2 WP-Group 3 WP-Group 3 WP-Group 4 WP-Group 5 WP-Group 6 WP-01* RF System WP-02* Low Level RF WP-03* Acc. Modules WP-04* S.C. Cavities WP-05* Power Couplers WP-06* HOM Couplers WP-07* Frequency Tuners WP-08* Cold Vacuum WP-09* Cavity String Assem. WP-11* Cold Magnets WP-46* 3.9 GHz System WP-12* Warm Magnets WP-14* Injector WP-15* Bunch Compression WP-16* Lattice WP-17* Stand. Diagnostics WP-18* Special Diagnostics WP-19* Warm Vacuum WP-20* Beam Dumps WP-21* FEL Concepts WP-71 Undulators WP-72 Sim. of Photon Fields WP-73 X-Ray Opt.& Beam Tr.. WP-74 X-Ray Diagnostics WP-75 Detector Development WP-76 DAQ & Control WP-78 Optical Lasers WP-79 Sample Environment WP-81 Scient.Instr. FXE WP-82 Scient.Instr. HED WP-83 Scient Instr. MID WP-84 Scient.Instr. SPB WP-85 Scient.Instr. SQS WP-86 Scient.Instr. SCS * Work Packages, which are covered by the Accelerator Construction Consortium WP-28* Acc. Controls WP-35 Radiation Safety WP-36 General Safety WP-38 Personnel Interlock WP-39* EMC WP-10* AMTF WP-13* Cryogenics WP-32* Survey & Alignment WP-33* Tunnel Installation WP-34* Utilities WP-40* IPS Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 4 CLC MLC WP-31 Site & Civil Constr. WP-41/42/43 Site Lot 1-3 WP-44 Site Engineering WP-45 AMTF Hall WP-monitoring by PB-member: CCC WP-47 Lots 4-7, 9 WP-48 Lot 8 PSC TC

In-Kind Contributions > To a great extent, the European XFEL facility will be realized by means of in-kind contributions by shareholders and partners > Work Packages may receive contributions from more than one institute > Institutes may contribute to more than on Work Package Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 5

Collaborative Engineering Systematics >Complex facilities are developed via the interaction of many, sometimes thousands of participants, who are working concurrently on different engineering aspects >Collaborative engineering aims to provide a systematic approach for integrating engineering contributions aiming to converge on a single solution that is acceptable to all participants >XFEL is a large and complex facility with a longlasting lifecycle which is built by an international distributed collaboration Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 6

Collaborative Engineering Systematics Facility specs, designs, parts, procedures, services, Facilitate * communication, collaboration, coordination, Lab A Lab B Distributed collaboration Lab N Establish agreement, synchronize activities Supplier I specs, designs, parts, procedures, services, Supplier II Translate languages, Supplier data formats,, X respect cultures * by information management Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 7

Collaborative Design & Design Integration A 3D MODEL OF THE ENTIRE XFEL Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 8

Design Integration at European XFEL Civil Construction (WP31) Civil construction starts 3 years ahead of all other trades Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 9

Design Integration at European XFEL Civil Construction (WP31) Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 10

Design Integration at European XFEL Lattice (BLC) Geometry generated from lattice simulation files Civil Construction (WP31) Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 11

Design Integration at European XFEL Lattice (BLC) Dump (WP20) 3D models already from four (!) different (CAD) sources Civil Construction (WP31) Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 12

Design Integration at European XFEL Lattice (BLC) Dump (WP20) RF (WP01) Civil Construction (WP31) Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 13

Design Integration at European XFEL Lattice (BLC) Dump (WP20) RF (WP01) LLRF (WP02) Civil Construction (WP31) Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 14

Design Integration at European XFEL Dump (WP20) RF (WP01) Lattice (BLC) Electrical (WP34) LLRF (WP02) Civil Construction (WP31) Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 15

Design Integration at European XFEL Dump (WP20) RF (WP01) Lattice (BLC) Electrical (WP34) Water (WP34) LLRF (WP02) Civil Construction (WP31) Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 16

Design Integration at European XFEL Dump (WP20) RF (WP01) Cryomodules (WP03) Lattice (BLC) Electrical (WP34) Water (WP34) LLRF (WP02) Civil Construction (WP31) Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 17

Design Integration at European XFEL Cryogenics (WP13) Dump (WP20) RF (WP01) Cryomodules (WP03) Lattice (BLC) Electrical (WP34) Water (WP34) LLRF (WP02) Civil Construction (WP31) Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 18

Design Integration at European XFEL Cryogenics (WP13) Interlock (WP38) Dump (WP20) RF (WP01) Cryomodules (WP03) Lattice (BLC) Electrical (WP34) Water (WP34) LLRF (WP02) Civil Construction (WP31) Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 19

Design Integration at European XFEL Cryogenics (WP13) Interlock (WP38) Dump (WP20) RF (WP01) Cryomodules (WP03) Lattice (BLC) Electrical (WP34) Racks (TC) Water (WP34) LLRF (WP02) Civil Construction (WP31) Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 20

Design Integration at European XFEL Cryogenics (WP13) Interlock (WP38) Dump (WP20) RF (WP01) Cryomodules (WP03) Lattice (BLC) Electrical (WP34) Racks (TC) Water (WP34) Transportation (WP33) LLRF (WP02) Transportation needs to block space for handling components Civil Construction (WP31) Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 21

Design Integration at European XFEL Cryogenics (WP13) Interlock (WP38) Dump (WP20) RF (WP01) Cryomodules (WP03) Lattice (BLC) Electrical (WP34) Racks (TC) Water (WP34) Transportation (WP33) LLRF (WP02) Civil Construction (WP31) Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 22

Design Integration at European XFEL Cryogenics (WP13) Interlock (WP38) Dump (WP20) RF (WP01) Cryomodules (WP03) Lattice (BLC) Electrical (WP34) Racks (TC) Water (WP34) Transportation (WP33) LLRF (WP02) Safety (WP35) Safety needs to block space for escape routes Civil Construction (WP31) Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 23

Design Integration at European XFEL Cryogenics (WP13) Interlock (WP38) Dump (WP20) RF (WP01) Cryomodules (WP03) Lattice (BLC) Electrical (WP34) Racks (TC) Water (WP34) Transportation (WP33) LLRF (WP02) Safety (WP35) Civil Construction (WP31) Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 24

Design Integration at European XFEL Cryogenics (WP13) Interlock (WP38) Dump (WP20) RF (WP01) Cryomodules (WP03) Lattice (BLC) Electrical (WP34) Racks (TC) Water (WP34) Transportation (WP33) LLRF (WP02) Safety (WP35) Survey (WP36) Civil Construction (WP31) Survey needs to block space for laser beams of alignment system Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 25

Design Integration at European XFEL Cryogenics (WP13) Interlock (WP38) Dump (WP20) RF (WP01) Cryomodules (WP03) Lattice (BLC) Electrical (WP34) Racks (TC) Water (WP34) Transportation (WP33) LLRF (WP02) Safety (WP35) Survey (WP36) Civil Construction (WP31) Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 26

Design Integration at European XFEL Cryogenics (WP13) Interlock (WP38) Dump (WP20) RF (WP01) Cryomodules (WP03) Lattice (BLC) Electrical (WP34) Racks (TC) Water (WP34) Transportation (WP33) LLRF (WP02) Safety (WP35) Survey (WP36) Civil Construction (WP31) Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 27

Design Integration at European XFEL Cryogenics (WP13) Interlock (WP38) Dump (WP20) RF (WP01) Cryomodules (WP03) Lattice (BLC) Save costs Electrical detect (WP34) Racks (TC) and remove collisions Water (WP34) before fabrication Share visions, communicate better, develop faster Transportation (WP33) LLRF (WP02) Safety (WP35) Survey (WP36) Civil Construction (WP31) Accept contributions from anyone, at any time, by any system Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 28

Design Integration at European XFEL Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 29

Civil Construction (CFS) COLLABORATING WITH CONSTRUCTION COMPANIES Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 30

The Role of Civil Construction Drawings Room book: Required infrastructure per room Drawings are prepared by DESY for tendering, after that detailed by construction company - Drawings used with construction companies & on construction sites - Drawings must be in German language, legally and practically - Collaborators sometimes need drawings, but mostly use 3D models Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 31

Workflow for Civil Construction Drawings Civil engineer from construction company uploads drawing and starts workflow Several engineers from XFEL work packages review and comment drawing WP leader reads all comments and takes decision on approval All project members can access the drawing through EDMS Working Reviewing Approved Process 10,000 ++ drawings per year in time Manage revisions and handle changes with a controlled process Include constructor in workflow & track full data exchange history Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 32

Project Management COLLABORATIVE PLANNING OF >50 WORK PACKAGES Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 33

Project Planning WP Leaders manage detailed plans of their WPs (schedule/cost) Project Office synchronizes WPs (milestones, dependencies) XFEL Project Planning Database Project Managers compare plans and progress In-Kind Contributors schedule their involvement in entire project > Need separate plans for each WP and central plan for entire project > Need different kinds of plans for different kinds of users > Need to allow users to work with their well-known tools (spreadsheets ) Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 34

Distributed Project Planning XFEL master plan WP01 Implement dependencies by propagating milestones WP02 Coordinate and consolidate project planning in > 50 WPs Follow well-defined PM process, obtain automated reports Maintain project plans within WPs & global plan in Project Office Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 35

Cryomodules QUALITY MANAGEMENT IN SERIES PRODUCTION Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 36

Quality Management in Cryomodule Production > Objective: Provide procedures for reliably gathering, recording, processing and archiving the complete fabrication information. > Approach: Use EDMS as central platform for collaboration and documentation Tuner piezo system #10137509 on Cold Mass with String (left) and in EDMS (right) Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 37

How to Build a Cryomodule > Store complete fabrication instructions in EDMS in a structured way > Include assembly procedures, test instructions and templates, design drawings, specs, Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 38

What s in a Module: Parts Tracking > Store complete module configuration in EDMS in a structured way Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 39

Keep the Process Under Control Keep the series production under control Ensure quality, handle non-conformities fast and reliable Be compliant with legal documentation requirements Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 40

SUMMARY & CONCLUSIONS Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 41

> Design collaboration started already during TESLA planning Note: CFS works in host lab s language > Well-designed tools and processes scale as project grows and evolves EDMS is a mighty tool which can support the entire project lifecycle EDMS reaches full power when offered with central collaboration services > Tools and processes may help to organize collaboration but collaboration is best when everybody has the same picture in mind Vision sharing is the best foundation for collaboration Tools and procedures should be in place already very early Collaboration needs to be organized by information mgt. Lars Hagge, Benno List Engineering Collaboration at European XFEL and ILC GDE 08.10.2013 Page 42