Client Name General Description Date

Similar documents
Client Name General Description Date Customs Border Protection Sub-Contractor install 140 Self Support Tower APR 2018 Maine Army National Guard,

Client Name General Description Date Hawaii MARS Maintenance Contract Annual maintenance contract for six tower AUG 2018

Client Name General Description Date State of Vermont, Department of Guy wire replacement and tower painting at SEP Bellevue, VT.

Client Name General Description Date

Installer. Antenna Brunswick, ME. Antennas Expansion & Install Two NVIS B&W Antennas Camp Chamberlain, ME. Antennas Expansion Passadumkeag, ME

Recreation Facility Hours

GENERAL INSPECTION AND MAINTENANCE PROCEDURE FOR FIXED HF ANTENNA SYSTEMS

Metrological Telecommunication System Development Project

APPENDIX H PRICE WORKSHEETS, REVISED 12/26/15 1. BATTERIES, MODULAR FLOODED LEAD-ACID 2. BATTERIES, MODULAR VALVE REGULATED LEAD ACID

Legislative Joint Transportation Committee Meeting. Arkansas Convention Center Texarkana Thursday, November 21, 2013

Directorate of Joint Strategic Communication Support

RE-ESTABLISHING ONE WORLD TRADE CENTER AS A MAJOR COMMUNICATIONS HUB IN NYC

RADIO AND TELEVISION SATELLITE EQUIPMENT

University of Bristol - Explore Bristol Research. Peer reviewed version. Link to published version (if available): /geng.13.

Assembly Manual. Mobile Communications ANTENNA SYSTEMS LBI ERICSSONZM ERICSSONZM

UDW Technology Conference Dan McLeod / John Jacobson Lockheed Martin MS2 July 27, Secure Energy for America

A B C Title # of issues Approximate holdings American genealogist 116

Space and Missile Systems Center

SECTION 35 ANTENNAS AND TOWERS

Bridge Condition Assessment Using Remote Sensors

Training Course Calendar 2014

SPECIAL SPECIFICATION 8802 Radio Communication Tower Inspection, Maintenance, and Repair

VAN BUREN COUNTY TENNESSEE

Active Cable TV Connections. Active Residential Cable Modem Customers. Page FIRST QUARTER REPORT

AWOS A Site Preparation Manual

Subtracting Rational Numbers

Indoor/Outoor Antenna User s Manual

Appendix C Site Visits

RADIO AND TELEVISION TOWER & EQUIPMENT PROPERTY DAMAGE APPLICATION

NUTC R293. Field Evaluation of Thermographic Bridge Concrete Inspection Techniques. Glenn Washer

White Paper. GPS Jamming. Increasing system resilience to counteract intentional and unintentional GPS signal interferences

Assessing the Feasibility of Wind Power Production for the University of Rhode Island s Bay Campus

RADIO AND TELEVISION TOWER & EQUIPMENT PROPERTY DAMAGE APPLICATION

Tower Grounding Training For Telecommunications Networks

Report. Name Birth date Birth location Death date Death location Spouse

Weakley County District Public Safety Tower Study

Estimation of Fault Resistance from Fault Recording Data. Daniel Wong & Michael Tong 2014-November-5

Practice Test Chapter 8 Sinusoidal Functions

Richard Rickett, General Manager Engineering and Procurement - March Case Study

Delivering Reliability. Services. Strength You Can Count On. oldcastleprecast.com/services

NATIONAL INSTITUTE OF ECONOMIC AND SOCIAL RESEARCH ESTIMATES OF MONTHLY GDP. Embargo until hours on 11 th January 2013

VLF-LF Loop Antenna Installation at Cohoe Radio Observatory Whitham D. Reeve. 1. Introduction

NEW LEASE AMENDMENT TO EXISTING LEASE RECONTRACT BTS ANCHOR TENANT

Example Macro WTS Facility

SEQUATCHIE COUNTY TENNESSEE

Phase 2 Silver Line Update

Signs of End of Life FM Antennas and Transmission Line Systems

Economic and Housing Market Outlook

Site Surveying and Antenna Mounting

Recommended Citations

Source 2018 COURSE SCHEDULE SGT. MAJ. PHIL FASCETTI GIVES BACK UC SAN DIEGO EXTENSION CELEBRATES 25 YEARS OF MAKING SAFER WORK SPACES SAFETY FEST

Bridge Condition Assessment Using Remote Sensors

800MHz Advisory Board August 24, 2017

PENTRUDER 8-20 HF 22KW/30HP WALL SAW (MAX BLADE DIAMETER - 79, WILL TAKE 39 BLADE OUT OF CUT) PART NUMBER DESCRIPTION DETAILS MSRP

Past, Present and Future U.S. Lamb Market, 2013

DATE: FY 2015 President's Budget March 2014 PRIOR YR FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 TO COMP TOTAL PROG QUANTITY

Appendix B. Oregon Ship Sailings, 1824 to The Hudson Bay Supply Ship Sailings to the Columbia River, 1824 to 1846

NZQA unit standard version 3 Page 1 of 5. Install and maintain telecommunications radio frequency systems

AWOS II & AWOS A-V Site Preparation Manual

2013 Rainfall Report for Hays County, Texas

Ham Radio Safety In & Out Of The Shack

Southeast Region Reserve Components. Conveyance Progress Report

STATE AGENCIES FOR SURPLUS PROPERTY

Public Safety Radio Communications System Update. Presented by Steve Streiffert Assistant Director, IT Solutions May 10, 2011

Climate Update. Nolan Doesken, State Climatologist Atmospheric Science Department Colorado State University Presented by Reagan Waskom

State Capitals Directions:

The Confederation Commemorative

3000 Series Granger Broadband HF Multi-Mode SPIRA-CONE Antennas

Housing Market Outlook

Joint Service Power Expo

STRLodgingPerformanceSnapshotAugust2017CYTD

Climate Update. Nolan Doesken, State Climatologist Atmospheric Science Department Colorado State University.

2012 ACCE Industry Advisory Board Best Practices Positioning Your Firm After the Great Recession

Real Estate Trends and Outlook

PART 74 EXPERIMENTAL RADIO, AUXILIARY, SPECIAL BROADCAST AND OTHER PROGRAM DISTRIBU- TIONAL SERVICES

Operation Guide 3721

THE 3905 CENTURY CLUB, INC POINT AWARD APPLICATION (AND SUBSEQUENT 1000-POINT INCREMENTS) (EACH BAND/MODE SEPARATELY) (NOT ENDORSABLE)

MERA NEXT GENERATION SYSTEM SUMMARY PROJECT DESCRIPTION IN ADVANCE OF CEQA SUBSEQUENT ENVIRONMENTAL IMPACT REPORT (SEIR)

AWOS III T & AWOS III P/T Site Preparation Manual

Research and Statistics Department FOR RELEASE 8:50 A.M. Thursday, October 26, 2017

Global Positioning Systems Directorate


DAS Solutions. Delivering coverage and capacity in today s challenging environments

Climate Update. Nolan Doesken State Climatologist Atmospheric Science Department Colorado State University.

Memorylink UltraSync GPS-100M Synchronization Guide. for PTP 600 Series Wireless Ethernet Bridges

Research and Statistics Department FOR RELEASE 8:50 A.M. Monday, May 28, 2018

Rod Larson President, Latin America. Houston, Texas March 9-10, 2011

UNITED STATES. United We Stand Flag Stamp EDNA FERBER DIE CUT X ON 34 C. Washington. Self-Adhesive Booklet Stamps

FDOT Voice Radio Communications and Microwave Network

Chapter 1: Telecommunication Fundamentals

Maritime Telecommunication System Development Project (3)

A Prototype Simple Reconfigurable Antenna for the. Multiband LMR Antenna System

Type 2701 and 2702 Series GRANGER Horizontally Polarized, Log-Periodic HF Antennas

- go over homework #2 on applications - Finish Applications Day #3 - more applications... tide problems, start project

National Radio Channels. PPM measurement October 2017

Economic and Real Estate Market Outlook

I dedicate this book to the Lord Jesus Christ, my mentor and teacher. Proverbs 16:3 NOTICE TO THE READER ABOUT THE AUTHOR

Trip Report Visit to Gambia

SPECIAL SPECIFICATION 6574 Low Power Wireless Modem

Federal Partnership for Interoperable Communications

Transcription:

Client Name General Description Date Town of Bristol, NH Remove existing communication site and install new 80 self-support tower with 7 antennas and new communications shelter JUN/JUL/AUG 2017 Wheeler AAF Install approximately 53 of cable bridge, two AUG 2017 antennas and two runs of LMR 400 through building to communications desk AUG 2017 Annual tower inspection MAY 2017 Ice Bridge and Safety Climb at Philo, VT Safety Climb at Pierson Hill, VT Safety Climb at Streeter Hill, VT Lightning Protection and Grounding at Brownington, VT MAY 2017 MAY 2017 US Navy, 58 Antenna/Line Repairs at Pt. Mugu, CA APR/MAY 2017 Lightning Protection Install in St. Albans, VT Antenna/Line Install on Moose Mountain, NH Install Safety Climb at Terrace St, VT Grounding at Williston Barracks, VT Cable Management, Grounding and Exothermic Welding at Pierson Hill, VT MAR 2017 GAM Electronics, a division of Yankee Microwave Inc Antenna/Line Install at Millstone Hill, VT JAN 2017 Product Line Expansion Project DEC 2016 JAN 2017 FEB 2017 MAR 2017 Low band custom Omni antenna located atop Mount Mansfield OCT/NOV 2016 OCT 2016 Town of Bristol, NH Build 80 self-support tower site SEP 2016

Emergency Services Maryland Transportation Authority Lockheed Martin Minnesota DOT Permit pending Quarterly maintenance contract for six tower AUG 2016 Annual 22 tower maintenance and inspection JUN/JUL/AUG contract 2016 Annual tower inspection JUN 2016 Quarterly maintenance contract for six tower (one add l tower) Sub-Contractor to upgrade/expand microwave links dish antennas, wave guides, and associated interior communications building equipment Sugarloaf Mountain, Kingston, Maine Remove and replace ODU microwave radio Replace PTZ camera and mount MAY 2016 APR 2016 MAR 2016 FEB 2016 Replace broken lightning rod 80 tower Sub-Contractor to install 50 square HF antenna on rooftop at National Guard base for in Nebraska Sub-Contractor to erect two monopoles at Lockheed Radar Test Facility in New Jersey Sub-Contractor to install 50 square HF antenna on rooftop at National Guard base for in West Virginia Sub-Contractor to install HF straight wire antenna for on capitol building rooftop in Delaware Replace lighting system with FAA approved LED side markers and flash beacons on five towers NOV 2015 OCT 2015 AUG 2015

NEC West Point MICC Ft. Drum University of Texas Pine Bluff Arsenal, Arkansas Boone National Guard, Frankfort, KY MICC Ft. Drum Picatinny Arsenal, New Jersey Replace guy wires and hardware on five selfsupport towers Tower Inspection Maintenance and LED light repair on control towers at Range 48, Ft. Drum, New York JUN 2015 Annual tower inspection JUN 2015 Replace ten AC units in five communication shelters at various sites Replace lighting system with FAA approved LED side markers and flash beacons on five towers Install rooftop communications self-support tower and antenna systems including grounding Replace antenna system and lightning protection on 80 tower Inspect five towers at Range 48, Ft. Drum, New York Sub-Contractor to inspect LMR tower and repair beacon light Spruce Mountain, Maine PTZ camera alignment service Houlton, Maine Replace safety climb system on monopole Coburn Gore Point of Entry MAY 2015 APR 2015 APR 2015 MAR 2015 MAR 2015 FEB 2015 JAN 2015 NOV 2014 NOV 2014

Minnesota DOT and Virginia State Police SAAB Sensis Oregon Caves National Park Service Calias Ferry Point Houlton, Maine Jackman Point of Entry Burke Tower Install outdoor NEMA communications box Richford, Vermont Install outdoor NEMA communications box Relocate all radio equipment to GFM DDB box at tower base on new foundation including ground ring and underground ac circuit MT. Alone, New York Replace 12 guy wires and hardware, paint Perform statewide tower inspections including AUG 2014 guy wire tensioning and tower alignment. Install FAA approved LED lighting systems Annual tower inspection AUG 2014 Canaan, Vermont on 80 tower Sub-Contractor to install VHF and UHF radio communication systems at tow tower sites including grounding to R56 Motorola standards Ben Young Hill, Vermont Repair and test grounding system and treat anchor points for corrosion. Nelson Hill, Vermont Install 6 port entry enclosure with boots Tower repair and maintenance and install microwave link Sub-contractor for complete build of a radar test tower for defense contractor (SAAB Sensis) serving US Navy and other DOD contracts. Install a two link microwave system for data and telecommunications AUG 2014 AUG 2014 JUN 2014 JUN 2014 JAN 2014

Cherry Point MCAS, North Carolina LMR radio antenna services, relocation and repair, including servicing of existing LMR equipment. Tower inspection and maintenance, replace three guy wires and tension all existing wires. Installation of LED lighting system as per FAA specifications LMR radio antenna service, relocation and repair. Inspect two tower sites, including painting to FAA specified orange and white. OCT 2013 AUG 2013