INTRODUCTION. Tube and fitting

Similar documents
INSTALLATION STANDARD FOR WELDED COPPER AND COPPER ALLOY WATER TUBE IAPMO IS

PRE-PRINT. IaPMo Is InstallatIon standard For CoPPEr PlUMBInG tube, PIPE, and FIttInGs

SUPPLIED BY DELTA FLUID PRODUCTS LTD DELTA ROAD ST. HELENS WA9 2ED UK TEL: FAX:

Hand Torch or Flame Brazing Principles

(a) Work gloves may be cloth, leather palm, or all leather; (b) Welding gloves are gauntlet-type gloves with high

Welding Engineering Dr. D. K. Dwivedi Department of Mechanical & Industrial Engineering Indian Institute of Technology, Roorkee

METAL FABRICATION MECHANICAL

A Practical Update on Advanced Copper Alloys and On-Site Joining Methods for HVACR Systems. Educate Promote Defend Support Inspire

IX. FLARED JOINTS IX. FLARED JOINTS

Union coupling, copper x female thread. Cone joint

SOLDERING MANUAL A simple, yet easy to follow manual for your basic soldering needs. Copyright 2017 TortugaPro. All Rights Reserved

Case Study On-Site Brazing Audit Improves Client s Joint Quality and Optimizes Brazing Process Overview of Process

BRAZE INSTRUCTION VIDEO

7-1

Materials Needed. Tube Size O.D.

SOLDERING & BRAZING SOLDERING & BRAZING

Installation and Specification Manual December 2012

SME 2713 Manufacturing Processes. Assoc Prof Zainal Abidin Ahmad

SMAW LESSON #1: Initiating and maintaining an arc using the scratch start method

Soldering Techniques NIAGARA COLLEGE TECHNOLOGY DEPT.

Soldering & De-soldering

Better Soldering (A COOPER Tools Reprint) Overview Solder and Flux Base Material

BRAZING PROCEDURE SPECIFICATION NO

2.00AJ / 16.00AJ Exploring Sea, Space, & Earth: Fundamentals of Engineering Design Spring 2009

Unit 12 Soldering. INTC 1307 Instrumentation Test Equipment Teaching Unit 12 Soldering

Soldering Basics. Purpose We hope this short manual will help explain the basics of Soldering. The emphasis will be on the care and use of equipment.

What is PUK? PUK 3s professional plus PUK 2 and PUK 111

Durapipe ABS Jointing Guide

Turkey Football Panel

Introduction to Soldering

Terminating D /-0289 Subminiature SolderTact Contacts to Twisted-Pair Cable

Brazing Technical Bulletin

Metal Mould System 1. Introduction

User s Manual SOLDERING STATION

Cornerstone Electronics Technology and Robotics I Week 19 Soldering Tutorial

1. Initial Precautions 2. Technical Precautions and Suggestions 3. General Information and Cure Stages 4. Understanding and Controlling Cure Time

ELECTRICAL CONNECTIONS

The Virgo/Libra Steam Engine

SOLDERING TO TRANSDUCERS

HAND SOLDERING FOR THROUGH-HOLE COMPONENTS (DVD-42C) TRAINING CERTIFICATION EXAM v.2

A Precision 2000 Mixed Media Project

Drawing. Fig. 1 Drawing

Basic Assembly For Conventional Series 9000 Structural Panels

SOLDERED CONNECTIONS USING SOLDERING COPPERS METHOD OF MAKING AND REMOVING

INSTRUCTION MANUAL. Force Transducer Output Tube Repair Kit

Stained Glass Mission-Style Frame A stained glass project

WELDING. Section nine 9.1 CORRECT TOOLS

Catalog October Speedi-Sleeve The quickest and most economical way to repair worn shafts

FORM TP m a y /ju n e 2010

HBS-AP ASSEMBLING INSTRUCTIONS

Data Sheet. Number: 003 Issue: BASIC SOLDERING TECHNIQUES.

Avoiding Common Problems in Saw Preparation

Tube Facing Tool.

How to Sharpen a Knife

BRAZING AND SOLDERING. Turn to the. Pros SERVICEMAN S GUIDE

BRAZING AND SOLDERING. Turn to the. Pros SERVICEMAN S GUIDE

DVD-PTH-C Through-Hole Solder Joint Workmanship Standards

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233

Rigid Fluid Lines Tubing Materials Material Identification 7-1

Homemade Copper Solar Cells

SAVE THIS FOR FUTURE REFERENCE THIS PRODUCT IS FOR PROFESSIONAL LABORATORY USE ONLY USER'S MANUAL

Water Line and Water Line Assembly Gasket

Brazing Fittings. Cover. An introduction to the range and applications KM BSS BOSS Brazing Fitting Brochure_V8.indd 1

7mm/0Gauge BRF 025 ZUV SHARK Plough Brake. Building Instructions

Field Installed Connectors for TraceTek 7000-HUV Bulk Cable Installation Instructions

Visual Testing of Pipe Threads

Angle Grinder MODEL 9553B MODEL 9555B

SEMPEO SQA Unit Code FP38 04 Preparing and using manual flame brazing and braze welding equipment

1/4 Sheet Palm Sander

CIRRUS AIRPLANE MAINTENANCE MANUAL MODELS SR22 AND SR22T CHAPTER 56-30: DOOR GENERAL. Door 56-30: DOOR. 1. General

Explorer Wiring Kit (assembled)

Operator s Manual. Onion King 500N 501N 502N 503N ENGLISH

TECHNICAL BULLETIN BELT FINISHING WITH MICRO-MESH

1 SELECT suitable material. It takes time to cut a cab. Don t waste it on rubbish.

A Fresh Take. Tap the potential of repoussé to give your jewelry dimension without added weight.

TURBULENT ORB by Ned Kahn MAINTENANCE INSTRUCTIONS

Manufacturing Process - I Dr. D. K. Dwivedi Department of Mechanical and Industrial Engineering Indian Institute of Technology, Roorkee

How to use a Touch Up Bottle & Brush

Chapter 25. Other Machining Processes. Materials Processing. MET Manufacturing Processes. Shaping Planing Broaching Sawing Filing

Hand Crimping Tools , , and AUG 12 Rev D

Multiple-Use-Mold Casting Processes

Bandsaw Blade Selection Guide

By Greg Holster. Grinding... where protecting gases could be blown away by the wind and higher productivity

Operation Manual K

Fasteners. Metal Fasteners, Joining, and Adhesives. Bolts. Metal Fasteners, Joining, and Adhesives

INSTRUCTIONS ASSEMBLY SAFETY USE

SYGEF Standard SYGEF Plus PVDF Flanges

SAFETY AND OPERATING MANUAL. Hedge Trimmer WG205E WG206E WG207E WG208E

UNSIGNED HARDCOPY NOT CONTROLLED

Photo-Etch Demonstration Notes. Presented at the AMPS Central SC August 11, 2011 Meeting

Guild of Oregon Woodworkers Shop Safety Test

QUASAR ELECTRONICS KIT No DRILL SPEED CONTROLLER

POTENTIAL HEALTH & SAFETY HAZARDS

Forming and assembling pipework systems

Students will learn to correctly prepare, assemble, and solvent weld ABS piping.

Standard Kit #1 (3-way switch)

Items Needed: Be sure to read and fully understand all Instructions before beginning.

FM Wireless Microphone Kit Instructions for Assembly Page 1 of 5

SAFETY INSTRUCTION TEST

Welding & Fabrication Tools FT-Flat Electrode Welding

Transcription:

Service Application Manual SAM Chapter 630-41A Section 21 SOLDERING & BRAZING COPPER TUBE The Copper Development Association Inc. INTRODUCTION The material that follows is adapted from publications first developed by the Copper Development Association, and is reprinted with permission from the CDA. Copper tube and fittings (Figure 1) may be joined in a number of ways, depending on the purpose of the system. Soldering and brazing with capillary fittings are the methods most commonly used. Tube and fitting The American Welding Society defines soldering as a joining process that takes place below 840 F, and brazing as a similar process that occurs above 840 F but below the melting point of the base metals. In actual practice for copper systems, most soldering is done at temperatures ranging from about 350 F to about 550 F, while most brazing is done at temperatures ranging from about 1100 F to about 1500 F. The choice between soldering and brazing normally will depend on operating conditions. Soldered joints generally are used in applications where the service temperature does not exceed 250 F. Brazed joints can be used in applications where greater strength is required, or where system temperatures are as high as 350 F. Copyright 1995, 2009, By Refrigeration Service Engineers Society. -1-

the joining process Soldering and brazing both involve the same basic steps, which you must learn to execute with care and craftsmanship. The eight main steps in the joining process are: measuring and cutting reaming cleaning fluxing assembly and support heating applying the filler metal cooling and cleaning. Each step contributes to a strong, dependable joint. MEASURING AND CUTTING Measuring Measure the length of each tube segment accurately (Figure 2). Inaccuracy can compromise joint quality. If the tube is too short, it will not reach all the way into the socket of the fitting and a proper joint cannot be made. If the tube segment is too long, there is a danger of cocking the tube in the fitting and putting a strain on the system that could affect service life. Once the tube is measured, it can be cut. Cutting can be accomplished in a number of different ways to produce a satisfactory square end. You can cut the tube with a disk-type tube cutter (Figure 3), a hacksaw, an abrasive wheel, or with a stationary or portable bandsaw. Make sure that the tube is not deformed while being cut. Regardless of the method used, the cut must be square with the run of the tube so that the tube will seat properly in the fitting socket. reaming Cutting leaves a small burr on the end of the tube. If this rough edge is not removed by reaming, erosion-corrosion may occur, caused by local turbulence and increased flow velocity in the tube. A properly reamed piece of tube provides a smooth surface for better flow. Cutting Copyright 1995, 2009, By Refrigeration Service Engineers Society. -2-

Tools used to ream tube ends include the reaming blade on the tube cutter, half-round or round files (Figure 4), a pocket knife (Figure 5), and a suitable deburring tool (Figure 6). Both the inside and the outside of the tube may require reaming. With an annealed tube, you must be careful not to deform the tube end by applying too much pressure. If a soft tube is deformed, it can be brought back to roundness with a sizing tool, which consists of a plug and sizing ring. Reaming with a file Reaming with a pocket knife Copyright 1995, 2009, By Refrigeration Service Engineers Society. -3-

Reaming with a deburring tool cleaning Cleaning is quick and easy to do. The removal of oxides and surface soil is crucial if filler metal is to flow properly into the joint. Unremoved oxide, surface soil, and oil can interfere with the strength of the joint and cause failure. Mechanical cleaning is a simple operation. Lightly abrade the end of the tube with sand cloth (Figure 7) or nylon abrasive pads (Figure 8) for a distance only slightly more than the depth of the fitting socket. Clean the socket of the fitting with sand cloth, abrasive pads (Figure 9), or a properly sized fitting brush (Figure 10). Copyright 1995, 2009, By Refrigeration Service Engineers Society. -4-

Cleaning the tube with sand cloth Cleaning the tube with an abrasive pad Copyright 1995, 2009, By Refrigeration Service Engineers Society. -5-

Copper is a relatively soft metal. If too much material is removed, a loose fit will result and interfere with satisfactory capillary action in making the joint. The capillary space (between the tube and the fitting) is approximately 0.004 in. Solder or brazing filler metal can fill this gap by capillary action. Spacing is critical--it must allow the filler metal to flow into the gap and form a strong joint. Chemical cleaning may be utilized, provided that the tube and fittings are rinsed thoroughly after cleaning according to the recommendations furnished with the cleaner. Once cleaned, surfaces should not be touched with bare hands or oily gloves. Skin oils, lubricating oils, and grease impair solder flow and wetting. Up to this point, the joining process is the same for both soldering and brazing. This is also true for assembly and support, discussed below. In contrast, there are differences between soldering and brazing in the areas of fluxing, heating, filler metal type, and cooling and cleaning. Accordingly, each of these operations is discussed separately below. soldering The soldering process consists of: applying the proper flux Cleaning the fitting with an abrasive pad assembly and support heating applying the solder cooling and clean-up. APPLYING FLUX Use a non-aggressive soldering flux. Stir the flux before using it (Figure 11). A good flux will: Cleaning the fitting with a fitting brush Copyright 1995, 2009, By Refrigeration Service Engineers Society. -6-

Stirring the flux dissolve and remove traces of oxide from the cleaned surfaces to be joined protect the cleaned surfaces from reoxidation during heating promote wetting of the surfaces by the solder. In general, fluxes identified as self-cleaning are not recommended. While all fluxes have a slight cleaning effect, those designed to circumvent manual cleaning of the tube and fitting are suspect. Apply a thin, even coating of flux with a brush to both tube and fitting (Figures 12 and 13) as soon as possible after cleaning. Do not apply flux with your fingers. Chemicals in the flux can be harmful if carried to the eyes or mouth, or if they come in contact with open cuts. Copyright 1995, 2009, By Refrigeration Service Engineers Society. -7-

Use care in applying flux. Careless workmanship can cause problems long after the system has been installed. If excessive amounts of flux are used, the flux residue can cause corrosion. In extreme cases, such flux corrosion can perforate the wall of the tube, fitting, or both. assembly and support After properly fluxing the surfaces of both the tube and the fitting, you can assemble the joint, making sure that the tube seats against the base of the fitting socket (Figure 14). A slight twisting motion ensures even coverage by the flux. Remove excess flux from the exterior of the joint with a cotton rag (Figure 15). Applying flux to the tube Applying flux to the fitting Copyright 1995, 2009, By Refrigeration Service Engineers Society. -8-

Make sure that the tube and fittings are properly supported, with a uniform capillary space around the entire circumference of the joint. Uniformity of capillary space will ensure good penetration of the filler metal if all other guidelines of successful joint-making are followed. Excessive joint clearance can cause the filler metal to crack under stress or vibration. The joint is now ready for soldering or for brazing--the assembly and support procedures are the same for both processes. Once prepared, joints should be completed the same day. Do not leave a joint that is ready for soldering or brazing unfinished overnight. heating Because an open flame and high temperatures are required for soldering, and because flammable gases are used, safety precautions must be observed. The heat generally is applied with an air/fuel torch (Figure 16). Such torches use acetylene or an LP gas. Electric resistance pliers also can be used (shown with solder in Figure 17). They employ heating electrodes and should be considered in cases where an open flame is a concern. Assembly Removing excess flux Copyright 1995, 2009, By Refrigeration Service Engineers Society. -9-

When heating, the service technician may find it helpful to remember the word USE. This is a constant reminder that: the heat should be Uniform, it should be Sufficient, but it must not be Excessive. Begin heating with the flame perpendicular to the tube (Figure 18). The copper tube conducts the initial heat into the fitting socket for an even distribution of heat inside and out. The extent of this preheating depends on the size of the joint. Experience will indicate the amount of time needed. Next, move the flame onto the fitting cup (Figure 19). Then move Heating with an air/fuel torch Using electric resistance pliers Copyright 1995, 2009, By Refrigeration Service Engineers Society. -10-

the flame from the fitting socket back onto the tube a distance equal to the depth of the fitting socket. Touch the solder to the joint. If the solder does not melt, remove it and continue the heating process. Be careful not to overheat or to direct the flame into the face of the fitting cup. This could cause the flux to burn and destroy its e ffectiveness. When the melting temperature of the solder has been reached, heat may be applied to the base of the cup to aid capillary action in drawing the solder into the cup. applying solder For tube in a horizontal position, start by applying the solder slightly off-center at the bottom of the joint (Figure 20). Proceed across the bottom of the fitting and up to the top center position. Return to the point where you began, overlap the starting point, and then proceed up the uncompleted side to the top again, overlapping the solder. A common mistake is to start feeding the solder in at the top of a horizontal joint. But remember that the joint is being made with the solder in the solid, pasty, and liquid conditions. Starting at the bottom means that the solidified solder forms an effective dam. Especially in larger-diameter horizontal joints, the dam prevents the solder from running out of the joint as the sides and top are being filled (Figure 21). Preheating the tube Preheating the fitting Copyright 1995, 2009, By Refrigeration Service Engineers Society. -11-

For joints in a vertical position, you can make a similar sequence of overlapping passes, starting wherever is convenient for you. Molten solder will be drawn into the joint by capillary action regardless of whether the solder is being fed upward, downward, or horizontally. cooling and cleaning Allow the completed joint to cool naturally. Shock cooling with water may cause unnecessary stress on the joint and result in its eventual failure. When the joint is cool, clean off any remaining flux with a wet rag (Figure 22). Whenever possible, completed systems should be flushed to remove excess flux and debris. Soldering Schematic of a solder joint Copyright 1995, 2009, By Refrigeration Service Engineers Society. -12-

Cleaning types of solder There is a variety of solders available that produce sound, leak-tight joints. The selection of a solder depends primarily on the type of application--its operating pressure and temperature--and on local codes. A 50-50 tin-lead solder is usually suitable for moderate pressures and temperatures. For higher pressures, or in cases where greater joint strength is required, a 95-5 tin-antimony solder can be used. (For continuous operation at temperatures exceeding 250 F, or where the highest joint strength is required, brazing filler metals should be used.) For drinking water systems, solders that do not contain lead must be used. Solders containing lead are banned for potable water systems by the 1986 amendment to the Federal Safe Drinking Water Act. brazing Brazing is the second most commonly used method for joining copper tube. Making brazed joints is similar to making soldered joints with respect to measuring, cutting, reaming, cleaning, and assembly and support techniques. And, as is the case with soldering, the filler metal for brazing is melted by the heat of the tube and fitting and drawn into the joint by capillary action. Copyright 1995, 2009, By Refrigeration Service Engineers Society. -13-

The major differences between soldering and brazing are: the type of flux used the composition of the filler metal the amount of heat required to melt the filler metal. Brazing filler metals sometimes are referred to as hard solders or silver solders, but these confusing terms should be avoided. APPLYING FLUX The fluxes used for brazing copper joints are different in composition from soldering fluxes. The two types cannot, and should not, be used interchangeably. Brazing fluxes are water-based, whereas most soldering fluxes are petroleum-based. Similar to soldering fluxes, brazing fluxes dissolve and remove residual oxide from the metal surface, protect the metal from reoxidation during heating, and promote wetting of the surfaces to be joined by the brazing filler metal. Fluxes also provide the service technician with an indication of the temperature of the joint during the brazing process (Figure 23). Application of the flux is the same as when you are soldering. If the outside of the fitting and the heat-affected area of the tube are covered with flux (in addition to the end of the tube and the cup), oxidation will be prevented and the appearance of the joint will be greatly improved. Behavior of flux during the brazing cycle Copyright 1995, 2009, By Refrigeration Service Engineers Society. -14-

brazing filler metals There are two general types of brazing filler metals used for joining copper tube. Classified according to their components, they are: BCuP (Brazing-Copper-Phosphorus) BAg (Brazing-Silver). BCuP filler metals are preferred for joining copper tube and fittings. The phosphorus in them acts as a fluxing agent and the lower percentage of silver makes them relatively inexpensive. When copper tube, wrought copper fittings, and a BCuP brazing filler metal are used, fluxing is optional due to the self-fluxing action of the phosphorus. The choice of filler metals for brazing depends on four main factors: the dimensional tolerance of the joint the fitting type and material (cast or wrought) the desired appearance cost. heating Oxy/fuel torches generally are used for brazing be-cause of the higher temperatures required (Figure 24). Recent innovations in tip design make air/fuel torches useful on a wider range of sizes for soldering and brazing. Heating with an oxy/fuel torch Working temperatures for brazing are high, and safety precautions must be followed to protect both the operator and the materials being used. Copyright 1995, 2009, By Refrigeration Service Engineers Society. -15-

The heating operation is the same as for soldering. First preheat the tube and then the tube and fitting. When the filler metal starts to melt, apply heat at the base of the fitting socket to help draw the brazing filler metal in by capillary action. applying brazing filler metal Remember to allow the heat of the joint, not the flame, to melt the filler metal. The melted filler metal will be drawn into the joint by capillary action. It is very important that the flame be in continuous motion. It must not be allowed to remain at any one point long enough to burn through the tube or fitting. The flux may be used as a guide as to how long to heat the tube- -continue heating the tube until the flux becomes quiet and transparent, like clear water. If the filler metal fails to flow, or has the tendency to ball up, it indicates either that there is oxide on the surfaces being joined or that the parts to be joined are not hot enough. If the filler metal refuses to enter the joint, the fitting cup is not hot enough. If it tends to flow over the outside of either part of the joint, it indicates that that part is overheated. When the brazed joint is completed, a continuous fillet should be visible completely around the joint. lareger-diameter tube Larger-diameter tube is more difficult to heat to the desired temperature. It may be necessary to use a heating tip or rosebud to maintain the proper temperature over the area being brazed. Once total heat control is attained, follow the same procedures used for smaller tube. cooling and cleaning When the brazed joint is finished, allow it to cool naturally. Flux residues can be removed by washing with warm water and brushing with a stainless steel wire brush. summary If the copper tube and fittings to be joined by soldering or brazing are prepared and heated properly, and if the correct filler metal is used, the finished joint will be sound. Soldered or brazed copper piping systems, when installed properly, will provide decades of safe and reliable service. Through the proper application of the installation techniques covered in this chapter, the service technician can achieve consistently reliable soldered and brazed joints in copper tubing systems of all diameters. Copyright 1995, 2009, By Refrigeration Service Engineers Society. -16-