GIS Disconnector Switching Operation VFTO Study

Similar documents
Calculation of Transient Overvoltages by using EMTP software in a 2-Phase 132KV GIS

VFTO STUDIES DUO TO THE SWITCHING OPERATION IN GIS 132KV SUBSTATION AND EFFECTIVE FACTORS IN REDUCING THESE OVER VOLTAGES

A Simple Simulation Model for Analyzing Very Fast Transient Overvoltage in Gas Insulated Switchgear

Estimation of Re-striking Transient Over voltages in a 132KV Gas insulated Substation

Calculation of Transients at Different Distances in a Single Phase 220KV Gas insulated Substation

Estimation of Re-striking Transient Overvoltages in a 3-Phase 132KV Gas insulated Substation

Modeling and Analysis of a 3-Phase 132kv Gas Insulated Substation

Effect of High Frequency Cable Attenuation on Lightning-Induced Overvoltages at Transformers

Modeling insulation in high-voltage substations

INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY. Approach for Fault Detection in GIS.

Effect of Shielded Distribution Cables on Lightning-Induced Overvoltages in a Distribution System

Tab 2 Voltage Stresses Switching Transients

Modelling of Sf6 Circuit Breaker Arc Quenching Phenomena In Pscad

Transient recovery voltage analysis for various current breaking mathematical models: shunt reactor and capacitor bank de-energization study

ANALYSIS OF VERY FAST TRANSIENT OVER VOLTAGES IN GAS INSULATED SUBSTATION

SUPPRESSION METHODS FOR VERY FAST TRANSIENT OVER- VOLTAGES ON EQUIPMENT OF GIS

Ferroresonance in MV Voltage Transformers: Pragmatic experimental approach towards investigation of risk and mitigating strategy

CHAPTER 2. v-t CHARACTERISTICS FOR STANDARD IMPULSE VOLTAGES

Sources of transient electromagnetic disturbance in medium voltage switchgear

Revision of TRV Requirements for the Application of Generator Circuit-Breakers

Analysis of Very Fast Transient over Voltages of Transformer in Gas Insulated Substation (GIS) using Wavelet Technique

The various factors influencing the VFTO levels in 500kV and. 750kV GIS have been discussed by developing the simulink models which

MODIFICATION OF THE ARRESTER ARRANGEMENT WHEN CONVERTING THE METHOD OF NEUTRAL TREATMENT

A TECHNICAL REVIEW ON CAPACITOR BANK SWITCHING WITH VACUUM CIRCUIT BREAKERS

Electromagnetic Disturbances of the Secondary Circuits in Gas Insulated Substation due to Disconnector Switching

DC current interruption tests with HV mechanical DC circuit breaker

10. DISTURBANCE VOLTAGE WITHSTAND CAPABILITY

Modeling for the Calculation of Overvoltages Stressing the Electronic Equipment of High Voltage Substations due to Lightning

2000 Mathematics Subject Classification: 68Uxx/Subject Classification for Computer Science. 281, 242.2

Comparison of switching surges and basic lightning impulse surges at transformer in MV cable grids

AORC Technical meeting 2014

Chapter 1. Overvoltage Surges and their Effects

G. KOEPPL Koeppl Power Experts Switzerland

Research Article A Simplified High Frequency Model of Interleaved Transformer Winding

When surge arres t ers are installed close to a power transformer, overvoltage TRANSFORMER IN GRID ABSTRACT KEYWORDS

A Study on Ferroresonance Mitigation Techniques for Power Transformer

Ferroresonance Experience in UK: Simulations and Measurements

High voltage engineering

DIFFERENCE BETWEEN SWITCHING OF MOTORS & GENERATORS WITH VACUUM TECHNOLOGY

Analysis of MOV Surge Arrester Models by using Alternative Transient Program ATP/EMTP

Prevention of transformers damage in HPP with double generating units connected to GIS via HV cables

Session Four: Practical Insulation Co-ordination for Lightning Induced Overvoltages

TECHNICAL NOTE 2.0. Overvoltages origin and magnitudes Overvoltage protection

Ironing out resonance

GIS Instrument Transformers: EMC Conformity Tests for a Reliable Operation in an Upgraded Substation

Effect of Shielded Distribution Cable on Very Fast Transients

PREVENTING FLASHOVER NEAR A SUBSTATION BY INSTALLING LINE SURGE ARRESTERS

(2) New Standard IEEE P (3) Core : (4) Windings :

Lumped Network Model of a Resistive Type High T c fault current limiter for transient investigations

Power Quality and Reliablity Centre

LIGHTNING OVERVOLTAGES AND THE QUALITY OF SUPPLY: A CASE STUDY OF A SUBSTATION

FERRORESONANCE SIMULATION STUDIES USING EMTP

Lightning transient analysis in wind turbine blades

A Methodology for the Efficient Application of Controlled Switching to Current Interruption Cases in High-Voltage Networks

SWITCHING OVERVOLTAGES IN A 400-KV CABLE SYSTEM

Switching Induced Transients:

Fast Front Transients in Transformer Connected to Gas Insulated Substations: (White+Black) Box Models and TDSF Monitoring

Appendix D Fault Levels

Parameters Affecting the Back Flashover across the Overhead Transmission Line Insulator Caused by Lightning

Transmission Line Transient Overvoltages (Travelling Waves on Power Systems)

HF Resonators for Damping of VFTs in GIS

Insulation Co-ordination For HVDC Station

Adi Mulawarman, P.E Xcel Energy Minneapolis, MN. Pratap G. Mysore, P.E Pratap Consulting Services, LLC Plymouth, MN

ANALYSIS OF VOLTAGE TRANSIENTS IN A MEDIUM VOLTAGE SYSTEM

ANALYSIS OF FAULTS INTERRUPTED BY GENERATOR

Coordination of surge arresters in DC 3 kv railway traction system field tests

A Special Ferro-resonance Phenomena on 3-phase 66kV VT-generation of 20Hz zero sequence continuous voltage

POWER SYSTEM TRANSIENTS - Switching Overvoltages in Power Systems - Juan A. Martinez-Velasco, Jacinto Martin-Arnedo

Ferroresonance Conditions Associated With a 13 kv Voltage Regulator During Back-feed Conditions

Prediction of Transient Transfer Functions at Cable-Transformer Interfaces

Electrical Transient Interaction between Transformers and Power System. Brazilian Experience

Condition Assessment of High Voltage Insulation in Power System Equipment. R.E. James and Q. Su. The Institution of Engineering and Technology

Simulation of switching overvoltages of 400 kv shunt reactor. Shunt reactor grounded through a neutral reactor in 400/132 kv highvoltage

Switching Restrikes in HVAC Cable Lines and Hybrid HVAC Cable/OHL Lines

Visualization of the Ionization Phenomenon in Porous Materials under Lightning Impulse

Alternative Coupling Method for Immunity Testing of Power Grid Protection Equipment

Simulation and Analysis of Lightning on 345-kV Arrester Platform Ground-Leading Line Models

Lightning overvoltage and protection of power substations

Overview of Grounding for Industrial and Commercial Power Systems Presented By Robert Schuerger, P.E.

Utility System Lightning Protection

Analysis of lightning performance of 132KV transmission line by application of surge arresters

Electric Stresses on Surge Arrester Insulation under Standard and

Transient Analysis and Mitigation of Capacitor Bank Switching on a Standalone Wind Farm

Comprehensive modeling of Dry type foil winding transformer to analyse inter turn insulation under Lightning Impulse Voltage

Electricity Ten Year Statement November Electricity Ten Year Statement November Appendix D

VOLTAGE OSCILLATION TRANSIENTS CAUSED BY CAPACITOR BANKING ENERGIZING FOR POWER FACTOR CORRECTION IN THE POWER SYSTEM

DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING QUESTION BANK SUBJECT CODE & NAME : EE 1402 HIGH VOLTAGE ENGINEERING UNIT I

Shunt Reactor Switching

A MODEL TO SIMULATE EM SWITCHING TRANSIENTS IN ELECTRIC POWER DISTRIBUTION SUBSTATIONS

Distribution Transformer Random Transient Suppression using Diode Bridge T-type LC Reactor

Analysis of Electromagnetic Transients in Secondary Circuits due to Disconnector Switching in 400 kv Air-Insulated Substation

Research Article Survey of Induced Voltage and Current Phenomena in GIS Substation

Substation Insulation Coordination Study

ROEVER ENGINEERING COLLEGE ELAMBALUR, PERAMBALUR DEPARTMENT OF ELECTRICAL & ELECTRONICS ENGINEERING

Power Frequency Withstand Voltage On-site testing of 400 kv GIS

The Analysis Results of Lightning Overvoltages by EMTP for Lightning Protection Design of 500 kv Substation

EE 1402 HIGH VOLTAGE ENGINEERING

FAULT IDENTIFICATION IN TRANSFORMER WINDING

EXPERIMENTAL INVESTIGATION OF A TRANSIENT INDUCED VOLTAGE TO AN OVERHEAD CONTROL CABLE FROM A GROUNDING CIRCUIT

OVERVOLTAGE PROTECTION OF POLE MOUNTED DISTRIBUTION TRANSFORMERS

Transcription:

GIS Disconnector Switching Operation VFTO Study Mariusz Stosur, Marcin Szewczyk, Wojciech Piasecki, Marek Florkowski, Marek Fulczyk ABB Corporate Research Center in Krakow Starowislna 13A, 31-038 Krakow, Poland E-mail: mariusz.stosur@pl.abb.com Abstract Very Fast Transient overvoltages (VFTO) in power systems are result of switching operations such as disconnector opening and closing inside GIS substation. The VFTO causes great threat to the insulation of the high-voltage equipment (e.g. bushings or windings of transformers). These transients are associated with very short rise times in the nanoseconds range, and are normally followed by oscillations having the frequency spectrum well above several MHz. In the present paper simulation results of the VFT overvoltages at the transformer terminals, resulting from a disconnector switching operations in a typical GIS substation are presented. In a common approach used for insulation coordination study, typically a single re- or prestrike in the disconnector is analyzed. In the presented paper an advanced model of the GIS disconnector is involved. The new model enables the analysis of multiple re- or prestrikes generated during the operation of the device. This in turn allows one to analyze the impact of the repetitive phenomenon on the HV equipment. The simulation results with use of high-frequency power network components were performed using the ATP/EMTP program. Keywords-Gas Insulated Substation, Very Fast Transient, Disconnector switching, modelling, simulation, ATP/EMTP I. INTRODUCTION Gas Insulated Substations (GIS) have found a broad range of applications in power systems because of their high reliability, easy maintenance, small ground space requirements etc. It has been shown that operations of disconnector switches and breakers can cause Very Fast Transient overvoltages (VFTO), tip of which is very steep accompanied with high frequency oscillation. VFTO not only influence the operating reliability of GIS, but also causes great threat to the insulation of the high-voltage equipment, especially to windings of the transformer [1]. The VFTO in power systems cover a frequency range from 100 khz to 100 MHz. VFT arises within GIS due to various operations, any time causing an instantaneous change in voltage. Most often this change occurs as a result of opening or closing of disconnector switch, but other events such as operation of a circuit breaker, the closing of a grounding switch or the occurrence of a fault can also cause VFT. These transients generally have a very short rise time in the range of 2 to 100 ns, and are normally followed by oscillations having the frequencies in the range of 1 to 100 MHz. Their magnitude is in the range of 1.5 to 2.0 p.u. of the line-to-neutral voltage crest, but they can also reach values as high as 2.5 p.u. These values are generally below the BIL of the GIS and connected equipment of lower voltage classes. VFT in GIS are of greater concern at the highest voltages, for which the ratio of the BIL to the system voltage is lower. II. GAS INSULATED SUBSTATION MODELING For certain switching conditions where GIS disconnectors are operated following circuit breaker operation it is possible to generate VFTO, which act as travelling waves and propagate within and external to the GIS. Due to the travelling wave nature of the VFT the GIS elements were modeled as electrical equivalent circuits composed of distributed parameter lines (defined by surge impedance and travelling times) as well as lumped elements. In order to achieve reliable simulation results the GIS was subdivided into several shorter sections. TABLE I. GIS component closed circuit breaker disconnector EXAMPLE OF GIS COMPONENTS TO BE MODELED open closed open Modeling parameter in series with grading capacitor in series with capacitor (contact gap) earthing switch open lumped capacitor to earth cone insulator, line bushing, power transformer with line bushing, voltage and current transformer busbar overhead line lumped capacitor to earth infinite line terminated by surge impedance of the line In its simplest form and for the purpose of modeling, the GIS installation can be regarded as series of distributed Modern Electric Power Systems 2010, Wroclaw, Poland MEPS'10 - paper 13.4

transmission lines and lumped capacitor elements. The values of each GIS section can be calculated from the standard formula of capacitance and inductance, treating the GIS as a concentric conductor. The lumped capacitance values applicable to the insulators, busbars, line bushings etc., can be determined from first principles using the manufacturer s drawings and technical component data for a specific type of equipment. In order to model various switching configurations it is necessary to consider modeling disconnectors and circuit breakers in both open and closed positions. The modeling of the GIS is therefore a combination of distributed and lumped parameters, as it is summarized in Table I (also reported in e.g. [2, 3]). III. SIMULATION SET-UP For the VFT study a typical GIS substation layout has been taken into consideration. Its single line diagram is shown in Fig. 1. For that diagram, a complete ATP/EMTP model has been developed according to the description given in sec. II (Fig. 2). Due to the already stated random nature of the trapped charge at the commencement of a disconnector opening (or closing) and its direct affect on the resulting magnitude of VFTO, the studies have been carried out not only on the worst case scenario, i.e. 1.0 p.u. trapped charge, but also for other levels of trapped charge. IV. DISCONNECTOR MODEL A. Common approach single spark model The common approach which is in use for the purpose of VFT modeling due to disconnector switching involves only a single spark model, as it is widely reported in the literature (e.g. [4, 5]). In such an approach, the assumption of the so called worst-case analysis is being made, in which only the spark of maximum amplitude is taken into account (i.e. the last one for breaking and the first one for making operation). The spark resistance is modeled by the exponential formula [2]: R = R a + R 0 e -t/τ, (1) where: R a arc resistance, R 0 resistance of the gap while disconnector is opened, τ time constant leading to the spark duration specific for the breakdown in SF 6. B. New disconnector model For the purpose of simulations presented in the paper, a new disconnector model has been developed. In the model, not only one spark, but the whole process including many re- or prestrikes has been incorporated. Figure 1. Single line diagram of a typical HV GIS substation with marked calculated configuration Figure 3. EMTP model of disconnector; u S source side voltage, u L load side voltage Figure 2. Complete ATP/EMTP simulation model for VFT phenomenon study new GIS disconnector model applied (more in paragraph IV) The main idea of the model is based on the concept previously applied for modelling of Vacuum Circuit Breaker, as it is presented in e.g. [6]. The concept (Fig. 3) is to control the nonlinear resistance using the MODELS tool of the EMTP program [7]. By means of the control procedure, a decision is being made whether the spark is to be ignited or extinguished in order to produce the VFT phenomenon of interest. The decision is based on the values of potentials on source and load side of the disconnector, which are compared with the withstand voltage of the contact gap. The withstand voltage is calculated in each simulation step on the basis of moving contact velocity (obtained from mechanical characteristics of the disconnector) and the rated power frequency withstand

voltage across isolating distance. Trapped charge is modeled by additional capacitance, which is triggered by the ideal switch so that it does not influence the travelling wave phenomenon constituting VFT. A detailed description of the model together with simulations performed for the purpose of its verification (based both on theoretical analysis and Test Duty measurements) is presented in [8]. V. SIMULATION RESULTS A. VFT and VFTO waveforms In Fig. 4, the VFT waveforms are shown for breaking and making operation of disconnector in the GIS under consideration. Common step-wise patterns of the load side voltage, as well as a so called falling pattern (which is due to contacts asymmetry) are visible. It can be noticed that for the breaking operation (Fig. 4a) the amplitude of VFT is very close to 1 p.u. However, for the making operation with the trapped charge -1 p.u. (Fig. 4b) it is clearly visible that not only one prestrike has significant amplitude, but at least few of them. The corresponding waveforms of VFT overvoltages appearing at transformer terminals due to disconnector operations are depicted in Fig. 5. B. Quantitative measure of VFT As it was already mentioned, the most significance of VFT phenomenon is related to the impact which is imposed on the HV adjacent equipment, such as bushings or transformers. Hence, not only the amplitude of the worst-case VFT is of importance, but also other parameters of VFT can play an important role, especially those which are related to some cumulative aging effect on an insulation material of the adjacent equipment. This leads to the need for providing a measure by which the VFT phenomenon would be expressed quantitatively. 600 400 0 - a) 400 300 100 a) 0,515 0,519 0,523 0,527 0,531 [s] 0,535 550 450 b) 0-100 350 - -300 250 0,00 0,05 0,10 0,15 0,20 [s] 0,25 150 500 350 b) 50 0,5193 0,5194 0,5194 0,5194 0,5194 0,5194 [s] 0,5194 Figure 5. Very Fast Transient Overvoltages at transformer terminals: a) two selected sparks, b) view of the first spark magnified 50-100 -250 0,4 0,5 0,6 0,7 0,8 0,9 [s] 1,0 Figure 4. VFT due to disconnector switching source side voltage (continuously alternating) and load side voltage (step wise) for: a) breaking (restrikes), b) making (prestrikes) operation at disconnector terminals In presented paper, such a measure has been provided. A particular VFT waveform has been characterized by a total number of sparks occurring during the whole process of contact movement of disconnector. Also, the number of sparks of certain amplitudes has been counted for each process. The dot plots demonstrating the VFT phenomenon for breaking and making operation are depicted in Fig. 6, 7. The amplitudes of the most significant VFTO have been depicted for each operation (i.e. last 50 for breaking and first 100 for making) against the peak amplitude of the source voltage (which is assumed as 1 p.u., 1 p.u. = V r 2/3).

C. VFT analysis Based on the dot plots, the two histograms of VFTO amplitudes have been obtained, as depicted in Fig. 8, 9. In Fig. 9, the total number of overvoltages is presented for breaking operation as well as for four cases of making operation characterized by different levels of trapped charge: -1 p.u., -0.5 p.u., -0.15 p.u. and zero. In Fig. 9 a number of overvoltages of certain amplitude for above mentioned cases is shown. A total number of sparks, and hence a total number of VFTO, depends of the type of disconnector operation, whether it is breaking of making (Fig. 8). For the making operation the total number of sparks is approximately 4 times larger than it is for the making operation, no matter how large the trapped charge is while the making operation is performed. The number of sparks of certain amplitude (i.e. those of 1.0 1.5 p.u. vs. those 1.5 2.0 p.u.) depends on the type of disconnector operation in a very similar way as the total number of sparks does (Fig. 9). It is also larger for the making than for the breaking operation and decreases with reduction of the trapped charge for the making operation. However, the number of overvoltages of significant amplitude notably decreases when the trapped charge is small. VFTO [p.u.] Figure 8. Total number of sparks for breaking and making operations; with different levels of trapped charge for making operation n Figure 6. Very Fast Transient Overvoltages for breaking operation (restrikes) at transformer terminals, last n = 50 sparks VFTO [p.u.] Figure 9. Number of sparks of a certain amplitude for breaking and making operations; with different levels of trapped charge for making operation Figure 7. Very Fast Transient Overvoltages for making operation (prestrikes) at transformer terminals, first n = 100 sparks; trapped voltage = -1 p.u As it was expected, the total number of sparks decreases with the decrease of the trapped charge while the making operation is performed. However, the reduction is not significant, namely from 421 sparks at -1 p.u. of trapped charge to 391 sparks at the common level of trapped charge equals - 0.15 p.u. n VI. SUMMARY AND CONCLUSIONS Very Fast Transient overvoltages study has been presented in the paper, based on a typical High Voltage Gas Insulation Substation. The study has been performed with use of the newly developed model of disconnector, in which not only the worst case, but the whole process of VFT has been modeled. It was confirmed that the Very Fasts Transients exceed neither BIL (Basic Lightning Impulse Insulation Level) nor BSL (Basic Switching Impulse Insulation level), hence the existing protection system of GIS, such as surge arresters, is completely transparent for this phenomenon. Therefore, VFT can stress high voltage equipment (such as bushings and/or transformers). Therefore, the following parameters of the phenomenon are of importance: amplitude of the worst case overvoltage, total number of sparks during the whole process,

number of sparks that lead to overvoltages of significant amplitude, frequency of sparks occurrence (since it can match the resonant frequency of bushings or transformers). The study presented in the paper concentrates on VFT parameters related to the numbers: the total number of sparks and the number of sparks that lead to overvoltages of significant amplitude. Simulations have been performed with use of the model of a very typical GIS substation, based on the state of art of GIS modelling. Not only one spark, but the whole VFT phenomenon is of importance due to the above mentioned features of VFT impact on high voltage equipment. One of a possible measure of VFT has been presented in the paper. The new approach based on the analysis of the entire switching operation process allows one to assess quantitatively the overall impact of the switching process on the adjacent equipment. REFERENCES [1] CIGRE JWG A2-A3-B3.21, Electrical Environment of Transformers Impact of Fast Transients, Electra No. 218, Feb. 5, pp. 25-37 [2] Povh D., Schmitt H., Volcker O., Witzmann R., Chewdhuri P., Imece A. E., Iravani R., Martinez J. A., Keri A., Sarshar A., Modeling and Analysis Guidelines for Very Fast Transients, IEEE Power Engineering Review, Volume: 17, Issue: 13, 1996 [3] Pinches D.S.,. Al-Tai M. A., Very Fast Transient Overvoltages Transient Overvoltages Generated by Gas Insulated Substations, 43rd International Universities Power Engineering Conference, UPEC 8 [4] Ecklin G., Schlicht D.: Overvoltages in GIS caused by the operation of isolators, Proceedings of the Brown Boveri Research Centre, Baden, Switzerland, September 3-4, 1979, pp. 115-128 [5] Boggs S. A., Chu F. Y., Fujimoto N., Krenicky A., Plessl A., Schlicht D.: Disconnect Switch Induced Transients and Trapped Charge in Gas- Insulated Substations, IEEE Transactions on Power Apparatus and Systems, Volume: PAS-101, Issue: 10, 1982, pp. 3593-3602 [6] Wong S. M., Snider L. A., Lo E. W. C.: Overvoltages and reignition behaviour of vacuum circuit breaker, International Conference on Power Systems Transients (IPST), New Orleans, USA, 3 [7] Dommel H. W., Meyer W. S.: Computation of electromagnetic transients, Proceedings of the IEEE, vol. 62, no. 7, July 1974, pp. 983-993 [8] Szewczyk M. et al., New disconnector model for Very Fast Transient studies in High Voltage Gas Insulated Substation EEUG Meeting 2010, European EMTP-ATP Conference, Finland, August 2010